Neighborhood Commission Agendas & Minutes
Regular MeetingHampton, VA · January 11, 2016
Agenda
HAMPTON NEIGHBORHOOD COMMISSION
Neighborhood Commission
Monday, January 11, 2016— 5:00-6:30PM
Community Development Conference Room
BE A GREAT NEIGHBOR - ENGAGE OUR NEIGHBORHOODS - ENCOURAGE NEIGHBORHOODS
TO BE GREAT PLACES - BE A CONDUIT BETWEEN OUR NEIGHBORHOODS AND OUR CITY - KEEP
NEIGHBORHOOD LEADERS INFORMED - HELP GUIDE NEIGHBORHOOD LEADERS IN REACHING THEIR GOALS -
ENCOURAGE NEIGHBOR ENGAGEMENT WITHIN THEIR NEIGHBORHOODS AND CITY
——————————————————————————————————————————-
District Representatives:
District Representatives:
District One
District One
David Duxbury
Karen Duncan
District Two I. Opening
District
Vacant
Pam Two
Croom
Pam Croom
District Three A. Roll Call and Verification of Quorum
District
Vacant
Chris Three
Henderson B. Pledge of Allegiance
Chris Henderson
District Four C. Review and Approve minutes of the October 12, 2015 Meeting
District
Sandra
Sandra Four
Medina,
King-Medina
Chair-Elect D. Chair Announcements
SandraFive
District King-Medina
District
PatriciaFive
Parker II. Director’s Report
PatriciaSix
District Parker
District Six
Alice Callahan III. Items to be Presented by Public
Alice
DistrictCallahan
Seven
District Seven
Sally Lazorchak IV. Briefings
John Lowe
District Eight A. Hampton Neighborhood Development Partnership Update Briefing
District
BrandyEight
Evelyn Stephenson
Marteney B. Capital Improvement Projects (CIP) Report Briefing
Jason Samuels
District Nine
District
Deena
Rhonda Nine
Franklin
Woods V Action Items (Voting Items) - Consent Agenda
ThomasTen
District Southall A. Consideration of the District 10 Commissioner Appointment
District
Vacant Ten B. Consideration of Blitz Location for the Spring 2016
Judy Hart
School Representative: VI. Dialogue (Ongoing/Old Business)
School Representative: A. Strategic Issues Update
Ann Bane 1. Hampton Neighborhood College
Ann Bane
a. Hampton 101 (Jan. 23rd)
City Representatives: 2. You Make A Difference (March)- CivCom/CAPI
City Representatives: 3. Home Repair Blitz (April 30th)- CAPI
Anthony
Lynn Alsbrook
Reyes
Anthony
Steve
Maj. Reyes
Ronald
Bond Davis 4. Neighborhood Commission Annual Retreat (Jan. 30th)
MajorRonald
Steve
Maj. RonaldDavis
Bond Davis
James Gray B. Committee Status Reports on Work Plan Progress
Institutional Representatives: 1. Nominating Committee
Institutional Representatives: a. Committee Assignments
StevenMills
Henry Edwards
Henry Mills 2. Community Appearance, Pride & Image Committee
Stephanie
Kathy Johnson
Afonja
Kathy Johnson, Chair 3. Youth Committee
StevenMills
Henry Edwards, Chair
Steven Edwards, Chair-Elect a. 20th Anniversary (Dec. 27th)
At-Large Representatives: 4. Civic Communications Committee
At-Large Representatives:
Peggy Todd, Chair-Elect
5. Neighborhood-School Partnerships Committee
Barbara Franklin
VII. Items by Commissioners
Youth Representatives:
Grace
VacantKelly
Sonya Medina
Nehemiah Lipford
Vacant The next Hampton Neighborhood Commission meeting will be held on February 8, 2016, at
Executive Director: 5 pm in a location to be announced.
Executive Director:
Jonathan E. McBride
Executive Director:
Jonathan E.
—————————————-
McBride
Terry O’Neill
c/o Housing & Neighborhood
—————————————-
Services Division
c/o Housing
22 Lincoln
& Neighborhood
Street
Hampton,
Services
VADivision
23669-3591 Protocol for Public Input at Neighborhood Commission Meetings:
22 Lincoln Street Hampton Neighborhood Commission meetings are open to the public. The public is invited to attend meetings
Hampton,(757)
Phone VA 727-6140
23669-3591 and to observe the work and deliberations of the Neighborhood Commission. The public may also address the
Fax (757) 728-2449
Neighborhood Commission during the agenda item “Items to be Presented by the Public” by signing up to speak.
Phone (757) 727-6140
www.hampton.gov/
Fax (757) 728-2449 The sign-up sheet will be available to the public until the agenda item “Items to be Presented by the Public” is
neighborhoods reached in the course of the meeting. Speakers will be recognized in the order in which they sign up and are
www.hampton.gov/ asked to limit their comments to 5 minutes.
neighborhoods
MEETING DATE: January 11, 2016
HAMPTON NEIGHBORHOOD COMMISSION
AGENDA REVIEW
Preparer: J.Bryson Reviewer: J.McBride Presenter: A. Bigelow
SUBJECT: Briefing on Hampton Neighborhood Development Partnership Update
AGENDA ITEM: IV. A
ACTION REQUESTED: N/A
BACKGROUND STATEMENT: Andy Bigelow, President of the Hampton Neighborhood
Development Partnership and former Neighborhood Commissioner, will be
presenting and update on the organization and next steps.
The Hampton Neighborhood Development Partnership (HNDP) is a 501(c) 3
organization whose mission is “to improve neighborhoods in the City of Hampton
by working with charitable, governmental, and other organizations to identify and
distribute resources that will enhance the quality of life in Hampton
neighborhoods.”
NEXT STEPS (If Applicable): N/A
ADDITIONAL REFERENCE MATERIALS ENCLOSED: N/A
COMMITTEE RECOMMENDATIONS: N/A
MEETING DATE: January 11, 2016
HAMPTON NEIGHBORHOOD COMMISSION
AGENDA REVIEW
Preparer: J.Bryson Reviewer: J.McBride Presenter: D. McCormick
SUBJECT: Briefing on FY15-19 Capital Improvement Plan
AGENDA ITEM: IV. B
ACTION REQUESTED: N/A
BACKGROUND STATEMENT: The Capital Improvement Plan (CIP) is a 5 year plan
that directs the spending priorities in the City for physical projects and public
facility maintenance needs. Each year the City updates the plan to reflect the
current revenues and opportunities within the community. Similar to last year,
community feedback will be solicited through conversations with key boards and
commissions.
The Budget Director will present a brief overview of the purpose of the CIP, and its
role in implementing strategic initiatives and infrastructure maintenance/
improvements. Commissioners will be given the opportunity to ask questions and
provide input on key project priorities that are important for the future of
neighborhoods.
NEXT STEPS (If Applicable): N/A
ADDITIONAL REFERENCE MATERIALS ENCLOSED: FY15-19 Council Approved CIP
Plan; CIP Community Road Show Presentation
COMMITTEE RECOMMENDATIONS: N/A
Financial Overview:
Summary of
Capital Improvement Plan
Planned Year Planned Year Planned Year Planned Year Total Total
REVENUE SOURCES FY 2015 FY 2016 FY 2017 FY 2018 FY 2019 Revenues %
Commonwealth of Virginia $2,000,000 $0 $0 $0 $0 $2,000,000 0.89%
Committed Fund Balance 810,064 0 0 0 0 810,064 0.36%
Congestion Mitigation Air Quality Funds 553,000 698,000 0 0 0 1,251,000 0.56%
General Fund Balance Transfer 3,750,000 2,600,000 2,500,000 2,000,000 2,000,000 12,850,000 5.73%
General Fund Operating Revenues 2,421,683 3,232,265 3,232,265 3,232,265 3,232,265 15,350,743 6.84%
Dedicated Tax Increase: City Investments 2,000,000 2,000,000 2,000,000 2,000,000 2,000,000 10,000,000 4.46%
Dedicated Tax Increase: Hampton City School Investments 2,000,000 2,000,000 2,000,000 2,000,000 2,000,000 10,000,000 4.46%
General Obligation Bond Proceeds~City 10,135,000 6,895,000 10,157,500 5,850,000 3,850,000 36,887,500 16.45%
General Obligation Bond Proceeds~Schools 5,287,500 10,287,500 5,287,500 10,287,500 5,287,500 36,437,500 16.25%
Stormwater Fund 2,528,241 3,935,000 4,185,000 4,685,000 4,685,000 20,018,241 8.93%
Urban Maintenance Contribution 5,770,392 5,921,106 6,039,528 6,160,318 6,281,108 30,172,452 13.45%
VDOT Bridge Replacement Fund 3,786,764 0 0 0 0 3,786,764 1.69%
VDOT Revenue Sharing City Match 717,500 3,125,000 750,000 0 0 4,592,500 2.05%
VDOT Revenue Sharing State Match 2,405,000 3,725,000 750,000 0 0 6,880,000 3.07%
VDOT Urban Contribution Initiative Fund 1,608,463 0 0 0 0 1,608,463 0.72%
Wastewater Fund 3,327,000 4,390,000 6,550,000 8,700,000 8,650,000 31,617,000 14.10%
TOTAL REVENUES $49,100,607 $48,808,871 $43,451,793 $44,915,083 $37,985,873 $224,262,227 100.00%
Planned Year Planned Year Planned Year Planned Year Total Total
EXPENDITURE CATEGORIES FY 2015 FY 2016 FY 2017 FY 2018 FY 2019 Expenditures %
Education $7,444,894 $12,456,604 $7,456,604 $12,456,604 $7,456,604 $47,271,310 21.08%
Hampton's Waterways 3,028,241 3,935,000 4,685,000 4,685,000 4,685,000 21,018,241 9.37%
Maintenance of Public Properties/Performance Support 14,027,000 10,590,000 11,750,000 15,900,000 13,850,000 66,117,000 29.48%
Master Plans 150,000 798,872 1,606,372 798,872 798,872 4,152,988 1.85%
Master Plans Strategic Area Investments 2,000,000 2,000,000 2,000,000 2,000,000 2,000,000 10,000,000 4.46%
Neighborhood Support 350,000 350,000 350,000 350,000 350,000 1,750,000 0.78%
Other CIP Projects 1,964,289 1,964,289 1,964,289 1,964,289 1,964,289 9,821,445 4.38%
Other Economic Development Support 1,500,000 600,000 600,000 600,000 600,000 3,900,000 1.74%
Public Safety 1,712,500 500,000 5,050,000 0 0 7,262,500 3.24%
Streets and Infrastructure 16,923,683 15,614,106 7,989,528 6,160,318 6,281,108 52,968,743 23.62%
TOTAL EXPENDITURES $49,100,607 $48,808,871 $43,451,793 $44,915,083 $37,985,873 $224,262,227 100.00%
Financial Overview:
Capital Improvement Plan
by Expenditure Categories
Planned Year Planned Year Planned Year Planned Year
Revenue Sources FY15 FY16 FY17 FY18 FY19 TOTAL
General Fund Revenues
General Fund Balance Transfer $3,750,000 $2,600,000 $2,500,000 $2,000,000 $2,000,000 $12,850,000
General Fund Operating Revenues 2,421,683 3,232,265 3,232,265 3,232,265 3,232,265 15,350,743
Dedicated Tax Rate Increase: City Investments* 2,000,000 2,000,000 2,000,000 2,000,000 2,000,000 10,000,000
Dedicated Tax Rate Increase: Hampton City Schools Investments** 2,000,000 2,000,000 2,000,000 2,000,000 2,000,000 10,000,000
Committed Fund Balance 810,064 0 0 0 0 810,064
Urban Maintenance Contribution 5,770,392 5,921,106 6,039,528 6,160,318 6,281,108 30,172,452
VDOT Revenue Sharing City Match 717,500 3,125,000 750,000 0 0 4,592,500
Total: $17,469,639 $18,878,371 $16,521,793 $15,392,583 $15,513,373 $83,775,759
Other Revenues
Commonwealth of Virginia ♣ $2,000,000 $0 $0 $0 $0 $2,000,000
Congestion Mitigation Air Quality Funds 553,000 698,000 0 0 0 1,251,000
General Obligation Bond Proceeds ~ City 10,135,000 6,895,000 10,157,500 5,850,000 3,850,000 36,887,500
General Obligation Bond Proceeds ~ Hampton City Schools 5,287,500 10,287,500 5,287,500 10,287,500 5,287,500 36,437,500
Stormwater Fund 2,528,241 3,935,000 4,185,000 4,685,000 4,685,000 20,018,241
VDOT Bridge Replacement Fund 3,786,764 0 0 0 0 3,786,764
VDOT Revenue Sharing State Match 2,405,000 3,725,000 750,000 0 0 6,880,000
VDOT Urban Contribution Initiative Fund (UCI) 1,608,463 0 0 0 0 1,608,463
Wastewater Fund 3,327,000 4,390,000 6,550,000 8,700,000 8,650,000 31,617,000
Total: $31,630,968 $29,930,500 $26,930,000 $29,522,500 $22,472,500 $140,486,468
GRAND TOTAL ~ Revenues $49,100,607 $48,808,871 $43,451,793 $44,915,083 $37,985,873 $224,262,227
Planned Year Planned Year Planned Year Planned Year
Projects by Expenditure Categories FY15 FY16 FY17 FY18 FY19 TOTAL
1. Education
Hampton City Schools General Maintenance Projects $2,387,500 $2,387,500 $2,387,500 $2,387,500 $2,387,500 $11,937,500
Hampton City Schools Investment Panel Improvement Projects 2,900,000 2,900,000 2,900,000 2,900,000 2,900,000 14,500,000
Hampton City Schools Major Renovation Projects 0 5,000,000 0 5,000,000 0 10,000,000
Hampton City Schools "One-to-One" Technology Initiative** 2,000,000 2,000,000 2,000,000 2,000,000 2,000,000 10,000,000
Thomas Nelson Community College Site Improvements 157,394 169,104 169,104 169,104 169,104 833,810
Total: $7,444,894 $12,456,604 $7,456,604 $12,456,604 $7,456,604 $47,271,310
2. Hampton's Waterways
Berkshire Terrace Improvements from Mary Peake Study $50,000 $1,250,000 $0 $0 $0 $1,300,000
Buckroe Shopping Mall Wetlands 0 0 175,000 500,000 500,000 1,175,000
Burbank Elementary School Best Management Practices 100,000 0 0 0 0 100,000
Forrest Elementary School Best Management Practices 1,500,000 0 0 0 0 1,500,000
Jones Magnet Middle School Detention Pond 0 0 90,000 200,000 0 290,000
Kecoughtan High School Detention Pond 0 0 50,000 250,000 0 300,000
Lynnhaven Lake Outfall Structure 50,000 50,000 100,000 0 0 200,000
Mary Peake Outfall Improvements at Newmarket Creek 50,000 1,500,000 0 0 0 1,550,000
Merrimack Elementary Wetland 0 0 100,000 225,000 0 325,000
Neighborhood Stormwater Improvements 585,000 585,000 585,000 585,000 585,000 2,925,000
Old Point Avenue Detention Pond 0 0 0 200,000 1,700,000 1,900,000
Salt Pond Dredging 500,000 0 500,000 0 0 1,000,000
Water Quality Improvements from on-going Watershed Studies 0 0 2,185,000 1,825,000 1,300,000 5,310,000
Watershed Studies 193,241 500,000 500,000 600,000 600,000 2,393,241
Winchester Drive Drainage Improvements 0 50,000 400,000 300,000 0 750,000
Total: $3,028,241 $3,935,000 $4,685,000 $4,685,000 $4,685,000 $21,018,241
Financial Overview:
Capital Improvement Plan
by Expenditure Categories
Planned Year Planned Year Planned Year Planned Year
Projects by Expenditure Categories FY15 FY16 FY17 FY18 FY19 TOTAL
3. Maintenance of Public Properties and Performance Support
Circuit Courthouse (renovation of old facility) $0 $0 $0 $2,000,000 $1,000,000 $3,000,000
City-wide and Downtown Landscaping Enhancements 100,000 100,000 100,000 100,000 100,000 500,000
Design of Briarfield & Gosnold Hope Parks 250,000 0 0 0 0 250,000
Design for Youth Sports Tourism Facility 1,000,000 0 0 0 0 1,000,000
Infrastructure Rehabilitation Program (Wastewater Fund) 3,327,000 4,390,000 6,550,000 8,700,000 8,650,000 31,617,000
Langley Air Force Base Clear Zone 4,000,000 0 0 0 0 4,000,000
Parks and Recreation Maintenance 2,000,000 3,000,000 2,000,000 3,000,000 2,000,000 12,000,000
Public Facility Improvements 3,250,000 3,000,000 3,000,000 2,000,000 2,000,000 13,250,000
Re-engineering Technology 100,000 100,000 100,000 100,000 100,000 500,000
Total: $14,027,000 $10,590,000 $11,750,000 $15,900,000 $13,850,000 $66,117,000
4. Master Plans
Boardwalk Extension $0 $160,735 $0 $0 $0 $160,735
Coliseum Central Master Plan Updates 150,000 0 0 0 0 150,000
Mallory Streetscape {County Street to Seawall Avenue} 0 100,000 807,500 0 0 907,500
Master Plan Area Investments* 2,000,000 2,000,000 2,000,000 2,000,000 2,000,000 10,000,000
Strategic Acquisition City 0 538,137 798,872 798,872 798,872 2,934,753
Total: $2,150,000 $2,798,872 $3,606,372 $2,798,872 $2,798,872 $14,152,988
5. Neighborhood Support
Blighted Property Acquisition and Demolition $250,000 $250,000 $250,000 $250,000 $250,000 $1,250,000
Housing & Neighborhood Improvement Funding 100,000 100,000 100,000 100,000 100,000 500,000
Total: $350,000 $350,000 $350,000 $350,000 $350,000 $1,750,000
6. Other CIP Projects
Contingency $100,000 $100,000 $100,000 $100,000 $100,000 $500,000
Motorola Lease Payment 1,864,289 1,864,289 1,864,289 1,864,289 1,864,289 9,321,445
Total: $1,964,289 $1,964,289 $1,964,289 $1,964,289 $1,964,289 $9,821,445
7. Other Economic Development Projects
Commercial Blight Abatement & Redevelopment $1,500,000 $600,000 $600,000 $600,000 $600,000 $3,900,000
Total: $1,500,000 $600,000 $600,000 $600,000 $600,000 $3,900,000
8. Public Safety
Police In-Car & Body Cameras $285,000 $0 $0 $0 $0 $285,000
Public Safety Radio System Microwave Upgrade 427,500 0 0 0 0 427,500
Self Contained Breathing Apparatus 1,000,000 0 0 0 0 1,000,000
Wythe Fire Station 0 500,000 5,050,000 0 0 5,550,000
Total: $1,712,500 $500,000 $5,050,000 $0 $0 $7,262,500
9. Streets and Infrastructure
Big Bethel Rd/Todds Ln Intersection Improvements $2,608,463 $0 $0 $0 $0 $2,608,463
City-wide Traffic Signal Upgrades - Phase 4 553,000 0 0 0 0 553,000
Coliseum Drive Extension Phase 1 250,000 0 1,500,000 0 0 1,750,000
Commerce Drive Extension 200,000 1,000,000 0 0 0 1,200,000
Fiber Optic Communications- Big Bethel Road 250,000 0 0 0 0 250,000
Franklin Street Extension 435,000 0 0 0 0 435,000
Freeman Drive Alignment 100,000 950,000 0 0 0 1,050,000
Financial Overview:
Capital Improvement Plan
by Expenditure Categories
Planned Year Planned Year Planned Year Planned Year
Projects by Expenditure Categories FY15 FY16 FY17 FY18 FY19 TOTAL
9. Streets and Infrastructure (Cont'd)
Kecoughtan Road/Sunset Creek Railing $425,000 $0 $0 $0 $0 $425,000
Mercury Boulevard Sidewalks {Coliseum Drive to Armistead Avenue} 100,000 950,000 0 0 0 1,050,000
Newmarket Creek Trail 400,000 1,400,000 0 0 0 1,800,000
North King Street Streetscape {Lincoln Street to I-64} 0 45,000 450,000 0 0 495,000
North King Street Streetscape - Phase 3 600,000 2,100,000 0 0 0 2,700,000
Old Northhampton Area Improvements- Phase 3 Langley 810,064 0 0 0 0 810,064
Pembroke Avenue Reconstruction - Phase 3 300,000 1,050,000 0 0 0 1,350,000
Replacement of Bridge Street Bridge 3,786,764 0 0 0 0 3,786,764
Street Resurfacing 5,400,392 5,551,106 5,669,528 5,790,318 5,911,108 28,322,452
Street Resurfacing- VDOT Allocation to Ft. Monroe 370,000 370,000 370,000 370,000 370,000 1,850,000
Settlers Landing Bridge Repairs 150,000 1,500,000 0 0 0 1,650,000
Sussex Sidewalk Completion Project 185,000 0 0 0 0 185,000
Traffic Signal System Retiming 0 698,000 0 0 0 698,000
Total: $16,923,683 $15,614,106 $7,989,528 $6,160,318 $6,281,108 $52,968,743
GRAND TOTAL ~ Projects by Expenditure Category $49,100,607 $48,808,871 $43,451,793 $44,915,083 $37,985,873 $224,262,227
Financial Overview:
Capital Improvement Plan
by Funding Source
Planned Year Planned Year Planned Year Planned Year
REVENUES FY15 FY16 FY17 FY18 FY19 Total
General Fund Revenues
General Fund Balance Transfer $3,750,000 $2,600,000 $2,500,000 $2,000,000 $2,000,000 $12,850,000
General Fund Operating Revenues 2,421,683 3,232,265 3,232,265 3,232,265 3,232,265 15,350,743
Dedicated Tax Rate Increase: City Investments* 2,000,000 2,000,000 2,000,000 2,000,000 2,000,000 10,000,000
Dedicated Tax Rate Increase: Hampton City Schools Investments** 2,000,000 2,000,000 2,000,000 2,000,000 2,000,000 10,000,000
Committed Fund Balance 810,064 0 0 0 0 810,064
Urban Maintenance Contribution 5,770,392 5,921,106 6,039,528 6,160,318 6,281,108 30,172,452
VDOT Revenue Sharing City Match 717,500 3,125,000 750,000 0 0 4,592,500
Total General Fund Revenues $17,469,639 $18,878,371 $16,521,793 $15,392,583 $15,513,373 $83,775,759
Other Revenues
Commonwealth of Virginia ♣ $2,000,000 $0 $0 $0 $0 $2,000,000
Congestion Mitigation Air Quality Funds 553,000 698,000 0 0 0 1,251,000
General Obligation Bond Proceeds ~ City 10,135,000 6,895,000 10,157,500 5,850,000 3,850,000 36,887,500
General Obligation Bond Proceeds ~ Hampton City Schools 5,287,500 10,287,500 5,287,500 10,287,500 5,287,500 36,437,500
Stormwater Fund 2,528,241 3,935,000 4,185,000 4,685,000 4,685,000 20,018,241
VDOT Bridge Replacement Fund 3,786,764 0 0 0 0 3,786,764
VDOT Revenue Sharing State Match 2,405,000 3,725,000 750,000 0 0 6,880,000
VDOT Urban Contribution Initiative Fund (UCI) 1,608,463 0 0 0 0 1,608,463
Wastewater Fund 3,327,000 4,390,000 6,550,000 8,700,000 8,650,000 31,617,000
Total Other Revenues $31,630,968 $29,930,500 $26,930,000 $29,522,500 $22,472,500 $140,486,468
GRAND TOTAL ~ Revenues $49,100,607 $48,808,871 $43,451,793 $44,915,083 $37,985,873 $224,262,227
Planned Year Planned Year Planned Year Planned Year
EXPENDITURES FY15 FY16 FY17 FY18 FY19 Total
GENERAL FUND REVENUES: General Fund Balance Transfer
Hampton's Waterways
Salt Pond Dredging $500,000 $0 $500,000 $0 $0 $1,000,000
Maintenance of Public Properties and Performance Support
Public Facility Improvements 1,000,000 2,000,000 2,000,000 2,000,000 2,000,000 9,000,000
Master Plans
Coliseum Central Master Plan Updates 150,000 0 0 0 0 150,000
Public Safety
Police In-Car & Body Cameras 285,000 0 0 0 0 285,000
Public Safety Radio System Microwave Upgrades 427,500 0 0 0 0 427,500
Self Contained Breathing Apparatus 1,000,000 0 0 0 0 1,000,000
Streets and Infrastructure
Commerce Drive Extension 0 500,000 0 0 0 500,000
Fiber Optic Communications-Big Bethel Road 125,000 0 0 0 0 125,000
Freeman Drive Aligment 0 100,000 0 0 0 100,000
Kecoughtan Road/Sunset Creek Railing 212,500 0 0 0 0 212,500
Mercury Boulevard Sidewalks {Coliseum Drive to Armistead Avenue} 50,000 0 0 0 0 50,000
Total $3,750,000 $2,600,000 $2,500,000 $2,000,000 $2,000,000 $12,850,000
Financial Overview:
Capital Improvement Plan
by Funding Source
Financial Overview:
Capital Improvement Plan
by Funding Source
Financial Overview:
Capital Improvement Plan
by Funding Source
MEETING DATE: January 11, 2016
HAMPTON NEIGHBORHOOD COMMISSION
CONSENT AGENDA OVERVIEW
(ITEMS V. A thru B)
V. Action Items - Consent Agenda (Vote)
A. Consideration for Nominated District Commissioner
Approval of Nominee for District 10 Appointment:
I. Chekesha White
B. Consideration of the recommended neighborhood for the Spring 2016
Hampton Home Repair Blitz
Approval of the Recommended Neighborhood Area:
I. Shell Rd. Corridor
MEETING DATE: January 11, 2016
HAMPTON NEIGHBORHOOD COMMISSION
AGENDA REVIEW
Preparer: J.Bryson Reviewer: J. McBride Presenter: A. Callahan
SUBJECT: Consideration of the Nominated District 10 Commissioner
AGENDA ITEM: V. A. (Consent Agenda)
ACTION REQUESTED: Approve the recommendation from the Nominating Committee to
submit a nominee for District 10 Commissioner to City Council for appointment.
Suggested Language for the Motion – “I move that we approve the recommendation
from the Nominating Committee to submit 1 nominee to serve as the District 10
Commissioner.”
BACKGROUND STATEMENT: The Nominating Committee is tasked with presenting a
recommendation for candidates to serve as representatives on the Neighborhood
Commission.
Candidates were selected based on the qualifications and expectations outlined in the
Operations Manual-Chapter 2. After reviewing their applications and interviewing
candidates, the Nominating Committee recommends;
Nominee Sector Term beginning Term ending
Chekesha White District 10 1/27/2016 9/30/16
(Continuing an
unexpired term)
NEXT STEPS (If Applicable): If approved, the recommendation will be forwarded to
Hampton City Council for appointment at the January 27, 2016 meeting.
ADDITIONAL REFERENCE MATERIALS ENCLOSED: N/A
COMMITTEE RECOMMENDATIONS: The Nominating Committee recommends approval of
City Representative Nominees for appointment by Hampton City Council.
MEETING DATE: January 11, 2016
HAMPTON NEIGHBORHOOD COMMISSION
AGENDA REVIEW
Preparer: J.Bryson Reviewer: J.McBride Presenter: S. Edwards_
SUBJECT: Consideration of the recommended neighborhood for the Spring 2016
Hampton Home Repair Blitz
AGENDA ITEM: V. B. (Consent Agenda)
ACTION REQUESTED: Approval of the Recommended Neighborhood Area
SAMPLE MOTION: None needed – Motion by the CAPI Committee
BACKGROUND STATEMENT:
In June, the Community Appearance Pride and Image (CAPI) Committee recommended
a set of priority areas for the upcoming Spring 2016 Home Repair Blitz event.
Following recent Home Repair Blitz events, the Committee agreed on key factors that
would help to ensure that the upcoming Blitz events were equally successful, including:
Access to facilities for logistical and volunteer support,
Opportunity to build stronger neighborhood & school partnerships,
Awareness of seasonal activities that would impact the project (sports/activities),
Visibility and concentration of homeowners with repair needs, and
Existing community network and neighborhood organizations.
Given the considerations above, the Committee agreed to the Blitz area as follows:
Spring 2016 Blitz: Shell Rd. Corridor Area
NEXT STEPS: NA
ADDITIONAL REFERENCE MATERIALS ENCLOSED: Blitz Target Area Map
COMMITTEE RECOMMENDATIONS: CAPI Committee Recommends Approval of the Shell
Rd. Corridor Neighborhood
e
e nu
s Av
New
t
p or
e w
N
Ho
m
Fa ir es
te a
lan
d n
Rid ve
ge Av
en dA
n ue
ve ue
es yA
wa
W
oo
tw ue
e
nu
ve
dA d
a
ll Ro
h e
S
¯
0 0.08 0.16
Miles
Legend
City of Hampton Tenure
Planning and Zoning Administration Divison Owner Occupied (57.3%)
Source: City of Hampton Assessor
April 17, 2015 Renter Occupied (42.7%)
MINUTES
Hampton Neighborhood Commission Meeting
Community Development Conference Room
Executive Committee
October 26, 2015
Time 5:00-6:00 p.m.
Present
Alice Callahan – Chair of Nominating Committee
Steve Bond – City Rep.
Steven Edwards – Chair
Barbara Franklin – Chair of Civic Communications Committee
Sandra Medina – District 4
Peggy Todd – Chair-Elect
Absent
Henry L. Mills, Institutional Rep.
Ann Bane – Chair of Neighborhood - School Partnership Committee
Steven Edwards – Chair
Staff
Jonathan McBride, Executive Director
Marcie Spragan - Recording Secretary
Jasmine Bryson - Coordinator
Shanel Lewis - Housing & Neighborhood Services Staff
Darren Robinson - Housing & Neighborhood Services Staff
Shellae Blackwell – Safe& Clean Coordinator
Guests
None
Item #1
Nominating Update –
Alice reported The Committee will be meeting after this and have several
interviews scheduled for District 8,9,10, and the Non-Profit Institutional Position.
Item #2
Neighborhood Commission Retreat
Peggy spoke on the upcoming retreat for the Neighborhood Commissioners. The
goal is to try and help them better understand their roles as Neighborhood
Commissioners.
Jonathan spoke on half of the day being enrolled in discussion focused on there
should be Neighborhood Commissioners are to interact with other boards and
1
commissions. He also spoke with council members may want to hold a discussion
on how to interact with our board and commissions.
Jim Moynihan, Asset Based Community Development (ABCD) Trainer and
Coach, as the special speaker for the other half of the retreat.
Item #3
Holiday Social
The discussion of location was talked about. It can possibly be held at Alice’s
clubhouse. She will check the availability of it with the possibility of the Holiday
Social being held there since the next Neighborhood Commission meeting is
December 14, 2015.
Peggy and Steve will discuss a back-up location if the club house is not
available. Jonathan put across that the new commissioners will be attending the
next Neighborhood Commission meeting for the first time.
Item #4
Strategic Projects Updates
A. Hampton Neighborhood College – NSP
o Hampton 201 (October 29th) – The first class is due to begin and it will be held
on the 9th from 6pm-9pm.
o Hampton 101 (December 3rd) – This will be held from 7am – 1pm. at the
Hampton History Museum and will be geared for Military and Realtors.
B. Meet and Greet (November)
o Civic Communications - There are four (4) proclamations
C. Home Repair Blitz (April) – C.A.P.I. –
o Meeting was cancelled
Item #5
Review and approve draft agenda for September 29TH, 2015 Neighborhood Commission
Meeting
Agenda approved.
Item #6
Other Business
Item #7
Solicit Remarks for Chair Announcements
Next Meeting Date: November 23rd, 2015. Location TBD.
2
MINUTES
Hampton Neighborhood Commission Meeting
Community Development Conference Room
Executive Committee
December 16, 2015
Time 5:00-6:00pm
Present
Sandra Medina - District 4
Alice Callahan - District 6
Ann Bane - School Representative
Steve Bond - City Representative
Henry Mills - Institutional Representative
Steven Edwards - Institutional Representative
Peggy Todd - Chairperson
David Duxbury - District 1
Absent
Patricia Parker - District 5
Sally Lazorchak - District 7
Evelyn Stephenson - District 8
Deena Franklin - District 9
Marcie Spragan - Housing & Neighborhood Services Staff
Staff
Jonathan McBride - Executive Director
Jasmine Bryson – Coordinator (Recorder for this meeting)
Shanel Lewis - Housing & Neighborhood Services Staff
Darren Robinson - Housing & Neighborhood Services Staff
Guests
Bonnie Brown – City Attorney’s Office
Item #1
Wesley Methodist Playground Grant Update
In early 2015 the Commission approved a grant for a community playground at
the Wesley United Methodist church in partnership with Riverdale and Tide Mill
Machen Neighborhoods to do a playground at the corner of Tide Mill Lane and
Armistead Avenue.
The church obtained a Use Permit last summer for the project. Through final
legal review of the grant agreements, it was realized that state law prohibits
public donations to sectarian organizations and would either have to agree to
an o
easement appraoch to install a public amenity or to withdraw the grant.
Staff would follow-up with the community leadership to determine next steps
and assist in identifying other resources in the community. In addition, staff will
draft changes to the grant policies in the upcoming months.
1
Item #2
Parking on the Lawn – Little England Project
Jonathan conveyed to the committee the Little England requested consideration
as a “pilot” program to prohibit “Parking on the Lawns”. This has not yet gone to
the City Attorney’s office for review to see if it can be done in a targeted area.
The Executive Committee decided that questions and issues that arise with the
pilot program should be worked through in the C.AP.I. committee.
Item #3
Neighborhood Commission Retreat Agenda
At this time, The Neighborhood Commission Retreat will be held on Saturday,
January 30, 2016 from 8:00 a.m. to 3:30 p.m. The guest speaker will be Jim
Moynihan (ABCD). Peggy Todd and a few Neighborhood staff members are to
meet with Jim tomorrow to discuss the retreat agenda. A focus may be on the
neighborhood initiative's "Third Decade." Staff will request to have one or two
City Council members in addition to the City Manager at the retreat.
Item #4
Nominating Update
The Committee will recommend appointments for District 8,9, 10, and the Non-
Profit Position.
Please continue to push for Districts, 2, 3, and 5.
Item #5
Committee Status Reports:
A. Civic Communications Committee
No update.
B. Community Appearance, Pride and Image Committee
No Update
C. Neighborhood-School Partnerships Committee
o Ann Bane reported that they met recently and the second semester
letter ready to go after New Year, which will be the first week in
January.
o Joy Phelps is a new member of the committee
o There will be no meeting in December 2015 for the group
D. Nominating Committee
o Peggy reported that there are vacancies in districts 2, 3 and 5 and
we continue to do recruitment to fill those slots. She also reported
that we have new 10-9-8. Lynn Allsbrook will attend the next
meeting and those that do not know him on this committee will get
to meet him. Moreover, Stephanie Afonja is our new non-profit.
E. Youth Committee
o Sandra reported that the holiday party was held the previous
Monday.
2
o Jonathan reminded the attendees that the 20th Anniversary
project coming up next Decenter and there will be updates
throughout the year regarding the planning process.
Item #6
Review and approve draft agenda for January 11, 2016 Neighborhood Commission
Meeting
Allison will be giving an update on the Special Event Permit process
The Budget office representative(s) will be giving their annual briefing on
C.I.P. status. It will include priorities around neighborhoods, grant funding,
housing issues.
The Hampton Neighborhood Development Partnership would like to do
an update to the Neighborhood Commission in what they offer to the
community.
The consideration of the District 10 appointment and consideration for the
next Home Repair Blitz area
Agenda Approved
Item #7
Other Business
Item #8
Solicit Remarks for Chair Announcements
The Hampton 201Graduates will be in attendance at the Neighborhood
Meeting and will be presented their certificates and photos taken
Next Meeting Date: January 25, 2016, Location TBD.
3
Civic Communications Committee
Meeting Results
December 9, 2015- Canty Conference Room- 5:00 PM
Present: Barbara Franklin Chair - At-Large Commissioner
Sandra Medina - District 4 Neighborhood Commissioner
Shanel Lewis - Neighborhood Development Associate
Absent: Alice Callahan - District 6 Neighborhood Commission
Major Ron Davis – Hampton Police Department
I. Chair Announcements
• Newsletter
- Neighborhood Commission and Registered Neighborhood Organizations- Barbara
Franklin will take the lead and be in charge of putting newsletter together after
holidays
- Civic Communications Committee year outlook written for 2016- Barbara Franklin
will write up goals concerning promoting new RNSO’s, updating Neighborhood
Commission website page, newsletter
II. New Business
1. Debrief on “Meet and Greet”
• Pam Croom did not receive acknowledgement- will schedule to give her plaque at
an upcoming event
• Suggested more time to acknowledge new RNSO’s- have a brief description of
organization before giving the certificates
• Suggested to add crackers and rolls to snacks provided
• Suggested a tripod or large sign to display outside the agreed location for the
event
2. “You Make a Difference” Event
• Brainstorm for ideas for the theme suggested “moving forward”
• Location- Still to be determined
• Caterer- Suggested Phoebus High School Culinary
• Sponsorship- will distribute information for commissioners to help sponsorships
• Neighborhood Award Program- applications are due Janurary 30, 2016
• Joint Meeting with CAPI- Jan 2016
3. Hampton Registered Neighborhood Serving Organizations- Review
• Providence Free Will Baptist Church- did not have quorum- will review via email
to committee
The meeting was adjourned at 5:43PM
The next meeting will be held at 5:00 PM on January 18, 2016 in the Canty Conference Room
Minutes by: Sandra Medina
Hampton Neighborhood Commission
Draft Retreat Agenda – Jan 30, 2016
Greetings & Coffee - 8:15a-8:30a
Welcome - 8:30a-8:45a
Asset Based Community Development (PART I) - 8:45a-10:30a
- What is ABCD?
- In / To-For / With
Break 10:30-10:45
Asset Based Community Development (PART II) - 10:45a-12p
- Good Neighbors & Great Neighbors
- Asset Layers
- Head, Heart, Hands Exercise
Lunch / Asset Mapping – 12p-12:45p
Asset Based Community Development (PART III) – 12:45p-2:15p
- Focused Conversation – Guiding Principles
Break 2:15-2:30
Asset Based Community Development (PART IV) – 2:15p-3:30p
- Consensus Building
Get email alerts for Hampton
A daily email when new agendas and minutes are posted.