Committee of the Whole
Regular MeetingGahanna, OH · November 13, 2023
Minutes
200 South Hamilton Road
City of Gahanna Gahanna, Ohio 43230
Meeting Minutes
Committee of the Whole
Trenton I. Weaver, Chair
Karen J. Angelou
Merisa K. Bowers
Nancy R. McGregor
Kaylee Padova
Stephen A. Renner
Michael Schnetzer
Jeremy A. VanMeter, Clerk of Council
Monday, November 13, 2023 7:00 PM City Hall, Council Chambers
A. CALL TO ORDER:
Vice President of Council Trenton I. Weaver, Chair, called the meeting to
order at 7:00 p.m. The agenda was published on November 10, 2023.
Councilmember Bowers was absent. All other members were present. There
were no additions or corrections to the agenda.
B. DISCUSSIONS:
1. Public Arts Policy - Status Update and Discussion
Mayor Jadwin shared that the Public Arts Committee met last week and
are meeting again on Wednesday, November 15, 2023, at the Senior
Center. Councilman Weaver asked if Columbus Academy students are
painting the snowplows. Mayor Jadwin said the snowplows were
dropped off at Columbus Academy and Gahanna Lincoln High School.
They were asked to submit designs and artwork following what has been
done in the past. Gahanna Jefferson schools decided not to paint yet.
They want to wait until the policy is adopted. She believes Columbus
Academy has decided to begin painting them. They will not be displayed
until the policy is adopted.
C. ITEMS FROM THE DEPARTMENT OF ADMINISTRATIVE SERVICES:
ORD-0078-2023 AN ORDINANCE AUTHORIZING THE MAYOR TO ENTER INTO
CONTRACT WITH THE BOARD OF HEALTH OF THE FRANKLIN
COUNTY GENERAL HEALTH DISTRICT (FRANKLIN COUNTY PUBLIC
HEALTH) FOR 2024 PUBLIC HEALTH SERVICES; AND DECLARING
AN EMERGENCY
Senior Director of Administrative Services Miranda Vollmer said the request is for an
ordinance authorizing the mayor to enter into contract with the Board of Health of the
Franklin County General Health District for the 2024 Public Health Services contract.
City of Gahanna Page 1
Committee of the Whole Meeting Minutes November 13, 2023
The city contracts with Franklin County Public Health to provide Health Services for
the city and to function as the city’s Public Health Department. The services include
administrative services, data services, environmental health, emergency preparedness,
epidemiology health promotion, health systems planning, immunization and a variety of
many other services to the city. The cost for the 2024 program is $349,450 which is
$9.89 per capita. This represents approximately a 3% increase from the 2023
contract. The request is for emergency so that the contract is affected on January 1,
2024. Administration received the contract from Franklin County Public Health on
November 6, 2023, and that is the reason for the request for emergency.
Vice President Weaver asked if the city attorney’s office had reviewed the contract.
Assistant City Attorney Matt Roth has not reviewed the contract and did not know if
City Attorney Mularski had. Roth asked the administration if the contract is different
from the previous years. Mayor Jadwin shared the terms are the same, except for the
amount. Weaver said it is worth noting that this would be a separate contract from
anything that is being considered in terms of tobacco retail licensing that would be a
separate contract in a separate agreement. Mayor Jadwin said there is no reference
to the tobacco retail issue within this contract.
Recommendation: Introduction/First Reading on Regular Agenda on
11/20/2023; Second Reading/Adoption on Consent Agenda on 12/4/2023.
D. ITEMS FROM THE DEPARTMENT OF ECONOMIC DEVELOPMENT:
ORD-0082-2023 AN ORDINANCE AUTHORIZING THE MAYOR TO ENTER INTO AN
AGREEMENT WITH THE GAHANNA CONVENTION & VISITORS
BUREAU (CVB) FOR THE YEARS 2024-2028 FOR THE PURPOSE OF
PROMOTING TOURISM AND ATTRACTING VISITORS TO THE CITY
Director of Economic Development Shannon Hamons said the request is for an
ordinance authorizing the mayor to enter into an agreement with the Gahanna
Convention and Visitors Bureau (CVB) for 2024 through 2028 to promote tourism
and attracting visitors to the city. CVB Director Lori Kappes and some board
members were in attendance. The sharing of bed tax revenue is required by ORC
and this agreement does extend it for 5 years through 2028, with a continuation of
sharing 66.7% of the bed tax for the CVB purposes. There are some minor changes
to section four. The CVB had asked for clarification of responsibilities as it relates to
any type of termination language. Also, in the scope of services, in the addendum it
outlines and specifies that for certain circumstances beyond their control they will not
be held responsible, such as street closures, utility work, and things that might prevent
them from hosting events. It also has continuation of events such as the Creekside
Blues & Jazz Fest and the Holiday Lights. In 2022, there was a sharing of about
$248,000 and we are running just about the same for 2023.
Councilmember Padova asked for clarification on the contract. The contract says for
four years but Hamons said five years. Hamons said it needed changed to five years.
The contract is through 2028. Some communities go into perpetuity and do not have
end dates. He thinks it is judicial on the city’s part to look at the contract every five
years. Padova said it would increase from three years to five years. Hamons
City of Gahanna Page 2
Committee of the Whole Meeting Minutes November 13, 2023
confirmed that is correct. Padova said she believes there are some misconceptions in
the community about the CVB, and it is her understanding that it is not different from
others. She asked Director Kappes to give a brief overview of how this works in
other communities if Gahanna is the same or different.
Director Kappes said most communities all over Ohio and the nation have a
convention and visitors bureau. Specific to the Columbus area, the Gahanna CVB is a
member of the Capital Area Tourism Alliance, which is CVB directors from all over
Central Ohio. Most of the communities around Columbus have a CVB. To stay
relevant and competitive, she believed Gahanna needed to have a CVB and do the
promotion work and the events and things that the CVB does. Padova asked if it is
typical for the CVB to get the bed tax dollars and if that was the typical funding
method. Kappes said that is correct.
Councilmember McGregor asked if the city did not have a CVB, where would the
bed tax dollars go? Kappes said it is her understanding that the dollars would go back
to the county. Hamons said if Gahanna did not have a CVB, Franklin County would
receive the money and we would not be able to utilize it locally.
Vice President Weaver said the agreement is for two-thirds of the bed tax dollars.
Hamons said it is correct, 66.7%. Weaver clarified that without a CVB, all 100%
would go back to the county. Hamons said that is correct. Weaver asked where the
remaining third goes. Hamons said that will be addressed in the next item.
Recommendation: Introduction/First Reading on Regular Agenda on
11/20/2023; Further Discussion in Committee of the Whole on 11/27/2023;
Second Reading/Adoption on Consent Agenda on 12/4/2023.
ORD-0083-2023 AN ORDINANCE AUTHORIZING THE MAYOR TO ENTER INTO
AGREEMENT WITH THE GAHANNA CONVENTION & VISITORS
BUREAU (CVB) FOR THE YEARS 2024-2028 FOR THE
MANAGEMENT AND OPERATIONS OF THE OHIO HERB CENTER
(OHC)
Director Hamons said the request is for an ordinance authorizing the mayor to enter
an agreement with the Gahanna CVB for the years 2024 through 2028 for the
management operation of The Herb Center. This is a five-year continuation of
sharing 16.67% of what is collected in bed tax. It would be approximately $62,000,
which is about the same as last year. With respect to the remaining 16.66%,
approximately $62,000, the city can retain.
Vice President Weaver said these are all dollars that stay here in the City of Gahanna
and used to promote the City of Gahanna. Weaver said he had a request for both
items to come back to committee. However, he had no problem moving it forward
with the first reading and then on the consent agenda.
Recommendation: Introduction/First Reading on Regular Agenda on
11/20/2023; Further Discussion in Committee of the Whole on 11/27/2023;
Second Reading/Adoption on Consent Agenda on 12/4/2023.
City of Gahanna Page 3
Committee of the Whole Meeting Minutes November 13, 2023
Amendment Requested - Exhibit A:
ORD-0077-2023 AN ORDINANCE TO AUTHORIZE THE MAYOR TO ENTER INTO AN
INFRASTRUCTURE CONSTRUCTION AGREEMENT WITH CP
CRESCENT, LLC, TO ENGAGE THE DEVELOPER AS THE
CONTRACTOR FOR CONSTRUCTION OF A NEW STREET AND
RELATED UTILITIES AT THE CRESCENT AT CENTRAL PARK; AND
TO ACCEPT A SIB LOAN SHORTFALL GUARANTY FROM THE
DEVELOPER
Director Hamons said that this ordinance was heard at a previous meeting. This
ordinance is to allow the mayor to enter into an infrastructure construction agreement
with CP Crescent LLC. This is for the developer to take on the improvements to
Tech Center Drive and also to do the utilities at Crescent and Central Park.
Administration wanted to make amendment to that original document to allow the
developer to also take on the management and construction of a traffic signal in that
location. This was recommended by the city engineering department. They will be out
there doing the work in that area and the city wanted to add this to the list of items
that would be comprehensively done at the same time. The traffic signal was an
obligation from 2010. They were getting ready to undertake that and we thought that
this would be more efficient to allow them to undertake this and then pay them for the
design and the construction of the traffic signal at that location.
Councilmember Schnetzer wanted to confirm what is in front of council is just the
addition of the traffic signal to an already existing authorized project. Hamons said
that is correct. It is just adding the traffic signal and nothing else to the improvements
that were already talked about. There is a little more than $4.3 million of
improvements in the contract that the developer would pay initially. Those
improvements would be paid back through the SIB loan of $2 million and about $2.3
million in the TIF payments.
Vice President Weaver said his understanding is that the ordinance has had a first
reading but this would have to be an amendment to that ordinance to include the
scope of the traffic signal as part of the legislation. As a matter of process, Council
would need an amendment at the regular council meeting.
President Renner said he is in support of the addition of traffic signals because they
are traffic calming. He asked where exactly this will be. Mayor Jadwin clarified that
Mayor Stinchcomb agreed to the traffic signal in 2010 as part of the Buckles property
and Tech Center Drive construction. This is a fulfillment of an obligation that was
made almost 13 years ago. Director of Engineering Tom Komlanc said the traffic
signal would be east of Hamilton Road along Tech Center Drive at the proposed
Crescent Boulevard, servicing the multi-family site and a host of other developments.
Recommendation: Second Reading/Adoption on Regular Agenda on
11/20/2023; Amendment needed for the substitute Exhibit A prior to adoption on
11/20/2023.
City of Gahanna Page 4
Committee of the Whole Meeting Minutes November 13, 2023
E. ITEMS FROM THE DEPARTMENT OF PUBLIC SERVICE:
ORD-0073-2023 AN ORDINANCE AUTHORIZING THE DIRECTOR OF PUBLIC
SERVICE TO AWARD AND THE MAYOR TO ENTER INTO CONTRACT
WITH COMPLETE GENERAL CONSTRUCTION FOR STREETLIGHT
AND TRAFFIC INFRASTRUCTURE MAINTENANCE
Vice President Weaver said there was a request to bring this one back as there were
questions about the incomplete bid that had been received among the three. Weaver
had some follow up questions. He just wanted to make it clear that it is included in the
bid package that is published that bids must be complete to be considered. There is
not an option to say they will provide information later. Weaver asked if that
information is clearly presented in the bid package. Mayor Jadwin said that is correct.
President Renner said it is a very standard thing and it happens all the time.
Recommendation: Second Reading/Adoption on Consent Agenda on
11/20/2023.
ORD-0081-2023 AN ORDINANCE ESTABLISHING UTILITY RATES AND AMENDING
GAHANNA CODIFIED ORDINANCES TITLE THREE PUBLIC UTILITIES
- CHAPTER 921 SANITARY SEWER CONNECTIONS AND RENTAL
RATES, CHAPTER 927 STORM SEWERS, CHAPTER 929 WATER
CONNECTIONS AND RATES; AND DECLARING AN EMERGENCY
Senior Deputy Director of Administrative Services Corey Wybensinger presented the
item on behalf of the Department of Public Service. Wybensinger said every year the
department reviews Gahanna code and fee schedules looking for necessary updates
and revisions to ensure that the city remains current and that the rates are applicable.
Code changes requested for this year are routine annual changes and are minor
nature. In consultation with Baker Tilly, a rate study has been done that has led some
additional adjustments to some of the connection fees, frontage fees, and other minor
revenue producing services for water and sewer. Council was given an outline and
redline version of the proposed code changes. These changes are being brought forth
due to the timing of the City of Columbus Department of Public Utilities rate
recommendation to their Sewer and Water Advisory Board, which occurs annually
around the third week of October. That is when the city knows what Columbus will
be charging Gahanna for services. Gahanna then to adjusts its rates for residents.
The City of Columbus Sewer and Water Advisory Board is recommending in their
2024 budget to raise sewer rates by 6% and water rates by 5% for all their
customers. President Renner said the correct rates for sewer are 5%, water by 5%,
and storm by 1%. Wybensinger said this would include the master meter. Over the
next few years, the projected sewer increases are said to peak around 6% through
2026 and remain around a 6% annual increase. Water increases are to peak around
8% between 2027 and 2030. These rate increases are result of many factors, such as
increased prices and materials, chemicals, EPA requirements and increase in debt
repayment with capital related projects. To cover the City of Columbus rate increases
for the water, sanitary and the Columbus Consent Order (CCO), operation expense,
and to make sure the city is minimizing future rate spikes for residents, which may be
caused by some of the city’s capital projects, the proposal is for a 7% overall rate
City of Gahanna Page 5
Committee of the Whole Meeting Minutes November 13, 2023
increase for all utilities. This would include water, sanitary, storm, the CCO and
refuse. This rate increase equates to $7.63 increase per month based on an average
consumption of 4,000 gallons. Typically, that is a family of four average usage.
Anybody using less than that would not see that $7.63 increase. This is inclusive of
water, sanitary, storm water, the CCO and refuse fees. Roughly 80% of the fees
collected for water and sewer is essentially a pass through to the City of Columbus to
pay for the consumption. The City of Gahanna water and sewer keeps around 20%
to maintain operations. For refuse, approximately 95% goes to the provider. The City
of Gahanna retains around 5% for administration of the contract. Even with the
proposed increases, the city’s 2024 rates will remain competitive and will fall
mid-range compared to neighboring communities. No rate increase is being
recommended for refuse services. The Utility Billing division will continue offering
discount programs for eligible seniors on refuse and as long as the City of Columbus
honors the water and sewer for low income, the city will continue that as well.
Administration is respectively requesting that city council pass the ordinance to
authorize the proposed code changes and the fee schedule updates to ensure that the
code and fee schedules are active and eligible for billing by January 1, 2024.
Administration is requesting the ordinance be passed with an emergency.
President Renner asked if there was any review of the City of Columbus, and the
Columbus Sewer and Water Advisory Board (SWAB), who recently published their
projected sewer and water rates into the future. He stressed that water and sewer
are getting ready to be very expensive in Central Ohio. In order to protect the
Gahanna citizens, was there any modeling done to understand that behavior versus
what we need, and if we can have some kind of supplemental or subsidization from
the General Fund? He said the information needs broadcasted what the city of
Columbus is telling communities. Gahanna needs to get in front of that and help try to
tell the story about how expensive water and sewer is getting. Wybensinger said part
of the Baker Tilly study was to forecast out of what we are able to attain from the
City of Columbus. He said it is not always easy to get in writing what their plan is.
The city attends the SWAB board meetings in order to depict their conversations as
to what they are anticipating through those conversations. They build in the projection
module with Baker Tilly where they think these are going to go. The $7.63 increase
for consumption is a heavier shift to city capital projects than that has been in the
past. There are a lot of capital projects identified under the CIP that we've been
working through that has helped the city understand a lot of the projects that are
going to be coming on board. With having a Senior Utility Resource Engineer and
Director Komlanc, they are helping the city with that path and plan. What is being
recommended helps the city on the capital side. The administration wants to avoid to
the best of its ability taking on extra debt. Whether it is a loan from the General Fund
or a Water loan, they are exploring grant opportunities. They are trying to minimize
any impact that they can on the rates that directly affect residents and business in the
community. Renner asked if they have access to the SWAB presentation they
presented. Wybensinger confirmed he has the presentation. Renner said the sooner
we can talk to residents and get the information to them, the better they will
understand the value. They are going to hear 7%, but we need to help them
understand what it is that they are getting.
City of Gahanna Page 6
Committee of the Whole Meeting Minutes November 13, 2023
Mayor Jadwin thanked Renner for pointing that out. She thinks a lot of people in the
community do not realize that essentially most of what they pay is pass through. The
City of Gahanna must pay the City of Columbus for the water. This is a conversation
we need have with our residents. She appreciates his recommendation and maybe
they can have a conversation and some suggestions as to how we can frame that
given his experience. Renner said the city’s sustainability committee is also another
point that the City needs to promote awareness of.
Councilmember McGregor said most of the increases are sort of minimal. The water
capital improvement rate went up three times. Why was that? Wybensinger said that
is projecting out what the city has for waterline maintenance and projects coming on
board. That rate was substantially lower than some of the neighboring communities as
well and understanding what type of revenue we need to bring in to be able to build
beyond not just our maintenance program but to prepare for some of these projects
that are coming up. The city’s infrastructure is aging and in certain areas highly aged.
The city does not want to wait until we have major projects and have a large spike in
what we have to charge for the funding for the water and sewer projects. This helps
get more than just the maintaining side but start working on some of these larger
projects.
Recommendation: Introduction/First Reading on Regular Agenda on
11/20/2023; Second Reading/Adoption on Consent Agenda on 12/4/2023.
F. ITEMS FROM THE DEPARTMENT OF PARKS & RECREATION:
ORD-0079-2023 AN ORDINANCE AUTHORIZING SUPPLEMENTAL APPROPRIATIONS
- Capital Improvement Fund for Grant Award
Director of Parks & Recreation Stephania Ferrell said the city was a awarded a
Refresh grant in the amount of $20,000 from the National Recreational Parks
Association (NRPA) and partnered with Niagara Bottling. The city was eligible due
to a grant that was received in 2019 through NRPA for the construction of the two
basketball courts at Sunpoint Park. There was not a match requirement for this grant.
There was a stipulation that the grant was to be applied to the same location as the
original award. The grant funds will be used to design a human sundial at Sunpoint
Park. Administration is respectfully requesting an ordinance to increase the Capital
Improvement Fund from the unappropriated and unencumbered balance in the
amount of $20,000.
President Renner said he was on the naming committee for the park and the sundial
was part of the vision. He thanked the department.
Vice President Weaver said it is always appreciated when the city can win grants
and bring those dollars to the city.
Recommendation: Introduction/First Reading on Regular Agenda on
11/20/2023; Second Reading/Adoption on Consent Agenda on 12/4/2023.
G. ADJOURNMENT:
City of Gahanna Page 7
Committee of the Whole Meeting Minutes November 13, 2023
With no further business before the Committee of the Whole, the Chair
adjourned the meeting at 7:32 p.m.
Jeremy A. VanMeter
Clerk of Council
APPROVED by the Committee of the Whole, this
day of 2023.
Trenton I. Weaver
Chair
City of Gahanna Page 8
Agenda
200 South Hamilton Road
City of Gahanna Gahanna, Ohio 43230
Meeting Agenda
Committee of the Whole
Trenton I. Weaver, Chair
Karen J. Angelou
Merisa K. Bowers
Nancy R. McGregor
Kaylee Padova
Stephen A. Renner
Michael Schnetzer
Jeremy A. VanMeter, Clerk of Council
Monday, November 13, 2023 7:00 PM City Hall, Council Chambers
A. CALL TO ORDER:
B. DISCUSSIONS:
1. Public Arts Policy - Status Update and Discussion
C. ITEMS FROM THE DEPARTMENT OF ADMINISTRATIVE SERVICES:
ORD-0078-2023 AN ORDINANCE AUTHORIZING THE MAYOR TO ENTER INTO
CONTRACT WITH THE BOARD OF HEALTH OF THE FRANKLIN
COUNTY GENERAL HEALTH DISTRICT (FRANKLIN COUNTY PUBLIC
HEALTH) FOR 2024 PUBLIC HEALTH SERVICES; AND DECLARING
AN EMERGENCY
D. ITEMS FROM THE DEPARTMENT OF ECONOMIC DEVELOPMENT:
ORD-0082-2023 AN ORDINANCE AUTHORIZING THE MAYOR TO ENTER INTO AN
AGREEMENT WITH THE GAHANNA CONVENTION & VISITORS
BUREAU (CVB) FOR THE YEARS 2024-2028 FOR THE PURPOSE OF
PROMOTING TOURISM AND ATTRACTING VISITORS TO THE CITY
ORD-0083-2023 AN ORDINANCE AUTHORIZING THE MAYOR TO ENTER INTO
AGREEMENT WITH THE GAHANNA CONVENTION & VISITORS
BUREAU (CVB) FOR THE YEARS 2024-2028 FOR THE MANAGEMENT
AND OPERATIONS OF THE OHIO HERB CENTER (OHC)
Amendment Requested - Exhibit A:
ORD-0077-2023 AN ORDINANCE TO AUTHORIZE THE MAYOR TO ENTER INTO AN
INFRASTRUCTURE CONSTRUCTION AGREEMENT WITH CP
CRESCENT, LLC, TO ENGAGE THE DEVELOPER AS THE
City of Gahanna Page 1 Printed on 11/10/2023
Committee of the Whole Meeting Agenda November 13, 2023
CONTRACTOR FOR CONSTRUCTION OF A NEW STREET AND
RELATED UTILITIES AT THE CRESCENT AT CENTRAL PARK; AND TO
ACCEPT A SIB LOAN SHORTFALL GUARANTY FROM THE
DEVELOPER
E. ITEMS FROM THE DEPARTMENT OF PUBLIC SERVICE:
ORD-0073-2023 AN ORDINANCE AUTHORIZING THE DIRECTOR OF PUBLIC SERVICE
TO AWARD AND THE MAYOR TO ENTER INTO CONTRACT WITH
COMPLETE GENERAL CONSTRUCTION FOR STREETLIGHT AND
TRAFFIC INFRASTRUCTURE MAINTENANCE
ORD-0081-2023 AN ORDINANCE ESTABLISHING UTILITY RATES AND AMENDING
GAHANNA CODIFIED ORDINANCES TITLE THREE PUBLIC UTILITIES -
CHAPTER 921 SANITARY SEWER CONNECTIONS AND RENTAL
RATES, CHAPTER 927 STORM SEWERS, CHAPTER 929 WATER
CONNECTIONS AND RATES; AND DECLARING AN EMERGENCY
F. ITEMS FROM THE DEPARTMENT OF PARKS & RECREATION:
ORD-0079-2023 AN ORDINANCE AUTHORIZING SUPPLEMENTAL APPROPRIATIONS -
Capital Improvement Fund for Grant Award
G. ADJOURNMENT: