City Council Agendas & Minutes
Regular MeetingFruit Heights, UT · August 1, 2023
Agenda
FRUIT HEIGHTS CITY COUNCIL MEETING
August 1, 2023, Fruit Heights City Council Chambers 910 S
Mountain Road Fruit Heights City, UT 84037
Fruit Heights City is now streaming City Council Meetings on its YouTube Channel. Please follow us at
https://www.youtube.com/@fruitheightscity9716/streams
7:00 P.M. CITY COUNCIL MEETING
1. WELCOME: MAYOR JOHN POHLMAN
1.1 Pledge of Allegiance (Diana) and Opening Ceremony (Gary).
1.2 Roll Call
1.3 City Council Training: City Council Member
2. DECLARATION OF CONFLICT(S) OF INTEREST
3. SPECIAL PRESENTATION(s)
3.1 YCC
3.2 Davis County Sheriff
4. SPEAK BEFORE CITY COUNCIL
4.1 Jacob Browning (Road Safety)
5. PUBLIC COMMENTS – The public may address the mayor regarding issues that are not on the agenda.
Please limit your comments to 3 minutes.
No action may be taken on any item not on the agenda.
6. CITY BUSINESS:
6.1 Review/Discuss/Approve/Deny Sidewalk for Rock Loft Ridge
6.2 Review/Discuss/Approve/Deny Award Bids for street Maintenance Projects.
7. REVIEW AND APPROVE CITY COUNCIL MINUTES:
7.1 June 15,2023
7.8 June 20,2023
8. CONSENT CALENDAR:
8.1 City Expenditures
8.2 June Financial Report
FOLLOW-UP ITEMS FROM PREVIOUS MEETING(S)
CITY COUNCIL & MANAGER REPORTS:
1. ELECTRONIC MEETING: By motion of the Fruit Heights City Council, Elected Officials and City Staff
can participate in regularly scheduled meetings via electronic media when approved by the
mayor.
2. CLOSED MEETING: By motion of the Fruit Heights City Council and pursuant to Title 52, Chapter 4 of
the Utah Code, the Fruit Heights City Council will hold a closed meeting for purposes outlined under
the code.
3. ADJOURNMENT:
CERTIFICATE OF POSTING
I HEREBY CERTIFY that a copy of this agenda was posted on the City’s website,
www.fruitheightscity.com, as well as posted on the Utah State public notice website
http://www.utah.gov/pmn/index.html.
Jacob J. Smith
Jacob J. Smith - City Recorder
In compliance with the Americans with Disabilities Act, individuals needing special accommodations
during this meeting should contact the City Manager, Jacob J. Smith at (801)546-0861, at least 24 hours
prior to the meeting.
CONSULTING ENGINEERS
MEMORANDUM
TO: Fruit Heights City Mayor and City Council
FROM: Zac Burk, P.E.
Fruit Heights City Engineer
CC: Jacob Smith – City Manager
Darren Frandsen – Assistant City Manager / Public Works Director
RE: 2023 Street Maintenance Projects
Date: July 26, 2023
______________________________________________________________________________
On July 26th, at 10:00 am, bids were opened for the 2023 Street Maintenance Projects. Six bids
were received and read publicly. The results of the bidding are shown on the enclosed Bid
Tabulation. We have checked the bids and found no errors.
This project had three sections (A, B, and C) that contractors could bid collectively or
individually, depending on the type of maintenance treatment that was required. This was to
allow specialty contractors to bid directly without having to add any mark-up to a general
contractor. Only two of the six bidders bid on individual sections and were not the low bid (Post
and Geneva Rock). We have reviewed all bids and narrowed our consideration to the lowest two
bidders on all collective sections: Advanced Paving & Construction and Staker Parson
Companies. Fruit Heights City has previously worked with both of these low bid contractors.
During this bid evaluation process the city staff considered the previous quality, cost, and overall
efficiency of each contractor. We have also observed that there are cost savings (up to $50,000
in some cases) to working with one single contractor on projects with multiple sections/phases
including our street maintenance projects. Rather than managing multiple contractors, jobsites,
quantity overages, change orders, and contract billing and administration. Staker Parson is the
better contractor in this regard, and for these reasons we would recommend awarding all sections
to Staker Parson Companies, with their collective bid of $873,296.23. Advanced Paving &
Construction had a collective bid total of $853,630.50 and makes a difference of $19,665.73.
Because of the multiple project sections, the project has two completion dates. Section A:
October 20th, 2023. Sections B & C: June 20th, 2024
The purpose of this project is to rebuild the worn-out asphalt on Raymond Road, place a new
asphalt overlay on Terrace Drive, Estate Way, and a small portion of Nicholls Road adjacent to
the baseball fields, and provide a chip and seal treatment on most of our new pavement
throughout the city.
6080 Fashion Point Drive ● South Ogden, Utah 84403 ● (801) 476-9767 ● www.jonescivil.com
2023 Street Maintenance Projects Page 2 of 2
Award Recommendation Memo
If the Council agrees with this recommendation, please pass a motion accepting the bid and
awarding the project contract to STAKER PARSON COMPANIES with their respective bid.
We will provide the Notice of Award and Contract Agreement for the City and Contractors to
sign. In addition to these documents, the contractor is also responsible for submitting
Performance and Payment Bonds, and Insurance Certificates within 10 days following Notice of
Award.
When these documents have been received, we will schedule a Preconstruction Conference. At
this conference we will issue a Notice to Proceed and discuss the construction details with the
contractor prior to beginning the work.
6080 Fashion Point Drive ● South Ogden, Utah 84403 ● (801) 476-9767 ● www.jonescivil.com
BID TABULATION *Shown as Lowest Bidder for Each Section
Fruit Heights 2023 Street Maintenance
Bid Opening: July 26, 2023, 10:00 am, Engineer's Office
Advanced Paving &
Section A: Rebuild Raymond Road ENGINEER'S ESTIMATE Staker & Parson Companies Post Construction Company Geneva Rock Products, Inc. Black Forest Paving Kilgore Contracting
Construction
Item Description Qty Unit Unit Price Total Unit Price Total Unit Price Total Unit Price Total Unit Price Total Unit Price Total Unit Price Total
1 Mobilization 1 ls $ 15,000.00 $ 15,000.00 $ 8,500.00 $ 8,500.00 $ 21,002.75 $ 21,002.75 $ 15,000.00 $ 15,000.00 $ 9,430.00 $ 9,430.00 $ 14,500.00 $ 14,500.00 $ 25,000.00 $ 25,000.00
2 Traffic Control 1 ls $ 5,300.00 $ 5,300.00 $ 7,500.00 $ 7,500.00 $ 12,650.00 $ 12,650.00 $ 12,000.00 $ 12,000.00 $ 6,230.00 $ 6,230.00 $ 9,500.00 $ 9,500.00 $ 45,000.00 $ 45,000.00
3 Record Location and lower Manhole / Valve / Utility Box / Monument to 36 ea $ 650.00 $ 23,400.00 $ 400.00 $ 14,400.00 $ 309.00 $ 11,124.00 $ 450.00 $ 16,200.00 $ 355.00 $ 12,780.00 $ 350.00 $ 12,600.00 $ 375.00 $ 13,500.00
prep for new pavement
4 Saw Cut Asphalt 300 lf $ 3.50 $ 1,050.00 $ 3.50 $ 1,050.00 $ 4.10 $ 1,230.00 $ 2.00 $ 600.00 $ 1.50 $ 450.00 $ 1.75 $ 525.00 $ 2.75 $ 825.00
5 Remove Asphalt 95,040 sf $ 0.65 $ 61,776.00 $ 0.50 $ 47,520.00 $ 0.42 $ 39,916.80 $ 0.60 $ 57,024.00 $ 0.45 $ 42,768.00 $ 0.57 $ 54,172.80 $ 0.60 $ 57,024.00
6 Remove Damaged curb 350 lf $ 6.00 $ 2,100.00 $ 6.50 $ 2,275.00 $ 10.30 $ 3,605.00 $ 15.00 $ 5,250.00 $ 9.50 $ 3,325.00 $ 200.00 $ 70,000.00 $ 6.00 $ 2,100.00
7 Remove Damaged Drive Approach 950 sf $ 3.50 $ 3,325.00 $ 2.50 $ 2,375.00 $ 5.15 $ 4,892.50 $ 4.50 $ 4,275.00 $ 5.95 $ 5,652.50 $ 6.00 $ 5,700.00 $ 1.00 $ 950.00
8 Subgrade Soft Spot Repair 800 cy $ 25.00 $ 20,000.00 $ 33.00 $ 26,400.00 $ 104.00 $ 83,200.00 $ 35.00 $ 28,000.00 $ 104.00 $ 83,200.00 $ 90.00 $ 72,000.00 $ 145.00 $ 116,000.00
9 New City Standard Curb and Gutter 350 sf $ 32.00 $ 11,200.00 $ 55.00 $ 19,250.00 $ 82.35 $ 28,822.50 $ 45.00 $ 15,750.00 $ 78.35 $ 27,422.50 $ 40.00 $ 14,000.00 $ 60.00 $ 21,000.00
10 New 6" Thick Drive Approach 950 sf $ 9.00 $ 8,550.00 $ 15.00 $ 14,250.00 $ 16.45 $ 15,627.50 $ 16.50 $ 15,675.00 $ 25.00 $ 23,750.00 $ 11.00 $ 10,450.00 $ 17.25 $ 16,387.50
11 Hot Mix Asphalt (4 Inch Thick) 2,534 ton $ 95.00 $ 240,730.00 $ 94.00 $ 238,196.00 $ 78.05 $ 197,778.70 $ 100.00 $ 253,400.00 $ 93.45 $ 236,802.30 $ 82.00 $ 207,788.00 $ 86.50 $ 219,191.00
12 Raise Manhole / Valve / Utility Box / Monument to Grade with Concrete 27 ea $ 650.00 $ 17,550.00 $ 700.00 $ 18,900.00 $ 720.00 $ 19,440.00 $ 750.00 $ 20,250.00 $ 711.80 $ 19,218.60 $ 550.00 $ 14,850.00 $ 635.00 $ 17,145.00
CollarUTBC - Concrete and Soft Spot Repair
13 New 135 ton $ 40.00 $ 5,400.00 $ 45.00 $ 6,075.00 $ 44.15 $ 5,960.25 $ 60.00 $ 8,100.00 $ 44.75 $ 6,041.25 $ 50.00 $ 6,750.00 $ 60.00 $ 8,100.00
TOTAL SECTION A $ 415,381.00 $ 406,691.00 $ 445,250.00 $ 451,524.00 $ 477,070.15 $ 492,835.80 $ 542,222.50
Page 1 of 3
Advanced Paving &
Section B: Mill and Overlay ENGINEER'S ESTIMATE Staker & Parson Companies Geneva Rock Products Inc. Black Forest Paving Post Construction Company Kilgore Contracting
Construction
Item Description Qty Unit Unit Price Total Unit Price Total Unit Price Total Unit Price Total Unit Price Total Unit Price Total Unit Price Total
Terrace Drive (250 North)
1 Mobilization 1 ls $ 9,000.00 $ 9,000.00 $ 3,843.13 $ 3,843.13 $ 3,500.00 $ 3,500.00 $ 3,800.00 $ 3,800.00 $ 8,500.00 $ 8,500.00 $ 4,500.00 $ 4,500.00 $ 14,500.00 $ 14,500.00
2 Traffic Control 1 ls $ 4,000.00 $ 4,000.00 $ 986.00 $ 986.00 $ 1,000.00 $ 1,000.00 $ 3,470.00 $ 3,470.00 $ 3,000.00 $ 3,000.00 $ 3,000.00 $ 3,000.00 $ 4,500.00 $ 4,500.00
3 Record Location and lower Manhole / Valve / Utility Box / Monument to $ 750.00 $ 3,750.00 $ 360.00 $ 1,800.00 $ 400.00 $ 2,000.00 $ 355.00 $ 1,775.00 $ 350.00 $ 1,750.00 $ 450.00 $ 2,250.00 $ 375.00 $ 1,875.00
5 ea
prep for new pavement
4 Remove Damaged curb 100 lf $ 6.00 $ 600.00 $ 10.30 $ 1,030.00 $ 8.00 $ 800.00 $ 9.45 $ 945.00 $ 20.00 $ 2,000.00 $ 19.00 $ 1,900.00 $ 6.25 $ 625.00
5 New City Standard Curb and Gutter 100 lf $ 32.00 $ 3,200.00 $ 82.35 $ 8,235.00 $ 50.00 $ 5,000.00 $ 78.00 $ 7,800.00 $ 48.00 $ 4,800.00 $ 45.00 $ 4,500.00 $ 60.00 $ 6,000.00
6 Asphalt Milling (2" depth - Full Width) 23,210 sf $ 0.40 $ 9,284.00 $ 0.36 $ 8,355.60 $ 0.30 $ 6,963.00 $ 0.35 $ 8,123.50 $ 0.45 $ 10,444.50 $ 0.60 $ 13,926.00 $ 0.54 $ 12,533.40
7 HMA Overlay (2" Thick) 310 ton $ 95.00 $ 29,450.00 $ 89.85 $ 27,853.50 $ 100.00 $ 31,000.00 $ 103.30 $ 32,023.00 $ 93.85 $ 29,093.50 $ 120.00 $ 37,200.00 $ 107.00 $ 33,170.00
8 Raise Manhole / Valve / Utility Box / Monument to Grade with Concrete $ 650.00 $ 1,950.00 $ 612.00 $ 1,836.00 $ 700.00 $ 2,100.00 $ 945.00 $ 2,835.00 $ 550.00 $ 1,650.00 $ 750.00 $ 2,250.00 $ 635.00 $ 1,905.00
3 ea
Collar
Estate Way (1400 East)
9 Mobilization 1 ls $ 9,000.00 $ 9,000.00 $ 3,755.00 $ 3,755.00 $ 3,500.00 $ 3,500.00 $ 3,800.00 $ 3,800.00 $ 7,000.00 $ 7,000.00 $ 4,500.00 $ 4,500.00 $ 13,000.00 $ 13,000.00
10 Traffic Control 1 ls $ 2,500.00 $ 2,500.00 $ 986.00 $ 986.00 $ 1,000.00 $ 1,000.00 $ 300.00 $ 300.00 $ 2,732.91 $ 2,732.91 $ 3,000.00 $ 3,000.00 $ 4,500.00 $ 4,500.00
11 Record Location and lower Manhole / Valve / Utility Box / Monument to 5 ea $ 750.00 $ 3,750.00 $ 360.00 $ 1,800.00 $ 400.00 $ 2,000.00 $ 355.00 $ 1,775.00 $ 350.00 $ 1,750.00 $ 450.00 $ 2,250.00 $ 375.00 $ 1,875.00
prep for new pavement
12 Remove Damaged curb 150 lf $ 6.00 $ 900.00 $ 10.30 $ 1,545.00 $ 8.00 $ 1,200.00 $ 9.45 $ 1,417.50 $ 23.00 $ 3,450.00 $ 19.00 $ 2,850.00 $ 6.25 $ 937.50
13 New City Standard Curb and Gutter 150 lf $ 32.00 $ 4,800.00 $ 82.35 $ 12,352.50 $ 50.00 $ 7,500.00 $ 78.00 $ 11,700.00 $ 48.00 $ 7,200.00 $ 45.00 $ 6,750.00 $ 60.00 $ 9,000.00
14 Asphalt Milling (2" depth - Full Width) 18,182 sf $ 0.40 $ 7,272.80 $ 0.36 $ 6,545.52 $ 0.30 $ 5,454.60 $ 0.35 $ 6,363.70 $ 0.45 $ 8,181.90 $ 0.60 $ 10,909.20 $ 0.54 $ 9,818.28
15 HMA Overlay (2" Thick) 245 ton $ 95.00 $ 23,275.00 $ 89.85 $ 22,013.25 $ 100.00 $ 24,500.00 $ 103.30 $ 25,308.50 $ 96.00 $ 23,520.00 $ 120.00 $ 29,400.00 $ 107.00 $ 26,215.00
16 Raise Manhole / Valve / Utility Box / Monument to Grade with Concrete 3 ea $ 650.00 $ 1,950.00 $ 612.00 $ 1,836.00 $ 700.00 $ 2,100.00 $ 945.00 $ 2,835.00 $ 550.00 $ 1,650.00 $ 750.00 $ 2,250.00 $ 635.00 $ 1,905.00
Collar
Nicholls Road
17 Mobilization 1 ls $ 11,000.00 $ 11,000.00 $ 1,335.00 $ 1,335.00 $ 3,500.00 $ 3,500.00 $ 4,580.00 $ 4,580.00 $ 7,000.00 $ 7,000.00 $ 4,500.00 $ 4,500.00 $ 11,000.00 $ 11,000.00
18 Traffic Control 1 ls $ 6,500.00 $ 6,500.00 $ 986.00 $ 986.00 $ 1,500.00 $ 1,500.00 $ 4,500.00 $ 4,500.00 $ 3,700.00 $ 3,700.00 $ 3,000.00 $ 3,000.00 $ 4,500.00 $ 4,500.00
19 Record Location and lower Manhole / Valve / Utility Box / Monument to 3 ea $ 400.00 $ 1,200.00 $ 360.00 $ 1,080.00 $ 400.00 $ 1,200.00 $ 355.00 $ 1,065.00 $ 350.00 $ 1,050.00 $ 450.00 $ 1,350.00 $ 375.00 $ 1,125.00
prep for new pavement
20 Asphalt Milling (2" depth - Full Width) 30,441 sf $ 0.40 $ 12,176.40 $ 0.36 $ 10,958.76 $ 0.30 $ 9,132.30 $ 0.35 $ 10,654.35 $ 0.45 $ 13,698.45 $ 0.60 $ 18,264.60 $ 0.54 $ 16,438.14
21 HMA Overlay (2" Thick) 406 ton $ 95.00 $ 38,558.60 $ 89.85 $ 36,468.32 $ 100.00 $ 40,588.00 $ 99.95 $ 40,567.71 $ 93.00 $ 37,746.84 $ 120.00 $ 48,705.60 $ 107.00 $ 43,429.16
22 Raise Manhole / Valve / Utility Box / Monument to Grade with Concrete 3 ea $ 650.00 $ 1,950.00 $ 612.00 $ 1,836.00 $ 700.00 $ 2,100.00 $ 945.00 $ 2,835.00 $ 550.00 $ 1,650.00 $ 750.00 $ 2,250.00 $ 635.00 $ 1,905.00
Collar
975 East
23 Mobilization 1 ls $ 5,000.00 $ 5,000.00 $ 1,335.00 $ 1,335.00 $ 1,500.00 $ 1,500.00 $ 2,310.00 $ 2,310.00 $ 5,800.00 $ 5,800.00 $ 2,000.00 $ 2,000.00 $ 11,000.00 $ 11,000.00
24 Traffic Control 1 ls $ 1,200.00 $ 1,200.00 $ 986.00 $ 986.00 $ 500.00 $ 500.00 $ 150.00 $ 150.00 $ 1,800.00 $ 1,800.00 $ 1,500.00 $ 1,500.00 $ 4,500.00 $ 4,500.00
25 Record Location and lower Manhole / Valve / Utility Box / Monument to 4 ea $ 400.00 $ 1,600.00 $ 360.00 $ 1,440.00 $ 400.00 $ 1,600.00 $ 355.00 $ 1,420.00 $ 350.00 $ 1,400.00 $ 450.00 $ 1,800.00 $ 375.00 $ 1,500.00
prep for new pavement
26 Asphalt Milling (2" depth - Full Width) 12,600 sf $ 0.40 $ 5,040.00 $ 0.36 $ 4,536.00 $ 0.30 $ 3,780.00 $ 0.35 $ 4,410.00 $ 0.48 $ 6,048.00 $ 0.75 $ 9,450.00 $ 0.54 $ 6,804.00
27 HMA Overlay (2" Thick) 168 ton $ 115.00 $ 19,320.00 $ 89.85 $ 15,094.80 $ 105.00 $ 17,640.00 $ 103.35 $ 17,362.80 $ 99.00 $ 16,632.00 $ 130.00 $ 21,840.00 $ 107.00 $ 17,976.00
28 Raise Manhole / Valve / Utility Box / Monument to Grade 4 ea $ 650.00 $ 2,600.00 $ 612.00 $ 2,448.00 $ 700.00 $ 2,800.00 $ 945.00 $ 3,780.00 $ 550.00 $ 2,200.00 $ 750.00 $ 3,000.00 $ 635.00 $ 2,540.00
with Concrete Collar
1150 East
29 Mobilization 1 ls $ 5,000.00 $ 5,000.00 $ 1,335.00 $ 1,335.00 $ 1,500.00 $ 1,500.00 $ 830.00 $ 830.00 $ 5,800.00 $ 5,800.00 $ 2,000.00 $ 2,000.00 $ 11,000.00 $ 11,000.00
30 Traffic Control 1 ls $ 1,200.00 $ 1,200.00 $ 986.00 $ 986.00 $ 500.00 $ 500.00 $ 150.00 $ 150.00 $ 1,800.00 $ 1,800.00 $ 1,500.00 $ 1,500.00 $ 4,500.00 $ 4,500.00
31 Record Location and lower Manhole / Valve / Utility Box / Monument to 3 ea $ 400.00 $ 1,200.00 $ 360.00 $ 1,080.00 $ 400.00 $ 1,200.00 $ 355.00 $ 1,065.00 $ 350.00 $ 1,050.00 $ 450.00 $ 1,350.00 $ 375.00 $ 1,125.00
prep for new pavement
32 Asphalt Milling (2" depth - Full Width) 10,632 sf $ 0.40 $ 4,252.80 $ 0.36 $ 3,827.52 $ 0.30 $ 3,189.60 $ 0.35 $ 3,721.20 $ 0.50 $ 5,316.00 $ 0.75 $ 7,974.00 $ 0.54 $ 5,741.28
33 HMA Overlay (2" Thick) 142 ton $ 115.00 $ 16,302.40 $ 89.85 $ 12,737.14 $ 105.00 $ 14,884.80 $ 103.35 $ 14,650.90 $ 99.00 $ 14,034.24 $ 130.00 $ 18,428.80 $ 107.00 $ 15,168.32
34 Raise Manhole / Valve / Utility Box / Monument to Grade 3 ea $ 500.00 $ 1,500.00 $ 612.00 $ 1,836.00 $ 700.00 $ 2,100.00 $ 945.00 $ 2,835.00 $ 550.00 $ 1,650.00 $ 750.00 $ 2,250.00 $ 635.00 $ 1,905.00
with Concrete Collar
Page 2 of 3
1180 East
35 Mobilization 1 ls $ 5,000.00 $ 5,000.00 $ 1,335.00 $ 1,335.00 $ 1,500.00 $ 1,500.00 $ 830.00 $ 830.00 $ 5,800.00 $ 5,800.00 $ 2,000.00 $ 2,000.00 $ 11,000.00 $ 11,000.00
36 Traffic Control 1 ls $ 1,200.00 $ 1,200.00 $ 986.00 $ 986.00 $ 500.00 $ 500.00 $ 150.00 $ 150.00 $ 1,800.00 $ 1,800.00 $ 1,500.00 $ 1,500.00 $ 4,500.00 $ 4,500.00
37 Record Location and lower Manhole / Valve / Utility Box / Monument to 3 ea $ 400.00 $ 1,200.00 $ 360.00 $ 1,080.00 $ 400.00 $ 1,200.00 $ 355.00 $ 1,065.00 $ 350.00 $ 1,050.00 $ 450.00 $ 1,350.00 $ 375.00 $ 1,125.00
prep for new pavement
38 Asphalt Milling (2" depth - Full Width) 10,632 sf $ 0.40 $ 4,252.80 $ 0.36 $ 3,827.52 $ 0.30 $ 3,189.60 $ 0.35 $ 3,721.20 $ 0.50 $ 5,316.00 $ 0.75 $ 7,974.00 $ 0.54 $ 5,741.28
39 HMA Overlay (2" Thick) 142 ton $ 115.00 $ 16,302.40 $ 89.85 $ 12,737.14 $ 105.00 $ 14,884.80 $ 103.35 $ 14,650.90 $ 99.00 $ 14,034.24 $ 130.00 $ 18,428.80 $ 107.00 $ 15,168.32
40 Raise Manhole / Valve / Utility Box / Monument to Grade 3 ea $ 500.00 $ 1,500.00 $ 612.00 $ 1,836.00 $ 700.00 $ 2,100.00 $ 945.00 $ 2,835.00 $ 350.00 $ 1,050.00 $ 750.00 $ 2,250.00 $ 635.00 $ 1,905.00
with Concrete Collar
1200 East
41 Mobilization 1 ls $ 5,000.00 $ 5,000.00 $ 1,335.00 $ 1,335.00 $ 2,500.00 $ 2,500.00 $ 830.00 $ 830.00 $ 5,800.00 $ 5,800.00 $ 2,000.00 $ 2,000.00 $ 11,000.00 $ 11,000.00
42 Traffic Control 1 ls $ 1,200.00 $ 1,200.00 $ 986.00 $ 986.00 $ 500.00 $ 500.00 $ 150.00 $ 150.00 $ 1,800.00 $ 1,800.00 $ 1,500.00 $ 1,500.00 $ 4,500.00 $ 4,500.00
43 Record Location and lower Manhole / Valve / Utility Box / Monument to 3 ea $ 400.00 $ 1,200.00 $ 360.00 $ 1,080.00 $ 400.00 $ 1,200.00 $ 355.00 $ 1,065.00 $ 350.00 $ 1,050.00 $ 450.00 $ 1,350.00 $ 375.00 $ 1,125.00
prep for new pavement
44 Asphalt Milling (2" depth - Full Width) 11,730 sf $ 0.40 $ 4,692.00 $ 0.36 $ 4,222.80 $ 0.30 $ 3,519.00 $ 0.35 $ 4,105.50 $ 0.50 $ 5,865.00 $ 0.75 $ 8,797.50 $ 0.54 $ 6,334.20
45 HMA Overlay (2" Thick) 156 ton $ 115.00 $ 17,986.00 $ 89.85 $ 14,052.54 $ 105.00 $ 16,422.00 $ 103.35 $ 16,163.94 $ 99.00 $ 15,483.60 $ 130.00 $ 20,332.00 $ 107.00 $ 16,734.80
46 Raise Manhole / Valve / Utility Box / Monument to Grade 3 ea $ 500.00 $ 1,500.00 $ 612.00 $ 1,836.00 $ 700.00 $ 2,100.00 $ 945.00 $ 2,835.00 $ 550.00 $ 1,650.00 $ 750.00 $ 2,250.00 $ 635.00 $ 1,905.00
with Concrete Collar
47 New UTBC 85 ton $ 50.00 $ 4,250.00 $ 104.00 $ 8,840.00 $ 45.00 $ 3,825.00 $ 45.00 $ 3,825.00 $ 50.00 $ 4,250.00 $ 40.00 $ 3,400.00 $ 60.00 $ 5,100.00
TOTAL SECTION B $ 315,565.20 $ 259,232.03 $ 262,272.70 $ 283,384.69 $ 310,047.18 $ 355,730.50 $ 390,654.68
Advanced Paving &
Section C: Chip & Seal ENGINEER'S ESTIMATE Staker Parson Companies Kilgore Contracting Black Forest Paving
Construction
Item Description Qty Unit Unit Price Total Unit Price Total Unit Price Total Unit Price Total Unit Price Total
1 Mobilization 1 ls $ 18,000.00 $ 18,000.00 $ 3,000.00 $ 3,000.00 $ 8,500.00 $ 8,500.00 $ 22,000.00 $ 22,000.00 $ 18,500.00 $ 18,500.00
2 Traffic Control 1 ls $ 12,000.00 $ 12,000.00 $ 9,580.00 $ 9,580.00 $ 9,500.00 $ 9,500.00 $ 16,500.00 $ 16,500.00 $ 12,000.00 $ 12,000.00
3 Chip and Seal using Lightweight Aggregate (Utelite) "A" Chip with CSS-1
Fog Seal
a Country Lane (200 North to Raymond Road) 10,067 sy $ 3.50 $ 35,234.50 $ 3.30 $ 33,221.10 $ 3.60 $ 36,241.20 $ 3.70 $ 37,247.90 $ 4.20 $ 42,281.40
b Country Way 5,712 sy $ 3.50 $ 19,992.00 $ 3.30 $ 18,849.60 $ 3.60 $ 20,563.20 $ 3.70 $ 21,134.40 $ 4.20 $ 23,990.40
c Village Way (Country Road to 6100 South) 8,489 sy $ 3.50 $ 29,711.50 $ 3.30 $ 28,013.70 $ 3.60 $ 30,560.40 $ 3.70 $ 31,409.30 $ 4.20 $ 35,653.80
d Blossom Circle 1,800 sy $ 3.50 $ 6,300.00 $ 3.30 $ 5,940.00 $ 3.60 $ 6,480.00 $ 3.70 $ 6,660.00 $ 4.20 $ 7,560.00
e Cherry Lane (Jost Lane to Mountain Road) 3,610 sy $ 3.50 $ 12,635.00 $ 3.30 $ 11,913.00 $ 3.60 $ 12,996.00 $ 3.70 $ 13,357.00 $ 4.20 $ 15,162.00
f Mahogany Drive 3,415 sy $ 3.50 $ 11,952.50 $ 3.30 $ 11,269.50 $ 3.60 $ 12,294.00 $ 3.70 $ 12,635.50 $ 4.20 $ 14,343.00
g Vista Drive 4,301 sy $ 3.50 $ 15,053.50 $ 3.30 $ 14,193.30 $ 3.60 $ 15,483.60 $ 3.70 $ 15,913.70 $ 4.20 $ 18,064.20
h Golden Circle Drive (1350 E) 5,189 sy $ 3.50 $ 18,161.50 $ 3.30 $ 17,123.70 $ 3.60 $ 18,680.40 $ 3.70 $ 19,199.30 $ 4.20 $ 21,793.80
4 Furnish and Install 4" Traffic Striping (Solid White Line)
a Country Lane (200 North to Raymond Road) 4,115 lf $ 0.35 $ 1,440.25 $ 1.35 $ 5,555.25 $ 1.00 $ 4,115.00 $ 0.74 $ 3,045.10 $ 0.79 $ 3,250.85
b Country Way 63 lf $ 0.35 $ 22.05 $ 1.35 $ 85.05 $ 1.00 $ 63.00 $ 0.74 $ 46.62 $ 0.79 $ 49.77
5 Furnish and Install 4" Traffic Striping (Double Yellow Line)
a Country Lane (200 North to Raymond Road) 1,910 lf $ 0.40 $ 764.00 $ 2.70 $ 5,157.00 $ 2.00 $ 3,820.00 $ 1.48 $ 2,826.80 $ 1.57 $ 2,998.70
b Country Way 190 lf $ 0.40 $ 76.00 $ 2.70 $ 513.00 $ 2.00 $ 380.00 $ 1.48 $ 281.20 $ 1.57 $ 298.30
6 Furnish and Install 12" Traffic Striping (Solid White Line)
a Country Lane (200 North to Raymond Road) 315 lf $ 1.00 $ 315.00 $ 5.50 $ 1,732.50 $ 7.00 $ 2,205.00 $ 4.75 $ 1,496.25 $ 5.06 $ 1,593.90
b Country Way 105 lf $ 1.00 $ 105.00 $ 5.50 $ 577.50 $ 7.00 $ 735.00 $ 4.75 $ 498.75 $ 5.06 $ 531.30
7 Furnish and Install 24" Traffic Striping (Crosswalks) 130 lf $ 1.50 $ 195.00 $ 11.00 $ 1,430.00 $ 13.00 $ 1,690.00 $ 9.50 $ 1,235.00 $ 10.12 $ 1,315.60
Country Lane (200 North to Raymond Road)
8 Furnish and Install Traffic Markings 4 ea $ 50.00 $ 200.00 $ 165.00 $ 660.00 $ 90.00 $ 360.00 $ 69.00 $ 276.00 $ 73.00 $ 292.00
Country Way TOTAL SECTION C $ 182,157.80 $ 168,814.20 $ 184,666.80 $ 205,762.82 $ 219,679.02
Project Engineer Date 7/26/2023
Page 3 of 3
July 25, 2023
Fruit Heights City
Jacob Smith, City Manager
910 S Mountain Rd
Kaysville, UT 84037
Dear Jacob Smith,
Weber Basin Water Conservancy District is writing to discuss the loading
requirements on the Davis Aqueduct as it runs through the Rock Loft Development. The
Davis Aqueduct is a 78 inch concrete pipeline installed in the 1950s that conveys water
to communities along the Wasatch Front. The District is always concerned about
development efforts that occur on top of or near the aqueduct and any new loads that
are placed on it that exceed its engineered construction loading. The aqueduct has
three classes of pipe, “A”, “B”, and “C” pipe. “A” pipe can withstand loads of up to 5 ft of
overburden, “B” pipe up to 10 ft, and “C” pipe up to 15 ft. The Bureau of Reclamation
originally utilized these three classes of pipe to construct the aqueduct in order to save
costs when only class “A” pipe was required due to minimal loading requirements.
The District has met with the developer, Matt Lowe, to discuss the Rock Loft
development. The District has also reviewed cross sections provided by the engineer,
Reeve Engineering, for this development. The District has requested the developer to
make design changes to the construction plans to decrease the loading on the aqueduct.
Reeve Engineering has suggested using a combination of lowering the road and deleting
the sidewalk on the west side of Rock Loft Drive to help reduce loading on the aqueduct.
The District is in support of design changes that will reduce loading on the aqueduct,
particularly on the “A” classes of pipe. This aqueduct provides water for approximately
500,000 people along the Wasatch Front in Davis County.
We appreciate the efforts of the city to protect the Davis Aqueduct and the great
working relationship the District has with Fruit Heights City. The District understands the
city needs to make the best decision for this development and for the future residents
that will live in this area. Please let us know if you have any questions.
Sincerely,
Scott W. Paxman, PE
General Manager/CEO
SWP/DEH
DAVIS COUNTY
SHERIFF OFFICE
FRUIT HEIGHTS
STATISTICS
DAVIS CRIME INTELLIGENCE CENTER
AUGUST 1ST, 2023
DATES REVIEWED: 10/1/22 -7/30/23
QUARTER 4:
OCTOBER 1ST, 2022 - DECEMBER
31ST, 2023
2
QUARTER 4
(OCTOBER 1ST - DECEMBER 31ST, 2022)
PATROL HOURS IN CITY: 756.1
AVERAGE PER DAY: 8.4
SUMMARY DISPATCHED CALLS: 198
ONVIEW: 240
TRANSFERRED CALLS: 2
NON CRIMINAL: 160
PERSON CRIMES: 14
PROPERTY CRIMES: 13
SOCIETY CRIMES: 6
TRAFFIC: 208
- CITATIONS: 106
- WRITTEN WARNINGS: 12
- PARKING PROBLEMS: 54
MEDICALS: 37
QUARTER 4
Number of Cases Investigated
by Type
Approximate Hours Worked by
Detectives: 128
(OCTOBER 1ST - DECEMBER 31ST, 2022)
INVESTIGATION 37 New Cases Within the Last
S SUMMARY Quarter
4
5
QUARTER 4
(OCTOBER 1ST - DECEMBER 31ST, 2022)
OTHER SERVICES
SUMMARY
Administration: 6
Analytics: 25.5
Dispatch: 11-37
Crime Lab: 10.5
Records: 9.5
Victims Services: 16
6
QUARTER 1:
JANUARY 1ST, 2023 - MARCH 31ST,
2023
7
QUARTER 1
(JANUARY 1ST - MARCH 31ST, 2023)
PATROL HOURS IN CITY: 968.2
SUMMARY
AVERAGE PER DAY: 10.7
DISPATCHED CALLS: 202
ONVIEW: 195
NON CRIMINAL: 147
PERSON CRIMES: 19
PROPERTY CRIMES: 14
SOCIETY CRIMES: 6
TRAFFIC: 175
- CITATIONS: 49
- WRITTEN WARNINGS: 5
- PARKING PROBLEMS: 0
MEDICALS: 36
QUARTER 1
Number of Cases Investigated
by Type
Approximate Hours Worked by
Detectives: 51
(JANUARY 1ST - MARCH 31ST, 2023)
INVESTIGATION 15 New Cases Within the Last
S SUMMARY Quarter
9
10
QUARTER 1
(JANUARY 1ST - MARCH 31ST, 2023)
OTHER SERVICES
SUMMARY
Administration: 6
Analytics: 35.5
Dispatch: 10-33
Crime Lab: 30
Records: 8
Victims Services: 15
11
QUARTER 2:
APRIL 1ST, 2023 - JULY 30TH, 2023
12
QUARTER 2
(APRIL 1ST - JULY 30TH, 2023)
PATROL HOURS IN CITY: 730.91
AVERAGE HOURS PER DAY: 8.12
SUMMARY
DISPATCHED CALLS: 331
ONVIEW: 549
TRANSFERRED CALLS: 2
NON CRIMINAL: 317
PERSON CRIMES: 10
PROPERTY CRIMES: 20
SOCIETY CRIMES: 10
TRAFFIC: 484
- CITATIONS: 189
- WRITTEN WARNINGS: 21
- PARKING PROBLEMS: 1
- UNKNOWN DISPOSITION: 74
MEDICALS: 41
QUARTER 2
Number of Cases Investigated
by Type
Approximate Hours Worked by
Detectives: 32
(APRIL 1ST - JULY 30TH, 2023)
INVESTIGATION 21 New Cases Within the Last
S SUMMARY Quarter
14
15
QUARTER 2
(APRIL 1ST - JULY 30TH, 2023)
OTHER SERVICES
SUMMARY
Administration: 9
Analytics: 47
Dispatch: 22-73
Crime Lab: 10.5
Records: 15.5
Victims Services: 15
16
Number of Open
Investigations: 21
Person Crimes: 47.7%
Property Crimes: 33.3%
Society Crimes: 14.3%
Deaths: 4.8%
17
THANK YOU
18
FRUIT HEIGHTS GENERAL PLAN
SECTION 3.3 (ADOPTED APRIL 2023)
Road Citation Count
Mountain Road 747
2012 36
2013 38
2014 33
2015 44
2016 72
2017 62
2018 120
2019 112
2020 57
2021 34
2022 64
2023 75
Nicholls 625
2012 22
2013 30
2014 46
2015 113
2016 141
2017 88
2018 67
2019 35
2020 27
2021 8
2022 7
2023 41
Grand Total 1372
East Oaks Drive 11 South Mountain Road
910 South Mountain Road
95 South Mountain Road 129 South Mountain Road
1456 Nicholls
(11/2022)
East Oaks Drive (07/2021)
Nicholls Rd (11/2022) 32 MPH
11 South Mountain Road
600 South Mountain Road
1-15 South
325 North Mountain Road 932 South Mountain Road
Bottom of Nicholls (East)
Top of Nicholls (West)
MULTIPLE SPEED LIMIT SIGNS
STOP SIGNS
“YOUR SPEED” SIGNS
TRAFFIC HUMPS
2495 E Antelope Drive, Layton, UT
5031 Amethyst Drive, West Jordan, UT
Get email alerts for Fruit Heights
A daily email when new agendas and minutes are posted.