HPMPO Technical Coordinating Committee (TCC)
Regular MeetingHigh Point, NC · February 19, 2019
Agenda
HIGH POINT URBAN AREA MPO
TECHNICAL COORDINATING COMMITTEE
(TCC)
Agenda for the February 19, 2019 TCC
Meeting 3:00 PM
***Third Floor Conference Room***
High Point Municipal Building - City Hall
211 S. Hamilton Street, High Point
Action Items
1. Consideration of the January 15th TCC meeting minutes. (Mark McDonald) Page 1
2. Recommendation to the TAC for approval of amendments to the 2018-2027 MTIP.
(John Hanes) Page 7
3. Recommendation to the TAC for approval of amendment to the 2018-2027 MTIP by
High Point Transit System. (Andrew Edmonds) Page 10
4. Recommendation to the TAC for approval of the 2019 - 2020 Unified Planning Work
Program (UPWP). (Greg Venable) Page 12
MPO Reports
5. NCDOT Division Reports
Division 7 (Ed Lewis) Page 14
Division 8 (Bryan Kluchar) Page 20
Division 9 (Fred Haith)
6. NCDOT Transportation Planning Branch Report (Michael Abuya)
7. FHWA Report (Joe Geigle)
8. Public Transportation Reports
High Point Transit System (Angela Wynes)
Davidson County Transportation (Richard Jones) Page 21
RCATS (Tawanna Williams)
PART (Scott Rhine) Page 22
TCC
Meeting
Meeting Date 2/19/2019 Agenda Item No. 1
Action Requested Approve
Section Tab
Consideration of the January 15th TCC meeting minutes. (Mark McDonald)
Information Summary Attachments Yes No
The complete meeting minutes are in your packet as Attachment 1.
TCC Vote: Motion Second
By:__________________ By:_______________________
Vote: For_______________________ Against________________________
1
MINUTES
TECHNICAL COORDINATING COMMITTEE
January 15, 2019
TCC MEMBERS PRESENT: Greg Venable, Fred Haith, Roger Jones, Guy Cornman,
Joe Geigle, Bryan Kluchar, Bryan Fulbright, Ed Lewis, Michael Abuya, Jason Miller,
Mark Kirstner, Heidi Galanti, Chuck George, Mark McDonald.
TAC MEMBERS PRESENT: None present
OTHERS PRESENT: John Hanes (High Point), Andrew Edmonds (High Point), Gwen
Ford (High Point), Tamara Njegovan, Phillip Craver, Derrick Turner, Richard Jones,
Tawanna Williams.
RECORDING STAFF: MPO
Mark McDonald called the meeting to order.
ACTION ITEMS
Item 1: Consideration of the September 16, 2018 TCC Meeting Minutes.
The minutes were approved.
Motion by: Guy Cornman
Seconded by: Bryan Fulbright
Vote:
For: Unanimous
Against: None
Item 2: Recommendation to The TAC for approval of amendments to the
2018-2027 MTIP (John Hanes).
There are 3 pages of amendments representing not only January but also November and
December. On page 6 is the November amendments. NC 8/NC49 bridge replacement and
apply preservation treatment. This is a STIP modification to allow additional time to
complete the R-O-W plans that have moved from FY18 to FY19 at the request of the
structural management unit. Oakdale Road in Jamestown has been moved to allow
additional time for planning and design. Delay construction from FY18 to FY 19. STIP
deletions from November were from Lexington to S. Main St. and various bike and
pedestrian projects. On Page 7 is the December amendments. STIP modifications on
Davidson County airport lighting project. Accelerated construction from FY 20 to FY 19.
Main St. in Archdale updated work description and termini have been revised. Surret Dr
U-5864 the description has been modified to reflect current project scope. U-5864A
2
project break has been deleted and it has been added to U-5864. U5864B STIP deletions
that break has been deleted by the request of the division office so the project segment
can be reprioritized. On page 8 is the January amendments. Nc 8 / NC 49 bridge
replacement and apply deck preservation treatment. Since the cost increase has exceeded
$2 million dollars and 25% thresholds.
Motion by: Mark Kirstner
Seconded by: Bryan Kluchar
Vote:
For: Unanimous
Against: None
Item 3: Recommendation to the TAC to approve a Resolution of Support for
FY 2020 SPR Funding Request by PART. (Mark Kirstner)
The travel demand model requires several different inputs. One is the economic data that
is used to measure updates. Another piece is a household travel survey. It was 2008 since
the region has done one so we feel like this information can be updated and selected in
the Travel Demand Auto. To make it the best resource that it can be for everyone. To get
this done in a timely manner we feel like we need to start this in the year 2020. Based
upon some estimates recently completed survey from the Triangle. Total cost could be
around $675,000. The processing could take as long as twelve months and that puts us in
the FY 2021. For FY 2020 1/3 of the project would be complete. It would reflect in your
UPWP with a 1/3 of the cost there. We are hoping to fund this with SPR funds that we
are applying for through the state. It is an 80/20 match so it makes it more manageable
for all the MPO’s. We have gotten several rounds of SPR funds recently for the freight
study. This is a resolution of support that will be attached to our application.
Motion by: Mike Abuya
Seconded by: Roger Jones
Vote:
For: Unanimous
Against: None
Information Items
Item 4: Release of 2019-2020 Unified Planning Work Program (UPWP) for
public review. (Greg Venable)
In November we presented to TAC our draft UPWP. At that time, I was basing our
funding amounts off what we had available to us in previous years. For several years we
never spent all our budget and those were held as unobligated funds. Several other
3
smaller MPO’s had the same situation with a balance of unobligated funds. NCDOT has
decided at the request of the Federal Highway Administration they will take those funds
back. Our current year budget was $580,000 dollars. We had several dollars in it for
special studies. We have done several projects like the Archdale Pedestrian Plan. We are
in process of doing the Regional Bike Plan that accesses those funds. We have two
projects; one with the City of High Point for the stadium area traffic study. Lexington is
requesting some funding to do a study for NC 8 & I-85 area. We can fund those projects;
however, they combine all the unobligated funds at the state of Transportation Planning
and redistribute those funds to all the MPO’s. This is how we get our PL funds now. Our
annual allocation we get from the state is about $250,000 plus or minus. With the
redistributed funds we get an additional $90,000 dollars. About $350,000 is what we will
be getting for FY 19/20. I have revised our Planning Work Program and will send it out
to everyone. This will go out next week for the 30-day public review and comment
period. We can make a request to NCDOT Planning Branch if we know of a study
coming up like the Lexington Study. We would have to show above and beyond to
receive the funds. Our local match will be lower about $116,000.
Item 5: Draft 2019-2029 STIP Review. (Greg Venable)
The draft 2019-2029 STIP supplement includes year-by-year funding tables listing
projects that are funded for feasibility study. Projects not funded within that time frame
are generally not included unless some element of activity is underway and ongoing, e.g.
right-of-way acquisition.
Projects have been grouped by mode, roadway and related projects being listed first,
followed by aviation, bicycle/pedestrian, ferry, rail, and transit, in that order. Statewide
(non-Division-specific) projects are at the back. The projects in the highway section are
ordered by program (e.g. Interstate, then rural, urban, bridge, safety, and congestion
mitigation).
If history is any guide, budget modifications, project cost increases, delivery schedule
reviews and other factors will probably result in some programming changes prior to
adoption of a final STIP late next spring. Hopefully any changes will be minor, but no
guarantees.
MPO Reports
Item 6: NCDOT Division Reports
Division 7
Ed Lewis reported that things are moving along good in the High Point area. Central is
starting to put out a status report every month on projects that are in the area. I will speak
to the distributors and make sure the MPO receives them. Our public meeting is the same
week as Division 8 February 4-8.
4
Division 8
Bryan Kluchar reported that all Division 8 projects are in planning and design.
Division 9
Fred Haith reported staff will meet to discuss the draft STIP, project schedules and other
relevant information and after that has taken place. I will send in a bigger version to Greg
Venable to distribute to interested parties. The public comment for the draft STIP is
March 5, 2019. The final STIP will be June 2019. NC 8 Cotton Grove Rd. from Rothrock
Rd. to Hunt and it is a modernization project. As we move toward P6.0 we will be
looking at the projects that didn’t make the cut. Project estimate scopes and seeing which
projects need to be split. Fred asked Phillip to elaborate on the meeting coming up. Mike
Stanley has turned to Division 7, 8, & 9 on separate meetings and is going to discuss the
projects that didn’t make the cut in P5 and might need to be resubmitted in P6. To find
out which projects have the most interest. He will reach out to all MPO’s separately.
Item 7: NCDOT Transportation Planning Branch
Michael Abuya reported that CTP 2.0 will take place in February.
Item 8: FHWA
No report.
Item 9: Public Transportation
High Point Transit System
No report.
Davidson County Transportation
Richard Jones reported new routes started on January 7, 2019 and they are running well.
RCATS
No Report.
PART
Mark Kirstner reported the MPO’s in the region are embarking upon a freight study.
Unlike the Charlotte Region & the Triangle Region took the approach of a planning type
of document first and building into the modeling approach. We have taken the approach
of doing the modeling first. Recap phase 1 we did a lot of data collection of the existing
freight facilities. People that had distribution activities that were involved in the actual
model are in phase 3; which is the collection of the actual local travel data. This is a little
out of date, so we need to address that. This is a quick snap shot of how the Freight
Model that has been built is integrated into the over all Travel Demand Model. It does
5
run by itself and it feeds into the Travel Demand Model. Some ways it is integrated and
some ways it is separate. The whole purpose of that modeling after it was moved from a
destination origin type travel demand modeling to more of a core base; which is more
reflective of what freight movements do. Instead of most of our personal trips are from
point A to point B they do something that is like a tour. The information being collected
in the application is very detailed that feeds into the model. It is with SPR funds and that
is 80/20. We had a soft kickoff in December 2018 and we should be done by the end of
December 2019.
Item 10: Other Business
No other business.
6
TCC
Meeting
Meeting Date 2/19/2019 Agenda Item No. 2
Action Requested Recommendation
Section Tab
Recommendation to the TAC for approval of amendments to the 2018-2027 MTIP.
(John Hanes)
Information Summary Attachments Yes No
The proposed amendments to the 2018-2027 MTIP for the High Point MPO are included
in you packet. Staff is requesting a recommendation to the TAC for approval of the
amendments to the 2018-2027 MTIP.
TCC Vote: Motion Second
By:__________________ By:_______________________
Vote: For_______________________ Against________________________
7
High Point
RESOLUTION
AMENDING THE 2018-2027 HIGH POINT METROPOLITAN
Archdale
TRANSPORTATION IMPROVEMENT PROGRAM
WHEREAS, the Transportation Advisory Committee has reviewed the current 2018-
Denton 2027 Metropolitan Transportation Improvement Program and found an amendment is
necessary; and
Jamestown
WHEREAS, the following amendments have been proposed:
Lexington
Thomasville
Trinity
Wallburg
Davidson
County
Forsyth
County
Guilford
County
Randolph
County
8
High Point
Archdale
NOW THEREFORE, be it resolved by the Transportation Advisory Committee for the
High Point Metropolitan Planning Organization that the 2018-2027 Metropolitan
Transportation Improvement Program be amended as listed above on this the 26th day of
Denton February 2019.
A motion was made by TAC Member ______________and seconded by TAC
Jamestown
member _______________ and approved this the 26th day of February 2019.
_________________________
Neal Grimes
Lexington Chairman, Transportation Advisory Committee
Thomasville Subscribed and sworn to me this the 26th day of February 2019.
______________________________________
Trinity Notary Public
My commission expires ______________________
Wallburg
Davidson
County
Forsyth
County
Guilford
County
Randolph
County
9
TCC
Meeting
Meeting Date 2/19/2019 Agenda Item No. 3
Action Requested Recommendation
Section Tab
Recommendation to the TAC for approval of an amendment to the 2018-2027 MTIP for
renovations and upgrade of High Point Transit paratransit administration offices.
(Andrew Edmonds)
Information Summary Attachments Yes No
High Point Transit System would like to request the attached amendment to project TD-
5283 in the FY2018 – FY2027 MTIP for the renovations and upgrade to an existing
building to house the paratransit administration offices.
High Point Transit is requesting TCC/TAC approval of the amendment as soon as
possible to allow the MTIP and STIP reflect the additional state funding from the
Highway Trust Fund that is being provided for this project.
10
High Point
RESOLUTION
AMENDING THE 2018-2027 HIGH POINT METROPOLITAN
Archdale
TRANSPORTATION IMPROVEMENT PROGRAM
WHEREAS, the Transportation Advisory Committee has reviewed the current 2018-
Denton 2027 Metropolitan Transportation Improvement Program and found an amendment is
necessary; and
WHEREAS, the following amendments have been proposed:
Jamestown
MODIFICATIONS to the Transit 2018-2027 STIP
FY18 FY19 FY20 FY21 FY22 FY23 FY24
Lexington STIP # Transit Partner DESCRIPTION match FUND (000) (000) (000) (000) (000) (000) (000)
Building Facility Renovations
High Point and Upgrade To Para-Transit
Thomasville TD-5283 Transit System Administration Local HTF 337.5
Local L 37.5
Trinity
Wallburg
Davidson
County
NOW THEREFORE, be it resolved by the Transportation Advisory Committee for the
High Point Metropolitan Planning Organization that the 2018-2027 Metropolitan
Forsyth Transportation Improvement Program be amended as listed above on this the 26th day of
County February 2019.
A motion was made by TAC Member ______________and seconded by TAC
Guilford member _______________ and approved this the 26th day of February 2019.
County
_________________________
Neal Grimes
Randolph Chairman, Transportation Advisory Committee
County
Subscribed and sworn to me this the 26th day of February 2019.
______________________________________
Notary Public
My commission expires ______________________
11
TCC
Meeting
Meeting Date 2/19/2019 Agenda Item No. 4
Action Requested Recommendation
Section Tab
Recommendation to the TAC for approval of 2019-2020 Unified Planning Work Program
(UPWP). (Greg Venable)
Information Summary Attachments Yes No
The UPWP is the MPO’s annual budget and work plan. It lists the planning tasks that staff
expects to perform and the work products that we expect to produce during the fiscal year.
Our fiscal year runs from July 1st through June 30th of next year. The work program consists
of three major divisions: surveillance of change, long-range planning, and administration.
Each major division includes several line items under which the MPO can perform work.
Each line item includes explanatory text describing the customary work items for the line
item, the rationale for performing the work, how much money we plan to spend on the line
item and the work products that the MPO expects to produce during the upcoming year. The
UPWP also includes a series of tables showing the sources of the funds used, the amount of
federal funds used, the amount of the local match, and total expenditures for each line item
from each funding source.
The Draft UPWP was out for a thirty (30) day review and comment period and no
comments were received. Staff is requesting a recommendation to the TAC for approval
of the 2019-2020 UPWP. A copy of the resolution is included in your packet.
TCC Vote: Motion Second
By:__________________ By:_______________________
Vote: For_______________________ Against________________________
12
TCC
Meeting
Meeting Date 2/19/2019 Agenda Item No. 5-8
Action Requested Information
Section Tab
MPO Reports
Information Summary Attachments Yes No
Agenda Item 6
Division Reports
Agenda Item 7
NCDOT Transportation Planning Division Report
Agenda Item 8
FHWA Report
Agenda Item 9
Public Transportation Reports
TCC Vote: Motion Second
By:__________________ By:_______________________
Vote: For_______________________ Against________________________
13
NCDOT DIV 7 PROJECTS LOCATED IN HPMPO - UNDER DEVELOPMENT
Estimated
TIP/WBS # Description Let/Start Date Completion Cost Status Project Lead
Date
47725 Intersection re-alignment and installation of traffic signal at the Sept. 2018 Mar. 2019 $500,000 Construction underway - 95% complete (traffic Derek Dixon
intersection of SR1818 (Johnson St.) and SR1850 (Sandy items pending), utilities complete
Ridge Road)
EB-5517 Construct pedestrian bridge over East Fork of Deep River and Sept. 2018 Oct. 2019 $1,000,210 LAP, Project awarded to low bid and NCDOT Donnie Huffines
50033.3.1 install sidewalk along SR 1545 (East Fork Road) concurred
SS-4907CC Install traffic signal at the intersection SR 1193 (Baker Road) 12/7/18 Apr. 2019 $108,000 Signal plans complete, construction schedule Dawn McPherson
47676.1.1 and East Springfield Road (Non-System). Traffic signal to be pending contractor crew availability
47676.2.1 supported by metal strain poles.
47676.3.1
43250 Install pedestrian improvements on SR 1009 (N. Main Street) Mar. 2019 Sept. 2019 $240,000 LAP, project delayed due to water and sewer Donnie Huffines
at Lexington Avenue (WCR, pedestrian signal heads, traffic upgrades
islands)
SS-4907CF Install traffic signal with pedestrian count down heads at the Jun. 2019 Dec. 2019 $120,000 Signal plans underway, MA pending for mast Dawn McPherson
48252.1.1 intersection of SR 1278 (University Parkway) and Davis arms
48252.2.1 Avenue (non-system) in High Point. Traffic signal to be
48252.3.1 supported by metal strain poles.
B-5353 Replace Bridge 147 over SR 1009 (South Main Street) on US 8/18/20 FY2022 $7,300,000 Planning and Design activities underway, Laura Sutton
46067.1.1 29/70 and I-85 Business coordinate and combined let with U-5896
46067.2.1
46067.3.1
U-5896 Reconstruct interchange at US 29 / US 70 / Business 85 and 8/18/20 FY2022 $25,956,000 Planning and Design activities underway, Laura Sutton
44674.1.1 SR 1009(South Main Street) in High Point coordinate and combined let with B-5353,
44674.2.1 public meeting 7/31/18, advance acquisition
44674.3.1 underway
U-4758 Improvements to Johnson Street/Sandy Ridge Road from 9/21/21 FY2023 $18,300,000 Planning and Design activities underway, Laura Sutton
40251.2.1 Skeet Club Road to I-40 Public meeting 8/14/18
40251.3.1
U-6018 Improve interchange at NC62 and I-85 and realign 10/19/21 FY2023 $16,100,000 Planning and design activities underway, Jennifer Evans
47163.1.1 intersections along NC62 at SR 1154 (Kersey Valley Road) coordinate with U-6061
47163.2.1 and SR 1162 (Weant Road) in Archdale
47163.3.1
14
Page 1 HPMPO Feb. 2019.xlsx
NCDOT DIV 7 PROJECTS LOCATED IN HPMPO - UNDER DEVELOPMENT
Estimated
TIP/WBS # Description Let/Start Date Completion Cost Status Project Lead
Date
I-5712 Interchange improvements at I-40/US 421 and SR 1850 1/18/22 FY2024 $15,700,000 Planning and Design activities underway, Laura Sutton
50126.1.FS1 (Sandy Ridge Road) Public meeting tentatively scheduled early
50126.2.1 2018, U-6045 project being folded into I-5712,
50126.3.1 new limits Farmers Market Drive to Cider
Drive
U-4015A Widen SR 1556 (Gallimore Dairy Road) to multilanes from NC 5/16/23 FY2025 $24,300,000 Planning and design activities underway, Brian Ketner
35013.1.4 68 to Airpark East coordinate with U-5974
35013.2.4
35013.3.4
U-5974 Upgrade NC 68 to Superstreet from SR 1523 (Hickswood 5/16/23 FY2025 $32,742,000 Planning and design activities underway, Brian Ketner
45962.1.1 Road) to SR 1556 (Gallimore Dairy Road) in High Point coordinate with U-4015A
45962.2.1
45962.3.1
U-6050 Widen SR 1486 (East Lexington Avenue) to multilanes from 1/20/26 FY2028 $34,572,000 Planning and design activities underway Jennifer Evans
46996.1.1 SR 1009 (North Main Street) to SR 1471 (Montlieu Avenue) in
46996.2.1 High Point
46996.3.1
U-6061 Widen NC 610 (East Fairfield Road) to multilanes from SR 1/20/26 FY2028 $28,408,000 Planning and design activities underway, Jennifer Evans
47485.1.1 1009 (South Main Street) to NC 62 (Liberty Street) in High coordinate with U-6018
47485.2.1 Point
47485.3.1
15
Page 2 HPMPO Feb. 2019.xlsx
Page 1 of 4
02/07/2019
North Carolina Department of Transportation
Active Projects Under Construction - Guilford Co.
Contract TIP Location Description Contractor Name Resident Contract Bid Availability Completion Work Start Estimated Progress Completion
Number Number Engineer Amount Date Date Date Completion Schedule Percent
C200800 R-2309AB US-220 FROM SR-2182 (HORSEPEN TETRA TECH Lorenz, PE, Kris $96,195,464.51 04/02/2012 12/27/2016 05/09/2012 Date Percent
01/31/2019 98.80 87.01
CREEK RD) TO EXISTING NC-68 & CONSTRUCTION INC
US-220 INTERSECTION.
R-2413C US-220 FROM SR-2182 (HORSEPEN TETRA TECH Lorenz, PE, Kris $96,195,464.51 04/02/2012 12/27/2016 05/09/2012 01/31/2019 98.80 87.01
CREEK RD) TO EXISTING NC-68 & CONSTRUCTION INC
US-220 INTERSECTION.
C203197 U-2524C GREENSBORO-WESTERN LOOP VECELLIO & GROGAN Snell, PE, William $122,804,388.50 10/28/2013 03/14/2018 10/30/2013 12/01/2019 100.00 92.90
FROM SOUTH OF SR-2137 (OLD OAK INC DBA SHARPE H
RIDGE RD) TO NORTH OF US-220 BROTHERS
(BATTLEGROUND AVE).
C203256 U-3615B SR-1820 (SKEET CLUB RD) FROM APAC - ATLANTIC INC Ingram, PE, J. $30,898,017.15 03/02/2015 03/29/2019 05/20/2015 07/08/2021 29.20 39.06
EAST OF SR-1818 (JOHNSON ST) TO THOMPSON ARTHUR Paul
WEST OF NC-68 (EASTCHESTER DR) DIVISION
IN HIGH POINT.
C203399 U-2525B GREENSBORO EASTERN LOOP FLATIRON Snell, PE, William $111,683,421.13 07/28/2014 12/28/2018 08/08/2014 12/28/2019 100.00 94.14
FROM NORTH OF US-70 TO US-29 CONSTRUCTORS INC - H
NORTH OF GREENSBORO. BLYTHE
DEVELOPMENT CO
JOINT VENT
C203412 R-2612B US-421 AT SR-3418 (NEELLEY RD) BRANCH CIVIL INC Lorenz, PE, Kris $13,528,497.85 07/28/2014 12/28/2016 08/07/2014 07/31/2018 99.60 88.26
SOUTH OF GREENSBORO.
C203433 I-5110 FUTURE I-73 FROM EXISTING FLATIRON Smith, Brian V $176,550,000.00 05/07/2014 04/25/2017 05/07/2014 11/21/2018 100.00 99.92
SR-2085 (JOSEPH M BRYAN BLVD) / CONSTRUCTORS INC -
AIRPORT PKWY INTERCHANGE TO BLYTHE
SOUTH OF US-220 NEAR HAW RIVER. DEVELOPMENT CO
JOINT VENT
I-5110A FUTURE I-73 FROM EXISTING FLATIRON Smith, Brian V $176,550,000.00 05/07/2014 04/25/2017 05/07/2014 11/21/2018 100.00 99.92
SR-2085 (JOSEPH M BRYAN BLVD) / CONSTRUCTORS INC -
AIRPORT PKWY INTERCHANGE TO BLYTHE
SOUTH OF US-220 NEAR HAW RIVER. DEVELOPMENT CO
JOINT VENT
R-2413A FUTURE I-73 FROM EXISTING FLATIRON Smith, Brian V $176,550,000.00 05/07/2014 04/25/2017 05/07/2014 11/21/2018 100.00 99.92
SR-2085 (JOSEPH M BRYAN BLVD) / CONSTRUCTORS INC -
AIRPORT PKWY INTERCHANGE TO BLYTHE
SOUTH OF US-220 NEAR HAW RIVER. DEVELOPMENT CO
JOINT VENT
C203627 C-5558 CITY OF HIGH POINT SIGNAL SYS. HAYNES ELECTRIC Lorenz, PE, Kris $7,099,452.53 11/30/2015 02/15/2019 05/09/2016 06/15/2019 91.90 54.24
UTILITY
CORPORATION DBA A
DIVISION OF MB HAY
C203640 REPLACEMENT OF 4 BRIDGES IN HAYMES BROTHERS, Lorenz, PE, Kris $3,124,500.00 06/01/2015 11/01/2017 09/02/2015 03/15/2019 100.00 92.24
GUILFORD COUNTY AND 3 BRIDGES INC.
IN ORANGE COUNTY.
C203785 I-5790 PAVEMENT REHAB ON I-85 FROM S. PENHALL COMPANY Snell, PE, William $10,358,599.85 05/02/2016 09/15/2017 06/03/2016 01/31/2019 100.00 95.16
ELM EUGENE STREET TO I-40 H
I-5855 PAVEMENT REHAB ON I-85 FROM S. PENHALL COMPANY Snell, PE, William $10,358,599.85 05/02/2016 09/15/2017 06/03/2016 01/31/2019 100.00 95.16
ELM EUGENE STREET TO I-40 H
16
Page 2 of 4
02/07/2019
North Carolina Department of Transportation
Active Projects Under Construction - Guilford Co.
Contract TIP Location Description Contractor Name Resident Contract Bid Availability Completion Work Start Estimated Progress Completion
Number Number Engineer Amount Date Date Date Completion Schedule Percent
C203792 U-2524D GREENSBORO WESTERN LOOP - FLATIRON Ingram, PE, J. $57,956,530.84 10/31/2016 12/28/2020 11/07/2016 Date Percent
12/28/2020 47.40 60.50
FROM US-220 (BATTLEGROUND CONSTRUCTORS INC - Paul
AVENUE) TO SR-2303 (LAWNDALE BLYTHE
DRIVE). DEVELOPMENT CO
JOINT VENT
C203901 I-5734 PAVEMENT REHAB ON I-40 FROM PENHALL COMPANY Julian, Jason R $7,213,907.55 08/29/2016 09/01/2018 10/17/2016 10/18/2018 100.00 100.00
FORSYTH COUNTY LINE TO 1.1 MILE
EAST OF SR-1556 (GALLIMORE DAIRY
RD) IN GREENSBORO.
I-5762 PAVEMENT REHAB ON I-40 FROM PENHALL COMPANY Julian, Jason R $7,213,907.55 08/29/2016 09/01/2018 10/17/2016 10/18/2018 100.00 100.00
FORSYTH COUNTY LINE TO 1.1 MILE
EAST OF SR-1556 (GALLIMORE DAIRY
RD) IN GREENSBORO.
C203914 I-5738 PAVEMENT REHAB ON I-85 FROM I-85 TRIANGLE GRADING & Lorenz, PE, Kris $14,981,507.83 09/26/2016 11/01/2018 11/10/2016 07/31/2019 100.00 84.08
BUS. TO MAIN ST. IN ARCHDALE. PAVING INC
C203947 B-5345 REPLACE BRIDGE #456 OVER BRUSH SMITH-ROWE, LLC Snell, PE, William $1,648,380.43 03/15/2018 04/23/2019 03/20/2018 01/08/2019 73.10 89.86
CK. ON SR-2136 (FLEMING RD). H
C203974 I-5812 PAVEMENT REHAB ON I-40/85 FROM APAC - ATLANTIC INC Ingram, PE, J. $8,506,519.41 08/28/2017 10/01/2018 09/15/2017 10/01/2018 100.00 98.34
EAST OF SR-4240 (G. CITY BLVD) TO THOMPSON ARTHUR Paul
EAST OF SR-3056 (ROCK CRK DAIRY) DIVISION
C204026 I-5956 PAVMENT REHAB ON I-40/I-85 FROM APAC - ATLANTIC INC Ingram, PE, J. $4,067,357.08 08/28/2017 07/01/2018 04/30/2018 08/31/2019 100.00 98.42
EAST OF SR-3056 (ROCK CRK DAIRY THOMPSON ARTHUR Paul
RD) TO WEST OF SR-1226 (UNIV. DR). DIVISION
C204045 I-5852B PAVEMENT REHAB ON I-73 FROM 0.7 TRIANGLE GRADING & Snell, PE, William $5,464,750.19 08/28/2017 09/15/2018 10/07/2017 02/28/2019 31.60 41.24
MILES SOUTH OF I-40 TO 0.73 MILES PAVING INC H
SOUTH OF SR-2085 IN GREENSBORO.
C204071 U-5169 I-74/US-311 AND NC-68 BRANCH CIVIL INC Snell, PE, William $22,481,354.65 07/30/2018 01/28/2021 09/14/2018 01/28/2021 18.70 11.50
(EASTCHESTER DR) INTERCHANGE H
IMPROVEMENTS.
C204096 U-2525C GREENSBORO EASTERN LOOP ES WAGNER Julian, Jason R $120,471,182.82 04/30/2018 10/26/2018 05/07/2018 11/20/2022 13.50 14.82
FROM US-29 NORTH OF COMPANY
GREENSBORO TO SR-2303 LLC/SMITH-ROWE
(LAWNDALE DR). LLC-JV
C204100 B-5351 REPLACE BRIDGE #237 AND #242 SMITH-ROWE, LLC Snell, PE, William $8,026,687.83 07/30/2018 03/14/2021 08/01/2018 03/14/2021 28.00 16.30
OVER DEEP RIVER ON US-29/US-70/ H
I-85 BUS IN HIGH POINT.
C204103 U-2412A SR-1486/SR-4121 BRANCH CIVIL INC Lorenz, PE, Kris $55,963,119.69 07/30/2018 12/28/2021 09/12/2018 12/28/2021 13.60 8.55
(GREENSBORO/HIGH POINT RD)
FROM PROPOSED US-311 BYPASS
TO WEST OF SR-1480 (VICKREY
CHAPEL RD).
C204122 I-5811 PAVEMENT REHAB ON I-40 FROM SHARPE BROTHERS A Ingram, PE, J. $8,292,044.45 07/30/2018 10/15/2019 09/24/2018 08/07/2020 12.00 49.64
WEST OF I-73 TO EAST OF HOLDEN DIVISION OF VECELLIO Paul
RD OVERPASS IN GREENSBORO. & GROGAN INC
C204174 I-5852A PAVEMENT REHAB ON I-73/US-421 DIAMOND SURFACE Snell, PE, William $13,393,320.88 03/15/2019 10/15/2020
FROM I-85 TO I-40 IN GREENSBORO. INC H
DG00218 RESURFACE 5.041 MILES OF US 220 APAC - ATLANTIC INC Lorenz, PE, Kris $1,376,734.85 04/27/2015 11/20/2015 07/09/2015 12/08/2015 100.00 100.00
(WENDOVER AVE.) THOMPSON ARTHUR
DIVISION
17
Page 3 of 4
02/07/2019
North Carolina Department of Transportation
Active Projects Under Construction - Guilford Co.
Contract TIP Location Description Contractor Name Resident Contract Bid Availability Completion Work Start Estimated Progress Completion
Number Number Engineer Amount Date Date Date Completion Schedule Percent
DG00339 REPLACE BRIDGE NO.270 ON SR SMITH-ROWE, LLC Snell, PE, William $426,687.96 04/10/2017 02/10/2018 04/27/2017 Date Percent
07/14/2017 100.00 90.74
3360 (BOWMAN DAIRY ROAD) OVER H
UT TO NORTH PRONG OF STINKING
QUARTER CREEK
DG00361 RESURFACE US 220 SHARPE BROTHERS A Lorenz, PE, Kris $1,551,695.42 04/24/2017 11/16/2018 02/18/2018 01/31/2019 95.90 99.54
(BATTLEGROUND AVE) FROM DAVID DIVISION OF VECELLIO
CALDWELL/MARTINSVILLE R TO SR & GROGAN INC
2182 HORSEPEN CREEK ROAD
DG00375 RESURFACE RIVERDALE DR, APAC - ATLANTIC INC Lorenz, PE, Kris $1,688,091.23 07/05/2017 11/01/2018 09/27/2017 11/01/2018 94.50 99.74
OAKDALE RD, SPRUCEWOOD DR, THOMPSON ARTHUR
THAYER CIR, SCOTLAND RD, DIVISION
TARRANT RD, NEELEY RD, DAVIS RD
DG00390 RESURFACE SR 2760, SR 2762, SRRILEY PAVING INC Lorenz, PE, Kris $848,938.30 04/02/2018 10/12/2018 08/08/2018 10/12/2018 84.60 32.62
2763, SR 2764, SR 2767, SR 2768 SR
2769, SR 2771, SR 2772, SR 2782, SR
2784, SR 2785, ETC
DG00392 RESURFACE 26 SECONDARY ROADS RILEY PAVING INC Kirkman, PE, $1,059,904.41 04/02/2018 10/12/2018 08/02/2018 12/15/2018 100.00 65.12
IN ALAMANCE CO. & 1 SEC. ROAD Christopher D
(SR 3349) IN GUILFORD
DG00396 REPLACE PIPE ON SR 3466 NORTH STATE Snell, PE, William $201,005.00 09/25/2017 05/15/2018 10/11/2017 11/30/2017 90.00 93.42
(LYNWOOD DR.) O.3 MILES EAST OF ENVIRONMENTAL INC H
SR 3549 (LIBERTY ROAD)
DG00401 RESURFACE US 29 FROM PROJECT APAC - ATLANTIC INC Lorenz, PE, Kris $2,569,232.46 07/09/2018 11/01/2019
U-2525B NORTHERN LIMITS (APRIL THOMPSON ARTHUR
LANE) TO NORTH OF GUILFORD- DIVISION
ROCKINGHAM COUNTY LINE
DG00411 REPLACE BRIDGE # 210 ON SR 3124 R.E. BURNS & SONS Ingram, PE, J. $928,581.18 06/18/2018 04/19/2019 06/18/2018 04/19/2019 99.00 100.00
(STEWART MILL RD) OVER LITTLE CO., INC. Paul
ALAMANCE CREEK
DG00414 I-5854A BRIDGE REHAB ON I-85, I-73, SR 1392, THE TRUESDELL Lorenz, PE, Kris $997,997.00 04/01/2018 11/01/2019 10/08/2018 11/01/2019 40.70 20.57
SR 1115, SR 1007, SR 3300, CORPORATION
I-85 NB, I-85/US 421 SB
DG00423 BRIDGE REHAB ON #58 SR 1961 AMERICAN CIVIL Snell, PE, William $3,699,999.00 05/21/2018 11/30/2018 06/19/2018 01/31/2019 100.00 75.08
(WEST MARKET CENTER DRIVE) CONSTRUCTORS H
OVER PROSPECT ST., CSX RAILROADWEST COAST LLC
& SHERMAN COURT
DG00432 RESURFACE A PORTION OF US 70 RILEY PAVING INC Kirkman, PE, $1,878,598.12 07/09/2018 11/01/2019
AND 6 SECONDARY ROADS IN Christopher D
ALAMANCE COUNTY AND A PORTION
OF 1 SR IN GUILFORD CO.
DG00439 RESURFACING 86 SECONDARY SHARPE BROTHERS A Lorenz, PE, Kris $4,073,304.05 07/09/2018 11/01/2019 08/06/2018 11/01/2019 18.70 93.09
ROADS DIVISION OF VECELLIO
& GROGAN INC
DG00441 DECK OVERLAYS W/LATEX MODIFIED EXTREME CONCRETE Kirkman, PE, $1,248,556.25 06/04/2018 09/24/2018 08/08/2018 12/22/2018 100.00 94.13
CONCRETE - VERY EARLY STR BRDG CUTTING OF GAFFNEY Christopher D
JNT REPL ON BRIDGE LLC
#71-ALA, 90,195,261 - GUILFORD
18
Page 4 of 4
02/07/2019
North Carolina Department of Transportation
Active Projects Under Construction - Guilford Co.
Contract TIP Location Description Contractor Name Resident Contract Bid Availability Completion Work Start Estimated Progress Completion
Number Number Engineer Amount Date Date Date Completion Schedule Percent
DG00442 RESURFACING A PORTION OF SR BLYTHE Ingram, PE, J. $3,347,856.96 07/09/2018 11/01/2019 Date Percent
1541 (WENDOVER AVE.) INCL RAMPS CONSTRUCTION INC Paul
AND A PORTION OF SR 4121 (GATE
CITY BLVD)
DG00443 WIDENING, RESURFACING AND APAC - ATLANTIC INC Ingram, PE, J. $1,224,754.51 07/09/2018 11/01/2019
BRIDGE DECK REHABILITATION ON THOMPSON ARTHUR Paul
SR 3056 (ROCK CREEK DAIRY ROAD) DIVISION
FROM SR 3000 (MCCONNELL RD)
DG00446 B-5726 REPLACE BRIDGE # 135 ON SR 1001 TRIANGLE GRADING & Lorenz, PE, Kris $1,069,372.80 08/06/2018 06/01/2019 09/19/2018 06/01/2019 100.00 23.44
(NORTH CHURCH STREET) OVER PAVING INC
SQUIRREL CREEK
DG00448 REPLACE BRIDGE #293 ON SR 3314 NATIONAL BRIDGE Snell, PE, William $693,416.69 03/01/2019 12/15/2019
(WILEY LEWIS ROAD) OVER LITTLE BUILDERS LLC H
ALAMANCE CREEK
DG00454 WIDENING, MILLING, RESURFACING APAC - ATLANTIC INC Lorenz, PE, Kris $3,538,049.26 07/09/2018 11/01/2019 09/04/2018 11/01/2019 21.40 36.70
AND ADA COMPLIANTE CURB THOMPSON ARTHUR
RAMPS ON PORTIONS OF 57 DIVISION
SECONDARY ROADS
DG00456 R-5787CB INSTALLATION OF ADA COMPLIANT ATLANTIC Ingram, PE, J. $248,777.00 07/23/2018 02/15/2020 08/13/2018 02/15/2020 100.00 77.26
CURB RAMPS AT VARIOUS CONTRACTING Paul
INTERSECTIONS THROUGHOUT THE COMPANY, INC.
COUNTY
DG00459 REPLACE PIPE ON NC 62, 0.1 MILES CHATHAM CIVIL Robinson, $299,989.00 04/01/2019 11/30/2019
SOUTH OF THE INTERSECTION WITH CONTRACTING LLC Stephen J
SR 3121 (FERGUSON ROAD)
DG00460 REHAB BRIDGES 264, 288, 530, 543 IN LANFORD BROTHERS Snell, PE, William $3,589,101.82 11/12/2018 07/15/2019 10/22/2018 07/15/2019 19.40 24.19
GUILFORD COUNTY CO INC H
DG00462 REHAB BRIDGES 264, 288, 260, 543 IN ELITE INDUSTRIAL Snell, PE, William $967,383.15 08/01/2019 01/01/2020
GUILFORD COUNTY AND BRIDGE 031 PAINTING INC H
IN ORANGE COUNTY
DG00465 W-5707I I-85 BUS/US 29/US 70 SOUTHBOUND NICKELSTON Snell, PE, William $113,256.25 11/05/2018 02/28/2019
INSTALLATION OF GUARDRAIL INDUSTRIES INC H
DG00466 W-5707J I-85 BUS/US 29/US 70 SOUTHBOUND NICKELSTON Snell, PE, William $126,610.00 11/05/2018 02/28/2019
INSTALLATION OF GUARDRAIL INDUSTRIES INC H
DG00468 REPLACE BRIDGE #112 ON SR 2109 APAC - ATLANTIC INC Ingram, PE, J. $954,375.87 03/04/2019 01/26/2020
(EVERSFIELD ROAD) OVER THE HAW THOMPSON ARTHUR Paul
RIVER DIVISION
DG00472 B-4960 REMOVE BRIDGE # 214 ON SR 3058 SMITH-ROWE, LLC Robinson, $1,689,142.69 04/01/2019 03/01/2020
(JUDGE ADAMS RD) AND GRAVEL Stephen J
EXTENSION OF SR 3224
19
Randolph County - High Point MPO - Upcoming Projects - Division 8 - February 2019
Contract # or Completion
Route Description Let Date Contractor Project Admin. Project Cost Notes
WBS # or TIP # Date
U-3400 SR 1577 / SR 1004 Widening from SR 1567 (Robbins Country 6/15/2021 TBD TBD Jeffrey Teague TBD Right of Way 6/2019
(Archdale Road) Rd) to US 311 (Main Street) in Archdale (910) 773-8025 Public Meeting held 2/27/18
U-5308 SR 1547 Widening from south of SR 3106 Kennedy 6/16/2020 TBD TBD Jeffrey Teague TBD Right of Way 6/2019
(Finch Farm Rd) Rd to I-85 in Trinity Extending northern (910) 773-8025 Public Meeting held 3/29/2018
limit to NC 62 Study options to reduce footprint
2nd Public Meeting Nov 29th 2018
U-5770 I-85 / SR 1993 Interchange Improvements 4/20/2021 TBD TBD Jeffrey Teague TBD Right of Way 4/2019
(South Main Street) Frontage Road Alternative Selected (910) 773-8025 Public Meeting held 11/30/17
Newsletter Mailed 6/8/18
U-5864 SR 1595 (Surrett Drive) 3-lane widening from I-85 to Eden 6/15/2021 TBD TBD Greg Davis TBD Right of Way 6/2019
Terrace in Trinity, Archdale, and High (910) 773-8022 Public Meeting held 8/16/16
Point
U-6191 NC 62 Modernize roadway between SR 3252 DSTIP TBD TBD Jeffrey Teague TBD DSTIP Right of Way FY 2025
(Surrett Dr) in Trinity to SR 1009 (N. Main FY 2027 (910) 773-8025 Project may become committed with
St) in Archdale BOT approval
20
Deviated Fixed Route Statistics 2nd Quarter
Thomasville FY19 FY18 Difference
Riders 10,686 13,116 -2430
Miles 17,566 17,340 226
Service Hours 852 840 12
Lexington FY19 FY18 Difference
Riders 13,402 10,395 3007
Miles 11,006 10,907 99
Service Hours 684 649 35
Connector FY19 FY18 Difference
Riders 4588 4285 303
Miles 18,242 12,637 5605
Service Hours 708 526 182
Total FY19 FY18 Difference
Riders 28,676 27,796 880
Miles 46,814 40,884 5,930
Service Hours 2,244 2,015 229
DCTS MPO Update
Current Projects:
• NEW ROUTES. The implementation of the new routes was successful. We are running
ahead of our posted stop times, so we are working on adjustments to improve our on-
time performance.
• NTD Audit. We are working with an outside auditor for our 10-year NTD required ac-
counting audit.
• January Ridership for the New Routes: (FY2018 Ridership for 3 routes: 9,218)
• RED 2,057 17.16%
• GREEN 2,029 16.93%
• BLUE 4,921 41.06%
• ORANGE 2,657 22.17%
• T’ville Saturday 321 2.68%
• Total Ridership 11,985 100.00%21
MPO Updates
Piedmont Authority February 2019
for Regional Transportation
PART Express Updates
• PART Express Ridership totaled 27,161 for the month of December.
• Do you have a service suggestion for PART Express? PART is analyzing and reviewing
routes and would love to hear from you. Email us at contactus@partnc.org.
• PART Express management firm, National Express Transit, is now hiring bus drivers
and offering a $500 hiring bonus.
Congratulations to Crystal Farrior who was recognized as the PART Express
Driver of the Year for 2018. As a driver for National Express Transit Crystal
operates the Route 1 Winston-Salem Express daily. She has set a standard for
all operators with PART Express with a customer friendly and service quality
focus every time she gets behind the wheel. Thank you Crystal for your
service and dedication for the past 9 years!
PART would like to welcome two incoming Board Members for the
2019 Board. Mark Marion, Surry County Commissioner and Steve
Carter, Alamance County Commissioner.
The PART Board of Trustees meets on the second Wednesday of every
month at the PART Office. The date for the March meeting has been
changed to March 20th.
In The Region
• Give your input for the Greensboro Plan2Play Master Plan
• Make sure to learn more about the multi-use stadium in High Point
• Davidson County Transportation System (DCTS) rolled out new service
on Jan 7th
• GTA Welcomed Keolis as new Transit Contractor on Jan 1
STAY CONNECTED
www.PARTNC.org 336.883.7278 facebook.com/partnc @partnc
contactus@partnc.org
22 youtube.com/partnc Bus Tracking App
@partnc
www.PARTNC.org
336.883.7278 MPO Updates - Page 2
Regional Planning
• In preparation of ReFresh 2.0 staff has been studying ridership influencers and current
system characteristics.
• Freight Study Phase III consists of the collection of actual truck movements in the Triad.
NCDOT completed the procurement process and RSG is the lead consultant with Planning
Communities handling engagement activities.
• CommunityViz growth allocation results will be reviewed in Feb then training to follow.
Commuter Resources/TDM
• Staff continued to work with employers in Winston-Salem to complete enrollment in the
Business 40 XPass discount program. There are 18 employers registered offering the
benefit.
• A lunch and learn was held at Truliant Federal Credit Union along with NCDOT.
• Staff met with MWI Animal Health to present on the PARTnership program. The company is
located in Brown Summit, a survey will be distributed to employees.
• PART received delivery of four new 2019 Dodge Caravans recently which will help with
increased demand for the smaller sized vehicles.
Regional Marketing
• How to Ride PART and Use Touch Pass videos are complete and will begin being distributed.
• A new brochure was developed for DCTS which will be used to promote those routes in the
community.
• A meeting was held at the PTI Airport to create better
awareness and partnership with the Airport promoting PART
services.
• New engagement campaign upcoming to use social media for
testimonials and sharing called “I Take PART”.
Piedmont Transit Resources Call Center
• In November the Call Center had 11,255 presented calls.
• The majority of the calls were about PART Shuttle, PART Fixed Route Bus, High Point
Transit Fixed Route Bus, DCTS Thomasville Rider Info, PART Rider Info.
23