Finance Committee
Regular MeetingGahanna, OH · June 12, 2023
Minutes
200 South Hamilton Road
City of Gahanna Gahanna, Ohio 43230
Meeting Minutes
Finance Committee
Michael Schnetzer, Chair
Karen J. Angelou
Merisa K. Bowers
Nancy R. McGregor
Kaylee Padova
Stephen A. Renner
Trenton I. Weaver
Jeremy A. VanMeter, Clerk of Council
Monday, June 12, 2023 City Hall, Council Chambers
Immediately following Committee of the Whole meeting on June 12, 2023
A. CALL TO ORDER:
Councilmember Michael Schnetzer, Chair, called the meeting to order at
7:29 p.m. The agenda was published on June 9, 2023. All members were
present for the meeting. There were no additions or corrections to the
agenda.
B. DISCUSSIONS:
1. Quarter 1 Financial Report FY 2023
2023-0112 Quarter 1 Financial Report FY 2023
Director of Finance Joann Bury reviewed the first-quarter performance of the
general fund and special revenue funds. She noted that the general fund
revenue was at 30 percent, which is expected for this time of the year. She
mentioned that income tax revenue was at 25 percent, while property taxes
were at 49 percent due to the semi-annual collection and distribution
schedule. Additionally, Bury highlighted that charges for services were
running a little high, particularly with additional shelter and sports field rentals
compared to the first quarter of 2022. She noted the receipt of the Creekside
rent payment in the first quarter, contributing to increased revenue. Bury
expected a significant increase in interest and investment income, with a 54
percent increase already achieved in the first quarter compared to 2022. She
pointed out a nine percent increase in income tax revenue and an overall 18
percent increase compared to 2022. Bury credited the growth to charges for
services, increased rentals, Creekside rent, and substantial interest and
investment income. She explained that there was a dip in other revenue,
which was related to one-time EV charging stations reimbursements
received in 2022.
There were no questions from the Committee on revenue.
City of Gahanna Page 1
Finance Committee Meeting Minutes June 12, 2023
Director Bury examined expenditures for the first quarter and noted that they
were at 21 percent, aligning with expectations. She compared expenditures
to the previous year and found a 15 percent increase, primarily driven by
salaries and benefits. She explained that the increase in salaries and
benefits was expected due to the partial implementation of the approved pay
plan from 2022, negotiated increases, and the hiring of new positions and
filling vacancies during the first quarter. Bury also analyzed materials and
supplies expenditures, attributing the increase to inflation, fleet parts, and
utility costs. She discussed contract service expenditures, which were also
higher due to increased costs and timing related to new insurance. Also, she
mentioned that the timing of insurance premiums for the new risk insurance
policy shifted from the second quarter of 2022 to the first quarter of the
current year. Bury invited questions from the Committee regarding the
expenditure side of the report.
Vice President Weaver inquired about whether the salaries and benefits
mentioned in the report included the recently approved additional hires.
Director Bury stated that the new positions were not yet online during the Q1
period but would be included in the subsequent quarterly reports. She
explained that the positions approved during the appropriation process and
that were filled would have been reflected in the first quarter.
Councilmember Bowers asked if Bury could explain the principal retirement
line item.
Director Bury responded that those are the litigation bonds those are related
to the litigation settlement for the income tax. The City took out litigation
bonds for that. Bury explained that those are now being retired from the
general fund. She stated that payments occurring in June would be interest
and then payments in December would be the principal and the remaining
interest for the year. That was why no activity is reflected for Q1.
There were no other questions from the Committee on expenditures.
Director Bury provided an overview of other financing sources and uses. She
noted that there was an increase in transfers out compared to the previous
year, which was planned. More funds were required from the general fund to
cover Debt Service payments, particularly for the bond retirement fund.
Additionally, she mentioned that certain funds, such as intergovernmental
receipts and pilot payments, contributed to a portion of the debt. Regarding
advances, the Director explained that the water fund's last payment was
made during the current quarter. This payment marked the final repayment
to the general fund for advances made in 2016 and 2017. In terms of the
overall financial position, there was a net change in fund balance amounting
to approximately $1.5 million. As of March, the total fund balance stood at
nearly $30 million. A portion of this balance, approximately $6.6 million, was
reserved for encumbrances. Furthermore, there was an increase in the
emergency reserve, totaling $7.45 million. Consequently, the unencumbered
available balance was approximately $16 million, equivalent to about seven
City of Gahanna Page 2
Finance Committee Meeting Minutes June 12, 2023
months' worth of operating expenses, significantly exceeding the two-month
requirement set by policy.
There were no questions from the Committee on fund balance.
Director Bury introduced a different approach for presenting the special
funds report, aiming to streamline the discussion. She highlighted that the
results for the funds were quite similar. She began by presenting a
side-by-side comparison of all three funds in relation to the budget for the
year. Across the board, the income tax revenues for all three funds were at
25 percent, which aligned with expectations. Both Public Safety and Public
Service funds had total revenues at the 25 percent mark, as anticipated. In
contrast, Parks and Recreation stood at 18 percent, which was
understandable considering their season does not begin until the second and
third quarters. Moving on to expenses, the Director noted that salaries and
benefits reflected the planned increases based on pay plan amendments
and negotiated agreements. Parks & Recreation had a lower percentage
compared to the budget, which was attributed to the timing of their season.
As the year progressed, it was expected that this percentage would increase.
Regarding the Public Service fund, there had been a vacancy issue that
continued into the first quarter. However, efforts were underway to fully staff
the department by the end of the second quarter, which would likely lead to
an increase in expenses. The Director then discussed the fund balances
based on the actual results for all three funds. In each case, money was
added back to the reserve fund balance, and she presented the ending
balances for each fund at the close of the first quarter. The floor was opened
for questions before proceeding to the comparisons with actual figures.
Councilmember Schnetzer asked if there was anything from the Committee
on the Special Revenue funds actual versus budget. He remarked on Bury’s
top-notch budgeting, hitting the nail on the head with 25 percent through Q1.
There were no other comments by the Committee on the special funds.
Director Bury discussed the comparison between the projected budget and
the actual results of 2022. Revenue in the general fund showed an increase
compared to the first quarter of 2022, primarily due to heightened activity in
income tax. The percentages reflecting the revenue changes may appear
unusual, as they are adjusted annually based on the analysis of budget
operating budgets and other incoming revenue. This adjustment affects the
allocation sent to different funds. The variations in income tax percentages
were mainly driven by changes in the allocation process and the overall
revenue increase. The categories of salaries and benefits, materials and
supplies, and contract services mirrored the trends observed in the general
fund. Planned increases in these categories were consistent with
expectations, and the timing of insurance premiums influenced the financial
outcomes, with Q1 and Q2 of 2022 having different impacts.
There were no questions from the Committee on the year-on-year quarter
performance.
City of Gahanna Page 3
Finance Committee Meeting Minutes June 12, 2023
Director Bury noted the capital Improvement fund showed promising revenue
results, aligning with expectations. On the expenditure side, it stood at only
three percent, which was influenced by the construction season. However,
as we moved into Q2 and Q3, those numbers were expected to increase. By
the end of the quarter, approximately $3.7 million was added back,
contributing to a total fund balance of around $22.6 million. Out of the total
fund balance, $17 million was reserved, leaving an available balance of
approximately $5.6 million that remained unreserved. Pages four and five of
the report contained two tables that provided a breakdown of costs and
encumbrances related to projects. These tables offered a comprehensive
overview of the types of costs and a more detailed list of projects.
There were no questions from the Committee on the Capital Improvement
Fund.
Director Bury provided an update on income tax, specifically focusing on the
breakdown of the one and a half percent and one percent collections.
Withholding taxes remained high, indicating that the economy was still in an
expansion phase, which was positive. Examining the underlying data, it was
noted that there were more early filers compared to the previous year,
contributing to the increase in individual income tax collections for the first
quarter. On the net profit side, there was hope for a turnaround, although it
was acknowledged that this category was influenced by various external
factors beyond their control, such as individual businesses' operations.
Continuous monitoring was planned to observe whether there would be a
return to pre-pandemic levels in net profit tax collections.
There were no questions from the Committee on income tax.
Director Bury provided an overview of the investments held by the City, with
a major portion being held in Investments with Star Ohio. The pooled cash
investments primarily consisted of long-term bonds, which contributed to a
current yield to maturity of approximately 1.47 years. The focus remained on
maintaining a lower end of the yield spectrum, although short-term
investments were still generating slightly higher returns. The intention was to
explore longer-term options, considering that the City could invest up to five
years into the future. Interest rates remained high, showing little difference
from the end of the previous year. This trend was expected to continue at
least through the third quarter, as efforts were made to manage inflation
levels. The measures taken to control inflation seemed effective, with the
inflation rate decreasing from around 8.5 percent to approximately five
percent by the end of the first quarter. The City planned to take advantage of
the favorable high interest rates and reinvest responsibly and safely,
ensuring optimal utilization of available opportunities.
Councilmember Schnetzer confirmed with Director Bury that the net cash
illustrated on her slide was bank deposits.
Director Bury concluded that at the end of the quarter, the City observed
positive indicators, with revenue stabilizing and both revenue and
expenditure growth aligning with expectations. Economic conditions
City of Gahanna Page 4
Finance Committee Meeting Minutes June 12, 2023
remained relatively unchanged since the previous quarter, with a gradual
decrease in inflation and a slight increase in interest rates. The hope was for
interest rates to stabilize in the upcoming period, and the focus shifted
towards continued stabilization and the normalization of operations.
Councilmember Schnetzer asked Director Bury for insights, referring to
previous discussions during the budget process. The remark acknowledged
that the current stage of the economic cycle seemed to be late, with the
Federal Reserve tightening monetary conditions to curb inflation. The labor
market was identified as a stabilizing factor, which benefited the city through
withholdings and individual filings. Councilmember Schnetzer sought Director
Bury's insights on how a broader economic slowdown might impact the local
economy and the city specifically.
Director Bury asked if Schnetzer meant as the recession was planning on
possibly hitting late.
Councilmember Schnetzer said yes. He asked if Bury expected better or
about the same.
Director Bury expressed her expectation of minimal change in the economic
landscape. It was stated that the projected recession, for areas experiencing
growth, would likely be a temporary and minor disruption. The rapid pace of
growth and the abundance of incoming opportunities made it challenging to
slow down unless a major recession, like the one experienced in 2008-2009,
occurred. Economists continued to predict a brief and limited recession,
which was not anticipated to have a significant impact on entities currently
undergoing growth.
There were no other questions from the Committee on the financial report.
2. Capital Improvement Plan
2023-0109 Capital Improvement Plan Draft
Kevin Schultz, Senior Director of Operations, greeted the Committee and
began the presentation by providing a summary of the current document. He
mentioned that the document was introduced in mid-April, although he
initially thought it was closer to the end of March. Schultz informed the
attendees that they now had the document in front of them. He highlighted
that the first 20 to 30 pages, specifically Sections 1 through 3, had not
undergone significant changes. He also mentioned that the slide deck
remained largely the same since March. Schultz explained that the
document they were reviewing was a draft plan. It would be presented to the
Committee over the next few weeks and ultimately requested for adoption in
August. He emphasized that the schedule for the plan could be found on the
last slide of the presentation. Schultz emphasized that the Capital
Improvement Plan (CIP) provided a more formal process for structuring and
determining the needs and priorities of the city. It allowed for the effective
allocation of limited financial resources, maximizing the benefit to the citizens
of the City of Gahanna. Schultz mentioned that the projects included in the
City of Gahanna Page 5
Finance Committee Meeting Minutes June 12, 2023
plan were informed by various previous plans, such as the Gahanna Plan
from 2016 and the Parks Master Plan. He noted that these plans served as a
foundation for the Capital Needs Assessments (CNAs) in the past and the
current CIP, ensuring a strategic approach to project selection. Schultz
explained that all projects were categorized into six different categories, each
with its own subcategories. For example, Transportation Mobility included
bridges and traffic control, while Utility Systems encompassed water and
sewer projects. He also mentioned the priority system, with Priority 1 projects
being imperative (must do), Priority 2 projects being essential (should do),
and Priority 3 projects being important (can do). Schultz highlighted the
significance of capital maintenance in the plan. He explained that this
category focused on addressing deferred maintenance and ensuring
ongoing upkeep of city infrastructure. Projects under this category, such as
asphalt overlay and street rebuilds, were recurrent and involved updating the
specific details, such as the list of streets, each year. Schultz emphasized
that the CIP involved multiple funding mechanisms, not solely reliant on
Issue 12 funding. He mentioned the inclusion of TIFs, proprietary funds, and
grant funding. He also mentioned that the capital budget aligned with the
current year of the CIP and that the document was dynamic, subject to
changes from quarter to quarter.
Director Schultz discussed section two of the document, which focused on
the plan process. He explained that the advisory committee, comprising the
mayor, council president, council finance chair, senior directors, and the
director of finance, played a crucial role in recommending the content of the
plan to the Council. This committee was responsible for assessing projects
and submitting recommendations to the senior directors. If the advisory
committee approved a project for incorporation into the CIP, it would then be
presented to the Council for further consideration. Once Council action was
obtained, the project would be included in the CIP, and subsequent
procurement and legislation processes would be followed.
Schultz emphasized that being included in the CIP did not exempt projects
from standard procedures such as bidding and contracting. The CIP served
as a framework for planning, but projects still had to go through their
respective processes to be executed. As projects progressed and more
information became available, alternative solutions would be presented,
allowing for informed decision-making. Budget allocations would be adjusted
accordingly, and any surplus funds might be reallocated or returned if not
needed. The importance of capital maintenance was highlighted as a means
of addressing deferred maintenance and adopting a proactive approach to
infrastructure challenges. By practicing predictive maintenance, the city
could minimize unexpected issues and allocate resources more effectively.
Additionally, the plan proposed a project expiration policy. Projects that did
not progress significantly within a 24-month period, for various reasons, such
as cost considerations or alternative solutions, would have their funds
returned to the appropriate accounts. This allowed for the reallocation of
funds to other pressing needs. The advisory committee would periodically
review all projects, identifying those in an inactive status or requiring closure,
and returning the funds to their original sources for appropriate
City of Gahanna Page 6
Finance Committee Meeting Minutes June 12, 2023
reassignment.
Schultz noted the plan timeline in section three, chapter three, defines how
the projects are organized and presented. Each plan worksheet includes a
prior year appropriation to show the utilization of encumbered funds from
previous years. The current five-year period covered in the plan is from 2023
to 2027, with subsequent five-year increments beyond that. The program for
the next five years is well developed and comprehensive. As we approach
the years 2038 and 2043, the level of certainty and knowledge about future
projects decreases. Phase one of the plan includes a summary worksheet
without a detailed breakdown, as budget estimates for projects further into
the future are less precise. The years 2033 to 2037 are being considered for
the CIP, but the budget lacks certainty due to different options and potential
costs. Similarly, year five of the plan (15 to 20 years into the future) lacks a
fully defined scope, and the budget for these projects is largely unknown.
Schultz said that section three provides a summary of the dollar amounts
associated with each project category. The projects are listed by
subcategory to give a clear understanding of the expenses. The information
on the slide reflects the city's expenses and expenditures in transportation
and mobility for the years 2020, 2021, 2022, and the anticipated spending in
2023. The prior year encumbrance line shows the carried-over funds from
projects that span multiple years, and the practice of closing and reopening
purchase orders at the beginning of each year has been discontinued. The
allocated budget of $8.263 million for 2023 largely corresponds to the
approved capital budget from the previous year. The chart presented will
normalize the allocation of funds in future years, ensuring they appear in the
appropriate year.
Councilmember Schnetzer stated the slide likely accounts for a significant
portion of the Issue 12 dollars, with a look back at the spending from 2020
onwards. Although there could be some grant money included, he asked if it
is fair to estimate that nearly $70 million has been spent from Issue 12 funds
over the past three and a half years.
Director Bury said the slide primarily represents the Issue 12 dollars,
although there are other funds included as well. The funding from Issue 12
significantly exceeds the capital funding from other sources.
Director Schultz responded to Schnetzer that the administration would be
able to pull that apart so Council could see Water fund versus Capital Fund
and so on.
Councilmember Schnetzer asked if that at this point in the discussion Mr.
Schultz had taken Council through section 3 of the presentation.
Director Schultz responded that technically the next slide takes us through
section three. The section three slide defines the current five-year plan,
spanning from 2023 to 2043, with a total project cost of $315,871,000. In the
first five years (23 to 27), the projects amount to over $185 million. Referring
to the slide presented, Schultz indicated the number in parentheses
City of Gahanna Page 7
Finance Committee Meeting Minutes June 12, 2023
represented the total number of identified projects throughout the entire plan,
which is just below 150 projects. Capital maintenance projects may include
multiple individual projects rolled into one, such as the example of 40 traffic
cabinets rehabbed under a single capital maintenance project. The annual
allocation required for implementing these projects is approximately $37
million, derived by dividing the total project cost by five. The CIP advisory
committee needs to ensure that the capital budget for 2024 aligns with the
available appropriations, estimated to be around $17 to $18 million annually
from Issue 12 and other proprietary funds.
Director Bury noted that bonding or debt issuance would be necessary to
cover the costs mentioned in the first five years of the plan. Debt service
payments would be spread over a potential 30-year period to smooth out the
financial impact.
Director Schultz provided an example of $100 million spread out over five
years, with $20 million each year. He believed that depending on how things
came into fruition, there would need to be a determination of how much of
the $27 million shown on the screen could be returned to a fund balance to
finance other projects. Schultz expressed that the $185 million allocated for
the next five years may seem daunting but believes it is a reasonable and
manageable amount for the residents of Gahanna to comprehend and plan
around. He highlighted the example of the Price Road House project, which
is largely grant-funded, emphasizing that capital projects are not solely
reliant on capital funds. The discussion moved to phase one, phase two, and
phase three, with Schultz noting that except for Parks and Recreation, these
phases primarily focused on capital maintenance programs without
significant escalations. He clarified that the Utility Systems category had a
consistent allocation of $15 million every five years. In the City facilities
section, Schultz mentioned that it included projects like 825, Creekside, and
the Service Garage, as well as a Community Rec Center with a projected
$60 million in phase one. He acknowledged that determining whether the
Community Rec Center should be in phase one or phase two would require
further analysis as the plan matures and the CIP Advisory Group gains a
better understanding of resource availability. Schultz also provided an
example of the technology program's $410,000 allocation, stating that it
would cover the replacement of network switches, servers, and SAN storage
every five years. However, he expressed uncertainty about the specific
technology requirements in the distant future, such as in 2033 or 2043. He
mentioned that some of the numbers beyond the current five years are more
like placeholders than concrete plans, subject to further refinement as the
plan progresses.
Director Schultz introduced the summary worksheet for each project
category and mentioned that a summary worksheet by fund would be
included in the document introduced in July. He acknowledged that a few
projects were missing from the current draft due to an error in converting the
Excel file to PDF. Schultz discussed the next steps, including project
prioritization and ranking, budget analysis, and public participation through
document publication, Council meetings, public hearings, and a planned
town hall event. He highlighted that the CIP adoption would be followed by
City of Gahanna Page 8
Finance Committee Meeting Minutes June 12, 2023
the operating and capital budget adoption, as the CIP would serve as a
reference during the budget season in October-November.
Councilmember Schnetzer expressed gratitude to Schultz and
acknowledged the extensive content in the 10-section document, requesting
Council's thoughts on the best way to proceed and organize the information.
He opened the floor for general questions based on Schultz’ presentation.
Councilmember Padova had a question regarding the pool infrastructure
project, specifically regarding the Aquatic assessment facilities plan, where
the listed amount differed between page 25 ($6,060,000) and the back
($60,000). Schultz clarified that the project encompassed both the study and
potential replacement of one of the pool facilities at Gahanna Swimming
Pool. Padova sought confirmation that the $60,000 was solely for the study,
to which Schultz confirmed it was indeed for the study only. Director Schultz
stated that the situation regarding the project is a bit unclear. He used the
example of the West Side sewers project to explain the process of studying
the system and determining design alternatives. Mr. Komlanc and the
engineering department have a list of encumbered money for developing
these design alternatives. The design alternatives will ultimately determine
the construction cost required to address the issues with the West Side
sewers. Schultz mentioned that a similar situation arises with the study of the
pool facilities in the city of Gahanna. He indicated there could be
considerations about the number of pools needed to manage and maintain
for the city's population, and whether one of the pools should be replaced.
The exact answer to these questions is unknown, and Schultz emphasized
the need for a study to determine the best course of action. He
acknowledged the mixed methodology in the documents, where the back
sheet indicated $60,000 while the front sheet mentioned $6,060,000. Schultz
expressed the intention to clarify and align the project costs appropriately.
He proposed allocating $60,000 for the study and adjusting the plan sheet
based on the study's findings. He also emphasized the importance of
avoiding guesswork and relying on accurate information throughout the
document.
Councilmember Schnetzer asked if there were any additional comments or
questions based on the presentation.
Councilmember McGregor inquired about the last phase on the page
displaying timelines for different phases, noting that it appeared to be a year
longer. She sought clarification regarding the reason behind this
discrepancy. Director Schultz responded to Councilmember McGregor's
query, stating that all phases should be five years each. He explained that
the original plan consisted of an initial three-year phase, which resulted in
the last phase being seven years long. He expressed his thanks for
highlighting the error and assured that the correction would be made.
Vice President Weaver expressed gratitude to Mr. Schultz. He
acknowledged the interconnected nature of projects and their impact on
funding and other projects. Weaver mentioned his struggle to comprehend
the individual projects while considering their broader implications. He
City of Gahanna Page 9
Finance Committee Meeting Minutes June 12, 2023
requested Mr. Schultz to provide a walkthrough of Project X's life cycle as an
example. Weaver specified that he wanted to understand how a project's
duration, unexpected issues, and additional funding requirements affect
other projects. He emphasized the importance of gaining this understanding
for future iterations of the plan.
Director Schultz responded by stating that the numbers would become more
accurate and well-known over time as the plan matured. He used the
example of the pool replacement project, mentioning that the cost of
replacing the pool was known and appropriately included in the plan. Schultz
explained that as the administration improved project assessment and
estimation, it became easier to determine costs and project timelines. He
gave an example of replacing a water line, where the engineering
department could easily estimate costs based on linear footage. Schultz
emphasized the importance of incorporating accurate and strategic
information into the plan. He mentioned that the engineering side often
conducts studies to develop design alternatives for solving specific problems.
Schultz noted that the Parks and Recreation section of the document
differed from engineering and public service due to prior work on their
master plan. He explained how the Parks and Recreation department
accounted for the life cycle and replacement cost of a playground based on
its implementation year. Schultz acknowledged that as the plan matured, the
replacement cost for the playground would become more accurate. He
highlighted that the plan's information would improve over time, mentioning
the possibility of advancements in playground equipment by 2035. Schultz
clarified that the plan's initial year couldn't accommodate corrections and
alterations across all 150 projects. He provided an example related to capital
maintenance, illustrating the shift from extensive street replacements to
more preventative maintenance measures. Schultz mentioned the impact of
financial resources on project execution, using the Water Tower
Revitalization Project as an example. He explained how the project's delayed
implementation resulted in increased costs compared to executing it a
decade ago. Schultz highlighted the need to manage and maintain all
aspects, such as the traffic control network and equipment with life cycles.
He mentioned that the next iteration of the plan would feature a condensed
project list for the 2024 capital budget, aligned with budget projections.
Schultz stated that the CIP advisory committee and stakeholders would
organize the presentation of the project list. He shared his own experiences
of navigating the 150 projects included in the plan.
Councilmember Bowers expressed gratitude to Director Schultz, Director
Bury, and everyone involved in the discussion. She raised a procedural and
logistical concern regarding planned absences at the last meeting of the
month. Bowers proposed scheduling a Finance Committee meeting on July
10th instead, considering the importance of the discussion and the need to
digest the information. She suggested this alternative date if there would be
fewer anticipated absences among Council members.
Councilmember Schnetzer asked if there were any objections from Council
regarding Bowers’ proposal. He offered to host the Finance Committee
meeting if there was no objection.
City of Gahanna Page 10
Finance Committee Meeting Minutes June 12, 2023
Mayor Jadwin expressed that whatever schedule works best for Council is
preferred, aiming to gather as much input as possible.
Councilmember Schnetzer sought clarification whether the July 10th meeting
would be in addition to or instead of the June 26th meeting. He compared
the document's complexity and sections to a budget, suggesting that more
meetings could provide additional opportunities for comments. Schnetzer
mentioned his approval of keeping the June 26th Finance Committee
meeting and scheduling another meeting on July 10th if desired.
Councilmember Bowers supported the idea of scheduling the July 10th
meeting to accommodate council members' travel plans during the summer.
She anticipated that more members would have the chance to weigh in and
engage in further dialogue. Bowers asked Schnetzer if he believed it was
necessary to solicit and filter questions from council members.
Councilmember Schnetzer acknowledged that Bowers beat him to the
question. He referred to the previous process of submitting questions in
advance to the chair of the Finance Committee, filtering duplicates, and
sharing them with the administration for thorough preparation. Schnetzer
suggested having a robust discussion during the Monday night meeting
based on the administration's responses. He expressed willingness to oblige
if that was the council's preference or to consider alternative approaches
based on council input. Schnetzer asked Bowers if she preferred following
the same process used for the budget discussions.
Councilmember Bowers expressed uncertainty about whether the same
process used for the budget would apply to the current item but believed it
wouldn't hurt to try. She acknowledged that the process had worked well in
the past, allowing directors to research and prepare responses in advance,
which she found beneficial.
Councilmember Schnetzer noted several heads nodding from directors in the
audience and indicated agreement with Bowers’ comments for following the
same process. He mentioned the importance of being a good partner in this
regard.
Director Schultz expressed appreciation for the proposed process and stated
that it would be wonderful and greatly appreciated.
Mayor Jadwin emphasized the benefits of this process, mentioning that it
helps facilitate dialogue and ensures that council members are better
informed to respond to the information provided.
Councilmember Schnetzer suggested scheduling a Finance Committee
meeting on the 26th and asked council colleagues to submit their questions
to him in advance. He proposed compiling all the questions by the preceding
Wednesday night and having them ready for the administration to review on
Friday. Schnetzer inquired if this timeline would provide enough time or if an
earlier deadline was necessary.
City of Gahanna Page 11
Finance Committee Meeting Minutes June 12, 2023
Director Schultz indicated that the suggested timeline was sufficient and
raised another idea for consideration. He proposed hosting a Committee of
the Whole meeting on July 10th, in addition to the Finance Committee
meeting, to introduce the schematic design exterior of 825. Schultz
mentioned that all seven council members would be required to attend the
exterior reveal on that evening.
Vice President Weaver expressed his agreement with a proposed
Committee of the Whole meeting and stated that the proposed schedule
worked for him. He inquired if it was suitable for everyone else as well.
Councilmember McGregor indicated that she might not be there for the July
10 meeting. Vice President Weaver confirmed with McGregor that it was ok
to plan on that date for now. He then asked the Clerk to plan for that meeting
to be noticed for after the regular meeting on July 10.
Councilmember Schnetzer said it sounded like Council had a path forward
with anticipated discussions and meetings to be scheduled.
Councilmember Angelou expressed gratitude for the work done by the team,
acknowledging that as she reviewed the material, she realized there was a
lot of detailed work involved. She praised the comprehensive nature of the
work and commended the team members for their excellent performance.
Director Schultz mentioned that he was assigned to present the work to the
council and acknowledged the collaborative effort involved. He highlighted
the involvement of various individuals, including Joann Bury, Miranda
Vollmer, Corey Wybensinger, Tom Komlanc, and all the directors and
stakeholders. Schultz expressed his appreciation for the team's dedication
and their responsiveness to his requests and inquiries. He recognized the
teamwork and felt fortunate to have the opportunity to present the work to
the council.
Councilmember Angelou expressed her belief that the City of Gahanna is
fortunate to have such a capable and dedicated group of individuals working
on the project.
Mayor Jadwin thanked Angelou for her comments and expressed her
intention to thank the directors herself. She acknowledged the extensive time
and effort put into the project, mentioning that it had been over a year and a
half in the making. Jadwin anticipated that there would be robust discussions
moving forward but appreciated the work done so far. She thanked all the
directors, including Director Schultz, Director Bury, Director Vollmer, and
Director Wybensinger, for their commitment and the countless hours spent
analyzing the numbers. Jadwin recognized that the conversation was just
beginning and looked forward to the continuing discussion.
C. ADDITIONAL DISCUSSION:
Attorney Mularski informed the council that he had found answers to a
previous question asked during Committee of the whole through which a
City of Gahanna Page 12
Finance Committee Meeting Minutes June 12, 2023
couple of cases intended to provide guidance. He referenced the case of
Halstead v. Jackson, where an ordinance was passed as emergency
legislation to increase the city's income tax revenue and protect
infrastructure investments in the land to be developed. Mularski mentioned
that the purpose of the emergency legislation was also to ensure the city's
influence over and ability to fund infrastructure improvements. He then
mentioned the case of Laughlin v. James, which stated that an ordinance
was not illusory and the reasons for an emergency were sufficient to allow a
developer to proceed with Planning Commission proceedings. The
emergency designation was necessary to prevent further delays and
alleviate uncertainty in planning for future growth. Mularski concluded by
expressing hope that this information would assist in determining whether
ORD-0045-2023 could be classified as an emergency.
D. ADJOURNMENT:
With no further business before the Finance Committee, the Chair adjourned
the meeting at 8:37 p.m.
Jeremy A. VanMeter
Clerk of Council
APPROVED by the Finance Committee, this
day of 2023.
Michael Schnetzer
City of Gahanna Page 13
Agenda
200 South Hamilton Road
City of Gahanna Gahanna, Ohio 43230
Meeting Agenda
Finance Committee
Michael Schnetzer, Chair
Karen J. Angelou
Merisa K. Bowers
Nancy R. McGregor
Kaylee Padova
Stephen A. Renner
Trenton I. Weaver
Jeremy A. VanMeter, Clerk of Council
Monday, June 12, 2023 City Hall, Council Chambers
Immediately following Committee of the Whole meeting on June 12, 2023
A. CALL TO ORDER:
B. DISCUSSIONS:
1. Quarter 1 Financial Report FY 2023
2. Capital Improvement Plan
2023-0109 Capital Improvement Plan Draft
C. ADJOURNMENT: