City Council
Regular MeetingGrand Haven, MI · March 4, 2024
Agenda
AGENDA
Planning Commission
Monday, March 4, 2024 – 6:00 p.m.
I. Call to Order
Persons wishing to speak at public hearings, on agenda
items, or extended comments, must fill out a “Speakers
II. Roll Call Form” located on the counter. Completed forms must
be submitted to Township Staff prior to the meeting.
III. Pledge to the Flag
IV. Approval of the February 05, 2024 Planning Commission Meeting Minutes
V. Correspondence
VI. Brief Public Comments & Questions (Limited to 3 minutes)
VII. New Business
A. Discussion – Groesbeck Trailhead – MNRTF Grant Application
VIII. Reports
A. Staff Report
B. Commissioner Comments
IX. Extended Public Comments & Questions (Limited to 4 minutes)
X. Adjournment
MEETING MINUTES
GRAND HAVEN CHARTER TOWNSHIP
PLANNING COMMISSION
FEBRUARY 5, 2024
I. CALL TO ORDER
Wilson called the meeting of the Grand Haven Charter Township Planning Commission to
order at 6:00pm.
II. ROLL CALL
Members present: Frifeldt, Lemkuil, Reenders, Taylor, Wagenmaker, and Wilson
Members absent: Cousins, Hesselsweet, and Mesler
Also present: Community Development Director Thibault, Associate Planner
Chaphalkar, Interim Director of the Department of Public Works Tlachac,
and Peter Brink of Prien and Newhoff.
Without objection, Wilson instructed Chaphalkar to record the minutes.
III. PLEDGE TO THE FLAG
IV. APPROVAL OF MINUTES
Without objection, the minutes of the December 4, 2023 meeting were approved.
V. CORRESPONDENCE
Thibault provided correspondence from Fresh Coast Planning, 119 ½ Washington Ave. Studio
B, on behalf of the Robinson Township Planning Commission, indicating the solicitation of
comments regarding the Robinson Township Master Plan Draft.
VI. PUBLIC COMMENTS – NONE
VII. PUBLIC HEARINGS
A. Special Land Use – Township Meter Station
Wilson opened the public hearing at 6:01p.m.
Thibault provided an overview through a memo dated February 1, 2024.
Interim Director of the Department of Public Works Tlachac, and Peter Brink of Prien and
Newhof.were present to answer any questions, but none were asked.
There being no further comments, Wilson closed the public hearing at 6:014p.m.
VIII. OLD BUSINESS
A. Special Land Use – Township Meter Station
The Planning Commission noted the following points of discussion:
• Agreed striped parking was not necessary due to the expected use being limited to
municipal staff.
1
• Indicated support for proposed reduction in landscaping due to the impact of root
systems on the use and to improve circulation.
Motion by Reenders, second by Taylor, to conditionally approve the
Department of Public Service Site Plan Review Special Land Use application for
the construction of a new Government Building consisting of Parcel No 70-03-
33-100-087 based on it meeting the requirements of the Zoning Ordinance. This
motion is subject to, and incorporates, the following report. Approval is
conditioned upon the following:
1. Recommendation for approval from the City of Grand Haven per the Act 425
agreement due to the subject development being located in the Robbins Centre Pointe
PUD.
2. (18.07.A.11) Provide final plan approval from Ottawa County Water Resources,
prior to any building permit being issued.
3. (4.02.A.6) Generator pad to be screened with evergreen landscape material.
4. (6.09) Proposed wall pack lighting to be full cutoff variant .
Which motion passed unanimously.
REPORT – SPECIAL LAND USE – GOVERNMENT BUILDING – TOWNSHIP METER STATION
1. The application meets the site plan review standards of Section 18.07.G of the Zoning Ordinance. Specifically, the
Planning Commission finds as follows:
A. The uses proposed will not adversely affect the public health, safety, or welfare. Uses and structures located
on the site shall take into account topography, size of the property, the uses on adjoining property and the
relationship and size of buildings to the site. The site shall be developed so as not to impede the normal and
orderly development or improvement of surrounding property for uses permitted in this Ordinance.
B. Safe, convenient, uncontested, and well-defined vehicular and pedestrian circulation shall be provided for
ingress/egress points and within the site. Drives, streets and other circulation routes shall be designed to
promote safe and efficient traffic operations within the site and at ingress/egress points.
C. The arrangement of public or private vehicular and pedestrian connections to existing or planned street in the
area shall be planned to provide a safe and efficient circulation system for traffic within the Township.
D. Removal or alteration of significant natural features shall be restricted to those areas which are reasonably
necessary to develop the site in accordance with the requirements of this Ordinance. The Planning
Commission may require that landscaping, buffers, and/or greenbelts be preserved and/or provided to ensure
that proposed uses will be adequately buffered from one another and from surrounding public and private
property.
E. Areas of natural drainage such as swales, wetlands, ponds, or swamps shall be protected and preserved
insofar as practical in their natural state to provide areas for natural habitat, preserve drainage patterns and
maintain the natural characteristics of the land.
F. The site plan shall provide reasonable visual and sound privacy for all dwelling units located therein and
adjacent thereto. Fences, walls, barriers, and landscaping shall be used, as appropriate, to accomplish these
purposes.
G. All buildings and groups of buildings shall be arranged so as to permit necessary emergency vehicle access
as required by the Fire/Rescue Department.
H. All streets and driveways shall be developed in accordance with the Township Subdivision Control Ordinance,
the Ottawa County Road Commission, and/or Michigan Department of Transportation specifications, as
appropriate, unless developed as a private road in accordance with the requirements for private roads in this
Ordinance or any other Township Ordinance. Except that the Planning Commission may impose more
stringent requirements than those for the Road Commission or Department of Transportation with respect to
driveway location and spacing.
2
I. Sidewalks or pathways shall be deemed to be required along all public and private roadways unless the
applicant provides compelling evidence, in the opinion of the Planning Commission, that they are not
necessary for pedestrian access or safety. Sidewalks shall terminate in an appropriate fashion consistent with
the needs and safety of pedestrians. No sidewalk shall terminate into landscaping.
J. Appropriate measures shall be taken to ensure that removal of surface water will not adversely affect
neighboring properties of the public storm drainage system. Provisions shall be made to accommodate storm
water, prevent erosion and the formation of dust. The use of detention/retention ponds may be required.
Surface water on all paved areas shall be collected at intervals so that it will not obstruct the flow of vehicular
or pedestrian traffic or create puddles in paved areas. Catch basins may be required to contain oil filters or
traps to prevent contaminants from being discharged to the natural drainage system.
K. Exterior lighting shall be arranged so that it is deflected away from adjacent properties and so that it does not
interfere with the vision of motorists along adjacent streets. Lighting of buildings or structures shall be
minimized to reduce light pollution and preserve the rural character of the Township.
L. All loading and unloading areas and outside storage areas, including areas for the storage of trash, which face
or are visible from residential districts of public streets, shall be screened by a vertical screen consisting of
structural or plant materials no less than six (6) feet in height.
M. Entrances and exits shall be provided at appropriate locations so as to maximize the convenience and safety
for persons entering or leaving the site. The number of entrances to and exits must comply with this Ordinance
and the requirements of the Ottawa County Road Commission and/or the Michigan Department of
Transportation.
N. Site plans shall conform to all applicable requirements of County, State, Federal, and Township statutes and
ordinances. Approval may be conditioned on the applicant receiving necessary county, state, Federal, and
Township permits before final site plan approval or an occupancy permit is granted.
O. Appropriate fencing may be required by the Planning Commission around the boundaries of the development
if deemed necessary to minimize or prevent trespassing or other adverse effects on adjacent lands.
P. The general purposes and spirit of this Ordinance and the Master Plan of the Township shall be maintained.
This approval is based on the affirmative findings that the standards of Section 12.18 have been fulfilled.
2. This approval is based on the affirmative findings that the standards of Section 12.04 have been fulfilled.
3. The Planning Commission also finds the Project complies with the Overlay Zone findings and statement
of purpose found in Section 8.01 of the Zoning Ordinance.
A. The Project accommodates a variety of uses permitted by the underlying zoning, but ensures such
uses are designed to achieve an attractive built and natural environment.
B. The Project provides architectural and site design standards that are more demanding than required
elsewhere in the Township in order to promote harmonious development and complement the natural
characteristics in the western sections of the Township.
C. The Project promotes public safety and efficient flow of vehicular traffic by minimizing conflicts from
turning movements resulting from the proliferation of unnecessary curb cuts and driveways.
D. The Project ensures safe access by emergency vehicles.
E. The Project encourages efficient flow of traffic by minimizing the disruption and conflicts between
through traffic and turning movements.
F. The Project preserves the capacity along US-31 and other roads in the Overlay Zone by limiting and
controlling the number and location of driveways and requires alternate means of access through
service drives.
G. The Project seeks to reduce the number and severity of crashes by improving traffic operations and
safety.
H. The Project requires coordinated access among adjacent lands where possible.
I. The Project provides landowners with reasonable access, although the number and location of
access points may not be the arrangement most desired by the Developer.
J. The Project requires demonstration that prior to approval of any land divisions, the resultant parcels
are accessible through compliance with the access standards.
K. The Project preserves woodlands, view sheds, and other natural features along the corridor.
3
L. The Project ensures that distractions to motorists are minimized by avoiding blight and clutter while
providing property owners and businesses with appropriate design flexibility and visibility.
M. The Project implements the goals expressed in the US-31/M-45 Corridor Study.
N. The Project establishes uniform standards to ensure fair and equal application.
O. The Project addresses situations where existing development within the Overlay Zone does not
conform to the standards.
P. The Project promotes a more coordinated development review process with the Michigan
Department of Transportation and the Ottawa County Road Commission.
4. 8.09.A.2: The Planning Commission waives the standard were the City of Grand Haven to require and grant a
waiver from its equivalent standards.
5. 8.09.D: The Planning Commission grants the modifications to the access and circulation standards as shown given
the variation in existing physical conditions along the corridors as part of the site plan review process and in
consistency with the departures provided in the Robbins Centre Pointe PUD report
6. 2.08: The Zoning Administrator waives the standard per 2.10 for essential service facilities given the essential
service facility lot was minimized to the smallest practical extent possible, meeting the otherwise required setbacks.
7. 8.11.A.3.c.iii: The Zoning Administrator waives the standard per 2.10 for essential service facilities given the
security risk for including windows
8. 8.11.A.3.f: The Zoning Administrator waives the standard per 2.10 for essential service facilities given the awning
would interfere with placing, moving, or removing equipment from the building using a lift truck, as the awning
would block the lift truck boom from getting close enough to the building exterior wall to lift equipment from the
floor. To avoid the increased difficulty in maintenance, an awning over the access door was not included.
VIII. REPORTS
A. Staff Report - NONE
B. Commissioner Comments
• Wagenmaker explained proposed text amendments related to waiving water and sewer
connection requirements for PUDs.
• Commissioners discussed infill development.
• Taylor summarized the recent training session and encouraged further work with public
engagement and outreach.
IX. EXTENDED PUBLIC COMMENTS - NONE
X. ADJOURNMENT
Without objection, the meeting adjourned at 6:41 pm.
Respectfully submitted,
Cassandra Chaphalkar
Acting Recording Secretary
4
Community Development Memo
DATE: March 4, 2024
TO: Planning Commission
FROM: Rory Thibault – Community Development Director
RE: MNRTF Land Development Application Discussion – Groesbeck
BACKGROUND
Recall in 2020, the Township applied for an MNRTF
Acquisition grant to purchase 15.7 acres on
Groesbeck Street from Meritt Bethig to add a northern
entrance to Hofma Park and Preserve. The Township
was selected for funding in 2021.
The subject property is comprised of 2 parcels; those
15.7-acres of land have since been incorporated in
Hofma Park & Preserve. The 10.3 acre parcel is
vacant land and mostly wooded. On the 5.4 acre parcel
there was a single family dwelling with several
outbuildings. The Township has since demolished
those structures as required by the grant. There is
evidence that footpaths connecting this land to Hofma
have been utilized for many years and the land the
acquisition incorporates this informal neighborhood
entrance into the full park system pathway network.
DEVELOPMENT GRANT NARRATIVE
Development of a new trail entrance at the 583 acre Hofma Park and Preserve. Improvements
include a neighborhood-friendly trailhead parking lot, accessible low-impact multi-use trails,
and native plantings. The development will incorporate environmentally sustainable features
and celebrate universal design. The trails will interconnect and expand an existing trail network
in the park, as well as the Township's 33 miles of non-motorized pathway.
Engineer’s Cost Estimate
Groesbeck Trailhead
Site Prep $32,000 Site Amenities $25,000
Earthwork Benches
Grubbing & Tree Removal Trash Receptacles
Hardscape $117,500 Trailhead Kiosk
Sand Trailhead sign
Asphalt for parking, drive, paths Interpretive Signs
Aggregate Base for parking, drive, paths Parking striping & signage
Concrete sidewalk (6-feet) Entry Sign (by TWP)
Curb & gutter for drive Intersection Signs (by TWP)
Softscape $104,600 Site Utilities $70,300
Chips and Fines path (8-feet) Water Service
Native Seeding Stormwater/Basin
Native Trees Irrigation
Electric Service
Lighting
Sub-Total $349,400
Grand Total = $435,400
The MNRTF provides up to $400,000 for development applications, and requires a minimum 25%
match ($100,000). In order for the project to be competitive, the Township has historically maximized
our match percentage. In this case, the anticipated grant request would be $234,220 (49% of the total)
with a Township contribution of $243,780 (51% total). This project will not proceed unless the grant
application is successful and the project is funded.
TIMELINE
Township Staff have been working with the Township’s engineer, Prein & Newhof, for the pre-
development concept and cost estimation. Following is the anticipated timeline to meet the April 1st
grant application deadline.
o Monday, February 19th at 6pm: Pre-application meeting with the Planning
Commission
o Wednesday, February 21st : Parks & Rec Committee meeting
o Monday, March 11: Township Board to approve resolution in support of the
application
o Prior - April 1st: Application submitted to MNRTF
o December: MNRTF funding decision
o Winter ‘24/25: Formal site plan review application and development of DD/CD
documents
Note: we will not proceed with the park improvements unless grant funding
is secured
Site Survey to be conducted after grant decision
DISCUSSION
Pending a successful application, the project would proceed through the site plan review process –
public parks are permitted by right in all Zoning Districts. As such, the application will be brought to
the Planning Commission following Staff review of all applicable ordinances and regulations.
Are there any items of concern the Planning Commission has with the amenities
currently proposed, landscaping currently shown, or general concept that would
substantially impact the cost of the grant and scope of the grant application?
Please contact me if this raises questions.
Hofma Park & Preserve - Groesbeck St. Entrance - MNRTF Development Plan
Grand Haven Charter Township
GROESBECK ST.
EXISTING 10’ BIKE PATH
PARK ENTRANCE SIGN
DRIVEWAY W/CONCRETE CURB
LED PARKING LOT
LIGHTING TYP. NATIVE LANDSCAPE
NATIVE DUNE GRASS TYP. PARKING BUFFER TYP.
PAVED 8’ BIKE PATH
CONNECTOR
(3) BIKE RACKS
NO MOW NATIVE TURF
RESTORATION TYP.
PARKING LOT (12 SPACES)
BENCH W/COMPANION
SEATING
LANDSCAPE
BUFFER
INTERPRETIVE SIGN
(24X36)
TRAILHEAD KIOSK
TRASH & RECYCLING
UNIVERSALLY ACCESSIBLE
CHIPS & FINES PATH
01/29/2024
SCALE 1” = 20’
Engineering Estimate
Owner:
Grand Haven Charter Township
Project Title:
Hofma Park & Preserve - Groesbeck St. Trailhead Improvements - 2024 MNRTF Grant
Date & Time: Project #:
29-Jan-24 2230693
Item
No. Description Quantity Unit Unit Price Total Amount
1 Earthwork (Site Preparation, Excavating, Filling, Grading, Miscellaneous Removals) 1 LSUM $25,000 $25,000
2 Selective Clearing & Grubbing 2.0 ACRE $3,500 $7,000
3 Class II Sand, CIP (Allowance) 250 CYD $12 $3,000
4 HMA, 5EL (1.5" parking, drive, paths) 110 TON $150 $16,500
5 HMA, 4 EL (1.5"parking, drive, paths) 110 TON $150 $16,500
6 HMA, 5 EMH (1.5" drive taper) 15 TON $225 $3,400
7 HMA, 4 EMH (4" drive taper) 40.0 TON $200 $8,000
8 6" 21 AA Aggregate Base, CIP (parking, drive, paths) 1,500 SYD $15 $22,500
9 7" 21 AA Aggregate Base, CIP (drive taper) 76 SYD $20 $1,600
10 12" Storm 80 FT $60 $4,800
11 4' Dia. Catch Basin 2 EA $5,000 $10,000
12 4" Concrete Sidewalk (6' wide universally accessible) 2,320 SFT $9 $20,900
13 Concrete Curb & Gutter, MDOT F4 482 FT $45 $21,700
14 Concrete Valley Gutter - Type M Opening 75.0 FT $45 $3,400
15 4" Chips and Fines Path, 8' Wide (to woodline) 470 SYD $35 $16,500
16 4" Chips and Fines Path, 8' Wide (woodline to intersection) 1,625 SYD $35 $56,900
17 Irrigation (Backflow, Main, Valves, Zone Piping, and Heads) 1 LSUM $18,000 $18,000
18 Bench (6' surface mounted with recylcled slats and companion seating adjacent) 1 EA $1,500 $1,500
19 Trash & Recyling Receptacles (surface mounted with recycled slats) 2 EA $1,500 $3,000
20 Trail Intersection Signage (by owner) 2 EA $500 $1,000
21 Park Entrance Sign (by owner) 1 EA $2,500 $2,500
22 Trailhead Kiosk 1 EA $12,000 $12,000
23 Interpretive Signage (Surface mounted, educational for native plantings) 1 EA $2,000 $2,000
24 Barrier Free Parking Signage 2 EA $750 $1,500
25 Parking Lot Striping 1 LSUM $1,500 $1,500
26 Electric Service (Allowance) 1 LSUM $5,000 $5,000
27 LED Lighting 1 LSUM $25,000 $25,000
28 1" Water Service Connections 1 LSUM $7,500 $7,500
29 Type A Restoration Seeding (With 4" Imported topsoil) 1,000 SYD $6 $6,000
30 Evergreen Side Buffer Trees 5 Ea $600 $3,000
31 Native Shade Trees (2" Caliper Maple) 7 Ea $600 $4,200
32 Native Landscape Parking Buffer (plugs & seed) 675 SYD $15 $10,200
33 Stormwater Seed Mix (native topsoil) 215 SYD $6 $1,300
34 Dune Grass (plugs 16" triangular spacing) 40 SYD $20 $800
35 No Mow Native Seed Mix (native topsoil) 950 SYD $6 $5,700
Total Construction Costs $349,400
Contingency 10% $34,000
Engineering 15% $52,000
Grand Total $435,400
Township Match 51% $222,054
Grant Request 49% $213,346
Signed:
Date: 1320’
2640’ 2640’
1320’ 70-07-03-300-015
970’ 70-07-03-400-010
660’
911.55’
1150’
251.55’
70-07-03-400-011 1670’
70-07-02-300-003
408.45’
660’
1320’
660’
(TF20-154)
1320’
15582 Ferris St.
16295 Sleeper St.
15612 Groesbeck St.
13894 168th Ave.
583 Acres
1320’
3630’
1320’ 1320’ 70-07-02-300-003
70-07-11-100-002
660’
70-07-02-300-003
660’
70-07-02-176-008
280’
627’
2640’
1320’ 400’
350’
70-07-02-251-001
660’ 1287’
2640’