Gallatin Municipal-Regional Planning Commission
Special-Called Meetin g
Monday, September 10, 2018 Planning Commission - 5:00 p.m.
Dr. J. Deotha Malone Council Chambers City Hall
To access this agenda online: rvww.gallatintn.govo Boards & Commissions; Municipal-Regional Planning
Commission; Agenda & Minutes
a Call to Order
a Invocation
a Pledge of Allegiance
a Roll Call
1. GMRPC RESOLUTION NO. 2018- t-9417-t$C
BAKERS CROSSINGO FORZA GROUP _ FINAL PLAT
ARNOLD CONSULTING
THE OWNER AND APPLICANT REQUEST APPROVAL OF A FINAL PLAT FOR BAKER'S
cRossINc,THE FORZA GROUP, CONTAINING FIVE (5) LOTS AND EASEMENTS, ON AN 8.15
+/- ACRE PARCEL, LOCATED AT1460 TULIP POPLAR DRIVE.
2. ADJOURN
Page I of I
MEfl[ I GMRPC Resolution No. 2018-094
A RESOLUTION OF THE CITY OF GALLATIN MUNICIPAL.REGIONAL PLANNING
COMMISSION APPROVING A FINAL PLAT FOR BAKER'S CROSSING, THE FORZA
GROUP, CONTAINING FIVE (5) LOTS AND EASEMENTS ON AN 8.15 +/- ACRE
PARCEL (TAX MAP 125Mn GROUP A, PARCEL 001.05), LOCATED AT 1460 TULIP
POPLAR DRTVE. (r-9417-18C)
WHEREAS, THE CITY OF GALLATIN MUNICIPAL-REGIONAL
PLANNING COMMISSION considered the Final Plat submitted by Amold Consulting
Engineering Services, Inc. at the Special-Called meeting on September 10, 2018; and
WHEREAS, THE CITY OF GALLATIN MUNICIPAL-REGIONAL
PLANNING COMMISSION reviewed the application materials and supporting documentation
submitted by the applicant, the analysis, findings and recommendations presented by City Staff, in
the Planning Commission Staff Report and the evidence and testimony presented during the meeting.
NO\ry, THEREFORE, BE IT RESOLVED BY THE GALLATIN MUNICIPAL-
REGIONAL PLANNING COMMISSION as follows.
Section 1. The Gallatin Municipal-Regional Planning Commission in its
deliberations makes the following findings pursuant to TCA $ 13-3-
403, $13-3-404, $13-4-303, and g13-4-304 and Gallatin Subdivision
Regulations, Chapter 1, Section l-104, items 1-11 and Chapter 2,
Section 2-105:
1. The Final Plat is in agreement and consistent with the intent and recommendations of
the Gallatin on the Move 2020 General Development & Transportation Plan for the
area, and in particular, the Regional Activity Center Character Area.
2. The Final Plat is consistent with the Policy and Purpose of the Subdivision
Regulations of the City of Gallatin as described in Chapter 1, Section 1-104, items 1-
11.
3. The Final Plat is consistent with the purpose and intent of the MU-Mixed Use Zoning
District.
4. The Final Plat is consistent with T.C.A. Section 13-3-403, Section 13-3-404, Section
13-4-303 and Section 13-4-304.
5. The Final Plat complies with the requirements of the subdivision regulations as
described in chapter 2, section 2-105, Gallatin Subdivision Regulations.
6. The legal purposes for which zoning and subdivision regulations exists have not been
contravened.
7. The subdivision will not create adverse effects upon adjoining property owners or any
such adverse effect can be mitigated by applying design and performance standards or
is justified by the public good or welfare.
8. No one property owner or small group of property owners will benefit materially
from the approval to the detriment of the general public.
ITERtr I
Section 2. Action - The Gallatin Municipal-Regional Planning Commission
hereby approves the Final Plat for Baker's Crossing, The Forza Group,
consisting of a two (2) sheet plan prepared by Arnold Engineering
Consulting, of Bowling Green, Kentucky, with project number 18-
1286-L, dated August 27,2018, with the following conditions:
1. Submit detailed plans and specifications for water and sanitary sewer installations for
review and approval to the Gallatin Public Utilities Department.
2. Submit a copy of the Stormwater Maintenance Agreement to the Engineering
Division for review and approval. Once the document is approved by Engineering
Division and recorded, the recording citation will need to be added to the plat, then
provide a copy of the recorded Stormwater Maintenance Agreement to the
Engineering Division.
3. Submit PDF and DWG files to the Planning Department prior to the recording of the
final plat.
BE IT FURTHER RESOLVED BY THE CITY OF GALLATIN, TENNESSEE
MUNICIPAL-REGIONAL PLANNING COMMISSION that this resolution shall take effect
from and after its final passage, the public welfare requiring such.
IT IS SO ORDERED.
PRESENT AND VOTING
AYE:
NAY
DATED: 0911012018
John Puryear, Chairman
Johnny Wilson, Secretary
APPROVED AS TO FORM
SUSAN HIGH-MCAULEY
CITY ATTORNEY
ITEM 1
PLANNING DEPARTMENT STAFF REPORT
Baker's Crossing, The Forza Group Final Plat (l -9417-18C1
Located at 1460 Tulip Poplar Drive
Date: September 10, 2018
Request: Owner and applicant request approval of a Final Plat for Baker's Crossing,
The Forza Group, containing five (5) lots and easements, on an 8.15 +/- acre parcel
(Tax Map 125M, Group A, Parcel 001.05), located 1460 Tulip Poplar Drive.
OwrueR: Ga¡-tRt¡H AssocllrEs A, LP
Developen: Dnv Gor.¡srRucloN, Tte Fonzn Gnoup
Appuc¡rur: ARNoLD Got¡sulrtruG ENGTNEERNG SERVtces, ltrtc.
Srnrp RecoumeNDATroN: Recourue¡¡o AppnovAL oF GMRPC Resolurro¡¡ 2018-094
Srnrp Go¡¡rlcr: Rogenr J. Keusz
PLt¡l¡lrucConnurssrorr¡Dere: SepreMaenl0,20l8(Seecnl-GALLEDMeelruc)
PRopeRrY Ovenvlew: The owner and applicant request a Preliminary Plat for Baker's
Crossing, The Forza Group, containing five (5) lots and easements, on an Ll5 +/-
acre parcel (Tax Map 125M, Group A, Parcel 001.05), located at 1460 Tulip Poplar
Drive. The property is zoned MU-Mixed Use district. (Attachment 1-1 and 1-21
The Planning Department recommends approval of GMRPC Resolution 2018-094.
Gnse BtcxcRout¡o:
Property History and Previous Approvals
On September 25, 2006, the Planning Commission recommended approval of rezoning
37.72 +/- acres from R2O-Low Density Residential, CS-Commercial Services and CG-
Commercial General to MU-Mixed Use with a Preliminary Master Development Plan for
Baker's Crossing (File 3-23-06) and amending the Preliminary Master Development Plan
for the five (5) lots fronting on Nashville Pike, including 1208, 1212, 1214, and 1216
Nashville Pike, to accommodate the proposed extension of Tulip Poplar Drive. . The
rezoning with the Preliminary Master Development Plan for Baker's Crossing passed 2nd
Reading at the November 21, 2006 City Council meeting (Ordinance No. 00610-073).
On August 27, 2007, the Planning Commission approved Final Master Development Plan
for Commerce Union Bank at the corner of Nashville Pike (U.S. Hwy 31E) and Tulip Poplar
Drive (File 8-39-07). The final plat for Bakers Crossing, Lots 1 and 2, including the west 450
feet of Tulip Poplar Drive, was also approved (P.8. 25, Pg. 208).
Thefinal platfor Bakers Crossing, Phase 2, was approved in2012 (P.8. 27,P9. 181-183).
This plat only included Tulip Poplar Drive right-of-way from just west of Belvedere Drive to
just north of Nashville Pike.
Final Platfor Bakers Crossing, The Forza Group (L-9417-18C) September 10,2018
On October 29,2008, the Planning Commission recommended amending the Preliminary
Master Development Plan for Baker's Crossing (File 3-23-06) to include a 290-unit multi-
family development and changed previously approved building locations. The Amended
Preliminary Master Development Plan passed 2nd reading at the November 3, 2008 City
Council meeting (Ordinance No. O0810-68).
On August 22, 2011, the Planning Commission approved the a 2nd Amended Preliminary
Master Development Plan for Bakers Crossing-Tennessee Hills (PC9856-11), as a minor
amendment, for a252 multi-family unit complex and changing building locations.
On April 25, 2016, the Planning Commission recommended approval of a 3rd Amended
Preliminary Master Development Plan for Baker's Crossing (3-1697-16) for two (2) hotels
and conference centers, general retail, a restaurant and office buildings in three (3) phases
on an 8.15 +l- acre parcel. The Amended Preliminary Master Development Plan passed 2nd
reading at the June 21,2016 City Council meeting (Ordinance No. 01605-34).
On September 26, 2016, the Planning Commission approved the Final Master
Development Plan for Bakers Crossing, Phase 1, The Forza Group (8-2285-16) for a
hotel/restauranUconference building on an 8.15 +l- acre parcel.
On May 22,2017, the Planning Commission approved a 4th amendment to the Preliminary
Master Development Plan for Baker's Crossing, the Forza Group, as a minor amendment,
and approved a revised Final Master Development Plan for Baker's Crossing, Phase 1, The
Forza Group, (8-4061 -17) for a hotel/conference center building, on an 8.15 +l- acre parcel.
On August 27, 2018, the Planning Commission approved a 5th amendment to the
Preliminary Master Development Plan for Bakers Crossing, The Forza Group, as a minor
amendment, and approved a revised Final Master Development Plan for Bakers Crossing,
Phases 1 &2, The Forza Group (File 8-9176-18), revising the conference center, phase
lines, parking layout, internal connections, building layouts and proposing five (5) lots, on
an 8.1 5 +l- acre parcel (Tax Map 125M, Group A, Parcel 001.05). (Attachment 1-3)
On August 27, 2018, the Planning Commission approved a Preliminary Plat for Baker's
Crossing, Phase 2 (n.k.a The Forza Group) (File 1-9128-188), containing five (5) lots, on
an 8.15 +l- acre parcel (Tax Map 125M, Group A, Parcel 001.05), located at 1460 Tulip
Poplar Drive. (Attachment 1-4)
Dlscuss¡ol,¡:
Proposed Development
The owner and applicant request approval of a Final Plat for Baker's Crossing, The Forza
Group, containing five (5) lots and easements, on an 8.15 +/- acre parcel (Tax Map 1251V1,
Group A, Parcel 001.05), located at 1460 Tulip Poplar Drive. (Attachment 1-2)
Natural Features of the Site
The site is currently under construction and has been cleared and regraded. Previously, the
natural topography of the property sloped from the highest point of elevation (508') located
2
Final Platfor Bakers Crossing, The Forza Group (1-94L7-18C) September 1-0,2018
in the southeast corner of the property (intersection of the shared-access drive and N.
Martin Vineyard Way), and fans out with a steady and even decline towards the lowest
point of elevation (486') along the curvature of Tulip Poplar Drive right-of-way.
Based on FEMA FIRM Map 471650426G shows no portion of the property is located within
a flood hazard zone.
Adjacent Development and Zoning
The properties adjacent to the north, east, and west are vacant. The north and west
properties include other parts of the Bakers Crossing development, zoned MU-Mixed Use
and to the east is property zoned MU-Mixed Use being developed as Preston Park, the
former Home Depot site. The area to the south is zoned MRO-Multiple Residential and
Office and consists of commercial uses (i.e. Loden Vision Center, professional offices,
Stella's Boutique, etc.). A partially constructed roadway is located to the east (Common
Road (Area A). This roadway will become a street extension of N. Martin Vineyard Way
upon recording the Preston Park, Phase 1 Final Plat.
Loú Sizes
All lots on the plat meet the lot area, setback, and easement requirements of the MU -
Mixed Use zone district and the Amended PMDP/FMDP for Baker's Crossing, Phases 1 &
2, The Forza Group (File 8-91 76-1 8).
According to the recently approved Amended PMDP/Revised FMDP (File 8-9176-18), the
proposed uses and lot sizes are as follows:
. Lot 1 consisting of 2.45 +/- acres, for the 4-story Hilton Garden lnn (a 102 room hotel
now under construction), conference center, and parking area
. Lot 2 consisting of 0.52 +l- acres, 2-story mixed use building: 2,300 s.f. retail space
(lstfloor) and 5,800 s.f. restaurant (1st and 2nd floors) and parking area
o Lot 3 consisting of 1.38 +/- acres, 4-story, 77 room Comfort lnn & Suites and parking
area
o Lot 4 consisting of 1.95 +l- acres, bio-retention/detention basin easement, shared
parking area, and future development (vacant land)
o Lot 5 consisting of 1.85 +/- acres, 3-story mixed use building: 12,000 s.f. retail space
(lstfloor) and 20 multi-family units (2nd and 3'd floors)
Access and Easements (P.U.D.E.'s)
The plat shows the five (5) main access points (entrances) to the site and an additional
access point to/from the south to the 50 foot-wide shared access easement (24 foot-wide
shared access drive). This access point (entrance) aligns with an existing recorded shared
access driveway between Tax Map 1251\A, Group A, Parcels 010.00 and 011.00. The
southern driveway is within a 5O-foot wide cross access easement (24' shared access
drive) along the southern portion of Lots 4 and 5 which will also serve the properties
fronting Nashville Pike (Baker's Acres) (see plat note 9). This will allow an additional
access from Nashville Pike to the site. The plat shows access easements extending
through and along the lot boundaries to provide access to all other lots within the
subdivision.
3
Final Platfor Bakers Crossing, The Forza Group (1-941-7-1SC) September 1-0,2078
This plat relies upon obtaining access to the private access (Common Road - Area A) that
extends from Tulip Poplar Drive to North Martin Vineyard Way. This roadway is currently a
private roadway, but will be platted as part of the adjacent Preston Park development.
Until the Preston Park development is platted where "Common Road" (Area A) becomes a
right-of-way, no access can be provided from Baker's Crossing, The Forza Group unless
an easement is granted prior to platting. No Final Plat shall be approved until the roadway
is platted or an easement is granted to the owners of Baker's Crossing, The Forza Group.
The stormwater infrastructure system will be provided through 20 foot-wide storm sewer
easements between the adjoining lots.
Ten (10) foot-wíde Public Utility and Drainage Easements (P.U.D.E.) are shown along the
perimeter of the lots except for the lots located along Tulip Poplar and Common Road
(Area A) which shows a 20 foot-wide P.U.D.E. for proposed public utilities, drainage and
electrical services. Ten (10) foot-wide P.U.D.E.'s will be located in the internal shared
access easements.
A sidewalk will be constructed along Tulip Poplar Drive. This was not constructed when the
street was platted.
P I a n n i ng Depa rtment Co m ments
The Planning Department reviewed and commented on the Final Plat. Most of the Planning
Department comments have been satisfíed except those listed as conditions of approval in
the Resolution.
Engineering Division Comments
The Engineering Division reviewed and commented on the Final Plat. Most of the
Engineering Division comments have been satisfied except those listed as conditions of
approval in the Resolution.
Other Departmental Com ments
Other City Departments reviewed and commented on the Final Plat. Most of the City
Departments comments have been satisfied except those listed as conditions of approval in
the Resolution.
Recou¡meNDATroN:
The Planning Department recommends approval of GMRPC Resolution No. 2018-094
ATTACHMENTS
Attachment 1-1 Location Map
Attachmentl-2 Final Plat for Baker's Grossing, Phases 1 &2 (File 1-9417-18C1
Attachment 1-3 Amended PMDP/Revised FMDP for Baker's Crossing, Phases 1 & 2
(File 8-9176-18)
Attachmentl-4 Preliminary Plat for Baker's Crossing, Phase 2 (n.k.a. The Forza
Group) (File 1 -9128-188)
4
Location Map
Attachment 1-1 File I-9417- 18C
ATTACHMENT /-3
gITE qA]A
i
* , PROPOSEO6'SIDEWALX
I ws cMSSsTRrp'
/
a
lslî'8.
f'
',lr
PROPOSED MONUMENT l5 ô d
SIGN LOCAION aa>1È
..1.. ' l 4Ë) ú.2
F
z
CONST, ruO 8' THÉRMOPUSTIC
SIRIPES SPACED 6 FEETAPART
.r¡ PROPOSED 6' S D€WALK
W5'GMSS SIRIP
!rrså
õñÉ d À z
l gE9 H i
ilL UNITS
NOTE:ALL HVAC AND MECHAN
WLLBESCREENED l a!9e5 3J
NoTE: ESfIMTES oF TmFF CVoLUMES VARIANCÉ APPROVED TO ALLOW BUILD]NGS
rN 30 M.8.SL. (DEVELoPMENT PROPoSES
,'
ãE )
AND MOVEMENIS TOAND FROM THE
IO ALLOW SUILDINGS
TO I.]T]LLZE A20'M.B.S.L.
COMPLETEÐ PROJECTANÐ ALONG fNE
fO ENCROACh CLOSERIO STREEI
? I
BOUNDARY STREETS SHALL PROVIDED CONST. MO 8' THERMOPUSTIC
ATFIML MS-TER DEVÊLOPMEÑT PUN. CREA'NNGAND URBAN FEEL ) ãs STRIPÉS SPAC€D 6 FEET APARI
(PC 31637-16) I
NoïE: A PRo-RAIA SmRE OF 3E
SIGMLIZEO IMPROVEMENTS W]Lt 8Ë J
REQUIRED A'T SOTH INIERSECT]ONS rr,iii.ì. :ir lì..\'
(TUL P POPUR AT NASHVILLT PIKE AND Ê
I
ruL]P POPSR Af NORTN BELVEDERE : r'ìì ìi r' i. r.),ì,.,i.,.
I
DR]VE) FORTilIS DryELOPMENT IHE
AMOUNT OF THÉ PRO.RATA SHAREWILL
BE EASED ON LOTACRSGE COMPARED
, :l
l
TO IHE WHOIE OEVELOPMENT
ACREAGE.
ì,
i
NOIEI HILTON GAROEN NN
COMPLIMENTARY BRSKFASI HOURS
WLL BE FRoM 6-9:304M
I corsr.ruo¡ nERMopusrc
, STRIPES SPACEO 6 FEEIAPARI
MEEIING ROOM NOIRSWLLBE FROM
TAMTO5PM
l
, I z +i
Ji
]
PROPOSED6'SIDEWALK
ws cRAss srRtp !4
H
PROPOSEO 6'S]DEWALK
W 5'GRASS S-TRIP I ;*ñ
"-i
l
:i d:i
Êsl 4Z
I.i 3
,,.,¡....1 ..i ¡ r¡,¡. ¡ .;
:
ã*,
is r
i
1r
"l .ì, .)r ' u i .:. ¡. r..i , :,
I
t--.- i
jFttiÌJ l r.¡arcró
': i
I
l
cnecxeo
PROPOSED MULTI,TENNANT
L.
SIGN LOATON
,''
)
]NPUCEOF REQUIREDTPE
15 BUFFER YARD WE PROPOSEA 12'
SUTH
BOUNDARYLINE. I Hg
f:ir'., ii":.. ì..4.ìì: r i
r.. ti,.:raì ., r)
c;
g
É4
¡#t¡.¡-¡
c2.0
PROPOSED SITE
OVERALL
?-il?/ -/E
-r
SURVEYOR'S CERIIFICATF
I
¡ IÞOHEREBYCERTFYilÁÌI¡EUR$NSURVÊYSNOWNHEFÊONWÆ
LEGEND
* P€RFORMÉO INDER MY DIRECIION USING PPROPfuAIË G.P.S, MEINODS
FOR MÊÀSURNG RÊCOVÊRED MONUMENIS NÐ EST€LISHING SIREY
CONIROL ÀND/OR BYIH€ MÊüOD OF RÑOOM RWRSE. CONVENIIONA
PIN FOUND W 1" PLASTIC CAP STÂMPED
¡
MEIHODS OF REDINOANCY WERE EMPLOYEO IO ENSURE INE OIALIÍOF
IHÊ GPS OAIA. IHE UNAOJUSTEO MAfrÊMA¡CAL ERROR OFCLOSURE OF
o 1/2'
IRON
.DARNIL RLS 1571'UNLESS NOTED
THE IRAV€RSÊ ANO IHE IHEOREIICAL UNCERIANñOF IHECORNERS
ESÍÆLISHEOEXCEEÞÎH€SPECIFIEOIOLËMNCESSEIFORßBYIHÊ
SIÀIÉ OFIENNESSE€. BE ÊEÂRINGSANO ÞISIANCESSHOM HERËON
o 5/8' IRON PIN W 1 1/4" PLASTIC CAP STAMPED
'CUMMINGS RLS 2351'FOUND UNLESS NOÍED
HAVÉ NOI BEEN AOJUSED FOR CLOSIRE- frE ÞAIUM FORNß SURVÉY
IS GRID NORTH AS ESIABLISNEO BY IN SÍAE PLANE COORDINAES (ZONÊ a IRON PIN SET
4100, GEOID r2), TAGN FROM STA1C cpsOSSÈÊVÀÎON.
x CONCRETE R/W MONUMENT
+ @ SANITARY SEWER MANHOLE
@ CLEAN OUT
JEFF ARNOLD R,L.S. # 2526
ú ANCHOR
CLASS "A'SURVEY TOTA ARËA OF SURVEY ø UÏLIry POLE
OATE OF FIELOSURWY X WATER VÀVE
@ WAIËR METER
MAP FH lJ FIRE HYÐMNT
(\*.T.S.)
:l ]F
/; !î:r' @
Ë
STORM SEWER MNHOLE
OROP BOX INLET
TESÙRWYStsOWÑHEREONISBÆEDONGPSOAIA
ä! \1)1.! riLlì!ì',tl
tr:riri!r 'i
T CURB BOX INLET
ôOLLECTÉO 8Y ACES USING AOTN SIAIIC NO RfKMEÍHODS
WIÎH DUAL FREQUÊNCY IOPCON HIPER GA(GGDI RÈCEIERS-
IH€ ENÌÈT OFIHE DAIA COLLEOEO FORfrIS SURVEY
WAS OONÊ SO THROUGH GPS MEANS WHEN ACCE*A8LE:
{
*þ'ü;i:l;:::il ASBL
ESOL
BUILDING SET BACK LINE
EACH SIDE OF LINE
ÑO SY CONVÈN¡ONAL MENS FROM GPS CONIROL POINTS,
WHEN NECESSARY, RIK OAIA W6 COLLECED FORANY SIE
/',/ ;0 PUE PUBLICUTILITY EASEMENT
FEATURES AND ALL CONIROL POINÍS NO BOUNDARY
//.' I PROPERTY LINE
INFORMAIIONWÆCOLLECIEDINSÍAIICMODEWIHANRMS
OF O,O2' OR LESS. VECTORS AND/OR âÆELINES HAVE BEEN
CHECKFD IHROUGH STAIIC OESFRV¡ONS 5 l1
SETBACK LINÊ
EASÊMEMS
PARCEL OWNER, ADDRESS, r{,^""1 t.
Ì'
LOT LINE ABANDONED
AND SOURCE OF TITLE CÊNTERLINE
.l I
,ì tlr
GALLATIN ASSOCIAIÊSA
GALLAIIN.TN 37066
LP
.,2 )í Ic "o :; oH-
GAS LINE
OVERHEAD UTILITIES
oÊÉ0 BooK¡210 PAGÊ 625
PUI gooK2TPAGES rg1-133
zl i¡,,,9
lii tr
! -o SANITARY SEWER LINE
t WAIER LINE
Ø
li lr SIORM SEWER LINE
DRAINAGE EASEMENf
LOT 3
ACCESS EASEMENT
60.175 +/- SQ. FT.
1.38 +l ACRES
'14684 TULIP POPLAR DRIVE
/ lìì
I
lt
t,
l:l
NOIE:
LOT 5 ti SEE SHEET 2 OF 2 FOR BOUNOARYLINE ÑÐ CURW TASLE.
80.650 +/- SQ. FT.
1.85 +/- ACRÊS ls 0' 60' 124 180,
1468C TULIP POPLAR DRIVE
LOt 4 GMPHIC SCATE: 1 :60'
84,769 +Ê SQ. FT
SHEET 1 OF 2
l¡ I
1.95 +/- ACRES PRELIMINARY SUBDIVISION PT-AT
I
14688 TULIP POPLAR DRIVE oF Tlt¡l
I
BAKER'S CROSSING SUBDIVISION. THE FORZA GROUP
'l'AX MAP r25M, GROUP A, PARCEL oo1.o5
HEMMEI- SURATI
611 CONCORD DRIVE
GALLATIN, TN 37066
463.07'
s 57.34'24. W -
3es' clrfr'KrlD $Y:,r.
^RNor¡
ffii
ARNOLD CONSULTING ENGINEERING
çHÑ
SERVICES, INC,
P.O. BOX 1338 BOWLING GREEN. KY 42101
PHONÉ (270) 780-%4s
'Tì
¿
/- -
Get email alerts for Gallatin
A daily email when new agendas and minutes are posted.