Muyni
← Back to Hampton

War Memorial Stadium Advisory Board

Regular Meeting

Hampton, VA · August 20, 2018

AgendaMinutes

Minutes

PENINSULA STADIUM AUTHORITY Minutes August 20th, 2018 The meeting was called to order by Jim Wilson, Chair. Others in attendance included: Frank Feagan, Randy Price, Wayne Gomes, Brenda Stokes, Lola Perkins, Pat Uribes and Linda Williams from the Board. Guest speakers: Ron Sterling with City of Hampton Project Manager Engineer; Brad Alger with AE Com Civil Engineer, Jason Mitchell with City of Hampton Public Works. Henry Morgan with Community Baseball. Meeting minutes from Aug 2nd were approved by Randy and seconded by Frank and approved by the Committee. No change in Treasurers report since our last meeting. Check was received from the City of Hampton for this years allocation. A new insurance policy has been issued for the Stadium Authority and copies will be distributed to the appropriate departments. Jim will be reviewing the coverages to be sure that adequate coverage is on the policy to include all the changes to the Stadium. Jim, Sallie, Henry and Hank will be going over Budget items that need to go into the Budget application for 2020 Outside Funding Source. Application needs to be submitted by the end of September. Jim will discuss with Committee in our September meeting. Henry informed us that Community Baseball will be re-lamping the field lights by September 5th at no cost to the Stadium Authority. Jason from Public Works informed us that as far as the directional signs go, as long as there's a pole with space on it, they can put them up at no cost. Ron Sterling Project Manager with the City of Hampton explained the drain line process that is in progress now. The project should be completed in 3-3 1/2 weeks. Some stone work is going on right now, they are prepping the parking lot for the paving. Conduit will be going in prior to paving. They have just received Virginia Power's estimate for 17 new lights at a cost of $50,000, which is below budget. Waiting to hear from VA Power to find out if they will be maintaining the lights and if the can be manually turned off and on. They are dawn to dusk lighting. Parking lot space layout and design-Brad stated they designed the layout based on the items the City asked for. They drew up 9 X 20 parking spaces with 24' drive isles. Bus parking was also included. Total spaces 328 with 14 Handicap included. There was discussion about using grass space near parking lot for overflow parking. Frank had a non-profit organization sketch up a parking space design and presented it to the Committee. The layout was different, had more spaces, 18' drive isles (which meet City code). It would provide 247 spaces in the south side parking lot. Brad will look at Frank's diagram to see if they can add more spaces. Other options are going to be looked into as well for extra parking spaces and the safety of the fans. Entryway Pavilion Building-Bid was cancelled due to a protest that the winning bid was incomplete. Bid will be reissued on Tuesday. Stadium Beam-6 bids received. Winning bid was $275,000. Waiting for Procurement to see if we can use their form, they did not use the City form. Next meeting scheduled for Labor Day, September 3rd was cancelled and will be Monday, September 17th. Pat expressed his opinion of the twice a month meeting, he does not feel it is necessary and made a motion to keep the meetings at once a month. Linda seconded the motion. A vote was taken, 4 -For; 3- Against. The meetings will continue to be held on the first Monday of each month. PSA polo shirts-Frank and Randy have done some research on the logo design and printing of the shirts. We need a minimum order of 8-10 to place the order. There was enough interested in purchasing the shirts to move forward. We will decide on shirt color at our next meeting. Meeting was adjourned by Jim Wilson.

Get email alerts for Hampton

A daily email when new agendas and minutes are posted.

Report an issue with this meeting