Gainesville Regional Utilities Authority
Regular MeetingGainesville, FL · July 9, 2025
Minutes
Gainesville Regional Utilities Authority
MINUTES
July 9, 2025, 5:30 p.m.
GRU Administration Building
301 SE 4th Avenue
Gainesville, FL 32601
Members Present: Vice-Chair Haslam, Jack Jacobs, Chair
Lawson, Robert Skinner
_____________________________________________________________________
A. CALL TO ORDER
B. ROLL CALL
C. INVOCATION
D. PLEDGE OF ALLEGIANCE
E. ADOPTION OF THE AGENDA
Moved by Robert Skinner
Seconded by Vice-Chair Haslam
Public Comment: Jim Konish
F. APPROVAL OF MINUTES
Moved by Jack Jacobs
Seconded by Robert Skinner
Approved
G. CHAIR COMMENTS
No Comments
H. GENERAL PUBLIC COMMENT
1
Public Comment: Angela Casteel, Jim Konish, Chuck Ross,
Staff Response: Ed Bielarski responded to public comment.
Vice Chair Haslam responded to public comment.
I. DIRECTOR COMMENTS
Director Jacobs: Addressed the public based on previous public comment.
Vice Chair Haslam: Spoke to previous public comment
Director Skinner: No response
J. CONSENT AGENDA
1. State of the Utility, Monthly Update May 2025 (B)
K. CEO COMMENTS
CEO Bielarski presented an overview slide on customer disconnection metrics.
Additionally, he spoke to items regarding GRU's rating agencies.
Lastly, spoke to natural gas bids and TEA concerns.
L. ATTORNEY COMMENTS
Kiersten Ballou
M. BUSINESS DISCUSSION ITEMS
1. GRU Review (B)
Video, featuring customer comments on their experience with GRU's
LEEP program.
Discussed software updates GRU is embarking upon.
Chair Lawson questioned where GRU was with the AMI installation.
CEO Spoke to all the legal battles GRU is currently defending.
Director Jacobs commented to the most recent City Commission meeting.
Attorney Kiersten Ballou spoke to the legal issues concerning the City's
lawsuit against GRU and other legal matters.
Recommendation: No action required by the Board other than to listen
and ask questions about the presentation.
2
Board listened to a presentation by CEO Bielarski regarding updates
concerning GRU.
Directors asked questions with regards to presentation.
Heard
N. RESOLUTIONS (Roll Call Required)
O. DIRECTOR COMMENTS
Director Skinner: addressed the public concerning previous public comments
and advised of free energy audits provided by GRU.
Director Jacobs: Stated what he would like to see in the future, in regard to
GRU's direction.
Vice Chair Haslam: Wished to direct a comment to Mr. Konish, but he left
seconds into Director Comments.
Chair Lawson: Applauded GRU for rating reviews. Encouraged CEO Bielarski
to explain more to the public.
P. ADJOURNMENT
6:34 PM, Chair Lawson adjourned the meeting.
_________________________
Kunti Nesbitt, GRUA Staff Liaison
Tracie OSteen, GRUA Staff Liaison
3
Agenda
Gainesville Regional Utilities Authority
AGENDA
Wednesday, July 9, 2025, 5:30 p.m.
GRU Administration Building
301 SE 4th Avenue
Gainesville, FL 32601
Directors
Chair Eric Lawson
Vice-Chair David Haslam
Director Jack Jacobs
Director Robert Skinner
If you have a disability and need accommodation in order to participate in this meeting, please call
(352) 334-5051 at least two business days in advance. TTY (Text Telephone Telecommunication
Device) users please call 711 (Florida Relay Service). For Speech to Speech (STS) relay, please call
1-877-955-5334. For STS Spanish relay, please call 1-877-955-8773. For STS French Creole relay,
please call 1-877-955-8707.
A. CALL TO ORDER
Agenda Statement: The Gainesville Regional Utilities Authority encourages civil public
speech. The Gainesville Regional Utilities Authority expects each person entering this
chamber to treat others with respect and courtesy. Speakers are expected to focus on
agenda items under discussion. Signs, props, posters, food, and drinks should be left
outside the auditorium.
B. ROLL CALL
C. INVOCATION
D. PLEDGE OF ALLEGIANCE
E. ADOPTION OF THE AGENDA
Includes Consent and Regular Agenda Items
F. APPROVAL OF MINUTES
Approval of the Minutes from the June 11, 2025 GRUA Meeting (B)
G. CHAIR COMMENTS
H. GENERAL PUBLIC COMMENT
(for items not on the agenda, not to exceed 30 minutes total)
I. DIRECTOR COMMENTS
J. CONSENT AGENDA
Gainesville Regional Utilities Authority
1. State of the Utility, Monthly Update May 2025 (B)
Department: Gainesville Regional Utilities/Office of the Chief Operating Officer
Description: GRU will be providing a monthly update to Authority members to ensure
they are aware of the important projects and relevant utility measurements and
benchmarks. This report provides information from May 2025.
Fiscal Note: None
K. CEO COMMENTS
L. ATTORNEY COMMENTS
M. BUSINESS DISCUSSION ITEMS
1. GRU Review (B)
Department: Gainesville Regional Utilities/Office of the Chief Executive Officer
Description: The GRU Review has been added to the agenda as a recurring item in
order to update the Board on the significant and most meaningful events since the
last board meeting. The GRU Review isn’t meant to replace all the granularity of the
State of the Utility (which is included under the consent agenda), it is intended to
supplement it and can evolve over time depending on the requirements set forth by
the Board.
Fiscal Note: None
Recommendation: No action required by the Board other than to listen and ask
questions about the presentation.
N. RESOLUTIONS (Roll Call Required)
O. DIRECTOR COMMENTS
P. ADJOURNMENT
Page 2 of 49
Gainesville Regional Utilities Authority
MINUTES
June 11, 2025, 5:30 p.m.
GRU Administration Building
301 SE 4th Avenue
Gainesville, FL 32601
Members Present: Craig Carter, Vice-Chair Haslam, Jack
Jacobs, Chair Lawson, Robert Skinner
_____________________________________________________________________
A. CALL TO ORDER
B. ROLL CALL
C. INVOCATION
Lead by Director Carter
D. PLEDGE OF ALLEGIANCE
E. ADOPTION OF THE AGENDA
Moved by Robert Skinner
Seconded by Vice-Chair Haslam
Public Comment: Jim Konish
Approved
F. APPROVAL OF MINUTES
Moved by Robert Skinner
Seconded by Jack Jacobs
Approved
1
Page 3 of 49
G. CHAIR COMMENTS
Chair Lawson opted to hold his comments until the end of the meeting.
H. GENERAL PUBLIC COMMENT
Public Comment: Jim Konish, Janice Garry, Chuck Ross, Donald Shepherd
I. DIRECTOR COMMENTS
Director Jacobs spoke to public comment.
Vice Chair Haslam spoke to the public comment.
Director Skinner spoke to public comment and supported the comments made by
fellow directors.
J. CONSENT AGENDA
K. CEO COMMENTS
CEO, Ed Bielarski gave updates to recent internal meetings, projects and SLAs
(Service Level Agreements) with the City.
Introduced Utilities Attorney, Derek Perry.
L. ATTORNEY COMMENTS
Scott Walker spoke to the Director comments in support. Thanked Director Carter
for his numerous years of service to the City of Gainesville. Commended GRUA
Board for their decision to hire Derek Perry.
Kiersten Ballou gave updates as to the current legal appeal.
Utilities Attorney, Derek Perry addressed the Board and the public
2
Page 4 of 49
M. BUSINESS DISCUSSION ITEMS
1. Resource Management Agreement between The Energy Authority
(TEA) and GRU (B)
Director Skinner asked for clarification as to what this RMA would
encompass for GRU. CEO Bielarski responded.
Director Jacobs addressed comments made during public comment,
stating that GRU operates in accordance with specific standards and
regulations as set by the State of Florida.
Recommendation: The GRU Authority approve the executed RMA along
with Task Order 1.
Moved by Jack Jacobs
Seconded by Vice-Chair Haslam
CEO Bielarski gave a presentation regarding TEA relationship past and
future.
Public Comment: Jim Konish, Chuck Ross, Donald Shepherd
Approved as Recommended
2. Discussion surrounding misinformation about GRU and GRUA (B)
CEO Bielarski referred back to the Board comments from earlier during
Director Comments.
Recommendation: The GRU Authority to hear the presentation, discuss
and offer any suggestions.
Director Skinner thanked CEO for presentation.
Vice Chair Haslem supported the presentation, stating the public needs to
be aware of the facts.
Director Jacobs spoke to comments made at City Commission meeting,
recently. Expressed his concerns.
Heard
3
Page 5 of 49
3. Authorize the Utilities Attorney to file a lawsuit on behalf of the
Authority challenging City of Gainesville Ordinance No. 2025-416 in
the Eight Judicial Circuit Court.
Utilities Attorney Perry gave overview of what the lawsuit would
encompass.
Recommendation: The GRU Authority to authorize the Utilities Attorney
to file a lawsuit on behalf of the Authority challenging the City of
Gainesville’s Ordinance No. 2025-416 in the Eighth Judicial Circuit Court.
Moved by Jack Jacobs
Seconded by Robert Skinner
Lawsuit filing fee for service would be $450. GRU would entertain any
direction the Authority would like to offer.
PUBLIC COMMENT: Jim Konish, Chuck Ross, Donald Shepherd
Vice Chair Haslam questioned the amount of costs GRU would incur with
this new lawsuit and recommended pulling from GFT, as well.
Approved as Recommended
4. State of the Utility, Monthly Update April 2025 (B)
COO Tom Brown reviewed the State of the Utility report with the GRUA.
Chair Lawson inquired about the timeline for the availability of the
customer portal software, which will allow customers to access information
related to the new AMI meters.
COO Brown and CEO Bielarski gave updates to the software.
COO Brown pointed out some highlights and accolades to GRU's credit.
Energy Delivery Officer, Chad Parker, presented a video showcasing the
delivery of a new transformer, which will be replacing an outdated unit at
McMichen Substation.
Recommendation: The GRU Authority hears a monthly update from the
utility’s operational areas.
Heard
4
Page 6 of 49
N. RESOLUTIONS (Roll Call Required)
O. DIRECTOR COMMENTS
Director Jacobs gave warm farewell and appreciation to Director Carter.
Vice Chair Haslem also spoke to Director Carter in appreciation.
Director Skinner gave his appreciation to Director Carter.
Chair Lawson - Presented Director Carter with a plaque in appreciation of his
service to the GRUA Board, as well as spoke to his appreciation of Director
Carter's service.
Director Carter, offered his farewells and spoke to his tenure during the time as a
Director and former Chair of the GRUA Board.
P. ADJOURNMENT
Adjourned 7:32PM
_________________________
Kunti Nesbitt, GRUA Staff Liaison
Tracie OSteen, GRUA Staff Liaison
5
Page 7 of 49
Gainesville Regional Utilities Authority
Agenda Item Report
File Number: 2025-546
Agenda Date: July 9, 2025
Department: Gainesville Regional Utilities
Title: State of the Utility, Monthly Update May 2025 (B)
Department: Gainesville Regional Utilities/Office of the Chief Operating Officer
Description: GRU will be providing a monthly update to Authority members to ensure
they are aware of the important projects and relevant utility measurements and
benchmarks. This report provides information from May 2025.
Fiscal Note: None
Page 8 of 49
FY25
May
State of the Utility
Page 9 of 49
2025-546
State of the Utility
FY25
May
Page 10 of 49
Energy Supply
Major Figures &
Achievements Regulatory YTD
Recordable
Injuries Compliance Regulatory
Issues Recordable
1
Compliance
0
Injuries Issues
1 1
Regulatory Compliance (NERC)
Environmental Compliance
We currently have one outstanding environmental compliance issue: Following a recent outage at the Kelly Combined Cycle Plant
(JCC1), CO emissions exceeded permitted levels during CT4 tuning. In response, we coordinated a Short Duration Outage (SDO)
beginning after peak load on Friday, June 20, with work scheduled through Wednesday, June 25. GE tuning personnel are onsite for
advanced tuning of CT4 on June 26. Our Environmental Permitting and Compliance Director is in direct communication with FDEP
and will promptly provide post-SDO tuning results.
In parallel, beginning May 30, CT4 began intermittently shifting from the standard “pre-mix” operating condition to a less stable “lean/
lean” mode. This instability affected System Control’s ability to maintain AGC mode. A temporary derate to 61 MW on June 2 stabi-
lized operations, but by June 9, CT4 could no longer return to pre-mix mode. Since our permit does not support extended lean/lean
operation, CT4 was taken offline once adequate purchased power was secured. Troubleshooting and inspections under the SDO are
ongoing. We still plan to restart CT4 on June 24 to complete tuning.
Electric Reliability Compliance
• No outstanding electric compliance issues at this time.
• The NERC audit conducted by SERC was formally out-briefed on June 5. We are preparing our formal response, due within 30
days of that briefing.
Page 11 of 49
1 GAINESVILLE REGIONAL UTILITIES – MORE THAN ENERGY
Energy Supply
Deerhaven (DH)
Deerhaven Unit 1 (DH1)
• We are evaluating outage scope needs for 2026, based on a Lifetime Assessment study from 2021. The assessment will help
identify potential work needed to safely extend operation beyond the current retirement date of December 2027.
Deerhaven Combustion Turbines
• All three units are online and fully available. No issues reported.
Deerhaven Renewable (DHR)
• We are evaluating the feasibility of adding a Run Transformer and Run Breaker scheme to DHR, similar to our other steam units.
This upgrade is intended to address current reliability issues caused by voltage swings that affect auxiliary equipment, resulting in
unit trips. DH1, DH2, and JCC1 already isolate auxiliary systems via Run Transformers, preventing such trips.
Kelly Generating Station (JRK)
• Online throughout May; currently offline as of June 9.
• Out is a planned, short-duration outage as detailed previously in Regulatory Compliance.
South Energy Center (SEC)
• Wartsila Engine – Online.
• Solar Engine – On standby and fully available. The plant’s steam chiller turbine has been repaired by Alternative Repair and Ma-
chining (ARM) in Jacksonville. The rotor has been reassembled and recommissioning is underway, with return to service expected
during the week of June 16, 2025.
Other Items
Insurance & Recovery
• GRU has submitted an insurance claim for the repair of the DHR turbine rotor, which failed prematurely in October 2024 after
only 11 years in service. Our insurance adjuster retained a third-party engineering firm to assess the claim. While the carrier initially
denied the claim—citing a lack of a triggering “event”—we are challenging this basis and requesting policy documentation that
specifically supports their position.
Page 12 of 49
GAINESVILLE REGIONAL UTILITIES – MORE THAN ENERGY 2
Energy Supply
Fuels Management
Inventory
Coal Biomass
79,789 35,653
tons tons (MC Adjusted)
42 days at full load; 12.1 days at full load;
85 days at half load. 24.2 days at half load;
22.1 days at most recent
burn rate.
Page 13 of 49
3 GAINESVILLE REGIONAL UTILITIES – MORE THAN ENERGY
Energy Supply
Page 14 of 49
GAINESVILLE REGIONAL UTILITIES – MORE THAN ENERGY 4
Energy Supply
Page 15 of 49
5 GAINESVILLE REGIONAL UTILITIES – MORE THAN ENERGY
Energy Supply
Page 16 of 49
GAINESVILLE REGIONAL UTILITIES – MORE THAN ENERGY 6
Energy Supply
Emissions Data
Yearly Emissions
SO2 (tons) NOX (tons) Mercury (lbs)* PM (tons)* CO2 (tons) without DHR CO2 (tons) with DHR
2020 379.3 1,208.3 3.1 56.5 1,033,389.5 1,697,218.5
2021 614.7 1,643.0 3.7 63.7 1,027,918.9 1,991,487.9
2022 167.4 867.8 2.1 11.2 861,824.7 1,771,204.7
2023 80.2 737.1 0.6 12.2 980,726.2 1,458,824.3
2024 26.5 598.4 0.8 5.3 946,129.6 1,373,862.0
2025 (thru May)** 130.2 283.4 0.5 2.5 366,909.4 626,857.0
*Mercury and Particulate values are for Unit 2 only.
**Values Subject to Change - Final Values Dependent on Fuel Analyses
Page 17 of 49
7 GAINESVILLE REGIONAL UTILITIES – MORE THAN ENERGY
Energy Supply
Yearly Emissions
Page 18 of 49
GAINESVILLE REGIONAL UTILITIES – MORE THAN ENERGY 8
Energy Supply
Emissions Data
2025 (thru May)
SO2 (tons) NOX (tons) Mercury (lbs) PM (tons) CO2 (tons) SO2 Rate (lb/MMBtu) NOX Rate (lb/MMBtu) HTIP (MMBtu) GEN (MW-hours)
DH1 37.2 52.0 41,180.3 664,600.0 53,404.0
DH2 87.4 129.6 0.55 2.5 172,458.7 2,806,336.0 251,834.0
DHCT3 0.0 0.4 1,482.4 24,949.0 1,772.0
JRKCC1 0.7 27.9 151,788.0 2,553,977.0 298,245.0
DHR 4.9 73.5 259,947.6 2,468,890.5 184,587.0
TOTAL 130.2 283.4 0.55 2.5 626,857.0 8,518,752.5 789,842.0
TOTALS without DHR
SO2 (tons) NOX (tons) Mercury (lbs) PM (tons) CO2 (tons) SO2 Rate (lb/MMBtu) NOX Rate (lb/MMBtu) HTIP (MMBtu) GEN (MW-hours)
DH1 37.2 52.0 41,180.3 664,600.0 53,404.0
DH2 87.4 129.6 0.55 2.5 172,458.7 2,806,336.0 251,834.0
DHCT3 0.0 0.4 1,482.4 24,949.0 1,772.0
JRKCC1 0.7 27.9 151,788.0 2,553,977.0 298,245.0
Total
Without 125.3 209.9 0.55 2.5 366,909.4 6,049,862.0 605,255.0
DHR
Page 19 of 49
9 GAINESVILLE REGIONAL UTILITIES – MORE THAN ENERGY
Energy Supply
Emissions & Compliance Data
Environmental
May Calendar Year to Date (May)
Notices of Violation 0 0
Emissions
DH1, DH2, DHCT3, JRKCC1
CO2 (tons) 74,102.5 366,909.4
NOx (tons) 38.3 209.9
SO2 (tons) 0.4 125.3
DH Unit 2 (only)
PMFILT (tons) 0.2 2.5
Hg (lbs) 0.0 0.5
DHR
CO2 (tons) 62,497.0 259,947.6
NOx (tons) 18.0 73.5
SO2 (tons) 1.2 4.9
Page 20 of 49
GAINESVILLE REGIONAL UTILITIES – MORE THAN ENERGY 10
Energy Supply
Availability & Capacity
Month FY25 YTD FY24 YTD Month FY25 YTD FY24 YTD
DH-2 32.88% 91.59% 74.32% 11.99% 29.44% 29.13%
DH-1 99.65% 99.95% 90.96% 37.83% 19.57% 20.76%
Kelly CC 98.75% 87.09% 88.78% 96.81% 84.47% 81.90%
DH CT-1 100.00% 100.00% 95.09% 0.01% 0.01% 0.06%
DH CT-2 100.00% 99.89% 94.75% 0.00% 0.01% 0.02%
DH CT-3 100.00% 95.17% 99.09% 2.53% 0.37% 0.29%
DHR 100.00% 49.05% 84.30% 53.42% 28.08% 33.83%
Fuel Consumed
Month YTD Budget YTD Delta Budget
Coal (Tons) - 5,708 - 5,708
Gas (MCF) 1,216,506 10,271,712 10,192,001 79,711
Fuel Oil (Gal) - 491,892 - 491,892
Biomass (Tons) 55,943 226,199 61,716 164,482
Page 21 of 49
11 GAINESVILLE REGIONAL UTILITIES – MORE THAN ENERGY
Energy Supply
Performance Parameters
25-Feb Month YTD Budget YTD Delta Budget
DH-2 18,272 219,581 265,751 -46,170
DH-1 20,213 47,780 10,436 37,344
Kelly CC1 78,483 295,549 311,514 -15,965
CTs 1,446 1,753 39 1,714
Grid 13,072 -14,778 59,656 -74,434
DHR 39,458 161,418 46,855 114,563
Page 22 of 49
GAINESVILLE REGIONAL UTILITIES – MORE THAN ENERGY 12
Energy Supply
Vacancies and Retirements
Status Title Filled? Group Vacant Date
Vacant Engineer and Utility Designer IV N GRU Deerhaven Plant 12/01/23
Vacant Energy Supply Maintenance Planner N GRU Deerhaven Plant 03/01/25
Vacant Power Plant ICE Technician N GRU Deerhaven Plant 07/08/24
Vacant Power Plant Mechanic Journeyman N GRU Deerhaven Plant 04/03/23
Vacant Power Plant Mechanic Journeyman N GRU Deerhaven Plant 07/27/23
Vacant Power Plant MMG ICE Supervisor N GRU Deerhaven Plant 05/22/23
Vacant Production Technician N GRU Kelly Plant 02/03/25
Vacant Power Plant Journeyman Operator N GRU Deerhaven Plant 03/04/25
Vacant Production Leader Y Deerhaven Renewables 02/18/25
Vacant Power Plant Heavy Equipment Operator N GRU Deerhaven Plant 04/23/25
Vacant Energy Supply Maintenance Planner N GRU Deerhaven Plant 03/01/25
Vacant Maintenance Leader Y GRU Deerhaven Plant 03/06/25
Vacant Power Plant ICE Technician N GRU Deerhaven Plant 03/07/25
Personnel
Filled
FTE Vacancies
182 11
Page 23 of 49
13 GAINESVILLE REGIONAL UTILITIES – MORE THAN ENERGY
Energy Delivery
Reliability Statistics
Customers Total Customers Outage
Served Outages Affected Minutes
101,836 83 6,174 8,903
Outage Causes
Cause Overhead Underground Both
Undetermined 8 1 0
Weather 2 0 0
Vegetation 20 0 0
Animals 18 2 0
Foreign Interference 0 0 0
Human Cause 1 3 0
Equipment Failure 21 5 2
Other 0 0 0
Total 70 11 2
Page 24 of 49
15 GAINESVILLE REGIONAL UTILITIES – MORE THAN ENERGY
Energy Delivery
Electric System Consumption
2025 2024
CONSUMPTION (kWh) CUSTOMERS CONSTUMPION (kWh) CUSTOMERS
Feed-in-Tariff - Residential 206 86 772 93
Feed-in-Tariff - General Service 2,160 140 157 147
Electric - GS - Demand - Regular 45,789,746 1,108 43,954,038 1,098
Electric - General Service Demand PV 1,353,890 30 1,261,694 29
Electric - GS - Kanapaha w Curtail Cr 1,084,800 1 1,075,200 1
Electric - GS - Demand - Large Power 8,430,520 10 7,606,200 7
Electric - GS - Murphree Curtail Credit 1,560,000 1 1,452,000 1
Electric - GS - Large Demand PV 3,986,400 2 3,609,600 2
Electric - GS - Non Demand 15,407,775 10,143 14,202,806 10,139
Electric - General Service PV 142,251 92 84,390 84
Electric - Lighting - Rental * 805,021 1,798 825,577 7,040
Electric - Lighting - Street - City * 360,337 14 396,525 15
Electric - Lighting - Street - Country * 127,121 1 127,313 1
Electric - Lighting - Traffic 144 1 144 1
Electric - Residential - Non TOU 67,097,196 91,365 61,301,294 91,434
Electric - Residential PV 437,137 1,546 301,210 1,402
Total Retail Electric 146,584,292 104,525 136,198,606 104,438
* Number of customers is excluded from total customer count.
Page 25 of 49
GAINESVILLE REGIONAL UTILITIES – MORE THAN ENERGY 16
Energy Delivery
Gas System Consumption
2025 2024
CONSUMPTION (THM) CUSTOMERS CONSUMPTION (THM) CUSTOMERS
Gas - GS - Regular Service (Firm) 822,057 1,262 736,694 1,304
Gas - GS - Regular Service (Small) 30,893 495 28,454 448
Gas - GS - Interruptible - Regular Serv 43,841 1 39,311 1
Gas - GS - Interruptible - Large Volume 490,372 9 401,084 7
Gas - Residential - Regular Service 701,910 35,695 561,562 35,575
Total Retail Gas 2,089,073 37,462 1,767,105 37,335
Major Projects
Electric Engineering / T&D Construction
• North Florida Regional Medical Center at Archer – Waiting on customer to pull secondary wires before energizing transformers.
• Oaks Preserve Phase 2 – Electrical installation in progress for residential subdivision.
• Butler Plaza Center Cup – Design completed; construction started.
• Archer Place Apartments – Ongoing OH to UG conversion; permanent power pending road/building completion.
• Evergreen Apartments at Oaks Mall – Design completed; waiting on developer to begin electrical installation.
• Hawthorne Heights – Final design details in progress in ProjectDox.
• Natura – Design completed; released for construction.
• Hammock Preserve – Construction in progress for mixed-use development.
• Airport Parking Garage – Construction in progress.
• Gilbane-Colligate Apartments – Construction in progress on NW 20th Ave.
• Tesla at Oaks Mall – Fast charging station construction completed.
• Main St WWW Plant – In design; UG power source planned; work order to close soon.
• 203-205 Feeders Reconductoring (GRIP) – Work order released; awaiting DOE approval.
• Bradford Transmission Line 15 (GRIP) – 100 ductile iron poles & equipment replaced; construction mostly complete.
• TACTICS 931 – 98% complete; hardening lines & tie point for reliability.
• TACTICS 209/287 – Hardening & replacing old poles/crossarms; work in progress.
• New Feeder #1038 – Preliminary work initiated.
Page 26 of 49
17 GAINESVILLE REGIONAL UTILITIES – MORE THAN ENERGY
Energy Delivery
• Santa Fe College 12kV Enhancement – Survey complete; waiting for college to proceed.
• County Criminal Court Complex Expansion – New project.
• Circuit 932 and 936 – Upgrades complete.
Substation & Relay
• Parker Autotransformers (GRIP) – 90% design delivered; first transformer arrived May 5; second due October.
• McMichen T-42 Transformer (GRIP) – In service as of May 29.
• Line 16 Upgrade – Scope set; PRs/POs generated; construction starts October.
• Line 8 Upgrade (GRIP) – Scope set; includes major breaker/switch/relay work; start spring 2026.
• Fort Clarke T-81 & T-82 Relay Upgrade – Design/engineering started; summer FY25 install.
• Sugarfoot Feeder Replacements – Six breakers replaced; four more scheduled for FY25 summer.
• Millhopper T-53 & T-54 (GRIP) – Design started; transformers ordered; delivery in 2026.
• Kelly T-31 & T-32 (GRIP) – Transformers ordered; T-31 spring 2027, T-32 fall 2027 delivery.
Gas Engineering
• Bridlewood – 6” main extension under construction. Reroute design completed and permitted.
• Parker Rd Backfeed – Construction underway under current permit. Continuing design toward Lugano Subdivision.
• Convergence Research Park Phase 3 – Design completed and under construction. Joint trenching with electric.
• UF Backfeeds – Pricing provided to UF for additional backfeeds to enhance system reliability.
• UF Cogen Test – Testing complete. Project being closed out.
• Flint Rock Phase 2 – Design completed and construction underway. Joint trenching with electric contractor.
Gas T&D
• Museum Rd Pit Relocation – UF approved Center Dr relocation; documents submitted to State.
• Gainesville Housing Authority (2626 E Univ Ave) – Replacing 3,520 ft. of bare steel pipe; may defer to next FY.
• Bridlewood Subdivision – 66% of external main & 85% of Phase 1 complete; redesign due to conflicts.
• Archer Place Apts – Construction complete; waiting on meter install/test.
• Flint Rock Phases 2 & 3 – 99% complete; tie-ins scheduled week of June 9.
• Convergence Research Park – 66% complete; awaiting developer schedule.
• Williston Rd Regulation Station – Land rights coordination ongoing.
• Williston Rd & SW 23rd St (System Protection) – 200 ft. 4” main installation planned.
• UF Broward Hall (System Growth) – 450 ft. backfeed project
Pageon hold;
27 of 49awaiting landscape redesign.
GAINESVILLE REGIONAL UTILITIES – MORE THAN ENERGY 18
Energy Supply
Delivery
Advanced Metering Infrastructure (AMI)
Category Electric Water Natural Gas Total
Remote Reading 103,639 64,258 32,516 200,413
AMI Devices 103,696 65,500 32,586 201,782
Non-AMI Devices 35 12,609 5,325 17,969
Total Devices 103,731 78,109 37,911 219,751
Saturation % 100.0% 83.9% 86.0% 91.8%
Standard Industry Comparisons
Comparison Actual Goal Description
SAIDI 2.33 4.5 System Average Interruption Duration Index
CAIDI 38.48 55 Customer Average Interruption Duration Index
SAIFI 0.06 0.08 System Average Interruption Frequency Index
ASAI 99.99% Average Service Availability Index
Personnel
Filled
FTE Vacancies
230 27
Page 28 of 49
19 GAINESVILLE REGIONAL UTILITIES – MORE THAN ENERGY
Energy Supply
Delivery
Vacancies and Retirements
Status Title Filled? Group Vacant Date
Vacant Electric Line Clearance Coordinator N T&D Vegetation Management Nov. 2024
Vacant Principal Engineer and Utility Designer N Electric Engineering March 2024
Vacant Energy Delivery Facilities Specialist II N Electric Engineering March 2024
Vacant Engineer & Utility Designer III N Electric Engineering Jan. 2024
Vacant Relay Technician N Relay Operations March 2024
Vacant Energy Delivery Facilities Specialist II N Electric Engineering Feb. 2025
Vacant Meter Reader N Electric Meter Measurement Operations Feb. 2025
Vacant Meter Reader N Electric Meter Measurement Operations April 2025
Vacant Electric Measurement Technician N Electric Meter Measurement Operations Feb. 2025
Vacant Electric Line Worker N T&D Construction Feb. 2025
Vacant Electric Line Worker N T&D Construction Feb. 2025
Vacant Line Worker Lead N T&D Construction June 2024
Vacant Technical Systems Analyst II N Systems Control/Technical Support Feb. 2025
Vacant Line Technician Lead N Gas T&D Construction April 2025
Vacant Field Service Technician N Gas T&D Administration Feb. 2025
Vacant Operational Technology Network Analyst Senior N Systems Control/Technical Support April 2026
Vacant Distribution System Operator II N Systems Control Operations May 2025
Vacant GIS and Operational Systems Technician N GIS Operations and Standards May 2025
Vacant Electric Line Worker N T&D Construction June 2025
Vacant Power Systems Application Engineer N Systems Control Operations June 2025
Filled Electric Line Worker Y T&D Construction Sept. 2025
Page 29 of 49
GAINESVILLE REGIONAL UTILITIES – MORE THAN ENERGY 20
Water/Wastewater
Production
Murphree Water Treatment Plant (Operations Normal)
Permitted Capacity FY 25 YTD % of
Month (mgd) FY 25 YTD (mgd) FY 24 (mgd) (mgd) Permitted Capacity
Average Daily Flow 25.5 23.6 23.2 30 79%
Max Daily Peak Flow 36.6 36.6 35.4 54 68%
Main Street Water Reclamation Facility (Operations Normal, Reclaimed Water On)
Permitted Capacity FY 25 YTD % of
Month (mgd) FY 25 YTD (mgd) FY 24 (mgd) (mgd) Permitted Capacity
Average Daily Flow 5.1 5.6 6.2 7.5 75%
Max Daily Peak Flow 7.6 13.1 16.1 NA NA
Kanapaha Water Reclamation Facility (Operations Normal, Reclaimed Water On)
Permitted Capacity FY 25 YTD % of
Month (mgd) FY 25 YTD (mgd) FY 24 (mgd) (mgd) Permitted Capacity
Average Daily Flow 9.9 10.6 11.1 14.9 71%
Max Daily Peak Flow 16.4 19.1 24.7 NA NA
Page 30 of 49
22 GAINESVILLE REGIONAL UTILITIES – MORE THAN ENERGY
Water/Wastewater
Environmental Compliance
Water Distribution System
Month FY 25 YTD FY 24
Precautionary Boil Water Notices: 3 17 25
Wastewater Collection System
Month FY 25 YTD FY 24
Sanitary Sewer Overflows (SSOs) 0 13 22
SSOs By Type:
Residential Grease & Toiletries 3 8
Infrastructure 0 8 4
Third-Party Damage 2 3
Wet Weather 0
Named Storms 7
Page 31 of 49
GAINESVILLE REGIONAL UTILITIES – MORE THAN ENERGY 23
Water/Wastewater
Maintenance
Water Distribution System
Month FY 25 YTD FY 24 Monthly Goal
Dispatched Water Work Orders 412 3,532 3,866 -
Water Leaks 170 1,450 1,711 -
Water Damages (by 3rd Parties) 28 285 N/A -
Other Water Work Orders 214 1,797 2,175 -
AMI Large Meter Changeouts 23 535 1,057 -
Number of Water Services Replaced 97
94 639 1,278 83
Feet of Water Main Replaced 3,182 17,314 22,543 2,200
Wastewater Collection System
Month FY 25 YTD FY 24 Monthly Goal
Dispatched Sewer Work Orders 56 561 776 -
Sewer Stoppages 12 139 226 -
Sewer Damages (by 3rd Parties) 4 37 N/A -
Other Sewer Work Orders 40 385 550 -
SWAMP Program
Miles of Gravity Main Inspected 16.5 117 214 12.5
Number of Manholes Inspected 420 3,158 5,121 200
Reclaimed Distribution System
Month FY 25 YTD FY 24 Monthly Goal
Dispatched Reclaim Work Orders 13 88 86 -
Reclaim Leaks 1 18 12 -
Reclaim Water Damages (by 3rd Parties) 0 1 N/A -
Other Reclaim Work Orders 12 Page 32 of 49 69 74 -
24 GAINESVILLE REGIONAL UTILITIES – MORE THAN ENERGY
Water/Wastewater
Major Projects
Water Distribution
• Galvanized Water Main Replacements – Multiple replacement locations.
Wastewater Collection
• SW 24th Ave. Force Main Improvements Project (Grant Funded) – Construction in progress; completion expected July 2025.
• NW 34th Street Force Main Replacement – Infrastructure failure; construction by GRU crews, completion expected June 2025
• Fort Clarke Blvd. Force Main – Construction began March 2025; FDOT ROW work completed by July 2025; full completion ex-
pected December 2025.
Main Street Water Reclamation Facility
• Facility Update – Received 5-year operational permit from Florida Department of Environmental Protection.
Kanapaha Water Reclamation Facility
• Facility Update – Aerator replacement to begin June 2025; materials being delivered
Lift Stations
• Lift Station No. 1 Project – Concrete formwork underway for new electrical building; equipment installation scheduled for fall.
Murphree Water Treatment Plant
• Well 12 Replacement – Project completed.
Page 33 of 49
GAINESVILLE REGIONAL UTILITIES – MORE THAN ENERGY 25
Water/Wastewater
Vacancies and Retirements
Status Title Filled? Group Vacant Date
Posting Soon Wastewater ICE Tech N Water Reclamations Nov. 2024
Interviewing New Development Engineer 1-4 N W/WW Engineering Dec. 2024
Starting July 14 Principal Engineer N W/WW Engineering April 2025
Starting May 26 Crew Leader N Water Distribution Jan. 2025
Starting June 23 Service Operator N Water Distribution May 2025
Starting June 23 Service Operator N Wastewater Collection April 2025
Starting July 21 Construction Operations Specialist Y W/WW Engineering July 2025
Interviewing Development Operations Specialist Y W/WW Engineering Sept. 2025
Interviewing Treatment Plant Supervisor Y Water Reclamations Sept. 2025
Personnel
Filled
FTE Vacancies
158 6
Page 34 of 49
26 GAINESVILLE REGIONAL UTILITIES – MORE THAN ENERGY
Safety & Training
Safety Data
Month Injury Statistics
First Aid Recordable
Department DART*
Given Injuries
Administration
Injuries 0 0 0
Recorded W/WW 0 0 0
0
Energy Supply 0 0 0
Energy Delivery & Gas 0 0 0
GRUCom 0 0 0
Total 0 0 0
*DART: Days away, restricted or transferred.
Fiscal YTD Injury Statistics
First Aid Recordable
Department DART
Given Injuries
Injuries Administration 1 1 0
Recorded
6
W/WW 0 1 0
Energy Supply 0 1 30
Energy Delivery & Gas 0 3 11
GRUCom 0 0 0
Total 1 6 41
Page 35 of 49
28 GAINESVILLE REGIONAL UTILITIES – MORE THAN ENERGY
Safety & Training
Month Vehicle Collisions & Miles Driven
Recordable Preventable
Department Miles Driven
Collisions Collisions
Administration 0
Vehicle 11,428 0
Collisions W/WW 71,911 1 0
1
Energy Supply 4,225 0 0
Energy Delivery & Gas 102,008 0 0
GRUCom 6,191 0 0
Total 195,763 1 0
Fiscal YTD Vehicle Collisions & Miles Driven
Recordable Preventable
Department Miles Driven
Collisions Collisions
Administration 0
Vehicle 66,717 1
Collisions W/WW 565,650 6 0
13
Energy Supply 24,316 0 0
Energy Delivery & Gas 811,267 4 1
GRUCom 42,202 2 1
Total 1,510,152 13 2
Page 36 of 49
GAINESVILLE REGIONAL UTILITIES – MORE THAN ENERGY 29
Safety & Training
Injury Details
• None reported.
Collision Details
• May 1, 2025 – While stopped at red light, another vehicle rear-ended the back of U2163.
Page 37 of 49
30 GAINESVILLE REGIONAL UTILITIES – MORE THAN ENERGY
Customer Operations
Revenue Assurance
Referred Funds Prior Indebtedness
to Collections Collected Bankruptcies Funds Collected
$2,547,014.30 $135,190.46 $5,805.68 $32,677.09
YTD: $9,864,849.80 YTD: $645,453.63 YTD: $207,637.05 YTD: $267,305.15
Disconnections Reconnections
3,166 2,757
Billing & Customer Customer Experience
Solutions Transactional
Survey
• Invoicing rating: 99.95%
• Meter rereads: 109 4.2
• Locked reads: 8,839 Lobby
• Solar invoicing rating: 100% Survey
• Processed emails: 1,455/1,423 (102%) 4.9
Relationship
Survey
3.3
Page 38 of 49
32 GAINESVILLE REGIONAL UTILITIES – MORE THAN ENERGY
Customer Operations
New Services
Active Projects Amount
City 167
County 44
Building Permit Reviews 82
New Installations Amount
Electric 78
Water 70
Wastewater 61
Gas 2
Solar Reviews Amount
Plan Reviews for March 4
PVs Completed on Time 4
PV Installations 6
Avg. Handle Time (Weeks) 5.71
Page 39 of 49
GAINESVILLE REGIONAL UTILITIES – MORE THAN ENERGY 33
Customer Operations
Customer Service
Answer Speed
Call Type Actual YTD Goal
Residential 9:02 8:27 5:00
Total
Non-residential 3:00
3:31 2:09
Calls
Handle Time
Call Type Actual YTD Goal 14,608
Residential 9:02 8:05 6:00
Non-residential 8:30 8:45 6:00
Other Statistics
Payments Lobby Project Social
Returned Visits Share Service Vouchers
$3,440.31
450 3,435 249
$164,666.35 $235,408.89
Page 40 of 49
34 GAINESVILLE REGIONAL UTILITIES – MORE THAN ENERGY
Customer Operations
Payment Type Details
Payment Type Transactions Transactions YTD $ Amount $ Amount YTD
Drop Box 471 2,710 $264,646.75 $1,329,151.85
Mailed 16,218 141,357 $13,412,479.17 $119,588,428.74
Office Payment 33 279 $9,164.21 $92,476.82
Drive Thru 4,328 34,409 $2,592,898.32 $21,239,653.30
Kubra Cash 211 1,540 $36,005.24 $286,175.18
Check Free 6,733 53,404 $2,183,831.21 $17,085,752.90
Kubra ACH 18,199 140,694 $5,058,455.20 $41,683,293.63
Collection Agency 160 160 $50,686.32 $135,673.27
Kubra CC/EZPAY 24,037 190,533 $4,799,142.01 $39,961,649.70
Lobby Walk-Ins 2,331 18,377 $978,046.53 $7,697,519.45
Direct Debit 32,401 223,614 $8,339,049.66 $69,667,082.31
Page 41 of 49
GAINESVILLE REGIONAL UTILITIES – MORE THAN ENERGY 35
Gainesville Regional Utilities Authority
Agenda Item Report
File Number: 2025-548
Agenda Date: July 9, 2025
Department: Gainesville Regional Utilities
Title: GRU Review (B)
Department: Gainesville Regional Utilities/Office of the Chief Executive Officer
Description: The GRU Review has been added to the agenda as a recurring item in
order to update the Board on the significant and most meaningful events since the last
board meeting. The GRU Review isn’t meant to replace all the granularity of the State of
the Utility (which is included under the consent agenda), it is intended to supplement it
and can evolve over time depending on the requirements set forth by the Board.
Fiscal Note: None
Recommendation: No action required by the Board other than to listen and ask
questions about the presentation.
Page 42 of 49
2025-548A
GRU Review
Last month – June 2025
Page 43 of 49
GRU People
20.00%
Vacancy Rate for FTE counts
18.00%
• Filling positions across 16.00%
13.11%
organization 14.00%
11.31%
12.00%
10.00%
• Reducing vacancy rates 8.00%
from highs of ~ 14% in 6.00%
7.98%
2022 and 11% in 2023 4.00%
2.00%
0.00%
May-22 Aug-22 Nov-22 Feb-23 May-23 Aug-23 Nov-23 Feb-24 May-24 Aug-24 Nov-24 Feb-25
Page 44 of 49
GRU People
Regular Full Time Equivalents (FTEs)
950.00
• Filling positions but Budgeted FTEs 903
879
still under budget 900.00
Budgeted after vacancy rate 849
850.00
826
FTE's
800.00
Actual
801 809
750.00
700.00
May-22 Aug-22 Nov-22 Feb-23 May-23 Aug-23 Nov-23 Feb-24 May-24 Aug-24 Nov-24 Feb-25
Page 45 of 49
Change of Plans
• State approved a Claims case for ~ 11 million – GRU has paid it
• Kelly plant – been on reduced load due to combustion issues
• Last natural gas prepayment is on hold – market conditions
Page 46 of 49
Community
• Fact or Fiction series in Alachua Chronicle
• #1 The city is in a problem of its own making
• #2 GRU bills are affordable
• #3 City is ignoring the will of the people
• Summer campaign to promote conservation
• 8 Local artists on the art of keeping cool
• Speaking at FMEA annual conference on July 24th
• Customer First continues
• LEEP will hit $10 M milestone this year and 2,500 homes retrofitted.
Page 47 of 49
Projects
• Information Technology – Software upgrades
• Financial Management Information Systems (FMIS) – in process
• Customer Information Systems (CIS) – in process
• Success Factors – in process
• Customer Portal – working toward arrangement with Vertex1 and SEW
• Requiring involvement of up to 100 employees across organization
Page 48 of 49
Legal Scorecard
• Appeal of Judge Wright’s May 19th judgement
• GRU filed to First District Court of Appeals (DCA) on June 4th
• City made motion to expedite on June 17th
• GRU will reply to City’s motion to expedite
• Emergency Motion for Stay in Judge Wright’s court
• GRU filed in Circuit Court for an Order to Stay on June 18th
• City filed oppositional brief on June 20th
• GRU will reply to City’s opposition
• Fults/Mermer Petition for Writ of Quo Warranto filed on Feb 3rd
• Hearing on GRUA’s Motion to Dismiss set July 2nd cancelled when
Fults/Mermer voluntarily dismissed case that morning
• Forthcoming lawsuit authorized by GRUA at June 11th meeting
Page 49 of 49