Gainesville Regional Utilities Authority
Regular MeetingGainesville, FL · November 12, 2025
Minutes
Gainesville Regional Utilities Authority
MINUTES
November 12, 2025, 5:30 p.m.
GRU Administration Building
301 SE 4th Avenue
Gainesville, FL 32601
Members Present: Vice-Chair Haslam, Jack Jacobs, Chair
Lawson, Robert Skinner
_____________________________________________________________________
A. CALL TO ORDER
B. ROLL CALL
C. INVOCATION
Invocation given by Vice Chair Haslam
D. PLEDGE OF ALLEGIANCE
E. ADOPTION OF THE AGENDA
Moved by Robert Skinner
Seconded by Vice-Chair Haslam
Approved
F. APPROVAL OF MINUTES
Moved by Robert Skinner
Seconded by Jack Jacobs
Approved
G. CHAIR COMMENTS
Chair Lawson deferred his comments to the end.
1
H. GENERAL PUBLIC COMMENT
Public Comment: Jim Konish, Chuck Ross, Joe Hill, Angela Casteel, Jyoti
Parmar, Dr. Stanley DeTurris
I. DIRECTOR COMMENTS
Director Jacobs addressed points raised during the public comment period.
CEO Bielarski further elaborated on Director Jacobs' remarks.
Vice Chair Haslam offered additional perspective on the public comments.
Director Skinner responded to issues raised during public comment.
Chair Lawson also provided remarks in response to public comment.
J. CONSENT AGENDA
1. 2025-902 State of the Utility, Monthly Update September 2025 (B)
2. 2025-903 GRU’s Waiver from FERC’s Independent Functioning Rule
(B)
Recommendation: No further Authority action is required at this time.
GRU will monitor for any material changes that could affect the waiver and
will report back as needed. Staff will ensure compliance with FERC’s
conditions, including required notification to the Commission should any
material change occur.
K. CEO COMMENTS
CEO Bielarski addressed several topics raised during public comment:
He responded to requests for a pause on utility disconnections during the
government shutdown, noting the potential implications. He highlighted that GRU
has signed an agreement with PROMISE/LIHEAP to assist customers in need
with utility bill payments, and stated that GRU can issue communications to
inform customers about how to apply for this support.
He commented on the recent special election held on November 4, 2025, and
provided clarification on the language of HB1645, emphasizing that GRU is
adhering to the requirements of this state legislation.
He spoke about GRU’s ongoing environmental initiatives, including reducing
reliance on coal and transitioning to natural gas. He emphasized that these
2
efforts not only benefit the environment but also improve public health, and
affirmed GRU’s commitment to pursuing additional sustainability measures.
L. ATTORNEY COMMENTS
Scott Walker of Folds Walker addressed points raised during both public and
director comments. He provided an update on the ongoing legal proceedings
between GRUA and the City of Gainesville, including a detailed overview of the
timeline of the process.
Derek Perry, Utilities Attorney noted that he had no additional remarks beyond
Mr. Walker’s explanation.
Chair Lawson expressed appreciation to both Mr. Walker and Mr. Perry for their
diligence and hard work.
M. BUSINESS DISCUSSION ITEMS
1. 2025-904 Horizontal Directional Drilling (B)
Andrew Roberts, Director of Water & Wastewater provided a brief
overview of the requests being presented to the GRU Authority.
Public Comment: Chuck Ross
Director Skinner responded to the points raised during the public
comment period.
Moved by Vice-Chair Haslam
Seconded by Robert Skinner
Recommendation: The GRU Authority authorize the CEO, or designee to
1. Execute an annual contract for a three-year period with two (2) one-
year renewals with D&D, Inc. and General Underground LLC for
Horizontal Directional Drilling services, subject to the approval of the
Utilities Attorney as to form and legality.
2. Approve the issuance of purchase orders to D&D, Inc. and General
Underground, LLC in amounts not exceeding budgeted amounts for each
year of the contract, subject to the appropriation of funds for these
services for each fiscal year of the contract.
Approved as Recommended
2. 2025-905 GRU Review – October, 2025 (B)
3
CEO Bielarski delivered a presentation highlighting the most significant
developments at GRU during October 2025.
Director Skinner requested that Mr. Bielarski address comments from Mr.
Chuck Ross concerning levelization and stabilization rates, to which CEO
Bielarski provided a response.
Recommendation: The Authority hear a presentation from the CEO and
ask questions, if desired.
Heard
N. RESOLUTIONS (Roll Call Required)
O. DIRECTOR COMMENTS
Director Skinner noted that GRU Authority directors serve without
compensation.
Vice Chair Haslam addressed public comments regarding disconnections,
encouraging customers experiencing difficulties to contact GRU directly and seek
assistance from local support organizations.
Director Jacobs offered no comments.
Chair Lawson offered no comments.
P. ADJOURNMENT
Adjourned at 6:39pm.
_________________________
Kunti Nesbitt, GRUA Staff Liaison
4
Agenda
Gainesville Regional Utilities Authority
AGENDA
Wednesday, November 12, 2025, 5:30 p.m.
GRU Administration Building
301 SE 4th Avenue
Gainesville, FL 32601
Directors
Chair Eric Lawson
Vice-Chair David Haslam
Director Jack Jacobs
Director Robert Skinner
If you have a disability and need accommodation in order to participate in this meeting, please call
(352) 334-5051 at least two business days in advance. TTY (Text Telephone Telecommunication
Device) users please call 711 (Florida Relay Service). For Speech to Speech (STS) relay, please call
1-877-955-5334. For STS Spanish relay, please call 1-877-955-8773. For STS French Creole relay,
please call 1-877-955-8707.
A. CALL TO ORDER
Agenda Statement: The Gainesville Regional Utilities Authority encourages civil public
speech. The Gainesville Regional Utilities Authority expects each person entering this
chamber to treat others with respect and courtesy. Speakers are expected to focus on
agenda items under discussion. Signs, props, posters, food, and drinks should be left
outside the auditorium.
B. ROLL CALL
C. INVOCATION
D. PLEDGE OF ALLEGIANCE
E. ADOPTION OF THE AGENDA
Includes Consent and Regular Agenda Items.
F. APPROVAL OF MINUTES
Approval of Minutes from the GRUA meeting held on October 8, 2025 (B).
G. CHAIR COMMENTS
H. GENERAL PUBLIC COMMENT
(for items not on the agenda, not to exceed 30 minutes total)
I. DIRECTOR COMMENTS
J. CONSENT AGENDA
Gainesville Regional Utilities Authority
1. 2025-902 State of the Utility, Monthly Update September 2025 (B)
Department: Gainesville Regional Utilities/Office of the Chief Operating Officer
Description: GRU will be providing a monthly update to Authority members to ensure
they are aware of the important projects and relevant utility measurements and
benchmarks. This report provides information from September 2025.
Fiscal Note: None
2. 2025-903 GRU’s Waiver from FERC’s Independent Functioning Rule (B)
Department: Gainesville Regional Utilities/Energy Delivery
Description: A review of the waiver granted to GRU regarding the applicability of the
Federal Energy Regulatory Commission’s (FERC) Independent Functioning Rule to
GRU.
Fiscal Note: GRU’s personnel compliance costs are less potentially burdensome (no
longer requiring multiple FTEs) and now allow common sense operational practices
(e.g., cross training) with a waiver from FERC’s Independent Functioning Rule. Legal
expenses associated with obtaining the waiver amounted to $8,369.
Recommendation: No further Authority action is required at this time. GRU will
monitor for any material changes that could affect the waiver and will report back as
needed. Staff will ensure compliance with FERC’s conditions, including required
notification to the Commission should any material change occur.
K. CEO COMMENTS
L. ATTORNEY COMMENTS
M. BUSINESS DISCUSSION ITEMS
1. 2025-904 Horizontal Directional Drilling (B)
Department: Gainesville Regional Utilities/Water & Wastewater
Description: GRU’s water, wastewater, natural gas, and telecommunication systems
install underground pipe, conduit, and cable through trenchless technology known as
horizontal directional drilling. This type of drilling is used when trenching or
excavation is not practical at a work site, such as a roadway or sidewalk. Work can
be performed at the site to repair or install water, wastewater, natural gas, and
telecommunication infrastructure equipment with fewer open cuts, reducing repair
costs, expediting service restoration, improving public safety, and minimizing
interruptions to customers or citizens vehicular, bike, or pedestrian routes.
Establishing an annual contract for these services allows GRU departments to have a
contractor available to perform horizontal directional drilling services as needed to
facilitate repairs or new service. The combined annual cost for these services is
Page 2 of 62
Gainesville Regional Utilities Authority
approximately $2,500,000.
An Invitation to Bid for this work was issued by Utilities Procurement to the known
companies that perform this type of work, and the bid was posted on OpenGov. Two
bids were received and evaluated based on pricing, experience, resources, and
safety. D&D, Inc. and General Underground, LLC. submitted bids and are both
recommended for award of a contract to optimize greater resource availability since
this contract is used in multiple GRU areas. Attached is the Intent to Award
Notification.
Fiscal Note: Funding for this work is included in GRU’s Capital Improvements budget
for FY26 and will be requested in future fiscal year budgets.
Recommendation: The GRU Authority authorize the CEO, or designee to
1. Execute an annual contract for a three-year period with two (2) one-year renewals
with D&D, Inc. and General Underground LLC for Horizontal Directional Drilling
services, subject to the approval of the Utilities Attorney as to form and legality.
2. Approve the issuance of purchase orders to D&D, Inc. and General Underground,
LLC in amounts not exceeding budgeted amounts for each year of the contract,
subject to the appropriation of funds for these services for each fiscal year of the
contract.
2. 2025-905 GRU Review – October, 2025 (B)
Department: Gainesville Regional Utilities/Office of the Chief Executive Officer
Description: An update to the Board on the significant and most meaningful events
since the last board meeting. The GRU Review isn’t meant to replace all the
granularity of the State of the Utility (which is under Consent Agenda), it is intended
to supplement it and can evolve over time depending on the requirements set forth by
the Board.
Fiscal Note: None
Recommendation: The Authority hear a presentation from the CEO and ask
questions, if desired.
N. RESOLUTIONS (Roll Call Required)
O. DIRECTOR COMMENTS
P. ADJOURNMENT
Page 3 of 62
Gainesville Regional Utilities Authority
MINUTES
October 8, 2025, 5:30 p.m.
GRU Administration Building
301 SE 4th Avenue
Gainesville, FL 32601
Members Present: Vice-Chair Haslam, Jack Jacobs, Chair
Lawson, Robert Skinner
_____________________________________________________________________
A. CALL TO ORDER
B. ROLL CALL
C. INVOCATION
D. PLEDGE OF ALLEGIANCE
E. ADOPTION OF THE AGENDA
Public Comment: Jim Konish.
Moved by Robert Skinner
Seconded by Vice-Chair Haslam
Approved
F. APPROVAL OF MINUTES
Moved by Robert Skinner
Seconded by Jack Jacobs
Approved
G. CHAIR COMMENTS
Chair Lawson opened the discussion on the 2025 performance evaluation of
GRU CEO Ed Bielarski, inviting Chief People Officer Cheryl McBride to present a
1
Page 4 of 62
summary of the Board’s evaluations. Following the presentation, Chair Lawson
shared his own reflections on Mr. Bielarski’s leadership and invited comments
from fellow Board members before addressing the topic of a merit-based salary
adjustment.
Vice Chair Haslam acknowledged the personal criticism Mr. Bielarski has faced
on social media. Director Jacobs noted that, as the public face of GRU, Mr.
Bielarski’s statements may not always be received with trust by all stakeholders.
He suggested the potential value of appointing a Public Information Officer to
support public engagement. Director Skinner echoed concerns about social
media commentary.
Mr. Bielarski declined to comment during this portion of the meeting.
Chair Lawson noted that GRU employees are budgeted for a 3% merit increase
and requested Board input on applying the same adjustment to the CEO’s
compensation. He also recommended revisiting the CEO’s compensation
structure in the coming year, in consultation with the Chief People Officer, to
ensure alignment with market benchmarks. The proposed increase would be
retroactive to June 2025, marking Mr. Bielarski’s one-year anniversary in the role.
Vice Chair Haslam raised concerns about public perception, noting that Mr.
Bielarski is currently the highest-paid city employee. He emphasized that
compensation comparisons should be made against utility executives rather than
municipal roles. Director Jacobs supported the merit increase and expressed
interest in conducting further research. Director Skinner also endorsed the
adjustment, citing Mr. Bielarski’s industry expertise. Jacobs reiterated that the
CEO should receive the same merit increase as other GRU staff.
Mr. Bielarski concluded by clarifying that while the merit pool is set at 3%,
individual increases may vary.
Public comments were provided by Jim Konish, Chuck Ross, and Cheryl
McBride.
Vice Chair Haslam responded to points raised during public comment.
Moved by Vice-Chair Haslam
Seconded by Robert Skinner
The Board approved a 3% merit increase for Mr. Bielarski, retroactively effective
as of June 2025.
Approved
2
Page 5 of 62
H. GENERAL PUBLIC COMMENT
Public Comment: Chuck Ross, Jim Konish, David Fitzgerald
I. DIRECTOR COMMENTS
Vice Chair Haslam addressed several matters raised during the public comment
period, offering clarification and perspective on key concerns.
Director Jacobs also responded to public feedback and specifically addressed
circulating rumors regarding GRU’s potential purchase of power from Duke
Energy and selling assets.
J. CONSENT AGENDA
1. 2025-806 State of the Utility, Monthly Update August 2025 (B)
K. RESOLUTIONS (Roll Call Required)
1. 2025-807 GRUA resolution approving natural gas agreement with the
Municipal Gas Authority of Georgia and TD Bank (B)
Approved as Recommended
L. CEO COMMENTS
CEO Ed Bielarski responded to remarks made by Director Jacobs during the
Director Comments portion of the meeting, and also responded to a question
posed by Mr. Fitzgerald during public comment.
M. ATTORNEY COMMENTS
Scott Walker of Folds Walker provided an update on GRU’s ongoing legal
proceedings related to House Bill 1645.
Derek Perry, Utilities Attorney, confirmed his collaboration with Folds Walker on
the matter. He further clarified that he serves as GRU’s authorized representative
in legal communications with the firm and expressed appreciation for their
professionalism and support throughout the process.
N. BUSINESS DISCUSSION ITEMS
1. 2025-808 Approval of FY26 Information Technology Service Level
Agreement (SLA) between GRU and the City of Gainesville (B)
3
Page 6 of 62
CEO, Ed Bielarski provided an overview of the key components and
obligations outlined in the Service Level Agreement (SLA).
Chair Lawson provided an overview of the purpose of Service Level
Agreements (SLAs), emphasizing their positive impact on GRU. Vice
Chair Haslam expressed his support for implementing SLAs, affirming
their value to the organization.
Public Comment: Jim Konish
CEO Bielarski responded to comments made during public comment.
Moved by Jack Jacobs
Seconded by Vice-Chair Haslam
Recommendation: The GRU Authority approve the FY26 Enterprise
Information Technology Service Level Agreement between GRU and the
City of Gainesville executed by the Chief Executive Officer on behalf of
GRUA.
Approved as Recommended
2. 2025-809 Approval of Agreement Between GRU and the City of
Gainesville for Solid Waste and Stormwater Billing Services (B)
CEO Ed Bielarski presented an overview of the amended agreement,
originally established in 2023, which addresses GRU’s continued role in
billing City residents through utility statements. The amendment was
prompted by prior discussions about potentially discontinuing this service.
In response, Brian Singleton, Special Advisor to the City Manager, formally
requested that GRU maintain the billing arrangement. The proposed
amendment includes increased compensation to GRU and features an 18-
month termination clause to allow time for evaluating a transition to
property tax-based billing.
Mr. Singleton emphasized that the City has no plans to raise rates in the
upcoming fiscal year, citing recent adjustments and a biennial review
cycle. He also noted that GRU has administered this billing process since
the 1980s.
Chair Lawson supported the amendment, highlighting that it enables GRU
to leverage its infrastructure in support of City operations. He referenced
feedback from local business owners concerned that removing the billing
item from utility statements could shift the financial burden from residential
4
Page 7 of 62
tenants to businesses. Vice Chair Haslam expressed agreement with
Lawson’s position and acknowledged the arrangement’s value to GRU,
while cautioning that it could create public perception challenges if the City
were to raise rates.
Director Jacobs opposed the amendment, stating his concerns were
rooted in principle rather than optics. He warned that the arrangement
could give the City Commission unchecked authority to increase rates,
with GRU potentially being perceived as responsible. Jacobs advocated
for transferring billing responsibilities directly to the City and noted that
embedding charges in property taxes could influence voter sentiment. He
further clarified that while GRU controls IT SLA rates, it does not control
Solid Waste and Stormwater rates.
Vice Chair Haslam later shared that he was reconsidering his stance after
reflecting on Jacobs’ points. Though still undecided, he indicated he would
follow his instincts and second a motion if one were made.
Board Member Skinner viewed the proposal as mutually beneficial and
moved to approve the agreement with a term not to exceed 24 months,
allowing for future reevaluation and discussion.
Public Comment: Jim Konish
Moved by Robert Skinner
Seconded by Vice-Chair Haslam
Recommendation: The GRU Authority authorizes the Chief Executive
Officer to negotiate and execute an amended agreement between GRU
and the City of Gainesville for solid waste and stormwater billing services.
Director Skinner made a motion to approve the agreement with the City to
not exceed 24 months, when it can be reexamined and discussed again.
Approved
3. 2025-810 Integrated Resource Plan (IRP) Update – Plan vs. Action (B)
CEO Ed Bielarski delivered a presentation to the Board.
Director Skinner remarked that the issue reflects basic economic
principles, likening it to vehicle ownership—when purchasing a new car for
5
Page 8 of 62
$40,000 to $50,000 isn’t feasible, making strategic repairs is a practical
way to extend its lifespan.
Recommendation: The Authority hear the presentation and ask any
necessary questions.
Heard
4. 2025-811 GRU Review – September, 2025 (B)
CEO Ed Bielarski delivered a presentation to the Board.
During the discussion, Director Skinner sought clarification on the reported
customer call response time, specifically asking whether the current
average wait time was 31 minutes. CEO Bielarski indicated he would
follow up with the exact figure. Director Skinner also commended the gas
team for their prompt response to a recent gas leak, as well as the tree
trimming crew for their continued efforts.
Recommendation: The Authority hear a presentation from the CEO and
ask questions, if desired.
Heard
O. DIRECTOR COMMENTS
No further comments from the Directors.
P. ADJOURNMENT
Adjourned at 7:15pm.
_________________________
Kunti Nesbitt, GRUA Staff Liaison
6
Page 9 of 62
Gainesville Regional Utilities Authority
Agenda Item Report
File Number: 2025-902
Agenda Date: November 12, 2025
Department: Gainesville Regional Utilities
Title: 2025-902 State of the Utility, Monthly Update September 2025 (B)
Department: Gainesville Regional Utilities/Office of the Chief Operating Officer
Description: GRU will be providing a monthly update to Authority members to ensure
they are aware of the important projects and relevant utility measurements and
benchmarks. This report provides information from September 2025.
Fiscal Note: None
Page 10 of 62
2025-902A
State of the Utility
FY25
September
Page 11 of 62
Energy Supply
Major Figures &
Achievements Regulatory YTD
Recordable
Injuries Compliance Regulatory
Issues Recordable
0
Compliance
0
Injuries Issues
1 1
Regulatory Compliance (NERC)
Environmental Compliance
We have no outstanding ongoing environmental or electric regulatory compliance issues at this time.
The corrective actions to address Combustion Turbine 4 (CT4) have been effective in restoring operation within a derated capacity
of up to 100 MW in combined cycle mode while maintaining compliance. The final corrective actions to restore Kelly Combined Cycle
(JCC1) to full load capacity will occur during an extended planned outage scheduled to begin in January 2026, when hardware modi-
fications to the gas turbine will be completed.
Deerhaven (DH)
Deerhaven Unit 1 (DH1)
• Unit remains in economic outage and is fully available. The unit will transition from #6 Fuel (Bunker C) to #2 Fuel (Diesel) as the #6
Fuel Tank is decommissioned in early 2026. Approximately 500,000 gallons of #6 fuel will be utilized during a planned genera-
tion run in January 2026 to reduce existing inventory.
Deerhaven Unit 2 (DH2)
• Unit operated online through August and entered planned outage on October 10, 2025, scheduled for completion on November
10, 2025. The outage includes the Right Turbine Throttle Valve inspection and rebuild, along with balance-of-plant maintenance.
Deerhaven Combustion Turbines
• All three units are online and fully available.
Page 12 of 62
1 GAINESVILLE REGIONAL UTILITIES – MORE THAN ENERGY
Energy Supply
Deerhaven Renewable (DHR)
• Unit is online.
Kelly Generating Station (JRK)
• JCC1 (Combined Cycle) operating online at a fixed derated load of 100 MW net (65 MW from CT4, 35 MW from Unit #8).
• Preparations for the planned JCC1 outage are underway, including procurement of materials and services required to restore the
unit’s full-load capability with no emission or operational limits.
South Energy Center (SEC)
• Wärtsilä Engine: Online.
• Solar Engine: Standby, fully available.
• Steam Chiller: Restored to full service. Bearing temperatures normalized following precision machining to increase bearing clear-
ance. Two consecutive oil analyses confirmed no further issues. The chiller is operating as a baseload unit serving UF Health.
Other Items
• At the Innovation Energy Center (IEC), one of two electric chillers remains out of service due to electrical control damage from a
lightning strike. Replacement parts have been received; however, one control board was defective. A replacement board is on
order, with full restoration expected by October 2025.
Page 13 of 62
GAINESVILLE REGIONAL UTILITIES – MORE THAN ENERGY 2
Energy Supply
Fuels Management
Inventory
Coal Biomass
78,810 29,346
tons tons (MC Adjusted)
41 days at full load; 8.9 days at full load;
82 days at half load. 13.8 days at half load;
14.5 days at most recent
burn rate.
Page 14 of 62
3 GAINESVILLE REGIONAL UTILITIES – MORE THAN ENERGY
Energy Supply
Page 15 of 62
GAINESVILLE REGIONAL UTILITIES – MORE THAN ENERGY 4
Energy Supply
Page 16 of 62
5 GAINESVILLE REGIONAL UTILITIES – MORE THAN ENERGY
Energy Supply
Page 17 of 62
GAINESVILLE REGIONAL UTILITIES – MORE THAN ENERGY 6
Energy Supply
Emissions Data
Yearly Emissions
SO2 (tons) NOX (tons) Mercury (lbs)* PM (tons)* CO2 (tons) without DHR CO2 (tons) with DHR
2020 379.3 1,208.3 3.1 56.5 1,033,389.5 1,697,218.5
2021 614.7 1,643.0 3.7 63.7 1,027,918.9 1,991,487.9
2022 167.4 867.8 2.1 11.2 861,824.7 1,771,204.7
2023 80.2 737.1 0.6 12.2 980,726.2 1,458,824.3
2024 26.5 598.4 0.8 5.3 946,129.6 1,373,862.0
2025 (thru September)** 165.4 578.4 1.1 5.3 727,548.2 1,253,620.6
*Mercury and Particulate values are for Unit 2 only.
**Values Subject to Change - Final Values Dependent on Fuel Analyses
Page 18 of 62
7 GAINESVILLE REGIONAL UTILITIES – MORE THAN ENERGY
Energy Supply
Yearly Emissions
Page 19 of 62
GAINESVILLE REGIONAL UTILITIES – MORE THAN ENERGY 8
Energy Supply
Emissions Data
2025 (thru Sep)
Unit SO2 (tons) NOX (tons) Mercury (lbs) PM (tons) CO2 (tons) SO2 Rate (lb/MMBtu) NOX Rate (lb/MMBtu) HTIP (MMBtu) GEN (MW-hours)
DH1 50.4 100.9 85,345.7 1,397,862.0 111,100.0
DH2 103.9 276.0 1.11 5.3 381,360.6 6,310,000.0 569,926.0
DHCT3 0.0 1.0 4,011.9 67,499.0 4,948.0
JRKCC1 1.3 51.7 256,830.0 4,321,645.1 487,017.0
DHR 9.8 148.8 526,072.4 5,010,354.1 368,500.0
TOTAL 165.4 578.4 1.11 5.3 1,253,620.6 17,107,360.2 1,541,491.0
TOTALS without DHR
Unit SO2 (tons) NOX (tons) Mercury (lbs) PM (tons) CO2 (tons) SO2 Rate (lb/MMBtu) NOX Rate (lb/MMBtu) HTIP (MMBtu) GEN (MW-hours)
DH1 50.4 100.9 85,345.7 1,397,862.0 111,100.0
DH2 103.9 276.0 1.11 5.3 381,360.6 6,310,000.0 569,926.0
DHCT3 0.0 1.0 4,011.9 67,499.0 4,948.0
JRKCC1 1.3 51.7 256,830.0 4,321,645.1 487,017.0
Total Without DHR 155.6 429.6 1.11 5.3 727,548.2 12,097,006.1 1,172,991.0
Page 20 of 62
9 GAINESVILLE REGIONAL UTILITIES – MORE THAN ENERGY
Energy Supply
Emissions & Compliance Data
Environmental
September Calendar Year to Date (September)
Notices of Violation 0 0
Emissions
DH1, DH2, DHCT3, JRKCC1
CO2 (tons) 80,356.2 727,548.2
NOx (tons) 35.4 429.6
SO2 (tons) 2.2 155.6
DH Unit 2 (only)
PMFILT (tons) 0.6 5.3
Hg (lbs) 0.1 1.1
DHR
CO2 (tons) 63,553.7 526,072.4
NOx (tons) 17.9 148.8
SO2 (tons) 1.2 9.8
Page 21 of 62
GAINESVILLE REGIONAL UTILITIES – MORE THAN ENERGY 10
Energy Supply
Availability & Capacity
Availability Capacity
Month FY25 YTD FY24 YTD Month FY25 YTD FY24 YTD
DH-2 98.39% 94.26% 74.32% 33.55% 34.26% 29.13%
DH-1 98.83% 99.30% 90.96% 3.76% 21.30% 20.76%
Kelly CC 99.69% 83.54% 88.78% 91.11% 75.93% 81.90%
DH CT-1 97.94% 97.96% 95.09% 0.00% 0.02% 0.06%
DH CT-2 100.00% 99.91% 94.75% 0.00% 0.01% 0.02%
DH CT-3 100.00% 96.60% 99.09% 0.86% 0.71% 0.29%
DHR 100.00% 64.49% 84.30% 55.28% 37.07% 33.83%
Fuel Consumed
Month YTD Budget YTD Delta Budget
Coal (Tons) 110 6,650 - 6,650
Gas (MCF) 1,319,707 16,215,589 15,734,528 481,060
Fuel Oil (Gal) 86,820 757,804 - 757,804
Biomass (Tons) 55,098 464,876 247,561 217,315
Page 22 of 62
11 GAINESVILLE REGIONAL UTILITIES – MORE THAN ENERGY
Energy Supply
Performance Parameters
Sept. 2025 kWh/Month kWh/YTD Budget YTD Delta Budget
DH-2 51,740 501,839 $478,649.00 $23,190.15
DH-1 1,685 99,308 $22,561.00 $76,747.11
Kelly CC1 71,373 482,951 $623,133.00 $(140,182.01)
CTs 498 4,900 $244.00 $4,656.44
Grid 11,315 52,179 $78,950.00 $(26,771.00)
DHR 39,827 322,323 $178,903.00 $143,419.96
Personnel
Filled
FTE Vacancies
182 11
Page 23 of 62
GAINESVILLE REGIONAL UTILITIES – MORE THAN ENERGY 12
Energy Supply
Vacancies and Retirements
Status Title Filled? Group Vacant Date
Vacant Analyst Senior N Deerhaven Plant Aug. 28 '25
Filled Energy Supply Maintenance Planner Y Deerhaven Plant Feb. 18 '25
Filled Energy Supply Maintenance Planner Y Deerhaven Plant May. 26 '25
Vacant Engineer and Utility Designer IV N Deerhaven Plant Dec. 1 '23
Filled Power Plant Chemistry Technician Y Deerhaven Plant Jul. 18 '25
Vacant Power Plant ICE Supervisor N Deerhaven Plant May. 22 '23
Vacant Power Plant ICE Technician N DHR Operations Jul. 7 '25
Filled Power Plant ICE Technician Y Deerhaven Plant May. 28 '25
Vacant Power Plant ICE Technician N Deerhaven Plant Mar. 7 '25
Vacant Power Plant Journeyman Operator N Deerhaven Plant Mar. 4 '25
Vacant Power Plant Mech Journeyman N Deerhaven Plant Apr. 23 '23
Vacant Power Plant Shift Supervisor N Deerhaven Plant Jul. 3 '25
Vacant Process Plant Operator N Deerhaven Plant Aug. 19 '25
Vacant Process Plant Operator II N Deerhaven Plant Jul. 17 '25
Filled Production Technician Y Kelly Plant Jun. 3 '25
Vacant Production Technician N Kelly Plant Apr. 4 '25
Vacant Production Technician N Kelly Plant Jun. 23 '25
Vacant Production Technician N Kelly Plant May ‘25
Page 24 of 62
13 GAINESVILLE REGIONAL UTILITIES – MORE THAN ENERGY
Energy Delivery
Reliability Statistics
Customers Total Customers Outage
Served Outages Affected Minutes
101,836 44 5,805 7,031
Outage Causes
Cause Overhead Underground Both
Undetermined 4 0 0
Weather 0 0 0
Vegetation 19 0 0
Animals 4 0 1
Foreign Interference 0 0 0
Human Cause 6 0 0
Equipment Failure 5 3 2
Other 0 0 0
Total 38 3 3
Page 25 of 62
15 GAINESVILLE REGIONAL UTILITIES – MORE THAN ENERGY
Energy Delivery
Electric System Consumption
Sept. 2025 Sept. 2024
CONSUMPTION (kWh) CUSTOMERS CONSTUMPION (kWh) CUSTOMERS
Feed-in-Tariff - Residential 132 84 23 89
Feed-in-Tariff - General Service 2,460 140 1,895 145
Electric - GS - Demand - Regular 54,900,058 1,064 54,923,409 1,107
Electric - General Service Demand PV 1,881,554 32 1,743,325 31
Electric - GS - Kanapaha w Curtail Cr 1,116,000 1 1,060,800 1
Electric - GS - Demand - Large Power 10,568,940 10 10,289,680 9
Electric - GS - Murphree Curtail Credit 1,543,963 1 1,497,600 1
Electric - GS - Large Demand PV 5,832,000 2 5,344,800 2
Electric - GS - Non Demand 19,353,502 10,109 19,062,462 10,162
Electric - General Service PV 239,760 89 241,328 83
Electric - Lighting - Rental * 813,452 1,834 817,953 1,816
Electric - Lighting - Street - City * 449,521 14 403,921 15
Electric - Lighting - Street - County * 127,106 1 127,313 1
Electric - Lighting - Traffic 0 0 144 1
Electric - Residential - Non TOU 94,315,002 91,419 93,113,096 91,228
Electric - Residential PV 1,267,998 1,539 1,092,072 1,451
Total Retail Electric 192,410,966 104,494 189,719,815 104,308
* Number of customers is excluded from total customer count.
Page 26 of 62
GAINESVILLE REGIONAL UTILITIES – MORE THAN ENERGY 16
Energy Delivery
Gas System Consumption
Sept. 2025 Sept. 2024
CONSUMPTION (THM) CUSTOMERS CONSUMPTION (THM) CUSTOMERS
Gas - GS - Regular Service (Firm) 569,285 1,261 599,093 1,255
Gas - GS - Regular Service (Small) 28,247 504 20,658 475
Gas - GS - Interruptible - Regular Serv 66,485 2 43,274 2
Gas - GS - Interruptible - Large Volume 613,773 12 480,447 9
Gas - Residential - Regular Service 302,788 35,724 300,575 35,506
Total Retail Gas 1,580,578 37,503 1,444,047 37,246
Major Projects
ED Electric Engineering
• Archer Place Apartments – Multistory buildings with apartments and retail. Overhead to Underground Conversion of electrical
facilities is complete. Developer requested temporary power and started construction in Phase 1 (back end of property).
• TACTICS – Circuits 209–287 – T&D has started construction.
• County Criminal Court Complex Expansion – Demolition of parking lights and relocation of traffic light source complete. Coordi-
nating construction with developers and warehouse regarding switchgear availability based on new lead times.
• New Feeder for Amazon EV Fleet – Recent meeting between Amazon representatives, Substation & Relay, and Engineering for
progress updates and timelines.
• Woodland Park – Gainesville Housing Authority – Demolition complete.
• North Florida Regional Medical Center at Archer – Transmission line marker balls and beacons installed for hospital helipad.
• Oaks Preserve Phase 2 – Residential subdivision. Construction of electrical installations in progress.
• Natura – Multifamily apartment site with nine three-story buildings, clubhouse, garages, and common areas. Design complete and
released for construction.
• Hammock Preserve – Residential and commercial mixed-use development. Construction in progress.
• Gilbane–Collegiate Apartments – New multistory apartments on NW 20th Ave. Construction in progress.
• TACTICS – Circuit 550 – T&D construction in progress.
• New Feeder – Circuit 1038 – Under construction.
Page 27 of 62
17 GAINESVILLE REGIONAL UTILITIES – MORE THAN ENERGY
Energy Delivery
Gas Engineering
• AUD Rollout Implementation – Continuing design using AUD-only workflow. Rolled out completed AUD gas template jointly with
Electric Engineering; ongoing updates in coordination.
• Ben E. Keith Facility – Negotiating potential gas main extension to serve new manufacturing facility.
• Bridlewood – External 6” portion nearly complete; awaiting developer completion of internal section.
• Westgate Backfeed – Continuing design to remove and replace nonstandard 5” steel pipe from system.
Electric Operations
T&D Operations
• MSWRF OH to UG Conversion – Work began Sept. 18.
• Ckt 1038 – Directional boring complete; crews tying in bores to turn-ups and setting bases. Excavation around Sugarfoot under-
way to tie circuit into substation (25% complete).
• FDOT Lighting Upgrade SR-222 – 80% complete.
T&D Operations
• Parker Auto Transformers – Construction/demo for T-76 began 9/2. Transformer expected November 3, anticipated in service
mid-December.
• Line 16 Project – Scope includes replacement of two (2) 138 kV breakers, two (2) sets of 138 kV gang switches, and two (2) line re-
lays. Vendor collaboration resolved prior 90% drawing package issues; latest 90% package shows major improvement. IFC pack-
age expected late October; construction pushed to January due to Parker transformer project delays.
System Control
• Training back-office damage assessment team in OMS for storm preparation. Collaboration planned with wires-down team next
month.
• FPL power purchase began Aug. 1, scheduled to conclude Nov. 10.
System Control
• GIS Upgrade – Migration from 10.8 to 11.3, 30% complete.
• Land Base Migration – Transition from old SQL database to new SQL platform, 40% complete.
• AMI to OMS Integration – 40% complete.
• OMS Upgrade – 60% complete.
Page 28 of 62
GAINESVILLE REGIONAL UTILITIES – MORE THAN ENERGY 18
Energy Delivery
Energy Measurement & Field Operations
Utility Line Locate
• Line locates transitioned from DigTix ticketing system to the new Korterra platform, providing enhanced features at lower contract
cost.
Revenue Protection
• Investigated 24 damaged underground facilities in September.
Field Services
• Responded to 81 gas emergencies in September, bringing FY25 total to 946.
Electric Measurement
• Conducted 35 Generlink socket inspections, with 12 Generlink switches installed.
Gas Measurement
• Received permission on Sept. 30, 2025, to install a gas district station on Oak Hammock property. The new station will improve
reliability by providing a much-needed backfeed for the 24-lb gas system.
Gas T&D Major Projects
• Construction in Bridlewood S/D (High Springs) ongoing. Currently boring 6” piping from US-441 to subdivision and 4” for interior
of Phase 1. External 66% complete; interior 90% complete.
• PSC inspection completed 9/24/25 with no citations or recommendations.
• Installed 17 new gas services (FY25 total – 361), retired 2 inactive (FY25 – 251), and re-ran 2 services (FY25 – 67) in the last two
weeks.
Page 29 of 62
19 GAINESVILLE REGIONAL UTILITIES – MORE THAN ENERGY
Energy Supply
Delivery
Advanced Metering Infrastructure (AMI)
Category Electric Water Natural Gas Total AMI Financial Summary
Remote Reading 103,896 70,425 32,584 206,905 Actuals Spent $43,346,952 92.10%
AMI Devices 103,905 70,556 32,589 207,050 Budget Remaining $3,719,424 7.90%
Non-AMI Devices 30 7,716 5,655 13,401 Total Budget $47,066,376 100.00%
Total Devices 103,935 78,272 38,244 220,451
Saturation % 100.00% 90.10% 85.20% 93.90%
Standard Industry Comparisons
Comparison Actual Goal Description
SAIDI 2.83 4.5 System Average Interruption Duration Index
CAIDI 49.59 55 Customer Average Interruption Duration Index
SAIFI 0.06 0.08 System Average Interruption Frequency Index
ASAI 99.99% Average Service Availability Index
Personnel
Filled
FTE Vacancies
233 23
Page 30 of 62
20
GAINESVILLE REGIONAL UTILITIES – MORE THAN ENERGY GAINESVILLE REGIONAL UTILITIES – MORE THAN 20
ENERGY
Energy Supply
Delivery
Vacancies and Retirements
Status Title Filled? Group Vacant Date
Vacant Principal Engineer and Utility Designer N ED Electric Engineering March '24
Vacant Energy Delivery Facilities Specialist II N ED Electric Engineering March '24
Vacant Engineer & Utility Designer III N ED Electric Engineering Jan. '24
Vacant Relay Technician N ED Relay Operations March '24
Vacant Energy Delivery Facilities Specialist II N ED Electric Engineering Feb. '25
Vacant Meter Reader N Electric Meter Measurement Operations Feb. '25
Vacant Electric Line Worker N T&D Construction Feb. '25
Vacant Electric Line Worker N T&D Construction Feb. '25
Vacant Line Worker Lead N T&D Construction June '24
Vacant Line Technician N Gas T&D Construction Apr. '25
Vacant Field Service Technician N Gas T&D Administration Feb. '25
Vacant Operational Technology Network Analyst Senior N Systems Control/Technical Support Apr. '26
Vacant GIS and Operational Systems Technician N ED GIS Operations and Standards May. '25
Vacant Electric Line Worker N T&D Construction June '25
Vacant Transmission Planning Principal Engineer N ED Electric Engineering July '25
Vacant Energy Delivery Facilities Specialist Supervisor N ED Electric Engineering July '25
Vacant Principal Engineer N Systems Control/Technical Support July '25
Vacant Systems Control Manager N Systems Control Administration July '25
Vacant Electric Line Worker Apprentice N T&D Construction Aug. '25
Vacant Gas Worker Apprentice N Gas T&D Operations Aug. '25
Vacant Field Service Technician Apprentice N Meter Services Aug. '25
Vacant Energy Delivery Facilities Specialist II N ED Electric Engineering Sept. '25
Vacant Principal Engineer and Utility Designer N ED Electric Engineering Sept. '25
Page 31 of 62
21
GAINESVILLE REGIONAL UTILITIES – MORE THAN ENERGY GAINESVILLE REGIONAL UTILITIES – MORE THAN 21
ENERGY
Water/Wastewater
Production
Murphree Water Treatment Plant (Operations Normal)
Permitted Capacity FY 25 YTD % of
Month (mgd) FY 25 YTD (mgd) FY 24 (mgd) (mgd) Permitted Capacity
Average Daily Flow 26.4 24.0 23.2 30 80%
Max Daily Peak Flow 35.3 36.6 35.4 54 68%
Main Street Water Reclamation Facility (Operations Normal, Reclaimed Water On)
Permitted Capacity FY 25 YTD % of
Month (mgd) FY 25 YTD (mgd) FY 24 (mgd) (mgd) Permitted Capacity
Average Daily Flow 5.5 5.4 6.2 7.5 72%
Max Daily Peak Flow 8.5 13.1 16.1 NA NA
Kanapaha Water Reclamation Facility (Operations Normal, Reclaimed Water On)
Permitted Capacity FY 25 YTD % of
Month (mgd) FY 25 YTD (mgd) FY 24 (mgd) (mgd) Permitted Capacity
Average Daily Flow 10.5 10.6 11.1 14.9 71%
Max Daily Peak Flow 18.2 19.1 24.7 NA NA
Page 32 of 62
23 GAINESVILLE REGIONAL UTILITIES – MORE THAN ENERGY
Water/Wastewater
Environmental Compliance
Water Distribution System
Month FY 25 YTD FY 24
Precautionary Boil Water Notices: 0 22 25
Wastewater Collection System
Month FY 25 YTD FY 24
Sanitary Sewer Overflows (SSOs) 1 18 22
SSOs By Type:
Residential Grease & Toiletries 6 8
Infrastructure 1 10 4
Third-Party Damage 2 3
Wet Weather 0
Named Storms 7
Page 33 of 62
GAINESVILLE REGIONAL UTILITIES – MORE THAN ENERGY 24
Water/Wastewater
Maintenance
Water Distribution System
Month FY 25 YTD FY 24 Monthly Goal
Dispatched Water Work Orders 407 5,238 3,866 -
Water Leaks 202 2,189 1,711 -
Water Damages (by 3rd Parties) 13 358 N/A -
Other Water Work Orders 192 2,691 2,175 -
AMI Large Meter Changeouts 5 598 1,057 -
Number of Water Services Replaced 67 1058 1,278 83
Feet of Water Main Replaced 3,588 24,652 22,543 2,200
Wastewater Collection System
Month FY 25 YTD FY 24 Monthly Goal
Dispatched Sewer Work Orders 69 860 776 -
Sewer Stoppages 17 202 226 -
Sewer Damages (by 3rd Parties) 3 62 N/A -
Other Sewer Work Orders 49 596 550 -
SWAMP Program
Miles of Gravity Main Inspected 7.4 154 214 12.5
Number of Manholes Inspected 170 3,833 5,121 200
Reclaimed Distribution System
Month FY 25 YTD FY 24 Monthly Goal
Dispatched Reclaim Work Orders 10 115 86 -
Reclaim Leaks 1 20 12 -
Reclaim Water Damages (by 3rd Parties) 0 4 N/A -
Other Reclaim Work Orders 9 Page 34 of 62 91 74 -
25 GAINESVILLE REGIONAL UTILITIES – MORE THAN ENERGY
Water/Wastewater
Major Projects
Water Distribution
• NE 8th Avenue Water Main Improvements – Construction completed; sidewalk repair scheduled for completion in October
2025.
• Large Meter Changeouts for AMI – All large meter replacements completed in September 2025.
Wastewater Collection
• GNV Airport – 12-Inch Force Main Break – Emergency repair on Sept. 11 completed and service restored with no disruption to
airport operations.
• Haile Plantation Gravity Main Improvements Phase 2 – Phase 2 completed; Phase 3 began in late September with targeted
completion in November 2025.
• Fort Clarke Boulevard Gravity Main Replacement – Gravity main replacement ongoing; project completion expected in May
2026.
Main Street Water Reclamation Facility
• Construction continues on Phase 1. Electrical building gear installation and installation of new piping and equipment underway in
the new headworks facility.
Kanapaha Water Reclamation Facility
• Work underway to complete the Operations & Maintenance Performance Report for FDEP for inclusion in the five-year operating
permit renewal application.
Lift Stations
• Lift Station No. 24 – Mechanical equipment replacement completed.
Murphree Water Treatment Plant
• Rehabilitation of the 48-inch washwater drain pipe in progress. Quotes being obtained for pipe lining and installation of a new
access hatch.
Page 35 of 62
GAINESVILLE REGIONAL UTILITIES – MORE THAN ENERGY 26
Water/Wastewater
Vacancies and Retirements
Status Title Filled? Group Vacant Date
Job Posted Piping Engineer 1-4 N W/WW Engineering June ‘25
Job Posted Operator Mechanic N Water Reclamations Aug. ‘25
Job Posted Operator Mechanic N Water Reclamations Sept. ‘25
Vacant - Posting Soon Wastewater ICE Tech N Water Reclamations Nov. ‘24
Vacant - Posting Soon Wastewater ICE Tech N Water Reclamations July ‘25
Vacant - Posting Soon GIS/OS Specialist I N Wastewater Collection July ‘25
Vacant - Posting Soon GIS/OS Supervisor N WD & WWC June ‘25
Personnel
Filled
FTE Vacancies
151 7
Page 36 of 62
27 GAINESVILLE REGIONAL UTILITIES – MORE THAN ENERGY
Safety & Training
Safety Data
Month Injury Statistics
First Aid Recordable
Department DART*
Given Injuries
Administration
Injuries 0 0 0
Recorded W/WW 0 0 0
0
Energy Supply 0 0 0
Energy Delivery & Gas 0 0 0
GRUCom 0 0 0
Total 0 0 0
*DART: Days away, restricted or transferred.
Fiscal YTD Injury Statistics
First Aid Recordable
Department DART
Given Injuries
Injuries Administration 1 1 0
Recorded
9
W/WW 0 4 2
Energy Supply 0 1 30
Energy Delivery & Gas 0 3 11
GRUCom 1 0 0
Total 2 9 43
Page 37 of 62
29 GAINESVILLE REGIONAL UTILITIES – MORE THAN ENERGY
Safety & Training
Month Vehicle Collisions & Miles Driven
Recordable Preventable
Department Miles Driven
Collisions Collisions
Administration
Vehicle 10,463 0 0
Collisions W/WW 74,018 0 0
1
Energy Supply 2,760 0 0
Energy Delivery & Gas 89,088 1 0
GRUCom 4,941 0 0
Total 181,270 1 0
Fiscal YTD Vehicle Collisions & Miles Driven
Recordable Preventable
Department Miles Driven
Collisions Collisions
Administration
Vehicle 99,315 1 0
Collisions W/WW 857,950 7 0
17
Energy Supply 33,583 0 0
Energy Delivery & Gas 1,196,894 7 1
GRUCom 63,349 2 1
Total 2,251,091 17 3
Page 38 of 62
GAINESVILLE REGIONAL UTILITIES – MORE THAN ENERGY 30
Safety & Training
Injury Details
• None reported in September.
Collision Details
• Sept. 8 – While Driving W on NE 10th Ave at 18th St., Bicyclist rapidly rode through a break in a fence, entering roadway (without
looking for cross traffic) and struck GRU vehicle on front passenger side door/quarter panel. Bicyclist fled scene.
Page 39 of 62
31 GAINESVILLE REGIONAL UTILITIES – MORE THAN ENERGY
Customer Operations
Revenue Assurance
Referred Funds Prior Indebtedness
to Collections Collected Bankruptcies Funds Collected
$369,596.60 $99,376.69 $1,871.74 $25,851.44
YTD: $10,962,471.99 YTD: $1,043,706.22 YTD: $241,050.77 YTD: $369,266.85
Disconnections Reconnections
3,581 3,235
Billing & Customer Customer Experience
Solutions Transactional
• Invoicing rating: 99.97% Survey
• Meter rereads: 164
• Locked reads: 8,583
4.0
• Solar invoicing rating: 100% Lobby
• Processed emails: 2,253/2,255 (100%) Survey
5.0
Page 40 of 62
33 GAINESVILLE REGIONAL UTILITIES – MORE THAN ENERGY
Customer Operations
New Services
Building Permit Reviews 113
Active Projects Amount
City 195
County 38
New Installations Amount
Electric 48
Water 49
Wastewater 35
Gas 12
Solar Reviews Amount
Plan Reviews 19
PVs Completed on Time 19
PV Installations 9
Avg. Handle Time (in Weeks) 5.7
Page 41 of 62
GAINESVILLE REGIONAL UTILITIES – MORE THAN ENERGY 34
Customer Operations
Customer Service
Answer Speed
Call Type Actual YTD Goal
Residential 21:49 11:17 5:00
Total
Non-residential 3:00
3:08 2:24
Calls
Handle Time
Call Type Actual YTD Goal 14,874
Residential 8:07 8:12 6:00
Non-residential 8:37 8:40 6:00
Other Statistics
Payments Lobby Project Social
Returned Visits Share Service Vouchers
$3,402.59
848 3,411 16
$425,198.14 $11,814.78
Page 42 of 62
35 GAINESVILLE REGIONAL UTILITIES – MORE THAN ENERGY
Customer Operations
Payment Type Details
Payment Type Transactions Transactions YTD $ Amount $ Amount YTD
Drop Box 1,906 5,018 $1,147,390.37 $2,641,035.76
Mailed 15,360 209,355 $15,752,533.28 $183,668,840.61
Office Payment 34 516 $10,875.48 $195,510.93
Drive Thru 4,100 50,990 $1,920,457.26 $29,644,657.67
Kubra Cash 231 2,295 $49,231.42 $464,678.05
Check Free 6,593 80,328 $2,377,824.06 $27,686,059.65
Kubra ACH 18,039 213,090 $6,438,025.53 $66,810,723.94
Collection Agency 54 714 $20,995.07 $241,376.76
Kubra CC/EZPAY 25,431 288,083 $6,164,065.04 $56,849,833.83
Lobby Walk-Ins 2,340 27,883 $917,814.56 $12,541,552.11
Direct Debit 32,857 287,162 $10,590,699.84 $111,495,739.60
Page 43 of 62
GAINESVILLE REGIONAL UTILITIES – MORE THAN ENERGY 36
Customer Operations
Energy & Business Services
Residential Surveys 69
Commercial Surveys 6
plus
LEEPplus Applications Received 0
plus
LEEPplus Pre-Inspections 1
plus
LEEPplus Completed Homes 4
Page 44 of 62
37 GAINESVILLE REGIONAL UTILITIES – MORE THAN ENERGY
FY25
September
State of the Utility
Page 45 of 62
Gainesville Regional Utilities Authority
Agenda Item Report
File Number: 2025-903
Agenda Date: November 12, 2025
Department: Gainesville Regional Utilities
Title: 2025-903 GRU’s Waiver from FERC’s Independent Functioning Rule (B)
Department: Gainesville Regional Utilities/Energy Delivery
Description: A review of the waiver granted to GRU regarding the applicability of the
Federal Energy Regulatory Commission’s (FERC) Independent Functioning Rule to
GRU.
Fiscal Note: GRU’s personnel compliance costs are less potentially burdensome (no
longer requiring multiple FTEs) and now allow common sense operational practices
(e.g., cross training) with a waiver from FERC’s Independent Functioning Rule. Legal
expenses associated with obtaining the waiver amounted to $8,369.
Explanation: A legal review determined that although GRU is a municipal utility and not
a “public utility” under the Federal Power Act, FERC’s Independent Functioning Rule
(18 C.F.R. § 358.5) applies to GRU when taking transmission service under another
utility’s Open Access Transmission Tariff through reciprocity. GRU owns and operates
interstate transmission facilities and conducts marketing functions through internal staff
and The Energy Authority (TEA). To preserve operational flexibility for consolidating or
cross-training transmission and marketing personnel—which would otherwise conflict
with separation-of-functions requirements—staff recommended seeking a waiver.
FERC permits waivers for small public utilities, and GRU met the qualifying criteria. On
September 10, 2025, the Authority authorized its Utilities Attorney to apply for the
waiver, with a legal budget not to exceed $20,000. On October 28, 2025, FERC issued
an order in Docket No. TS25-4-000 granting GRU’s request for a waiver of the
Standards of Conduct, including the Independent Functioning Rule. The waiver remains
in effect unless a complaint is filed and sustained or a material change in facts requires
GRU to notify FERC.
Recommendation: No further Authority action is required at this time. GRU will
monitor for any material changes that could affect the waiver and will report back as
needed. Staff will ensure compliance with FERC’s conditions, including required
notification to the Commission should any material change occur.
Page 46 of 62
2025-903A
Page 47 of 62
Page 48 of 62
Page 49 of 62
Page 50 of 62
Page 51 of 62
Page 52 of 62
Gainesville Regional Utilities Authority
Agenda Item Report
File Number: 2025-904
Agenda Date: November 12, 2025
Department: Gainesville Regional Utilities
Title: 2025-904 Horizontal Directional Drilling (B)
Department: Gainesville Regional Utilities/Water & Wastewater
Description: GRU’s water, wastewater, natural gas, and telecommunication systems
install underground pipe, conduit, and cable through trenchless technology known as
horizontal directional drilling. This type of drilling is used when trenching or excavation is
not practical at a work site, such as a roadway or sidewalk. Work can be performed at
the site to repair or install water, wastewater, natural gas, and telecommunication
infrastructure equipment with fewer open cuts, reducing repair costs, expediting service
restoration, improving public safety, and minimizing interruptions to customers or
citizens vehicular, bike, or pedestrian routes. Establishing an annual contract for these
services allows GRU departments to have a contractor available to perform horizontal
directional drilling services as needed to facilitate repairs or new service. The combined
annual cost for these services is approximately $2,500,000.
An Invitation to Bid for this work was issued by Utilities Procurement to the known
companies that perform this type of work, and the bid was posted on OpenGov. Two
bids were received and evaluated based on pricing, experience, resources, and safety.
D&D, Inc. and General Underground, LLC. submitted bids and are both recommended
for award of a contract to optimize greater resource availability since this contract is
used in multiple GRU areas. Attached is the Intent to Award Notification.
Fiscal Note: Funding for this work is included in GRU’s Capital Improvements budget
for FY26 and will be requested in future fiscal year budgets.
Recommendation: The GRU Authority authorize the CEO, or designee to
1. Execute an annual contract for a three-year period with two (2) one-year renewals
with D&D, Inc. and General Underground LLC for Horizontal Directional Drilling
services, subject to the approval of the Utilities Attorney as to form and legality.
2. Approve the issuance of purchase orders to D&D, Inc. and General Underground,
LLC in amounts not exceeding budgeted amounts for each year of the contract, subject
to the appropriation of funds for these services for each fiscal year of the contract.
Page 53 of 62
2025-904A
GAINESVILLE REGIONAL UTILITIES
PURCHASING DIVISION
NOTICE OF INTENT TO AWARD
ITB# 2025-103
HORIZONTAL DIRECTIONAL DRILLING
~Via OpenGov~
October 13, 2025
To All Respondents of Solicitation No. 2025-103 for Horizontal Directional Drilling.
Gainesville Regional Utilities has completed its review of the responses submitted to the
above referenced Solicitation and is recommending award to both Respondents D&D, Inc.
and General Underground, LLC. as the most Responsive Responsible Respondents.
Below is a list of the Respondents in no particular order.
VENDOR NAME CONTACT PERSON
D&D, Inc. David Dollar
General Underground, LLC. Chris Brown
Thank you for your time participating on this ITB and for your interest in doing business with
Gainesville Regional Utilities (GRU). If you have any questions, please contact me at via email at
veleza1@gru.com.
Regards,
Annie Velez
Procurement Specialist III
Page 54 of 62
Gainesville Regional Utilities Authority
Agenda Item Report
File Number: 2025-905
Agenda Date: November 12, 2025
Department: Gainesville Regional Utilities
Title: 2025-905 GRU Review – October, 2025 (B)
Department: Gainesville Regional Utilities/Office of the Chief Executive Officer
Description: An update to the Board on the significant and most meaningful events
since the last board meeting. The GRU Review isn’t meant to replace all the granularity
of the State of the Utility (which is under Consent Agenda), it is intended to supplement
it and can evolve over time depending on the requirements set forth by the Board.
Fiscal Note: None
Recommendation: The Authority hear a presentation from the Ceo and ask questions,
if desired.
Page 55 of 62
2025-905A
GRU Review
October 2025
Page 56 of 62
GRU People Resources
• Vacancy rate bumped up from 8.51% in August to 8.84% in September
• FTEs are under 800 (taking out the HR folks previously under City HR)
• Hard to hire with such uncertainty
• CBA meetings have been suspended until governance is finalized
Page 57 of 62
Financial Performance
Page 58 of 62
Key Financial Variances
Variance In Millions of Dollars
System-Wide Revenues $11.6
Federal/State Grants $ 7.2
GRUCOM non-labor $ .9 M
Turbine/Boiler outages, Software Systems/Insurance ($ 1.7) – Kelly outage
Wages/Salaries/Fringes ($ 4.0) – See Attached
Interest Income ($ 5.7) - $3 M in Arbitrage Rebate set
aside plus lower investment funds
Interest Expense ($ 1.2) - < 2% variance
Other (Sum of minor variances) ($ .7) M
Page 59 of 62
Wages/Salaries/Fringes
Variance In Millions of Dollars
Lower salary/regular wages $ .8 M
Lower absorption into CAPEX ($ 2.6)
Higher O/T (Storm events, unplanned emergencies) ($ 1.1)
Higher Pension contribution ($ .9) M
Higher Fringes ($ .2) M
Total Wages/Salaries/Fringes Variance ($ 4.0)
Page 60 of 62
Community
• GRU awarded FMEA Building Strong • GRU represented by Energy Supply
Communities Award and Energy Delivery at Sante Fe Fall
Career Fair
• Walt Banks is finalist for 2026 ORBIE • First ever Campus Safe and Sound
Award representing Excellence I CIO event at EOC campus promoting
Technology and Leadership safety in the workplace
• Debbie Daugherty recognized by the • Charitable campaign underway with
Design Build Institute of America for a goal of collecting $30k for
fostering collaboration at an event in community charities
October
Page 61 of 62
GRU Governance Update
THE CITY IS ENJOINED FROM TAKING ANY ACTION TO
ENFORCE ANY CHARTER AMENDMENT RESULTING IN THE
DISSOLUTION OF THE GRUA, SET FORTH IN ANY CITY
ORDINANCE UNTIL THE RESOLUTION OF THE 1st DCA APPEAL
The Appeal seeks to overturn the trial court’s judgement that the
Gainesville City Commission has the legal authority to undo HB 1645
(The Special Act)
Page 62 of 62