HPMPO Technical Coordinating Committee (TCC)

Regular Meeting

High Point, NC · February 19, 2019

Agenda

Agenda

HIGH POINT URBAN AREA MPO TECHNICAL COORDINATING COMMITTEE (TCC) Agenda for the February 19, 2019 TCC Meeting 3:00 PM ***Third Floor Conference Room*** High Point Municipal Building - City Hall 211 S. Hamilton Street, High Point Action Items 1. Consideration of the January 15th TCC meeting minutes. (Mark McDonald) Page 1 2. Recommendation to the TAC for approval of amendments to the 2018-2027 MTIP. (John Hanes) Page 7 3. Recommendation to the TAC for approval of amendment to the 2018-2027 MTIP by High Point Transit System. (Andrew Edmonds) Page 10 4. Recommendation to the TAC for approval of the 2019 - 2020 Unified Planning Work Program (UPWP). (Greg Venable) Page 12 MPO Reports 5. NCDOT Division Reports Division 7 (Ed Lewis) Page 14 Division 8 (Bryan Kluchar) Page 20 Division 9 (Fred Haith) 6. NCDOT Transportation Planning Branch Report (Michael Abuya) 7. FHWA Report (Joe Geigle) 8. Public Transportation Reports High Point Transit System (Angela Wynes) Davidson County Transportation (Richard Jones) Page 21 RCATS (Tawanna Williams) PART (Scott Rhine) Page 22 TCC Meeting Meeting Date 2/19/2019 Agenda Item No. 1 Action Requested Approve Section Tab Consideration of the January 15th TCC meeting minutes. (Mark McDonald) Information Summary Attachments Yes No The complete meeting minutes are in your packet as Attachment 1. TCC Vote: Motion Second By:__________________ By:_______________________ Vote: For_______________________ Against________________________ 1 MINUTES TECHNICAL COORDINATING COMMITTEE January 15, 2019 TCC MEMBERS PRESENT: Greg Venable, Fred Haith, Roger Jones, Guy Cornman, Joe Geigle, Bryan Kluchar, Bryan Fulbright, Ed Lewis, Michael Abuya, Jason Miller, Mark Kirstner, Heidi Galanti, Chuck George, Mark McDonald. TAC MEMBERS PRESENT: None present OTHERS PRESENT: John Hanes (High Point), Andrew Edmonds (High Point), Gwen Ford (High Point), Tamara Njegovan, Phillip Craver, Derrick Turner, Richard Jones, Tawanna Williams. RECORDING STAFF: MPO Mark McDonald called the meeting to order. ACTION ITEMS Item 1: Consideration of the September 16, 2018 TCC Meeting Minutes. The minutes were approved. Motion by: Guy Cornman Seconded by: Bryan Fulbright Vote: For: Unanimous Against: None Item 2: Recommendation to The TAC for approval of amendments to the 2018-2027 MTIP (John Hanes). There are 3 pages of amendments representing not only January but also November and December. On page 6 is the November amendments. NC 8/NC49 bridge replacement and apply preservation treatment. This is a STIP modification to allow additional time to complete the R-O-W plans that have moved from FY18 to FY19 at the request of the structural management unit. Oakdale Road in Jamestown has been moved to allow additional time for planning and design. Delay construction from FY18 to FY 19. STIP deletions from November were from Lexington to S. Main St. and various bike and pedestrian projects. On Page 7 is the December amendments. STIP modifications on Davidson County airport lighting project. Accelerated construction from FY 20 to FY 19. Main St. in Archdale updated work description and termini have been revised. Surret Dr U-5864 the description has been modified to reflect current project scope. U-5864A 2 project break has been deleted and it has been added to U-5864. U5864B STIP deletions that break has been deleted by the request of the division office so the project segment can be reprioritized. On page 8 is the January amendments. Nc 8 / NC 49 bridge replacement and apply deck preservation treatment. Since the cost increase has exceeded $2 million dollars and 25% thresholds. Motion by: Mark Kirstner Seconded by: Bryan Kluchar Vote: For: Unanimous Against: None Item 3: Recommendation to the TAC to approve a Resolution of Support for FY 2020 SPR Funding Request by PART. (Mark Kirstner) The travel demand model requires several different inputs. One is the economic data that is used to measure updates. Another piece is a household travel survey. It was 2008 since the region has done one so we feel like this information can be updated and selected in the Travel Demand Auto. To make it the best resource that it can be for everyone. To get this done in a timely manner we feel like we need to start this in the year 2020. Based upon some estimates recently completed survey from the Triangle. Total cost could be around $675,000. The processing could take as long as twelve months and that puts us in the FY 2021. For FY 2020 1/3 of the project would be complete. It would reflect in your UPWP with a 1/3 of the cost there. We are hoping to fund this with SPR funds that we are applying for through the state. It is an 80/20 match so it makes it more manageable for all the MPO’s. We have gotten several rounds of SPR funds recently for the freight study. This is a resolution of support that will be attached to our application. Motion by: Mike Abuya Seconded by: Roger Jones Vote: For: Unanimous Against: None Information Items Item 4: Release of 2019-2020 Unified Planning Work Program (UPWP) for public review. (Greg Venable) In November we presented to TAC our draft UPWP. At that time, I was basing our funding amounts off what we had available to us in previous years. For several years we never spent all our budget and those were held as unobligated funds. Several other 3 smaller MPO’s had the same situation with a balance of unobligated funds. NCDOT has decided at the request of the Federal Highway Administration they will take those funds back. Our current year budget was $580,000 dollars. We had several dollars in it for special studies. We have done several projects like the Archdale Pedestrian Plan. We are in process of doing the Regional Bike Plan that accesses those funds. We have two projects; one with the City of High Point for the stadium area traffic study. Lexington is requesting some funding to do a study for NC 8 & I-85 area. We can fund those projects; however, they combine all the unobligated funds at the state of Transportation Planning and redistribute those funds to all the MPO’s. This is how we get our PL funds now. Our annual allocation we get from the state is about $250,000 plus or minus. With the redistributed funds we get an additional $90,000 dollars. About $350,000 is what we will be getting for FY 19/20. I have revised our Planning Work Program and will send it out to everyone. This will go out next week for the 30-day public review and comment period. We can make a request to NCDOT Planning Branch if we know of a study coming up like the Lexington Study. We would have to show above and beyond to receive the funds. Our local match will be lower about $116,000. Item 5: Draft 2019-2029 STIP Review. (Greg Venable) The draft 2019-2029 STIP supplement includes year-by-year funding tables listing projects that are funded for feasibility study. Projects not funded within that time frame are generally not included unless some element of activity is underway and ongoing, e.g. right-of-way acquisition. Projects have been grouped by mode, roadway and related projects being listed first, followed by aviation, bicycle/pedestrian, ferry, rail, and transit, in that order. Statewide (non-Division-specific) projects are at the back. The projects in the highway section are ordered by program (e.g. Interstate, then rural, urban, bridge, safety, and congestion mitigation). If history is any guide, budget modifications, project cost increases, delivery schedule reviews and other factors will probably result in some programming changes prior to adoption of a final STIP late next spring. Hopefully any changes will be minor, but no guarantees. MPO Reports Item 6: NCDOT Division Reports Division 7 Ed Lewis reported that things are moving along good in the High Point area. Central is starting to put out a status report every month on projects that are in the area. I will speak to the distributors and make sure the MPO receives them. Our public meeting is the same week as Division 8 February 4-8. 4 Division 8 Bryan Kluchar reported that all Division 8 projects are in planning and design. Division 9 Fred Haith reported staff will meet to discuss the draft STIP, project schedules and other relevant information and after that has taken place. I will send in a bigger version to Greg Venable to distribute to interested parties. The public comment for the draft STIP is March 5, 2019. The final STIP will be June 2019. NC 8 Cotton Grove Rd. from Rothrock Rd. to Hunt and it is a modernization project. As we move toward P6.0 we will be looking at the projects that didn’t make the cut. Project estimate scopes and seeing which projects need to be split. Fred asked Phillip to elaborate on the meeting coming up. Mike Stanley has turned to Division 7, 8, & 9 on separate meetings and is going to discuss the projects that didn’t make the cut in P5 and might need to be resubmitted in P6. To find out which projects have the most interest. He will reach out to all MPO’s separately. Item 7: NCDOT Transportation Planning Branch Michael Abuya reported that CTP 2.0 will take place in February. Item 8: FHWA No report. Item 9: Public Transportation High Point Transit System No report. Davidson County Transportation Richard Jones reported new routes started on January 7, 2019 and they are running well. RCATS No Report. PART Mark Kirstner reported the MPO’s in the region are embarking upon a freight study. Unlike the Charlotte Region & the Triangle Region took the approach of a planning type of document first and building into the modeling approach. We have taken the approach of doing the modeling first. Recap phase 1 we did a lot of data collection of the existing freight facilities. People that had distribution activities that were involved in the actual model are in phase 3; which is the collection of the actual local travel data. This is a little out of date, so we need to address that. This is a quick snap shot of how the Freight Model that has been built is integrated into the over all Travel Demand Model. It does 5 run by itself and it feeds into the Travel Demand Model. Some ways it is integrated and some ways it is separate. The whole purpose of that modeling after it was moved from a destination origin type travel demand modeling to more of a core base; which is more reflective of what freight movements do. Instead of most of our personal trips are from point A to point B they do something that is like a tour. The information being collected in the application is very detailed that feeds into the model. It is with SPR funds and that is 80/20. We had a soft kickoff in December 2018 and we should be done by the end of December 2019. Item 10: Other Business No other business. 6 TCC Meeting Meeting Date 2/19/2019 Agenda Item No. 2 Action Requested Recommendation Section Tab Recommendation to the TAC for approval of amendments to the 2018-2027 MTIP. (John Hanes) Information Summary Attachments Yes No The proposed amendments to the 2018-2027 MTIP for the High Point MPO are included in you packet. Staff is requesting a recommendation to the TAC for approval of the amendments to the 2018-2027 MTIP. TCC Vote: Motion Second By:__________________ By:_______________________ Vote: For_______________________ Against________________________ 7 High Point RESOLUTION AMENDING THE 2018-2027 HIGH POINT METROPOLITAN Archdale TRANSPORTATION IMPROVEMENT PROGRAM WHEREAS, the Transportation Advisory Committee has reviewed the current 2018- Denton 2027 Metropolitan Transportation Improvement Program and found an amendment is necessary; and Jamestown WHEREAS, the following amendments have been proposed: Lexington Thomasville Trinity Wallburg Davidson County Forsyth County Guilford County Randolph County 8 High Point Archdale NOW THEREFORE, be it resolved by the Transportation Advisory Committee for the High Point Metropolitan Planning Organization that the 2018-2027 Metropolitan Transportation Improvement Program be amended as listed above on this the 26th day of Denton February 2019. A motion was made by TAC Member ______________and seconded by TAC Jamestown member _______________ and approved this the 26th day of February 2019. _________________________ Neal Grimes Lexington Chairman, Transportation Advisory Committee Thomasville Subscribed and sworn to me this the 26th day of February 2019. ______________________________________ Trinity Notary Public My commission expires ______________________ Wallburg Davidson County Forsyth County Guilford County Randolph County 9 TCC Meeting Meeting Date 2/19/2019 Agenda Item No. 3 Action Requested Recommendation Section Tab Recommendation to the TAC for approval of an amendment to the 2018-2027 MTIP for renovations and upgrade of High Point Transit paratransit administration offices. (Andrew Edmonds) Information Summary Attachments Yes No High Point Transit System would like to request the attached amendment to project TD- 5283 in the FY2018 – FY2027 MTIP for the renovations and upgrade to an existing building to house the paratransit administration offices. High Point Transit is requesting TCC/TAC approval of the amendment as soon as possible to allow the MTIP and STIP reflect the additional state funding from the Highway Trust Fund that is being provided for this project. 10 High Point RESOLUTION AMENDING THE 2018-2027 HIGH POINT METROPOLITAN Archdale TRANSPORTATION IMPROVEMENT PROGRAM WHEREAS, the Transportation Advisory Committee has reviewed the current 2018- Denton 2027 Metropolitan Transportation Improvement Program and found an amendment is necessary; and WHEREAS, the following amendments have been proposed: Jamestown MODIFICATIONS to the Transit 2018-2027 STIP FY18 FY19 FY20 FY21 FY22 FY23 FY24 Lexington STIP # Transit Partner DESCRIPTION match FUND (000) (000) (000) (000) (000) (000) (000) Building Facility Renovations High Point and Upgrade To Para-Transit Thomasville TD-5283 Transit System Administration Local HTF 337.5 Local L 37.5 Trinity Wallburg Davidson County NOW THEREFORE, be it resolved by the Transportation Advisory Committee for the High Point Metropolitan Planning Organization that the 2018-2027 Metropolitan Forsyth Transportation Improvement Program be amended as listed above on this the 26th day of County February 2019. A motion was made by TAC Member ______________and seconded by TAC Guilford member _______________ and approved this the 26th day of February 2019. County _________________________ Neal Grimes Randolph Chairman, Transportation Advisory Committee County Subscribed and sworn to me this the 26th day of February 2019. ______________________________________ Notary Public My commission expires ______________________ 11 TCC Meeting Meeting Date 2/19/2019 Agenda Item No. 4 Action Requested Recommendation Section Tab Recommendation to the TAC for approval of 2019-2020 Unified Planning Work Program (UPWP). (Greg Venable) Information Summary Attachments Yes No The UPWP is the MPO’s annual budget and work plan. It lists the planning tasks that staff expects to perform and the work products that we expect to produce during the fiscal year. Our fiscal year runs from July 1st through June 30th of next year. The work program consists of three major divisions: surveillance of change, long-range planning, and administration. Each major division includes several line items under which the MPO can perform work. Each line item includes explanatory text describing the customary work items for the line item, the rationale for performing the work, how much money we plan to spend on the line item and the work products that the MPO expects to produce during the upcoming year. The UPWP also includes a series of tables showing the sources of the funds used, the amount of federal funds used, the amount of the local match, and total expenditures for each line item from each funding source. The Draft UPWP was out for a thirty (30) day review and comment period and no comments were received. Staff is requesting a recommendation to the TAC for approval of the 2019-2020 UPWP. A copy of the resolution is included in your packet. TCC Vote: Motion Second By:__________________ By:_______________________ Vote: For_______________________ Against________________________ 12 TCC Meeting Meeting Date 2/19/2019 Agenda Item No. 5-8 Action Requested Information Section Tab MPO Reports Information Summary Attachments Yes No Agenda Item 6 Division Reports Agenda Item 7 NCDOT Transportation Planning Division Report Agenda Item 8 FHWA Report Agenda Item 9 Public Transportation Reports TCC Vote: Motion Second By:__________________ By:_______________________ Vote: For_______________________ Against________________________ 13 NCDOT DIV 7 PROJECTS LOCATED IN HPMPO - UNDER DEVELOPMENT Estimated TIP/WBS # Description Let/Start Date Completion Cost Status Project Lead Date 47725 Intersection re-alignment and installation of traffic signal at the Sept. 2018 Mar. 2019 $500,000 Construction underway - 95% complete (traffic Derek Dixon intersection of SR1818 (Johnson St.) and SR1850 (Sandy items pending), utilities complete Ridge Road) EB-5517 Construct pedestrian bridge over East Fork of Deep River and Sept. 2018 Oct. 2019 $1,000,210 LAP, Project awarded to low bid and NCDOT Donnie Huffines 50033.3.1 install sidewalk along SR 1545 (East Fork Road) concurred SS-4907CC Install traffic signal at the intersection SR 1193 (Baker Road) 12/7/18 Apr. 2019 $108,000 Signal plans complete, construction schedule Dawn McPherson 47676.1.1 and East Springfield Road (Non-System). Traffic signal to be pending contractor crew availability 47676.2.1 supported by metal strain poles. 47676.3.1 43250 Install pedestrian improvements on SR 1009 (N. Main Street) Mar. 2019 Sept. 2019 $240,000 LAP, project delayed due to water and sewer Donnie Huffines at Lexington Avenue (WCR, pedestrian signal heads, traffic upgrades islands) SS-4907CF Install traffic signal with pedestrian count down heads at the Jun. 2019 Dec. 2019 $120,000 Signal plans underway, MA pending for mast Dawn McPherson 48252.1.1 intersection of SR 1278 (University Parkway) and Davis arms 48252.2.1 Avenue (non-system) in High Point. Traffic signal to be 48252.3.1 supported by metal strain poles. B-5353 Replace Bridge 147 over SR 1009 (South Main Street) on US 8/18/20 FY2022 $7,300,000 Planning and Design activities underway, Laura Sutton 46067.1.1 29/70 and I-85 Business coordinate and combined let with U-5896 46067.2.1 46067.3.1 U-5896 Reconstruct interchange at US 29 / US 70 / Business 85 and 8/18/20 FY2022 $25,956,000 Planning and Design activities underway, Laura Sutton 44674.1.1 SR 1009(South Main Street) in High Point coordinate and combined let with B-5353, 44674.2.1 public meeting 7/31/18, advance acquisition 44674.3.1 underway U-4758 Improvements to Johnson Street/Sandy Ridge Road from 9/21/21 FY2023 $18,300,000 Planning and Design activities underway, Laura Sutton 40251.2.1 Skeet Club Road to I-40 Public meeting 8/14/18 40251.3.1 U-6018 Improve interchange at NC62 and I-85 and realign 10/19/21 FY2023 $16,100,000 Planning and design activities underway, Jennifer Evans 47163.1.1 intersections along NC62 at SR 1154 (Kersey Valley Road) coordinate with U-6061 47163.2.1 and SR 1162 (Weant Road) in Archdale 47163.3.1 14 Page 1 HPMPO Feb. 2019.xlsx NCDOT DIV 7 PROJECTS LOCATED IN HPMPO - UNDER DEVELOPMENT Estimated TIP/WBS # Description Let/Start Date Completion Cost Status Project Lead Date I-5712 Interchange improvements at I-40/US 421 and SR 1850 1/18/22 FY2024 $15,700,000 Planning and Design activities underway, Laura Sutton 50126.1.FS1 (Sandy Ridge Road) Public meeting tentatively scheduled early 50126.2.1 2018, U-6045 project being folded into I-5712, 50126.3.1 new limits Farmers Market Drive to Cider Drive U-4015A Widen SR 1556 (Gallimore Dairy Road) to multilanes from NC 5/16/23 FY2025 $24,300,000 Planning and design activities underway, Brian Ketner 35013.1.4 68 to Airpark East coordinate with U-5974 35013.2.4 35013.3.4 U-5974 Upgrade NC 68 to Superstreet from SR 1523 (Hickswood 5/16/23 FY2025 $32,742,000 Planning and design activities underway, Brian Ketner 45962.1.1 Road) to SR 1556 (Gallimore Dairy Road) in High Point coordinate with U-4015A 45962.2.1 45962.3.1 U-6050 Widen SR 1486 (East Lexington Avenue) to multilanes from 1/20/26 FY2028 $34,572,000 Planning and design activities underway Jennifer Evans 46996.1.1 SR 1009 (North Main Street) to SR 1471 (Montlieu Avenue) in 46996.2.1 High Point 46996.3.1 U-6061 Widen NC 610 (East Fairfield Road) to multilanes from SR 1/20/26 FY2028 $28,408,000 Planning and design activities underway, Jennifer Evans 47485.1.1 1009 (South Main Street) to NC 62 (Liberty Street) in High coordinate with U-6018 47485.2.1 Point 47485.3.1 15 Page 2 HPMPO Feb. 2019.xlsx Page 1 of 4 02/07/2019 North Carolina Department of Transportation Active Projects Under Construction - Guilford Co. Contract TIP Location Description Contractor Name Resident Contract Bid Availability Completion Work Start Estimated Progress Completion Number Number Engineer Amount Date Date Date Completion Schedule Percent C200800 R-2309AB US-220 FROM SR-2182 (HORSEPEN TETRA TECH Lorenz, PE, Kris $96,195,464.51 04/02/2012 12/27/2016 05/09/2012 Date Percent 01/31/2019 98.80 87.01 CREEK RD) TO EXISTING NC-68 & CONSTRUCTION INC US-220 INTERSECTION. R-2413C US-220 FROM SR-2182 (HORSEPEN TETRA TECH Lorenz, PE, Kris $96,195,464.51 04/02/2012 12/27/2016 05/09/2012 01/31/2019 98.80 87.01 CREEK RD) TO EXISTING NC-68 & CONSTRUCTION INC US-220 INTERSECTION. C203197 U-2524C GREENSBORO-WESTERN LOOP VECELLIO & GROGAN Snell, PE, William $122,804,388.50 10/28/2013 03/14/2018 10/30/2013 12/01/2019 100.00 92.90 FROM SOUTH OF SR-2137 (OLD OAK INC DBA SHARPE H RIDGE RD) TO NORTH OF US-220 BROTHERS (BATTLEGROUND AVE). C203256 U-3615B SR-1820 (SKEET CLUB RD) FROM APAC - ATLANTIC INC Ingram, PE, J. $30,898,017.15 03/02/2015 03/29/2019 05/20/2015 07/08/2021 29.20 39.06 EAST OF SR-1818 (JOHNSON ST) TO THOMPSON ARTHUR Paul WEST OF NC-68 (EASTCHESTER DR) DIVISION IN HIGH POINT. C203399 U-2525B GREENSBORO EASTERN LOOP FLATIRON Snell, PE, William $111,683,421.13 07/28/2014 12/28/2018 08/08/2014 12/28/2019 100.00 94.14 FROM NORTH OF US-70 TO US-29 CONSTRUCTORS INC - H NORTH OF GREENSBORO. BLYTHE DEVELOPMENT CO JOINT VENT C203412 R-2612B US-421 AT SR-3418 (NEELLEY RD) BRANCH CIVIL INC Lorenz, PE, Kris $13,528,497.85 07/28/2014 12/28/2016 08/07/2014 07/31/2018 99.60 88.26 SOUTH OF GREENSBORO. C203433 I-5110 FUTURE I-73 FROM EXISTING FLATIRON Smith, Brian V $176,550,000.00 05/07/2014 04/25/2017 05/07/2014 11/21/2018 100.00 99.92 SR-2085 (JOSEPH M BRYAN BLVD) / CONSTRUCTORS INC - AIRPORT PKWY INTERCHANGE TO BLYTHE SOUTH OF US-220 NEAR HAW RIVER. DEVELOPMENT CO JOINT VENT I-5110A FUTURE I-73 FROM EXISTING FLATIRON Smith, Brian V $176,550,000.00 05/07/2014 04/25/2017 05/07/2014 11/21/2018 100.00 99.92 SR-2085 (JOSEPH M BRYAN BLVD) / CONSTRUCTORS INC - AIRPORT PKWY INTERCHANGE TO BLYTHE SOUTH OF US-220 NEAR HAW RIVER. DEVELOPMENT CO JOINT VENT R-2413A FUTURE I-73 FROM EXISTING FLATIRON Smith, Brian V $176,550,000.00 05/07/2014 04/25/2017 05/07/2014 11/21/2018 100.00 99.92 SR-2085 (JOSEPH M BRYAN BLVD) / CONSTRUCTORS INC - AIRPORT PKWY INTERCHANGE TO BLYTHE SOUTH OF US-220 NEAR HAW RIVER. DEVELOPMENT CO JOINT VENT C203627 C-5558 CITY OF HIGH POINT SIGNAL SYS. HAYNES ELECTRIC Lorenz, PE, Kris $7,099,452.53 11/30/2015 02/15/2019 05/09/2016 06/15/2019 91.90 54.24 UTILITY CORPORATION DBA A DIVISION OF MB HAY C203640 REPLACEMENT OF 4 BRIDGES IN HAYMES BROTHERS, Lorenz, PE, Kris $3,124,500.00 06/01/2015 11/01/2017 09/02/2015 03/15/2019 100.00 92.24 GUILFORD COUNTY AND 3 BRIDGES INC. IN ORANGE COUNTY. C203785 I-5790 PAVEMENT REHAB ON I-85 FROM S. PENHALL COMPANY Snell, PE, William $10,358,599.85 05/02/2016 09/15/2017 06/03/2016 01/31/2019 100.00 95.16 ELM EUGENE STREET TO I-40 H I-5855 PAVEMENT REHAB ON I-85 FROM S. PENHALL COMPANY Snell, PE, William $10,358,599.85 05/02/2016 09/15/2017 06/03/2016 01/31/2019 100.00 95.16 ELM EUGENE STREET TO I-40 H 16 Page 2 of 4 02/07/2019 North Carolina Department of Transportation Active Projects Under Construction - Guilford Co. Contract TIP Location Description Contractor Name Resident Contract Bid Availability Completion Work Start Estimated Progress Completion Number Number Engineer Amount Date Date Date Completion Schedule Percent C203792 U-2524D GREENSBORO WESTERN LOOP - FLATIRON Ingram, PE, J. $57,956,530.84 10/31/2016 12/28/2020 11/07/2016 Date Percent 12/28/2020 47.40 60.50 FROM US-220 (BATTLEGROUND CONSTRUCTORS INC - Paul AVENUE) TO SR-2303 (LAWNDALE BLYTHE DRIVE). DEVELOPMENT CO JOINT VENT C203901 I-5734 PAVEMENT REHAB ON I-40 FROM PENHALL COMPANY Julian, Jason R $7,213,907.55 08/29/2016 09/01/2018 10/17/2016 10/18/2018 100.00 100.00 FORSYTH COUNTY LINE TO 1.1 MILE EAST OF SR-1556 (GALLIMORE DAIRY RD) IN GREENSBORO. I-5762 PAVEMENT REHAB ON I-40 FROM PENHALL COMPANY Julian, Jason R $7,213,907.55 08/29/2016 09/01/2018 10/17/2016 10/18/2018 100.00 100.00 FORSYTH COUNTY LINE TO 1.1 MILE EAST OF SR-1556 (GALLIMORE DAIRY RD) IN GREENSBORO. C203914 I-5738 PAVEMENT REHAB ON I-85 FROM I-85 TRIANGLE GRADING & Lorenz, PE, Kris $14,981,507.83 09/26/2016 11/01/2018 11/10/2016 07/31/2019 100.00 84.08 BUS. TO MAIN ST. IN ARCHDALE. PAVING INC C203947 B-5345 REPLACE BRIDGE #456 OVER BRUSH SMITH-ROWE, LLC Snell, PE, William $1,648,380.43 03/15/2018 04/23/2019 03/20/2018 01/08/2019 73.10 89.86 CK. ON SR-2136 (FLEMING RD). H C203974 I-5812 PAVEMENT REHAB ON I-40/85 FROM APAC - ATLANTIC INC Ingram, PE, J. $8,506,519.41 08/28/2017 10/01/2018 09/15/2017 10/01/2018 100.00 98.34 EAST OF SR-4240 (G. CITY BLVD) TO THOMPSON ARTHUR Paul EAST OF SR-3056 (ROCK CRK DAIRY) DIVISION C204026 I-5956 PAVMENT REHAB ON I-40/I-85 FROM APAC - ATLANTIC INC Ingram, PE, J. $4,067,357.08 08/28/2017 07/01/2018 04/30/2018 08/31/2019 100.00 98.42 EAST OF SR-3056 (ROCK CRK DAIRY THOMPSON ARTHUR Paul RD) TO WEST OF SR-1226 (UNIV. DR). DIVISION C204045 I-5852B PAVEMENT REHAB ON I-73 FROM 0.7 TRIANGLE GRADING & Snell, PE, William $5,464,750.19 08/28/2017 09/15/2018 10/07/2017 02/28/2019 31.60 41.24 MILES SOUTH OF I-40 TO 0.73 MILES PAVING INC H SOUTH OF SR-2085 IN GREENSBORO. C204071 U-5169 I-74/US-311 AND NC-68 BRANCH CIVIL INC Snell, PE, William $22,481,354.65 07/30/2018 01/28/2021 09/14/2018 01/28/2021 18.70 11.50 (EASTCHESTER DR) INTERCHANGE H IMPROVEMENTS. C204096 U-2525C GREENSBORO EASTERN LOOP ES WAGNER Julian, Jason R $120,471,182.82 04/30/2018 10/26/2018 05/07/2018 11/20/2022 13.50 14.82 FROM US-29 NORTH OF COMPANY GREENSBORO TO SR-2303 LLC/SMITH-ROWE (LAWNDALE DR). LLC-JV C204100 B-5351 REPLACE BRIDGE #237 AND #242 SMITH-ROWE, LLC Snell, PE, William $8,026,687.83 07/30/2018 03/14/2021 08/01/2018 03/14/2021 28.00 16.30 OVER DEEP RIVER ON US-29/US-70/ H I-85 BUS IN HIGH POINT. C204103 U-2412A SR-1486/SR-4121 BRANCH CIVIL INC Lorenz, PE, Kris $55,963,119.69 07/30/2018 12/28/2021 09/12/2018 12/28/2021 13.60 8.55 (GREENSBORO/HIGH POINT RD) FROM PROPOSED US-311 BYPASS TO WEST OF SR-1480 (VICKREY CHAPEL RD). C204122 I-5811 PAVEMENT REHAB ON I-40 FROM SHARPE BROTHERS A Ingram, PE, J. $8,292,044.45 07/30/2018 10/15/2019 09/24/2018 08/07/2020 12.00 49.64 WEST OF I-73 TO EAST OF HOLDEN DIVISION OF VECELLIO Paul RD OVERPASS IN GREENSBORO. & GROGAN INC C204174 I-5852A PAVEMENT REHAB ON I-73/US-421 DIAMOND SURFACE Snell, PE, William $13,393,320.88 03/15/2019 10/15/2020 FROM I-85 TO I-40 IN GREENSBORO. INC H DG00218 RESURFACE 5.041 MILES OF US 220 APAC - ATLANTIC INC Lorenz, PE, Kris $1,376,734.85 04/27/2015 11/20/2015 07/09/2015 12/08/2015 100.00 100.00 (WENDOVER AVE.) THOMPSON ARTHUR DIVISION 17 Page 3 of 4 02/07/2019 North Carolina Department of Transportation Active Projects Under Construction - Guilford Co. Contract TIP Location Description Contractor Name Resident Contract Bid Availability Completion Work Start Estimated Progress Completion Number Number Engineer Amount Date Date Date Completion Schedule Percent DG00339 REPLACE BRIDGE NO.270 ON SR SMITH-ROWE, LLC Snell, PE, William $426,687.96 04/10/2017 02/10/2018 04/27/2017 Date Percent 07/14/2017 100.00 90.74 3360 (BOWMAN DAIRY ROAD) OVER H UT TO NORTH PRONG OF STINKING QUARTER CREEK DG00361 RESURFACE US 220 SHARPE BROTHERS A Lorenz, PE, Kris $1,551,695.42 04/24/2017 11/16/2018 02/18/2018 01/31/2019 95.90 99.54 (BATTLEGROUND AVE) FROM DAVID DIVISION OF VECELLIO CALDWELL/MARTINSVILLE R TO SR & GROGAN INC 2182 HORSEPEN CREEK ROAD DG00375 RESURFACE RIVERDALE DR, APAC - ATLANTIC INC Lorenz, PE, Kris $1,688,091.23 07/05/2017 11/01/2018 09/27/2017 11/01/2018 94.50 99.74 OAKDALE RD, SPRUCEWOOD DR, THOMPSON ARTHUR THAYER CIR, SCOTLAND RD, DIVISION TARRANT RD, NEELEY RD, DAVIS RD DG00390 RESURFACE SR 2760, SR 2762, SRRILEY PAVING INC Lorenz, PE, Kris $848,938.30 04/02/2018 10/12/2018 08/08/2018 10/12/2018 84.60 32.62 2763, SR 2764, SR 2767, SR 2768 SR 2769, SR 2771, SR 2772, SR 2782, SR 2784, SR 2785, ETC DG00392 RESURFACE 26 SECONDARY ROADS RILEY PAVING INC Kirkman, PE, $1,059,904.41 04/02/2018 10/12/2018 08/02/2018 12/15/2018 100.00 65.12 IN ALAMANCE CO. & 1 SEC. ROAD Christopher D (SR 3349) IN GUILFORD DG00396 REPLACE PIPE ON SR 3466 NORTH STATE Snell, PE, William $201,005.00 09/25/2017 05/15/2018 10/11/2017 11/30/2017 90.00 93.42 (LYNWOOD DR.) O.3 MILES EAST OF ENVIRONMENTAL INC H SR 3549 (LIBERTY ROAD) DG00401 RESURFACE US 29 FROM PROJECT APAC - ATLANTIC INC Lorenz, PE, Kris $2,569,232.46 07/09/2018 11/01/2019 U-2525B NORTHERN LIMITS (APRIL THOMPSON ARTHUR LANE) TO NORTH OF GUILFORD- DIVISION ROCKINGHAM COUNTY LINE DG00411 REPLACE BRIDGE # 210 ON SR 3124 R.E. BURNS & SONS Ingram, PE, J. $928,581.18 06/18/2018 04/19/2019 06/18/2018 04/19/2019 99.00 100.00 (STEWART MILL RD) OVER LITTLE CO., INC. Paul ALAMANCE CREEK DG00414 I-5854A BRIDGE REHAB ON I-85, I-73, SR 1392, THE TRUESDELL Lorenz, PE, Kris $997,997.00 04/01/2018 11/01/2019 10/08/2018 11/01/2019 40.70 20.57 SR 1115, SR 1007, SR 3300, CORPORATION I-85 NB, I-85/US 421 SB DG00423 BRIDGE REHAB ON #58 SR 1961 AMERICAN CIVIL Snell, PE, William $3,699,999.00 05/21/2018 11/30/2018 06/19/2018 01/31/2019 100.00 75.08 (WEST MARKET CENTER DRIVE) CONSTRUCTORS H OVER PROSPECT ST., CSX RAILROADWEST COAST LLC & SHERMAN COURT DG00432 RESURFACE A PORTION OF US 70 RILEY PAVING INC Kirkman, PE, $1,878,598.12 07/09/2018 11/01/2019 AND 6 SECONDARY ROADS IN Christopher D ALAMANCE COUNTY AND A PORTION OF 1 SR IN GUILFORD CO. DG00439 RESURFACING 86 SECONDARY SHARPE BROTHERS A Lorenz, PE, Kris $4,073,304.05 07/09/2018 11/01/2019 08/06/2018 11/01/2019 18.70 93.09 ROADS DIVISION OF VECELLIO & GROGAN INC DG00441 DECK OVERLAYS W/LATEX MODIFIED EXTREME CONCRETE Kirkman, PE, $1,248,556.25 06/04/2018 09/24/2018 08/08/2018 12/22/2018 100.00 94.13 CONCRETE - VERY EARLY STR BRDG CUTTING OF GAFFNEY Christopher D JNT REPL ON BRIDGE LLC #71-ALA, 90,195,261 - GUILFORD 18 Page 4 of 4 02/07/2019 North Carolina Department of Transportation Active Projects Under Construction - Guilford Co. Contract TIP Location Description Contractor Name Resident Contract Bid Availability Completion Work Start Estimated Progress Completion Number Number Engineer Amount Date Date Date Completion Schedule Percent DG00442 RESURFACING A PORTION OF SR BLYTHE Ingram, PE, J. $3,347,856.96 07/09/2018 11/01/2019 Date Percent 1541 (WENDOVER AVE.) INCL RAMPS CONSTRUCTION INC Paul AND A PORTION OF SR 4121 (GATE CITY BLVD) DG00443 WIDENING, RESURFACING AND APAC - ATLANTIC INC Ingram, PE, J. $1,224,754.51 07/09/2018 11/01/2019 BRIDGE DECK REHABILITATION ON THOMPSON ARTHUR Paul SR 3056 (ROCK CREEK DAIRY ROAD) DIVISION FROM SR 3000 (MCCONNELL RD) DG00446 B-5726 REPLACE BRIDGE # 135 ON SR 1001 TRIANGLE GRADING & Lorenz, PE, Kris $1,069,372.80 08/06/2018 06/01/2019 09/19/2018 06/01/2019 100.00 23.44 (NORTH CHURCH STREET) OVER PAVING INC SQUIRREL CREEK DG00448 REPLACE BRIDGE #293 ON SR 3314 NATIONAL BRIDGE Snell, PE, William $693,416.69 03/01/2019 12/15/2019 (WILEY LEWIS ROAD) OVER LITTLE BUILDERS LLC H ALAMANCE CREEK DG00454 WIDENING, MILLING, RESURFACING APAC - ATLANTIC INC Lorenz, PE, Kris $3,538,049.26 07/09/2018 11/01/2019 09/04/2018 11/01/2019 21.40 36.70 AND ADA COMPLIANTE CURB THOMPSON ARTHUR RAMPS ON PORTIONS OF 57 DIVISION SECONDARY ROADS DG00456 R-5787CB INSTALLATION OF ADA COMPLIANT ATLANTIC Ingram, PE, J. $248,777.00 07/23/2018 02/15/2020 08/13/2018 02/15/2020 100.00 77.26 CURB RAMPS AT VARIOUS CONTRACTING Paul INTERSECTIONS THROUGHOUT THE COMPANY, INC. COUNTY DG00459 REPLACE PIPE ON NC 62, 0.1 MILES CHATHAM CIVIL Robinson, $299,989.00 04/01/2019 11/30/2019 SOUTH OF THE INTERSECTION WITH CONTRACTING LLC Stephen J SR 3121 (FERGUSON ROAD) DG00460 REHAB BRIDGES 264, 288, 530, 543 IN LANFORD BROTHERS Snell, PE, William $3,589,101.82 11/12/2018 07/15/2019 10/22/2018 07/15/2019 19.40 24.19 GUILFORD COUNTY CO INC H DG00462 REHAB BRIDGES 264, 288, 260, 543 IN ELITE INDUSTRIAL Snell, PE, William $967,383.15 08/01/2019 01/01/2020 GUILFORD COUNTY AND BRIDGE 031 PAINTING INC H IN ORANGE COUNTY DG00465 W-5707I I-85 BUS/US 29/US 70 SOUTHBOUND NICKELSTON Snell, PE, William $113,256.25 11/05/2018 02/28/2019 INSTALLATION OF GUARDRAIL INDUSTRIES INC H DG00466 W-5707J I-85 BUS/US 29/US 70 SOUTHBOUND NICKELSTON Snell, PE, William $126,610.00 11/05/2018 02/28/2019 INSTALLATION OF GUARDRAIL INDUSTRIES INC H DG00468 REPLACE BRIDGE #112 ON SR 2109 APAC - ATLANTIC INC Ingram, PE, J. $954,375.87 03/04/2019 01/26/2020 (EVERSFIELD ROAD) OVER THE HAW THOMPSON ARTHUR Paul RIVER DIVISION DG00472 B-4960 REMOVE BRIDGE # 214 ON SR 3058 SMITH-ROWE, LLC Robinson, $1,689,142.69 04/01/2019 03/01/2020 (JUDGE ADAMS RD) AND GRAVEL Stephen J EXTENSION OF SR 3224 19 Randolph County - High Point MPO - Upcoming Projects - Division 8 - February 2019 Contract # or Completion Route Description Let Date Contractor Project Admin. Project Cost Notes WBS # or TIP # Date U-3400 SR 1577 / SR 1004 Widening from SR 1567 (Robbins Country 6/15/2021 TBD TBD Jeffrey Teague TBD Right of Way 6/2019 (Archdale Road) Rd) to US 311 (Main Street) in Archdale (910) 773-8025 Public Meeting held 2/27/18 U-5308 SR 1547 Widening from south of SR 3106 Kennedy 6/16/2020 TBD TBD Jeffrey Teague TBD Right of Way 6/2019 (Finch Farm Rd) Rd to I-85 in Trinity Extending northern (910) 773-8025 Public Meeting held 3/29/2018 limit to NC 62 Study options to reduce footprint 2nd Public Meeting Nov 29th 2018 U-5770 I-85 / SR 1993 Interchange Improvements 4/20/2021 TBD TBD Jeffrey Teague TBD Right of Way 4/2019 (South Main Street) Frontage Road Alternative Selected (910) 773-8025 Public Meeting held 11/30/17 Newsletter Mailed 6/8/18 U-5864 SR 1595 (Surrett Drive) 3-lane widening from I-85 to Eden 6/15/2021 TBD TBD Greg Davis TBD Right of Way 6/2019 Terrace in Trinity, Archdale, and High (910) 773-8022 Public Meeting held 8/16/16 Point U-6191 NC 62 Modernize roadway between SR 3252 DSTIP TBD TBD Jeffrey Teague TBD DSTIP Right of Way FY 2025 (Surrett Dr) in Trinity to SR 1009 (N. Main FY 2027 (910) 773-8025 Project may become committed with St) in Archdale BOT approval 20 Deviated Fixed Route Statistics 2nd Quarter Thomasville FY19 FY18 Difference Riders 10,686 13,116 -2430 Miles 17,566 17,340 226 Service Hours 852 840 12 Lexington FY19 FY18 Difference Riders 13,402 10,395 3007 Miles 11,006 10,907 99 Service Hours 684 649 35 Connector FY19 FY18 Difference Riders 4588 4285 303 Miles 18,242 12,637 5605 Service Hours 708 526 182 Total FY19 FY18 Difference Riders 28,676 27,796 880 Miles 46,814 40,884 5,930 Service Hours 2,244 2,015 229 DCTS MPO Update Current Projects: • NEW ROUTES. The implementation of the new routes was successful. We are running ahead of our posted stop times, so we are working on adjustments to improve our on- time performance. • NTD Audit. We are working with an outside auditor for our 10-year NTD required ac- counting audit. • January Ridership for the New Routes: (FY2018 Ridership for 3 routes: 9,218) • RED 2,057 17.16% • GREEN 2,029 16.93% • BLUE 4,921 41.06% • ORANGE 2,657 22.17% • T’ville Saturday 321 2.68% • Total Ridership 11,985 100.00%21 MPO Updates Piedmont Authority February 2019 for Regional Transportation PART Express Updates • PART Express Ridership totaled 27,161 for the month of December. • Do you have a service suggestion for PART Express? PART is analyzing and reviewing routes and would love to hear from you. Email us at contactus@partnc.org. • PART Express management firm, National Express Transit, is now hiring bus drivers and offering a $500 hiring bonus. Congratulations to Crystal Farrior who was recognized as the PART Express Driver of the Year for 2018. As a driver for National Express Transit Crystal operates the Route 1 Winston-Salem Express daily. She has set a standard for all operators with PART Express with a customer friendly and service quality focus every time she gets behind the wheel. Thank you Crystal for your service and dedication for the past 9 years! PART would like to welcome two incoming Board Members for the 2019 Board. Mark Marion, Surry County Commissioner and Steve Carter, Alamance County Commissioner. The PART Board of Trustees meets on the second Wednesday of every month at the PART Office. The date for the March meeting has been changed to March 20th. In The Region • Give your input for the Greensboro Plan2Play Master Plan • Make sure to learn more about the multi-use stadium in High Point • Davidson County Transportation System (DCTS) rolled out new service on Jan 7th • GTA Welcomed Keolis as new Transit Contractor on Jan 1 STAY CONNECTED www.PARTNC.org 336.883.7278 facebook.com/partnc @partnc contactus@partnc.org 22 youtube.com/partnc Bus Tracking App @partnc www.PARTNC.org 336.883.7278 MPO Updates - Page 2 Regional Planning • In preparation of ReFresh 2.0 staff has been studying ridership influencers and current system characteristics. • Freight Study Phase III consists of the collection of actual truck movements in the Triad. NCDOT completed the procurement process and RSG is the lead consultant with Planning Communities handling engagement activities. • CommunityViz growth allocation results will be reviewed in Feb then training to follow. Commuter Resources/TDM • Staff continued to work with employers in Winston-Salem to complete enrollment in the Business 40 XPass discount program. There are 18 employers registered offering the benefit. • A lunch and learn was held at Truliant Federal Credit Union along with NCDOT. • Staff met with MWI Animal Health to present on the PARTnership program. The company is located in Brown Summit, a survey will be distributed to employees. • PART received delivery of four new 2019 Dodge Caravans recently which will help with increased demand for the smaller sized vehicles. Regional Marketing • How to Ride PART and Use Touch Pass videos are complete and will begin being distributed. • A new brochure was developed for DCTS which will be used to promote those routes in the community. • A meeting was held at the PTI Airport to create better awareness and partnership with the Airport promoting PART services. • New engagement campaign upcoming to use social media for testimonials and sharing called “I Take PART”. Piedmont Transit Resources Call Center • In November the Call Center had 11,255 presented calls. • The majority of the calls were about PART Shuttle, PART Fixed Route Bus, High Point Transit Fixed Route Bus, DCTS Thomasville Rider Info, PART Rider Info. 23

Get email alerts for High Point

A daily email when new agendas and minutes are posted.

Report an issue with this meeting