Agenda
Mayor and Council
Work Session
December 6, 2016
Agenda
"A diverse, business-friendly, and sustainable community with clean, safe and strong neighborhoods."
"Providing the most efficient and highest-quality services as the municipal location of choice for all
customers."
"Challenges are what make life interesting and overcoming them is what makes life
meaningful."
Joshua J. Marine
3:00 PM Washington County Legislative Day
Hager Hall Conference and Event Center, 901 Dual Highway, Hagerstown,
Maryland
4:00 PM WORK SESSION
4:00 PM 1. Additional Roof Work for Elizabeth Hager Center - Eric Deike, Director of Public Works
4:15 PM 2. 2016 Tractor Drawn Aerial Move to Eastern Boulevard - Chief Steven Lohr
4:35 PM 3. Truck 11 Emergency Maintenance Repairs - Chief Steven Lohr
4:55 PM 4. 2015A and 2015B Bond Proceeds - Michelle Hepburn, Director of Finance
CITY ADMINISTRATOR'S COMMENTS
MAYOR AND COUNCIL COMMENTS
EXECUTIVE SESSION
5:30 PM 1. Executive Session
ADJOURN
REQUIRED MOTION
MAYOR AND CITY COUNCIL
HAGERSTOWN, MARYLAND
Topic:
Washington County Legislative Day
Hager Hall Conference and Event Center, 901 Dual Highway, Hagerstown, Maryland
Mayor and City Council Action Required:
Discussion:
Financial Impact:
Recommendation:
Motion:
Action Dates:
REQUIRED MOTION
MAYOR AND CITY COUNCIL
HAGERSTOWN, MARYLAND
Topic:
Additional Roof Work for Elizabeth Hager Center - Eric Deike, Director of Public Works
Mayor and City Council Action Required:
Action Requested
Staff is seeking approval from the Mayor and Council to move forward with additional roof
installation at the EHC (Elizabeth Hager Center). Roof work is currently being completed at this
facility on a smaller section of roof. The roof work being requested is for two separate, larger
areas of the facility. Approval would allow the existing contractor, by way of change order, to
move forward immediately with the work.
Discussion:
Discussion
The Elizabeth Hager Center is a city owned facility located at 14 North Potomac Street. The
property houses the city department of DCED (Department of Community and Economic
Development), DLLR (Maryland State Department of Licensing, Labor and Regulation), MOSH
(Maryland Occupational Safety and Health) and the CVB (Convention and Visitors Bureau).
The structure consists of several roof elevations. The roof system is not one large roof but three
separate, distinct roofs. There are two larger roof sections and one smaller roof section. The
smaller and highest roof had the most obvious leaks in the main field of the roof. Problems have
been ongoing for several years. This was the focus of the current replacement and should be
completed in the near future.
During this project, we requested a quote from the contractor to install a new roof on the two main
sections of roofing. The quote was to be for future budget purposes. Closer inspection found a
number of flashing (the water tight edges of the roof) issues that appear to be more recent in
nature. Staff believes extensive damage occurred to the flashing during the record snow storm of
January 2016.
The new roof system would be an overlay of the existing roof. The main field of these roofs is in
generally fair shape and it is the flashing along the edges that appear to be in the worst condition
allowing for water infiltration. Even so, the roofs are easily over 20 years old and at the end of
their useful life.
The new roof system would come with a twenty year warranty. Discussions with the roofing
contractor, USA Construction Services, Inc., indicate work could begin almost immediately hoping
to install most, if not all, of the new roof before winter weather arrives. Portions of the new roofing
system are temperature sensitive so time is of the essence.
Financial Impact:
Costs and Funding
The cost is expected to be ONE HUNDRED NINETEEN THOUSAND FIVE HUNDRED THIRTY-
THREE DOLLARS AND NO CENTS ($119,533.00) for the 12,900 square feet of roof area. The
roofing material is a Firestone 60 mil TPO Ultra-Ply product placed over a 1 inch thick insulation
board.
The EHC is currently funded within a city enterprise fund known as Property Management.
Generally speaking, enterprise funds are to be self sufficient and not to be funded directly with tax
dollars. Other city enterprise funds include the Electric Fund, Water Fund, Wastewater Fund,
Parking Fund and the Golf Fund. The majority of Property Management’s revenues come from
the rent charged to the tenants of the properties.
Funding for this project would initially come from the Property Management Fund. However, the
fund would be reimbursed with funding from a future bond issue to be discussed with the Mayor
and Council in the near future. The bond would then be paid off over the life of the bond.
Staff is asking for contingency funding for this project to allow for any unknowns, change orders
or extras. The additional money would only be spent if needed. If no changes or extras are
found, the funding would remain unspent. The contingency request is so the project can continue
forward without staff returning to the Mayor and Council to seek permission to spend additional
monies. The additional funding requested is approximately 10% of the project or TWELVE
THOUSAND DOLLARS AND NO CENTS ($12,000.00) for a total estimated project cost of ONE
HUNDRED THIRTY-ONE THOUSAND FIVE HUNDRED THIRTY-THREE DOLLARS AND NO
CENTS ($131,533.00).
The alternative to this is to not issue a change order for the work. Staff would create a bid for the
roof work and the work would be competitively bid sometime in the spring of 2017. The work
would then be scheduled for the summer of 2017.
Recommendation:
Conclusion
This process is a bit unusual in that the change order is almost as expensive as the original work.
The work is also not being competitively bid. The advantage is that the work can begin almost
immediately with the Mayor and Council’s approval. This is important since the condition of the
flashing was found to be in much worse condition than originally thought. Staff is asking for
informal approval to move forward given the time sensitivity with the weather. Formal approval
would be later in the month of December.
Motion:
NA
Action Dates:
NA
ATTACHMENTS:
File Name Description
Memo, quote
Additional_roof_work_at_EHC_2016_memo__quote__draft_consent_agenda.pdf and draft
consent
agenda form
REQUIRED MOTION
MAYOR AND CITY COUNCIL
HAGERSTOWN, MARYLAND
Topic:
2016 Tractor Drawn Aerial Move to Eastern Boulevard - Chief Steven Lohr
Mayor and City Council Action Required:
Discussion:
Financial Impact:
Recommendation:
Motion:
Action Dates:
ATTACHMENTS:
File Name Description
Truck_1_Relocation.pdf Truck 1 Relocation
HAGERSTOWN FIRE DEPARTMENT
CITY OF HAGERSTOWN
25 West Church Street
Hagerstown, Maryland 21740
Steven Lohr (301) 790-2476
Fire Chief FAX (301) 797-7448
slohr@hagerstownmd.org
TO: Valerie Means, City Administrator
FROM: Steve Lohr, Fire Chief
SUBJECT: 2016 Tractor Drawn Aerial Move
DATE: December 6, 2016
By copy of this memorandum, the HFD and the Pioneer Hook and Ladder Company in collaboration
with the Independent Juniors Fire Company, recommends to M & C that the 2016, 100 ft. Tractor
Drawn Aerial known as T-1 be permanently moved from the city owned facility at 21-23 West
Franklin Street to the City owned facility on Eastern Boulevard. This move returns the facility on
East Franklin St. to vacant inventory and will require future action(s) to dispose of.
The temporary transfer of new T-1 has been in effect since the delivery of that unit in the second
quarter of 2016, while a joint study group evaluated options for modifications and repairs to the
existing facility were conducted. Regrettably, work necessary to prevent water leakage and other high
priority repairs are in excess of $125,000. A more extensive renovation designed to deal fully with
structural issues are in excess of $350,000. Even if those repairs were made, many other factors
prevent this location from being the better site for fire-rescue deployment.
The existing facility is inappropriately located for efficient and effective response coverage. The
permanent move improves response coverage and response times to a larger area of the city and the
surrounding areas adjacent to the city where HFD units are due via automatic aid agreements and
frequently arrive first. Finally, by moving the truck to Eastern Boulevard, the ability to assemble four
FF's arriving at once is improved which increases our ability to comply with the Federal 2-in and 2-
out law. The previous administration has been fully briefed on the 2015 Insurance Services Office
Public Protection Rating that best demonstrates the improved coverage.
The Pioneer Volunteers may be interested in acquiring the structure. Should that not occur, the
Pioneer's support of this move is conditional upon acquiring a small amount of dedicated office and
storage space in the Eastern Boulevard facility within the existing footprint. Staff believes this to be
easily accomplished with only minor facility changes. They have demonstrated willingness to utilize
private funding to accomplish these modifications. Talks are ongoing between the parties and are
largely based upon a final determination of this move.
Page 2 – Truck 1 relocation
Finally, it is anticipated that a future CIP project would be recommended to review, design and
upgrade the Eastern Boulevard facility to house multiple companies and personnel rather than the
single driver only company that has been housed there since the original building was erected.
Respectfully,
REQUIRED MOTION
MAYOR AND CITY COUNCIL
HAGERSTOWN, MARYLAND
Topic:
Truck 11 Emergency Maintenance Repairs - Chief Steven Lohr
Mayor and City Council Action Required:
Discussion:
Financial Impact:
Recommendation:
Motion:
Action Dates:
ATTACHMENTS:
File Name Description
Truck_11_Repairs.pdf Detailed List
Truck_11_Rehab_Mayor___Council.pdf Memo
Truck_11_Repair_Contract_Info.pdf Consent Form
7386 Gallerher Road, Gainesville VA 20155
City of Hagerstown Fire Department PARTS & LABOR Proposal: 16-0205R
25 West Church Street DATE: 10/31/2016
Hagerstown, MD 21740 EXPIRATION: 11/30/2016
Description Part Part Ext. Price Labor* Extended
Qty Price
Repair right front outrigger work light. 1 $9.82 $9.82 $115.00 $124.82
Repair the rubber at the waterway bracket 1 $7.53 $7.53 $57.50 $65.03
Trouble shoot fifth wheel lock out circuitry. Light $345.00 $345.0
for fifth wheel locks go out when ladder is lifted
out of the cradle. Any parts needed will be
proposed separately for approval.
Replace the two inoperable step lights on 2 $21.55 $43.10 $57.50 $100.60
turntable.
Replace light for fifth wheel locks in cab. Missing 1 $26.64 $26.43 $34.50 $60.93
lens.
Replace left base spot light swivel mounting 1 $73.76 $73.76 $57.50 $131.26
bracket. Mount is worn and will not tighten.
Replace missing screws on ladder scuff plates. 1 $0.60 $0.60 $57.50 $58.10
Tighten all screws
Replace light for outrigger not deployed light on 1 $26.64 $26.64 $34.50 $61.14
turntable. Missing lens.
Repair inoperable beacon on tip of ladder fly 1 $104.52 $104.52 $34.50 $139.02
section.
Third Party Inspection Items
Troubleshoot emergency power system. Any $230.00 $230.00
parts needed will be proposed separately for
approval.
Replace rear outrigger beam electrical cables and 2 $493.76 $987.52 $805.00 $1,792.52
hoses including new sheathing
Troubleshoot rotation interlock system. It will not $690.00 $690.00
allow rotation of aerial without hitting overrides
when full set. When short set, does not work.
Any parts needed will be proposed separately for
approval.
Replace damaged cradle pad. 1 $40.46 $40.46 $57.50 $97.96
Replace all damaged cables through ladder 1 $5,003.00 $5,003.00 $1,840.00 $6,843.00
sections
Replace damaged electrical cable sheaves 9 $88.01 $792.09 $345.00 $1,137.09
Shop supplies 1 $49.83 $49.83 $49.83
Replace rotation interlock optical switches with 1 $3,725.66 $3,725.66 $1,610.00 $5,335.66
limit switches, replace the target plate with a
current style plate and rewire system
RedStorm Fire & Rescue Apparatus, Inc. 877.644.7598 T/ 866.500.3347 efax redstormfire.com
7386 Gallerher Road, Gainesville VA 20155
Improved Ride Recommendations
Check axle weights, tire pressure, axle mounts, $920.00 $920.00
adjust tiller air suspension ride height and test
drive
Install new tiller axle shocks (PN XSHOCK-002) 2 $673.19 $1,346.38 $575.00 $1,921.38
Install new tiller seat and seat belts (PN LTC- 1 $1,435.69 $1,435.69 $460.00 $1,895.69
77980079)
Total $21,999.03
*NOTE: $115 labor rate
Payment Terms: 25% down-payment; balance due upon completion.
Terms: Estimates are good for 30 days. The estimate does not include parts and lanor that
may be required for problems uncovered while performing the approved scope of work stated
above. All LTC repairs are warranted for a period of one (1) year. Transportation is the sole
responsibility of the owner. I authorize employees of Ladder Tower Co, RedStorm Fire &
Rescue Apparatus, Inc. and any subcontractors to operate the vehicle for testing, inspection
and repair purposes. Ladder Tower Co., RedStorm Fire & Rescue Apparatus, Inc. and any
subcontractors shall not be responsible for loss or damage to the vehicle for equipment that
has not been removed by its owner. I agree that RedStorm Fire & Rescue Apparatus, Inc. has
an express lien on the described vehicle for the parts and labor furnished under this repair
estimate, including this estimate and those from any prior estimate or repair order on the
vehicle. If I fail to pay such charges, I agree that the vehicle may be held until charges are
paid in full, in the event of a legal action to collect any sums due, I agree to pay all costs of
collection and fees including reasonable attorney fees.
Customer Acceptance: _________________________________________________
Signature / Title
Date: ___________________________
RedStorm Fire & Rescue Apparatus, Inc. 877.644.7598 T/ 866.500.3347 efax redstormfire.com
7386 Gallerher Road, Gainesville VA 20155
RedStorm Fire & Rescue Apparatus, Inc. 877.644.7598 T/ 866.500.3347 efax redstormfire.com
HAGERSTOWN FIRE DEPARTMENT
CITY OF HAGERSTOWN
25 West Church Street
Hagerstown, Maryland 21740
Steven Lohr (301) 790-2476
Fire Chief FAX (301) 797-7448
slohr@hagerstownmd.org
TO: Valerie Means, City Administrator
FROM: Steve Lohr, Fire Chief
SUBJECT: Truck 11 Emergency Maintenance Repairs
DATE: December 6, 2016
The HFD recommends that M&C accept the sole source quote in the amount of $21,999.03 from
Red Storm Fire Apparatus, to perform emergency maintenance repairs for T-11, a 1994 100 ft
tractor-drawn reserve aerial. Red Storm Fire and Rescue Apparatus is the regional dealer for
SMEAL/LTC; the parent company of the original equipment manufacturer (OEM) for this aerial
ladder truck.
This ladder was purchased a few years ago from East Rutherford, New Jersey to return a reserve
aerial unit to our fleet of available aerials. This is a 1994 unit with low mileage and little wear and tear
other than age. However, several items including the tiller-axle/suspension, tiller steering and
electronic controls for the aerial ladder have proven un-reliable while others have failed the annual
third-party service test. The quote includes a third-party reinspection that will last for one-year after
the repairs are approved. By conducting this work now, we are able to have the OEM perform and
warranty the work.
It is our goal to defer replacement of this aerial as a cost avoidance measure for three to five
additional years assuming no catastrophic failures of any major component. The three existing aerial
devices in the HFD were evaluated locally and by LTC to determine the most reliable truck to
maintain. The older 1994 truck referenced here was determined to be in the best overall condition
and the least likely to fail in the near term.
Attached you will find a copy of the proposal that also includes a one-year warranty that was
negotiated beyond the standard 30-day warranty at no additional costs to the city. The funds are
budgeted in the FY17 approved HFD CIP budget for an amount not to exceed $30,000. We have
confidence in this estimate as the result of the truck being fully evaluated at the Lancaster, PA
facility.
Work will begin immediately upon approval of the estimated repairs.
Respectively,
REQUIRED MOTION
MAYOR AND CITY COUNCIL
HAGERSTOWN, MARYLAND
Topic:
2015A and 2015B Bond Proceeds - Michelle Hepburn, Director of Finance
Mayor and City Council Action Required:
Discussion:
Financial Impact:
Recommendation:
Motion:
Action Dates:
ATTACHMENTS:
File Name Description
Reprogramming_Unspent_2015A_and_2015B_Memo_12.06.16.pdf 2015A & 2015B Bond
Reprogram
CI T Y OF H A G E R S T O W N, MARYLAND
Finance Department
301-739-8577 X160
To: Valerie Means, City Administrator
From: Michelle Hepburn, Director of Finance
Date: December 6, 2016
Subject: Reprogramming of Unspent 2015A and 2015B Bond Proceeds
City staff will discuss the need to reprogram unspent bond proceeds from the City’s 2015A tax exempt bond and
2015B taxable bond issue. Reprogramming the unspent bond proceeds will allow the City to move forward with
several important capital projects without issuing new bonds or transferring additional funds from the General
Fund into the Capital Improvements Program during FY17.
MAYOR AND COUNCIL ACTION REQUESTED
City staff has developed a proposed plan for the use of unspent bond proceeds based on previously approved
Mayor and Council projects. Work has already started on many of the proposed projects. Those
recommendations are listed below in the background information. Additionally, we would like Mayor and Council
permission to move forward with the bond reprogramming process with our bond counsel, Lindsey Rader from
Funk & Bolton, to draft a Supplemental Bond Ordinance and a Supplemental Bond Resolution.
BACKGROUND
The cost of several of the projects that we had planned to spend the 2015A and 2015B bond proceeds on was
less than expected, not undertaken, or additional funding sources were identified. This resulted in unspent bond
proceeds that need to be reprogrammed for other eligible uses. The 2015A tax exempt bond proceeds have time
spending requirements that are federally mandated. The sources of unspent bond proceeds by project (include
applicable interest earnings to date) are:
Description Project No. Amount
Projects with Unspent 2015A and 2015B Bond Proceeds
GF: Major Signal Intersection Upgrades C0243 2,033.11
GF: Stormdrain System Upgrades C0444 10,888.67
GF: MELP (former Municipal Electric Light Plant) C0839 651,840.62
Elec: HLD Admin Office Building C0542 234,990.70
WWT: Eliminate Pump Station C0832 25,074.23
Prop Mgmt: Roslyn Building Windows C0779 100,296.98
Total Unspent Bond Proceeds 1,025,124.31
Staff would like to share their recommendations for the use of the remaining unspent 2015A and 2015B bond
proceeds. Other eligible uses were identified, so that we can expend the funds within the expected timeframe for
use of tax exempt bonds. The project list is as follows:
City of Hagerstown Page 2 of 2
2015A and 2015B Bond Reprogramming
Description Project No. Amount
Use of Unspent 2015A and 2015B Bond Proceeds
GF: City Park lake design C0047 74,000.00
GF: Prospect Street Wall C0401 99,459.46
GF: Fairgrounds Grandstand Improvements C0624 154,000.00
WWT: Wastewater Plant Equipment C0584 25,074.23
WWT: Synagro Plant Improvements C0712 651,840.62
Prop Mgmt: Elizabeth Hager Center Building Roof C0803 20,750.00
Total Reprogrammed Prior Bond Proceeds 1,025,124.31
Reprogramming of Unspent Bond Proceeds - Proposed Plan
To meet the required deadline for spending the 2015A tax exempt bond proceeds by April 2018, staff is
recommending that the above project listing be approved by Mayor and Council, so that the necessary ordinances
and paperwork can be started.
Potential Calendar/Schedule of Items Required:
Discussion of Project Listing to Reprogram Bonds December 6, 2016
Introduction of Supplemental Bond Ordinance to Reprogram Bond Proceeds December 13, 2016
Adoption of Supplemental Bond Ordinance to Reprogram Bond Proceeds December 20, 2016
Effective Date of Supplemental Bond Ordinance January 20, 2017
Approval of Supplemental Resolution to Reprogram Bond Proceeds January 24, 2017
REQUIRED MOTION
MAYOR AND CITY COUNCIL
HAGERSTOWN, MARYLAND
Topic:
Executive Session
Mayor and City Council Action Required:
Discussion:
Financial Impact:
Recommendation:
Motion:
Action Dates:
ATTACHMENTS:
File Name Description
December_6__2016_Executive_Session.pdf Executive Session Agenda
EXECUTIVE SESSION
MAYOR & CITY COUNCIL
DECEMBER 6, 2016
AGENDA
5:30 p.m. EXECUTIVE SESSION – Room 407, 4th floor, City Hall
1. To consult with counsel to obtain legal advice, #7
*Seeking approval to engage attorneys
*AUTHORITY: Annotated Code of Maryland, General Provisions Article: Section 3-305(b)
(Subsection is noted in parentheses)
CITY OF HAGERSTOWN, MARYLAND
PUBLIC BODY: Mayor & City Council DATE: December 6, 2016 .
PLACE: Council Chamber, 2nd floor, City Hall TIME: 5:30 p.m. .
AUTHORITY: ANNOTATED CODE OF MARYLAND, GENERAL PROVISIONS ARTICLE: Section 3-305(b):
1. To discuss:
[ ] (i) the appointment, employment, assignment, promotion, discipline,
demotion, compensation, removal, resignation or performance
evaluation of appointees, employees, or officials over whom it has
jurisdiction; or
[ ] (ii) any other personnel matter that affects 1 or more specific individuals;
[ ] 2. To protect the privacy or reputation of individuals with respect to a matter that is not
related to public business;
[ ] 3. To consider the acquisition of real property for a public purpose and matters directly
related thereto;
[ ] 4. To consider a matter that concerns the proposal for a business or industrial
organization to locate, expand, or remain in the State;
[ ] 5. To consider the investment of public funds;
[ ] 6. To consider the marketing of public securities;
[X] 7. To consult with counsel to obtain legal advice;
[ ] 8. To consult with staff, consultants, or other individuals about pending or potential
litigation;
[ ] 9. To conduct collective bargaining negotiations or consider matters that relate to the
negotiations;
[ ] 10. To discuss public security, if the public body determines that public discussions
would constitute a risk to the public or public security, including:
(i) the deployment of fire and police services and staff; and
(ii) the development and implementation of emergency plans;
[ ] 11. To prepare, administer or grade a scholastic, licensing, or qualifying examination;
[ ] 12. To conduct or discuss an investigative proceeding on actual or possible criminal
conduct; or
[ ] 13. To comply with a specific constitutional, statutory, or judicially imposed
requirement that prevents public disclosures about a particular proceeding or matter;
or
[ ] 14. Before a contract is awarded or bids are opened, discuss a matter directly related to a
negotiation strategy or the contents of a bid or proposal, if public discussion or
disclosure would adversely impact the ability of the public body to participate in the
competitive bidding or proposal process.