HPMPO Technical Coordinating Committee (TCC)
Regular MeetingHigh Point, NC · January 17, 2023
Agenda
HIGH POINT URBAN AREA MPO
TECHNICAL COORDINATING COMMITTEE (TCC)
Agenda for the January 17, 2023 TCC Meeting
2:00 PM – Third Floor Conference Room
High Point Municipal Building - City Hall
211 S. Hamilton Street, High Point
Action Items
1. Consideration of the November 8th TCC meeting minutes. (Greg Venable) Page 1
2. Recommendation to the TAC of amendments to the 2020-2029 MTIP. (John Hanes)
Page 6
3. Recommendation to the TAC for approval to release the FY2023-2024 Unified Planning Work
Program (UPWP) for a minimum 30-day public review period. (Andrew Edmonds) Page 11
Information Items
4. FY 2024 Congestion Mitigation & Air Quality (CMAQ) and FY 2023 Carbon Reduction
Program (CRP) call for projects. (Andrew Edmonds) Page 14
5. P7.0 update. (Andrew Edmonds) Page 18
Agency Reports
6. NCDOT Division Reports
Division 7 (Stephen Robinson) Page 21
Division 8 (Bryan Kluchar) Page 26
Division 9 (Fred Haith)
7. NCDOT Transportation Planning Branch Report (Michael Abuya)
8. NCDOT Integrated Mobility Division Report (Alex Rotenberry)
9. FHWA Report (Joe Geigle) Page 27
10. Public Transportation Reports
High Point Transit System (Andrew Edmonds)
Davidson County Transportation (Richard Jones) Page 30
RCATS (Tawanna Williams)
PART (Mark Kirstner) Page 31
Next TCC Meeting
February 21, 2023
TCC
Meeting
Meeting Date 1/17/2023 Agenda Item No. 1
Action Requested Approve
Section Tab
Consideration of the November 8th TCC meeting minutes. (Greg Venable)
Information Summary Attachments Yes No
The complete meeting minutes are in your packet as Attachment 1.
TCC Vote: Motion Second
By:__________________ By:_______________________
Vote: For_______________________ Against________________________
1
MINUTES
TECHNICAL COORDINATING COMMITTEE
November 8, 2022
TCC MEMBERS PRESENT: Heidi Galanti, Stephen Robinson, Michael Abuya, Mark
Kirstner, Bryan Kluchar, Fred Haith, Michael Abuya, Mark Kirstner, Greg Venable,
Jason Miller, Roger Jones, Chuck George, Stevie Cox, Pat Ivey
TAC MEMBERS PRESENT: Joe Geigle
MPO Staff: John Hanes, Andrew Edmonds, and Gwen Ford
OTHERS PRESENT: Tamara Njegovan, Richard Jones, Phillip Craver, Kathy Vollert,
Alex Rotenberry, Jeron Monroe, Tawana Williams
RECORDING STAFF: Microsoft Teams
ACTION ITEMS
Item 1: Consideration of the October 18th TCC meeting minutes.
Motion by: Stevie Cox
Seconded by: Mark Kirstner
Vote:
For: Unanimous
Against: None
Item 2: Consideration of the 2023 TCC Schedule
Greg Venable reported that the TCC will continue to meet on the third Tuesday of each
month with exception of July and December. In November TCC will meet on the first
Tuesday to avoid conflicts with the Thanksgiving holiday.
Motion by: Stephen Robinson
Seconded by: Mark Kirstner
Vote:
For: Unanimous
Against: None
2
Item 3: Recommendation to the TAC for amendments to the 2020-2029
MTIP.
John Hanes reported the following amendments:
• BL-0071, construction of bike/ped, roadway, and streetscape improvements on Sunset
Drive in High Point.
• P-5732 (Lexington Train Station), modified to allow for additional time for
preliminary engineering.
• TO-5143C (PART Operating Assistance), funding modifications in FY23-FY 28.
Motion by: Stevie Cox
Seconded by: Chuck George
Vote:
For: Unanimous
Against: None
Item 4: Recommendation to the TAC for approval the 2023 Safety
Performance Targets established by NCDOT.
Andrew Edmonds reported NCDOT is recommending to MPOs approve safety
performance measure targets for 2023 that are consistent with NCDOT targets. A
resolution for the 2023 safety performance targets is included in the meeting packet.
Motion by: Mark Kirstner
Seconded by: Stevie Cox
Vote:
For: Unanimous
Against: None
Information Items
Item 5: DRAFT 2023-2024 Unified Planning Work Program (UPWP).
Greg Venable discussed the draft 2023-2024 Unified Planning Work Program (UPWP)
which is the MPO’s annual budget and work plan. It lists the planning tasks that staff
expects to perform and the work products that we expect to produce during the fiscal
year. Our fiscal year runs from July 1st through June 30th of next year. The work
program consists of three major divisions: surveillance of change, long-range planning,
and administration. Each major division includes several line items under which the MPO
can perform work. Each line item includes explanatory text describing the customary
work items for the line item, the rationale for performing the work, how much money we
plan to spend on the line item and the work products that the MPO expects to produce
during the upcoming year. The UPWP also includes a series of tables showing the
3
sources of the funds used, the amount of federal funds used, the amount of the local
match, and total expenditures for each line item from each funding source.
Item 6: High Point MPO FFY 2022 Authorizations
John Hanes reported that pursuant to 23 USC 134(j)(7)(B) and 23 CFR 450.334, "An
annual listing of projects for which Federal funds have been obligated in the preceding
year shall be published or otherwise made available by the metropolitan planning
organization for public review." Additionally, MPOs are also required to post
authorizations of funds for all transit projects in the STIP, not just those using STI funds.
Agency Reports
Item 7: NCDOT Division Reports
Division 7
Stephen Robinson added that the division report has been updated to include not only TIP
projects but SPOT, bridge replacement and EB projects.
Division 8
Bryan Kluchar reported that there are no changes to the project updates.
Division 9
Pat Ivey reported all schedules have been updated to reflect the draft 2024-2033 STIP.
Item 5: NCDOT Transportation Planning Branch Report
Michael Abuya had nothing to report.
Item 6: NCDOT Integrated Mobility Division Report
Alex Rotenberry shared information about a multimodal webinar on 11/10.
Item 7: FHWA Report
Joe Geigle had nothing to report.
Item 8: Public Transportation Reports
High Point Transit System
Nothing to report this month.
4
Davidson County Transportation
Richard Jones stated that he has heard back from FTA concerning being a direct recipient
and are addressing requests they have.
RCATS
Nothing to report this month.
PART
Mark Kirstner gave updates to the household travel survey, travel reporting, tour based
freight model, and growth allocation model.
Item 10: Meeting Adjourned.
Motion by: Mark Kirstner
Seconded: Stevie Cox
Vote:
For: Unanimous
Against: None
5
TCC
Meeting
Meeting Date 1/17/2023 Agenda Item No. 2
Action Requested Recommendation
Section Tab
Recommendation to the TAC for approval of amendments to the 2020-2029 MTIP. (John Hanes)
Information Summary Attachments Yes No
The proposed amendments to the 2020-2029 MTIP for the High Point MPO are included in you
packet. Staff is recommending approval of the MTIP amendments.
TCC Vote: Motion Second
By:__________________ By:_______________________
Vote: For_______________________ Against________________________
6
High Point
RESOLUTION
Archdale AMENDING THE 2020-2029 HIGH POINT METROPOLITAN
TRANSPORTATION IMPROVEMENT PROGRAM
WHEREAS, the Transportation Advisory Committee has reviewed the 2020-2029
Denton
Metropolitan Transportation Improvement Program and found an amendment is
necessary; and
Jamestown WHEREAS, the following amendments have been proposed:
Lexington
Thomasville
Trinity
Wallburg
Davidson
County
Forsyth
County
NOW THEREFORE, be it resolved by the Transportation Advisory Committee for the
High Point Metropolitan Planning Organization that the 2020-2029 Metropolitan
Guilford Transportation Improvement Program be amended as listed above on this the 24th day of
County
January 2023.
A motion was made by TAC Member ______________and seconded by TAC
Randolph member _______________ and approved this the 24th day of January 2023.
County
_________________________
Martha Wolfe,
Chair, Transportation Advisory Committee
7
High Point
Archdale
Subscribed and sworn to me this the 24th day of January 2023.
Denton
______________________________________
Notary Public
Jamestown My commission expires ______________________
Lexington
Thomasville
Trinity
Wallburg
Davidson
County
Forsyth
County
Guilford
County
Randolph
County
8
High Point
RESOLUTION
Archdale AMENDING THE 2020-2029 HIGH POINT METROPOLITAN
TRANSPORTATION IMPROVEMENT PROGRAM
WHEREAS, the Transportation Advisory Committee has reviewed the 2020-2029
Denton
Metropolitan Transportation Improvement Program and found an amendment is
necessary; and
Jamestown WHEREAS, the following amendments have been proposed:
Lexington
Thomasville
Trinity
Wallburg
Davidson
County
Forsyth
County
Guilford
County
Randolph
County
9
High Point
Archdale
Denton
Jamestown
Lexington
Thomasville
Trinity
Wallburg
Davidson
County
NOW THEREFORE, be it resolved by the Transportation Advisory Committee for the
High Point Metropolitan Planning Organization that the 2020-2029 Metropolitan
Transportation Improvement Program be amended as listed above on this the 24th day of
Forsyth January 2023.
County
A motion was made by TAC Member ______________and seconded by TAC
member _______________ and approved this the 24th day of January 2023.
Guilford
County _________________________
Martha Wolfe,
Chair, Transportation Advisory Committee
Randolph
County
Subscribed and sworn to me this the 24th day of January 2023.
______________________________________
Notary Public
My commission expires ______________________
10
TCC
Meeting
Meeting Date 1/17/2023 Agenda Item No. 3
Action Requested Recommendation
Section Tab
Recommendation for approval of the 2023-2024 Unified Planning Work Program
(UPWP). (Andrew Edmonds)
Information Summary Attachments Yes No
The UPWP is the MPO’s annual budget and work plan. It lists the planning tasks that staff
expects to perform and the work products that we expect to produce during the fiscal year.
Our fiscal year runs from July 1st through June 30th of next year. The work program consists
of three major divisions: surveillance of change, long-range planning, and administration.
Each major division includes several line items under which the MPO can perform work.
Each line item includes explanatory text describing the customary work items for the line
item, the rationale for performing the work, how much money we plan to spend on the line
item and the work products that the MPO expects to produce during the upcoming year. The
UPWP also includes a series of tables showing the sources of the funds used, the amount of
federal funds used, the amount of the local match, and total expenditures for each line item
from each funding source.
Our allocation from NCDOT for FY2023-2024 is $388,700 in Federal PL Funds. Our local
match for the MPO will be $91,750.
As required by our Public Participation Policy (PPP) the UPWP must go through a minimum
30-day public review and comment period. We request a recommendation to the TAC to
release the FY2023-2024 UPWP for public review and comment beginning February 1, 2023
and ending on March 3, 2023.
TCC Vote: Motion Second
By:__________________ By:_______________________
Vote: For_______________________ Against________________________
11
The High Point Metropolitan Planning Organization (MPO) is soliciting comments on the
Draft 2023-2024 High Point MPO Unified Planning Work Program (UPWP). The
UPWP outlines the work schedule, projects, and financing of MPO staff for the fiscal
year.
The public will have at least thirty (30) days to review and comment on the UPWP. The
public review period will begin on Wednesday, February 1, 2023 and end on Friday
March 3, 2023.
Copies of the UPWP will be available for public review in the following locations
beginning February 1, 2023:
• The High Point Public Library
• Archdale Public Library
• Jamestown Public Library
• Davidson County Libraries
(Lexington, Thomasville, Denton, North Davidson, West Davidson)
• High Point Department of Transportation
• Archdale Planning Department
• Denton Town Hall
• Jamestown Town Hall
• Lexington City Hall
• Thomasville Engineering Department
• Trinity City Hall
• Wallburg Town Hall
• Davidson County Planning Department
• Guilford County Planning Department
• Randolph County Planning Department
• The website of the MPO will post the draft UPWP for public review at
https://www.highpointnc.gov/HPMPO
Please submit all written comments to:
Andrew Edmonds
High Point Urban Area Metropolitan Planning Organization
PO Box 230
High Point, NC 27261
Office: 336-883-3235
Fax: 336-883-8568
Email: andrew.edmonds@highpointnc.gov
Written comments must be received by March 3, 2023
12
High Point
Archdale RESOLUTION APPROVING THE FY 2023-2024 PLANNING
WORK PROGRAM FOR THE HIGH POINT URBANIZED AREA
METROPOLITAN PLANNING ORGANIZATION
Denton
WHEREAS, a comprehensive and continuing transportation planning program
Jamestown
must be carried out cooperatively in order to ensure that funds for transportation
projects are effectively allocated to the High Point Urban Area; and
WHEREAS, the MPO has adopted a 25-year Metropolitan Transportation Plan to
Lexington
the Year 2045 that is fiscally constrained and meets federal requirements for
metropolitan transportation planning; and
Thomasville WHEREAS, the City of High Point has been designated as the recipient of Federal
Transit Administration Metropolitan Planning Program (Section 5303) funds; and
Trinity WHEREAS, members of the High Point Urban Area Transportation Advisory
Committee agree that the Planning Work Program will effectively advance the
transportation planning process for FY 2023-2024
Wallburg
NOW, THEREFORE, BE IT RESOLVED that the Transportation Advisory
Committee hereby endorses the FY 2023-2024 Planning Work Program for the
High Point Urban Area.
Davidson
County
A motion was made by TAC member _______________________ and seconded by
TAC member __________________________ for the adoption of the above
resolution, and upon being put to a vote was duly adopted on this the 28th day of
Forsyth
County
March 2023.
_______________________
Martha Wolfe
Guilford
County Chair, Transportation Advisory Committee
*******************************************************************
Randolph
County
Subscribed and sworn to me this 28th day of March 2023.
_______________________________Notary Public
My commission expires ______________
13
TCC
Meeting
Meeting Date 1/17/2023 Agenda Item No. 4
Action Requested Information
Section Tab
FY 2024 Congestion Mitigation & Air Quality (CMAQ) and FY 2023 Carbon Reduction
Program (CRP) call for projects. (Andrew Edmonds)
Information Summary Attachments Yes No
Congestion Mitigation & Air Quality (CMAQ) is a Federal program that funds transportation
projects and programs in air quality nonattainment and maintenance areas to help achieve and
maintain national standards for air quality pollutants. Funding is apportioned to North Carolina
based on the population in non-attainment and maintenance areas of the state and the severity of
air quality problem.
NCDOT announced the release of federal CMAQ funding for the High Point Urban Area MPO
for FY 2024. NCDOT has allocated $1,242,380 to the HPMPO. Projects submitted for
consideration must be a minimum of $100,000 and each project requires a 20% local match.
Carbon Reduction Program (CRP) is a Federal program introduced by the Bipartisan
Infrastructure Law that funds projects designed to reduce transportation emissions from on-road
highway sources. Funding is apportioned to North Carolina based on the urban area’s relative
share of population to the rest of the State.
NCDOT has announced an allocation of $380,331 in FY 23 CRP funds made available to the
High Point Urban Area MPO. Projects submitted for consideration must be a minimum of
$100,000 and requires a 20% local match. High Point Urban Area MPO is a non-TMA area and
must consult with NCDOT on which projects are selected to ensure eligibility.
CRP funds can be used for a wide range of projects that reduce emissions. Eligible
activities as identified in the statue are as follows: traffic management, truck stop
electrification, public transportation, transportation alternatives, advanced transportation
and congestion management technologies, intelligent transportation systems,
development of a carbon reduction strategy, travel demand management, efforts to reduce
the impacts of freight movement, deployment of alternative fuel vehicle, diesel engine
retrofits, traffic flow improvements that do not involve construction of new capacity; and
projects that reduce transportation emissions at port facilities. Other projects may be
eligible with demonstration of emissions reductions.
MPOs receiving CMAQ and CRP funding allocations can combine program funding.
The project submittal window for FY24 CMAQ and FY23 CRP projects will be open until
February 28, 2023. Projects will be considered for action at the April 2023 TCC and TAC
meetings.
TCC Vote: Motion by:________________ Second by:_____________________
Vote: For_______________________ Against________________________
14
CMAQ Target Allocations: Fiscal Year 2024
FY 2023
FY2023 Federal CMAQ Apportionment1 $ 55,821,208
2% SPR Setaside $ 54,704,784
90% Obg. Limit $ 49,234,305
Total Assumed CMAQ State Allocation3 $ 49,234,305
2010 Estimated Adjusted
NA Area Weighting Adjusted Percent FY 2023 FY 2023
Area Pollutants Population3 Factors4 Population (%) Target Target Notes
NCDOT Allocation 5 45% $ 22,155,437 $ 21,853,504
MPO/RPO Allocation 7 55% $ 27,078,868 $ 27,380,801
$ 49,234,305 $ 49,234,305
Catawba Region
Hickory MPO PM2.5 158,524 1.00 158,524 2.86% $ 774,598 $ 774,598 No adjustments
Great Smoky Mountain National Park Region
Land of Sky RPO Ozone (1997) 554 1.00 554 0.01% $ 2,707 $ 100,000 See note 8
See note 8
Southwestern RPO Ozone (1997) 3,342 1.00 3,342 0.06% $ 16,330 $ 100,000
Metrolina Region
Cabarrus‐Rowan MPO Ozone (2008,1997) 323,384 1.00 323,384 5.84% $ 1,580,156 $ 1,580,156 No adjustments
Charlotte Regional TPO Ozone (1997, 2008), CO $ 7,971,452 $ 7,971,452 No adjustments
Mecklenburg County Ozone (1997, 2008), CO 919,628 1.44 1,324,264 23.90% $ 6,470,774
All Other Areas Ozone (1997, 2008) 255,932 1.20 307,118 5.54% $ 1,500,678
Gaston Cleveland Lincoln MPO Ozone (1997, 2008) 287,839 1.00 287,839 5.19% $ 1,406,472 $ 1,406,472 No adjustments
Rocky River RPO Ozone (1997, 2008) 19,469 1.00 19,469 0.35% $ 95,132 $ 100,000 See note 8
Rocky Mount Region
Rocky Mount MPO Ozone (1997) 88,797 1.00 88,797 1.60% $ 433,890 $ 433,890 No adjustments
Upper Coastal Plain RPO Ozone (1997) 128,751 1.00 128,751 2.32% $ 629,118 $ 629,118 No adjustments
Traid Region
Burlington‐Graham MPO Ozone (1997), PM2.5 16,844 1.00 16,844 0.30% $ 82,305 $ 100,000 See note 8
Greensboro MPO PM2.5 376,308 1.00 376,308 6.79% $ 1,838,760 $ 1,838,760 No adjustments
High Point MPO PM2.5 254,257 1.00 254,257 4.59% $ 1,242,380 $ 1,242,380 No adjustments
Winston‐Salem MPO CO, PM2.5 382,904 1.00 382,904 6.91% $ 1,870,990 $ 1,870,990 No adjustments
NW Piedmont RPO Ozone (1997) 326 1.00 326 0.01% $ 1,593 $ 100,000 See note 8
Triangle Region
Capital Area MPO Ozone (1997), CO $ 6,100,383 $ 6,100,383 No adjustments
Wake County Ozone (1997), CO 900,993 1.20 1,081,192 19.51% $ 5,283,044
All Other Areas Ozone (1997) 167,271 1.00 167,271 3.02% $ 817,339
Durham‐Chapel Hill‐Carrboro MPO Ozone (1997), CO $ 2,288,132 $ 2,288,132 No adjustments
Durham County Ozone (1997), CO 267,587 1.2 321,104 5.79% $ 1,569,018
All Other Areas Ozone (1997) 147,169 1.00 147,169 2.66% $ 719,114
Kerr Tarr RPO Ozone (1997) 107,840 1.00 107,840 1.95% $ 526,940 $ 526,940 No adjustments
Triangle RPO Ozone (1997) 44,518 1.00 44,518 0.80% $ 217,529 $ 217,529 No adjustments
Totals 4,852,237 5,541,776 100% $ 49,234,305 $ 49,234,305
Footnotes:
1 Source ‐ https://www.fhwa.dot.gov/fastact/estfy20162020apports.pdf
3 Source ‐ GIS Analysis of 2010 Census Population, 2010 Census Adjusted MPO & RPO Boundaries & EPA Pollutant Shapefiles
4 See "Table 2: SAFETEA‐LU CMAQ Apportionment Factors " tab; Source ‐ http://www.fhwa.dot.gov/ENVIRonment/air_quality/cmaq/policy_and_guidance/2013_guidance/index.cfm
5 45% of NC CMAQ Apportionment, per NCDOT Guidelines
7 55% of NC CMAQ Apportionment, per NCDOT Guidelines
8 Per minimum CMAQ target allocation guidelines, a minimum yearly allocation will be guaranteed for any AQ region whose yearly allocation resulting from this formula is less than
$100,000 to ensure that each AQ region can program at least one CMAQ project that meets the $100,000 minimum project amount during the TIP update cycle. Funds deducted from
NCDOT Allocation to meet this $100,000 min threshold.
15
STATE OF NORTH CAROLINA
DEPARTMENT OF TRANSPORTATION
ROY COOPER J. ERIC BOYETTE
GOVERNOR SECRETARY
November 1, 2022
Mr. Greg Venable
Transportation Director
City of High Point
P.O. Box 230
High Point, North Carolina 27261
Subject: High Point Urban Area MPO, Federal FY23 Carbon Reduction Program
Allocation
Dear Mr. Venable:
On November 15, 2021, President Biden signed the Infrastructure Investment and Jobs
Act (IIJA) (Public Law 117-58, also known as the “Bipartisan Infrastructure Law”) (BIL)
into law. The BIL authorizes a new Carbon Reduction Program (CRP) codified at 23
United States Code (U.S.C.) 175 to reduce transportation emissions. The Transportation
Planning Division is pleased to inform you that the following funds have been made
available to the High Point Urban Area MPO through the CRP. For Federal FY23, the
High Point Urban Area MPO will receive the allocation of $380,331 in federal funds.
CRP funds are available for obligation for a period of 3 years after the last day of the
fiscal year for which the funds are authorized (See 23 U.S.C. 118(b)). Thus, CRP funds
are available for obligation for up to 4 years. The federal share for CRP funded projects is
80% and will require a 20% non-federal match for projects.
High Point Urban Area MPO is a non-TMA area and must consult with NCDOT on
which projects are selected to ensure eligibility.
CRP funds can be used for a wide range of projects that reduce emissions. Eligible
activities as identified in the statue are as follows: traffic management, truck stop
electrification, public transportation, transportation alternatives, advanced transportation
and congestion management technologies, intelligent transportation systems,
development of a carbon reduction strategy, travel demand management, efforts to reduce
the impacts of freight movement, deployment of alternative fuel vehicle, diesel engine
retrofits, traffic flow improvements that do not involve construction of new capacity; and
projects that reduce transportation emissions at port facilities. Other projects may be
eligible with demonstration of emissions reductions. All projects selected must follow
Title 23 requirements.
Mailing Address: T ELEPHONE: (919) 707-0900 Location:
NC DEPARTMENT OF TRANSPORTATION FAX: (919) 733-9794 1 S OUTH WILMINGTON S TREET
T RANSPORTATION PLANNING DIVISION C USTOMER SERVICE: 1-877-368-4968 RALEIGH NC 27601
1554 MAIL SERVICE CENTER
RALEIGH NC 27699-1554
16
WEBSITE: NCDOT. GOV
For additional guidance as next steps, we recommend you follow the listed of steps
below.
• Identify a list of projects that are eligible in your area. (Minimum project cost is
$100,000.)
• Develop a process for making sure that projects are distributed equitably if you
have more needs than funds.
• Identify and ensure that the local government has the 20% local match available
and that the total project cost includes an additional 10% for NCDOT project
oversight.
• Once you have identified the projects that you would like to fund with CRP funds,
email NCDOT-TPD the projects information to confirm eligibility.
• Once NCDOT- TPD has reviewed and confirmed eligibility of projects and issued
a CRP Verification Letter with STIP identifiers, then steps should be taken to
incorporate in MTP and STIP through the amendment process.
• Once your MPO has received confirmation of project eligibility, the jurisdiction
administering the project would then contact NCDOT Local Programs to establish
a funding agreement (instructions on how to do this will be in the verification
letter).
• Once the funding agreement is established and federal funds authorized, project
manager follows the process detailed in the Local Programs Management
Handbook.
For more information about the CRP, please review the Carbon Reduction Program
Implementation Guidance and fact sheet. If you have any questions, please contact
Nastasha Earle-Young at nbearle-young@ncdot.gov or 919-707-0931.
Sincerely,
Jamal Alavi, P.E.
Director, Transportation Planning Division
cc: Travis Marshall, PE, Transportation Planning Division
Heather Hildebrandt, Transportation Planning Division
Nastasha Earle-Young, Transportation Planning Division
Jason Schronce, PE, STIP Unit
Wright R. Archer, Division 7
Patrick Norman, PE, Division 8
Pat Ivey, PE, Division 9
Marta Matthews, Local Programs
17
TCC
Meeting
Meeting Date 1/17/2023 Agenda Item No. 5
Action Requested Information
Section Tab
P7.0 Update (Andrew Edmonds)
Information Summary Attachments Yes No
As the P7 Workgroup continues to meet, High Point MPO staff will give regular updates
on the upcoming project prioritization cycle. More information will be provided at the
meeting.
TCC Vote: Motion Second
By:__________________ By:_______________________
Vote: For_______________________ Against________________________
18
TCC
Meeting
Meeting Date 1/17/2023 Agenda Item No. 6-9
Action Requested Information
Section Tab
MPO Reports
Information Summary Attachments Yes No
Agenda Item 6
Division Reports
Agenda Item 7
NCDOT Transportation Planning Division Report
Agenda Item 8
FHWA Report
Agenda Item 9
Public Transportation Reports
TCC Vote: Motion Second
By:__________________ By:_______________________
Vote: For_______________________ Against________________________
19
NCDOT DIV 7 PROJECTS LOCATED IN HPMPO - UNDER DEVELOPMENT
Estimated
Draft STIP Let
TIP/WBS # Description Let/Start Date Completion Cost Status Project Lead
Date
Date
EB-5519 Lydia greenway trail from Jamestown municipal building to Jul. 2019 N/A 1/31/23 $1,198,415 LAP, Under Construction, Contract Town of
50035.3.1 York Leigh Road (Non-System) in Jamestown Administered by Town of Jamestown - Jamestown/Stephen
Punchlist Items Underway Robinson
SS-4907CN Install All-Way Stop with flasher and radius improvements on Dec. 2019 N/A 8/31/22 $90,000 Radius improvements still pending - all Dawn McPherson
48759.1.2 SR 1113 (Kivett Drive) at SR 1145 (Riverdale Drive) east of other construction items completed Derek Dixon
48759.2.1 High Point
48759.3.1
SS-4907CF Install traffic signal with pedestrian count down heads at the Mar. 2022 N/A 11/30/2022 $120,000 Signal plans not complete, MA w/City of Dawn McPherson
48252.1.1 intersection of SR 1278 (University Parkway) and Davis High Point executed. Poles arrived
48252.2.1 Avenue (non-system) in High Point. Traffic signal to be 8/23/2021. Construction underway
48252.3.1 supported by metal strain poles.
SS-6007AC Installation of 2 lines of trailing approach bridge guardrail at Jan. 2023 N/A Jun. 2023 $33,000 Planning and design activities underway Antoine White
49824.1.1 Bridge #400196 on SR 1193 (Baker Road) over US 29-70 in
49824.2.1 High Point.
49824.3.1
SS-6007P Bridge #57 on SR 1113 (Kivett Drive) over Reddick's Creek - Jan. 2023 N/A Jun. 2023 $36,000 Planning and design activities underway Antoine White
49423.1.1 Install bridge approach guardrail with MASH compliant end
49423.3.1 units
17BP.7.R.127 Replace Bridge #67 over Deep River in High Point on SR 1523 1/19/23 N/A FY 2025 $1,163,000 Planning and design activities underway Tim Powers
(Deep River Road)
17BP.7.R.114 Replace Bridge #52 (S. Scientific Street) 1/19/23 N/A FY2025 $1,045,000 Planning and design activities underway Tim Powers
HS-2007D I-74 at I-74 and US 29-70 (I-85 Business) Interchange. 3/16/23 N/A 10/31/23 $500,000 Planning and design activities underway Dawn McPherson
49317.1.5 Upgrade traffic signals, signing, and pavement markings at - coordination underway with contract
49317.2.5 intersections within the interchange. resurfacing
49317.3.5
HS-2007E Installation of long-life pavement markings on NC 62 3/16/23 N/A 10/31/23 $715,000 Planning and design activities underway Dawn McPherson
49317.1.6
49317.2.6
49317.3.6
C-5609L Six sidewalk projects in various locations in High Point MPO 3/31/23 N/A FY2025 $1,860,100 ROW activities underway City of High
Point/Stephen
Robinson
20
Page 1 HPMPO Jan. 2023
NCDOT DIV 7 PROJECTS LOCATED IN HPMPO - UNDER DEVELOPMENT
Estimated
Draft STIP Let
TIP/WBS # Description Let/Start Date Completion Cost Status Project Lead
Date
Date
C-5609F Oakdale Pedestrian Improvements - Phase 3 - Construct 6/30/23 N/A FY2025 $550,000 Preliminary Engineering activities Town of
sidewalks between Chimney Court and Jamestown Oaks Drive underway Jamestown/Stephen
in Jamestown Robinson
EB-5873 Construct sidewalk on SR 1278 (S. College Drive) from SR 6/30/23 FY2023 FY2025 $225,000 Preliminary Engineering activities City of High
1300 (E. Green Drive) to SR 1113 (E. Kivett Drive) in High underway Point/Stephen
Point Robinson
EB-5874 Construct sidewalk on NC 68 (Eastchester Drive) from 6/30/23 FY2023 FY2025 $435,000 Preliminary Engineering activities City of High
Johnson Street to SR 1278 (North College Road) in High Point underway Point/Stephen
Robinson
U-6018 Improve interchange at NC 62 and I-85 and realign 8/15/23 FY2023 FY2026 $12,300,000 Planning and design activities Rob Weisz
47163.1.1 intersections along NC62 at SR 1154 (Kersey Valley Road) 4/18/23 underway, ROW acquisition underway
47163.2.1 and SR 1162 (Weant Road) in Archdale
47163.3.1
EB-5889 Construct sidewalk with curb and gutter on SR 1486 (W. Main 9/20/23 FY2023 FY 2025 $500,000 Municipal Agreement required to begin Town of
Street); SR 1539 (Penny Road) from existing sidewalk on SR Preliminary Engineering work Jamestown/Stephen
1486 (W. Main Street) to park access on SR 1539 (Penny Robinson
Road) in Jamestown
U-4758 Improvements to Johnson Street/Sandy Ridge Road from 12/19/23 FY2024 FY2026 $45,700,000 Planning and Design activities Laura Sutton
40251.2.1 Skeet Club Road to I-40 underway, Public meeting 8/14/18 -
40251.3.1 ROW underway
U-4015A Widen SR 1556 (Gallimore Dairy Road) to multilanes from NC 1/16/24 FY2023 FY2025 $11,500,000 Planning and design activities Brian Ketner
35013.1.4 68 to Airpark East in Greensboro 5/16/23 underway, coordinate with U-5974,
35013.2.4 ROW acquisition underway
35013.3.4
C-5700 Extend Oakdale Road existing sidewalk from east of E. Main 2/29/24 FY2022 FY2026 $170,000 Preliminary Engineering activities Town of
Street to Chimney Court in Jamestown underway Jamestown/Stephen
Robinson
P-5721 Construct extension Norfolk Southern Rail Siding in 6/18/24 FY2024 FY2027 $4,070,000 Planning and design activities underway Brad Smythe
Jamestown
B-5723 Replace Bridge 54 over Richland Creek on SR 1158 (Jackson 11/19/24 FY2025 FY2026 $3,237,000 Planning and design activities underway Rob Weisz
45679.1.1 Lake Road)
45679.1.2
45679 2 1
15BPR.113 Rehab on Bridge #875 on I-73 over I-85 and on Bridge #524 on 3/18/25 N/A FY2027 $2,000,000 Planning and design activities underway Kristy Alford
NC 62 over I-85
EB-5922 Construct sidewalk on Eastchester Drive 7/30/25 FY2025 FY2027 $125,000 Municipal Agreement required to begin City of High
Preliminary Engineering work Point/Stephen
Robinson
21
Page 2 HPMPO Jan. 2023
NCDOT DIV 7 PROJECTS LOCATED IN HPMPO - UNDER DEVELOPMENT
Estimated
Draft STIP Let
TIP/WBS # Description Let/Start Date Completion Cost Status Project Lead
Date
Date
BP7-R008 Replace Bridge #47 on SR 1113 (Kivett Drive) 10/2/25 N/A FY 2027 $1,000,000 Planning and Design activities Tim Powers
underway
EB-5989 Construct sidewalk on Cedrow Drive from west of I-74 to East 9/25/26 FY2026 FY2028 $1,200,000 Municipal Agreement required to begin City of High
of I-74 in High Point Preliminary Engineering work Point/Stephen
Robinson
I-5712 Interchange improvements at I-40/US 421 and SR 1850 12/15/26 FY2027 FY2029 $14,500,000 Planning and Design activities Laura Sutton
50126.1.FS1 (Sandy Ridge Road) in Greensboro. Sandy Ridge Road underway, Coordinate with U-4758 & U-
50126.2.1 widening to Cider Road 6045
50126.3.1
U-5974 Upgrade NC 68 to Superstreet from SR 1523 (Hickswood 7/18/28 FY2029 FY2030 $48,100,000 Planning and design activities Brian Ketner
45962.1.1 Road) to SR 1556 (Gallimore Dairy Road) in High Point underway, coordinate with U-4015A
45962.2.1
45962.3.1
EB-5999 Construct sidewalk on Johnson Street from Parris Avenue to 8/17/28 Funded for FY2030 $145,000 Planning and design activities pending City of High
SR 1896 (E. Hartley Drive) in High Point Preliminary Point/Stephen
Engineering Robinson
only
EB-6000 Construct sidewalk on SR 1536 (Penny Road) from City Lake 8/17/28 Funded for FY2030 $1,500,000 Planning and design activities pending City of High
Park to Piedmont Environmental Center in High Point Preliminary Point/Stephen
Engineering Robinson
only
U-6121 Widen SR 1541 (Wendover Avenue) from NC 68 (Eastchester 11/21/28 Funded for FY 2031 $27,300,000 Planning and design activities pending Brian Ketner
48605.1.1 Drive) in High Point to SR 1541 (Guilford College Road) in Preliminary
48605.2.1 Greensboro. Engineering
48605.3.1 only
EB-6010 Construct sidewalk on US 70 (W. Wendover Ave.) from NC 68 8/16/29 Funded for FY2032 $220,000 Municipal Agreement required to begin City of High
(Eastchester Drive) to Gibson Park Entrance in High Point Preliminary Preliminary Engineering work Point/Stephen
Engineering Robinson
only
22
Page 3 HPMPO Jan. 2023
North Carolina Department of Transportation 1/9/2023
Active Projects Under Construction - Guilford Co.
Contract TIP Number Location Description Contractor Name Resident Contract Bid Availability Completion Work Start Estimated Progress Completion
Number Engineer Amount Date Date Date Completion Schedule Percent
Date Percent
C203256 U-3615B SR-1820 (SKEET CLUB RD) FROM EAST OF SR-1818 APAC - ATLANTIC INC Hayes, PE, $30,898,017.15 3/2/2015 3/29/2019 5/20/2015 2/28/2023 100 90.28
(JOHNSON ST) TO WEST OF NC-68 (EASTCHESTER DR) IN THOMPSON ARTHUR Meredith
HIGH POINT. DIVISION
C204071 U-5169 I-74/US-311 AND NC-68 (EASTCHESTER DR) BRANCH CIVIL INC Snell, PE, $22,481,354.65 7/30/2018 1/28/2021 9/14/2018 2/28/2023 100 84.48
INTERCHANGE IMPROVEMENTS. William H
C204096 U-2525C GREENSBORO EASTERN LOOP FROM US-29 NORTH OF ES WAGNER COMPANY Julian, Jason $120,471,182.82 4/30/2018 11/20/2022 5/7/2018 7/21/2023 99.87 88.16
GREENSBORO TO SR-2303 (LAWNDALE DR). LLC/SMITH-ROWE LL R
C204103 U-2412A SR-1486/SR-4121 (GREENSBORO/HIGH POINT RD) FROM BRANCH CIVIL INC Lorenz, PE, $55,963,119.69 7/30/2018 12/28/2021 9/12/2018 10/20/2023 92 92.38
US-311 BYPASS TO WEST OF SR-1480 (VICKREY CHAPEL Kris
RD).
C204150 U-5896 US-29/US-70/I-85 BUSINESS, SR 1009 (S. MAIN ST.) IN HIGH BOGGS CONTRACTING, Lorenz, PE, $25,325,396.73 3/28/2022 2/28/2025 4/23/2022 3/1/2025 28.8 13.53
POINT AND BRIDGE #147 OVER US-311 ON US-29/US-70/I- INC Kris
85 BUSINESS
C204499 R-4707 INTERCHANGE OF US 29 AND SR 4771 (REEDY FORK APAC - ATLANTIC INC Hayes, PE, $46,382,713.04 6/2/2021 10/28/2024 6/7/2021 10/28/2024 39.9 32.1
PARKWAY) THOMPSON ARTHUR Meredith
DIVISION
C204626 RESURFACE 1 SECTION OF NC 87, 1 SECTION OF NC 49 FSC II LLC DBA FRED Lorenz, PE, $4,639,570.37 6/3/2021 11/1/2022 6/28/2021 2/28/2023 100 88.38
AND 21 SECTIONS OF SECONDARY ROADS SMITH COMPANY Kris
C204665 U-5754 US-29/US-70/US-220 (O'HENRY BLVD.) FROM I-40/I-85 BUS. BRANCH CIVIL INC Lorenz, PE, $5,144,885.00 3/15/2022 3/14/2023 4/25/2022 3/14/2023 95.7 50.6
TO SOUTH OF FLORIDA ST. IN GREENSBORO. Kris
C204700 RESURFACE 1 SECTION OF US-158 AND 49 SECTIONS OF VECELLIO & GROGAN INC. Hayes, PE, $5,303,911.30 4/25/2022 7/15/2023 6/30/2022 7/15/2023 30 92.25
SECONDARY ROADS DBA SHARPE BROTHERS Meredith
C204712 B-5717 REPLACE BRIDGES #109 AND #121 OVER SOUTH CONTI CIVIL LLC Cvijetic, PE, $8,270,442.00 10/15/2022 10/28/2025 11/29/2022 10/28/2025 13.3 3.24
BUFFALO CREEK ON SR 4240 (EAST GATE CITY BLVD.) IN Bojan
GREENSBORO.
C204781 HE-0005 PIEDMONT TRIAD INTERNATIONAL AIRPORT - ROADWAY APAC - ATLANTIC INC Snell, PE, $8,991,271.36 9/15/2022 12/30/2024 10/5/2022 12/30/2024 9 11.47
CONNECTIONS IN RELATION TO BOOM SUPERSONIC THOMPSON ARTHUR William H
DIVISION
Page 1 of 3
23
North Carolina Department of Transportation 1/9/2023
Active Projects Under Construction - Guilford Co.
Contract TIP Number Location Description Contractor Name Resident Contract Bid Availability Completion Work Start Estimated Progress Completion
Number Engineer Amount Date Date Date Completion Schedule Percent
Date Percent
DG00490 AST TREATMENT OF 26 SECONDARY ROADS IN CAROLINA ROAD Lorenz, PE, $832.311.02 4/1/2021 10/30/2021 4/8/2021 4/30/2023 100 97.46
GUILFORD COUNTY SOLUTIONS LLC Kris
DG00512 RESURFACE 43 VARIOUS STATE ROUTES VECELLIO & GROGAN INC. Hayes, PE, $2,562,749.29 7/1/2021 11/1/2022 7/1/2022 4/30/2023 90 96.01
DBA SHARPE BROTHERS Meredith
DG00513 REPLACE BRIDGE #235 OVER BIG ALAMANCE CREEK ON SMITH-ROWE, LLC Hayes, PE, $1,675,367.75 6/21/2021 10/25/2022
SR 1005 (ALAMANCE CHURCH ROAD) Meredith
DG00515 AST TREATMENT OF 34 SECONDARY ROADS IN WHITEHURST PAVING CO. Lorenz, PE, $749,755.28 7/1/2021 6/30/2021 4/25/2022 4/30/2023 100 86.05
GUILFORD COUNTY INC. Kris
DG00524 R-5787-G INSTALLATION OF ADA COMPLIANT CURB RAMPS AT ATLANTIC CONTRACTING Lorenz, PE, $717,704.25 6/1/2021 4/14/2023 7/26/2021 4/14/2023 94.4 88.14
R-5787-H VARIOUS ROUTES COMPANY, INC. Kris
DG00551 R-2413A(L) LANDSCAPE PLANTING ALONG I-73 FROM BRYAN BLVD. COUNTRY BOY Lorenz, PE, $593,953.15 12/20/2021 6/19/2023 3/21/2022 6/19/2023 86.8 85.15
TO US 220 LANDSCAPING INC. Kris
DG00552 R-2413C(L) LANDSCAPE PLANTING ALONG US 220 FROM I-840 TO NC GOLDSTAR PROJECT Lorenz, PE, $119,464.76 12/20/2021 6/19/2023 3/4/2022 6/19/2023 86.8 73.24
65 GROUP LLC Kris
DG00558 U-6019 INTERSECTION IMPROVEMENTS AT SR 2334 (AIR ATLANTIC CONTRACTING Hayes, PE, $1,082,298.10 7/11/2022 11/15/2022 8/29/2022
HARBOR ROAD) AT SR 2347 (LAKE BRANDT ROAD) COMPANY, INC. Meredith
DG00564 MILLING, RESURFACING AND PAVEMENT MARKINGS ON APAC - ATLANTIC INC Hayes, PE, $3,519,513.72 4/1/2022 6/30/2023 7/25/2022 6/30/2023 49.6 74.72
59 SECONDARY ROADS IN GUILFORD COUNTY THOMPSON ARTHUR Meredith
DIVISION
DG00570 REPLACE BRIDGE #85 OVER REEDY FORK ON SR 1858 RE BURNS & SONS CO. Hayes, PE, $1,052,260.20 7/7/2022 4/29/2023 8/1/2022 4/29/2023 99 95.44
(BEESON ROAD) INC. Meredith
DG00572 REPLACE BRIDGE #25 OVER POLE CAT CREEK ON SR RE BURNS & SONS CO. Lorenz, PE, $1,285,359.02
1105 (EAST STEEPLE CHASE ROAD) INC. Kris
Page 2 of 3
24
North Carolina Department of Transportation 1/9/2023
Active Projects Under Construction - Guilford Co.
Contract TIP Number Location Description Contractor Name Resident Contract Bid Availability Completion Work Start Estimated Progress Completion
Number Engineer Amount Date Date Date Completion Schedule Percent
Date Percent
DG00573 RESURFACE SR 2335 (TROSPER RD.) AND 25 ADDITIONAL APAC - ATLANTIC INC Hayes, PE, $2,009,092.07 6/1/2022 8/31/2023 7/6/2022 8/31/2023 26.2 32.54
SECONDARY ROADS THOMPSON ARTHUR Meredith
DIVISION
DG00575 R-2413C(L) LANDSCAPE PLANTINGS ON I-785 - FROM US 70 TO US 29 MOTS LANDSCAPING & Cvijetic, PE, $299,543.48 9/1/2022 4/30/2024 10/18/2022 4/30/2024 63.5 43.13
LAWNS LLC Bojan
DG00576 AST RETREATMENT ON 50 SECONDARY ROADS IN WAUGH ASPHALT INC. Lorenz, PE, $811,504.54 5/9/2022 6/30/2023
GUILFORD COUNTY Kris
DG00597 R-5787J INSTALLATION OF ADA COMPLIANT CURB RAMPS AT CAROLINA GROUP Hayes, PE, $292,056.05 10/12/2022 2/28/2024 12/12/2022
VARIOUS ROUTES PROPERTIES LLC DBA Meredith
CAROLINA GROUP
CONTRACTING
Page 3 of 3
25
Randolph County - High Point MPO - Active Projects - Division 8--January 2023
Contract # or Completion
Route Description Let Date Contractor Project Admin. Project Cost Notes
WBS # or TIP # Date
HI-0002 C204703 I-85 Randolph Co. Pavement Rehab - from I-85/NC 109 in 4/19/2022 10/15/2023 Blythe Cary Fine $13,384,387 Project 74% complete
Thomasville to SR 1009 (South Main St) in Construction Inc. (336) 318-4020
Archdale
Randolph County - High Point MPO - Upcoming Projects - Planning & Design, R/W, or not started - Division 8- January 2023 Revised Draft STIP in RED
Contract # or Completion
Route Description Let Date Contractor Project Admin. Funds Needed Notes
WBS # or TIP # Date
U-3400 SR 1577 / SR 1004 Widening from SR 1567 (Robbins Country 7/18/2028 TBD TBD Jeff Stroder $38,626,000 Right of Way 10/20/2023 FY 2024
(Archdale Road) Rd) to US 311 (Main Street) in Archdale FY 2029 (910) 773-8034 Public Meeting held 2/27/18
U-5308 SR 1547 (Finch Farm Rd) Widening from south of SR 3106 Kennedy 1/19/2027 TBD TBD Greg Davis $35,462,000 Right of Way in progress
Rd to NC 62 FY 2027 (910) 773-8022 Public Meeting held 3/29/2018
2nd Public Meeting 11/29/18
U-5770 I-85 / SR 1993 Interchange Improvements - construct 3/17/2026 TBD TBD Jeff Stroder $19,193,000 Right of Way in progress
A= resurface (South Main Street) Diverging Diamond Interchange (DDI) and FY 2026 (910) 773-8034 Public Meeting 11/30/17
B= DDI RCI's Newsletter Mailed 6/8/18
U-5864 SR 1595 (Surrett Drive) 3-lane widening from I-85 to SR 1300 (W. 8/15/2028 TBD TBD Greg Davis $33,864,000 Right of Way 6/2024 FY 2026
Fairfield Rd. /Guilford Co.) in Trinity, FY 2029 (910) 773-8022 Public Meeting held 6/13/19
Archdale, and High Point
U-6191 NC 62 Modernize roadway between SR 3252 10/17/2028 TBD TBD Greg Davis $22,800,000 Right of Way 10/2026 FY 2027
(Surrett Dr) in Trinity to SR 1009 (N. Main FY 2029 (910) 773-8022
St) in Archdale
26
FHWA
FY 2023 RAISE $1.5 Billion Discretionary Grants Notice of Funding Opportunity
On December 14th, 2022 the U.S. Department of Transportation published a Notice of Funding
Opportunity (NOFO) for $1.5 billion in grant funding through the Rebuilding American Infrastructure
with Sustainability and Equity (RAISE) discretionary grant program for 2023. The popular program helps
communities around the country carry out projects with significant local or regional impact. The NOFO is
available here. The deadline for applications is 11:59 PM EST on February 28, 2023, and selections will
be announced no later than June 28, 2023.
FY 2023 Tribal Transportation Program Safety Fund due January 15, 2023
Each year under the Bipartisan Infrastructure Law (BIL), as enacted by the Infrastructure Investment and
Jobs Act (Public Law 117-58), 4% of the available TTP funds are set aside to address transportation safety
issues identified by federally recognized Indian tribes through a competitive, discretionary program.
The FY2022-2026 TTP Safety Fund Notice of Funding Opportunity (NOFO) for the TTP Safety Fund was
published on June 7, 2022. Applications for the FY2023 funding cycle will be accepted now
through January 15, 2023. For more information on the NOFO, the recorded webinars the program, and
Grant Writing Training please see link.
National Culvert Removal, Replacement, & Restoration Grants (Culvert AOP Program)
The National Culvert Removal, Replacement, and Restoration Grant Program (Culvert Aquatic Organism
Passage (AOP) Program) is an annual competitive grant program that awards grants to eligible entities
for projects for the replacement, removal, and repair of culverts or weirs that meaningfully improve or
restore fish passage for anadromous fish. Anadromous fish species are born in freshwater such as
streams and rivers, spend most of their lives in the marine environment, and migrate back to freshwater
to spawn. Applications for the 2023 Culvert AOP Program are due February 23, 2023. More information
on this grant program, such as program requirements, webinars, etc. can be found here.
Consolidated Appropriations Act of 2023 provides DOT funding for programs and projects
The Consolidated Appropriations Act of 2023 was passed by congress on December 23, 2022 and signed
by President Biden on December 30, 2022. The $1.7 trillion dollar bill allocates $62.9 billion to the
Federal Highway Administration and includes $3.4 billion for highway infrastructure programs/projects.
Congress also directed FHWA to continue to research, develop and deploy resilient infrastructure with
new and proven technologies; develop pilot projects for wildlife crossings at roadways; and to work with
state departments of transportation and local governments on interstate projects in the inter-mountain
West. Click here to read the full article. For a summary of the transportation portion of the new Act,
click here.
Fiscal Year 2023 Appropriations Approved Through September 30, 2023
The President signed a continuing resolution on December 16, 2022 to approve Federal funding
programs for Fiscal Year (FY) 2023 through December 23, 2022. The President then signed a continuing
resolution on December 23, 2022 to approve FY 2023 funding through December 30, 2022. After that
the President signed a consolidated appropriations act on December 29, 2022 to approve FY 2023
funding through September 30, 2023.
27
Census Bureau Publishes the List of Qualifying Urban Areas from the 2020 Census
On December 29, 2022, the U.S. Census Bureau published a Federal Register notice announcing the list
of qualifying urban areas from the 2020 Decennial Census. In the coming months, the Federal Highway
Administration (FHWA) and the Federal Transit Administration (FTA) will use the Census Bureau’s list of
qualifying areas to publish a Federal Register notice designating the urban areas with populations over
200,000 as transportation management areas (TMAs). In the interim, the FHWA Office of Planning will
update FHWA’s Census Issues website, including the estimated schedule of activities and frequently
asked questions (FAQs). More information is available from the Census Bureau here.
USDOT Announces $1.5 Billion in Available Funding for the RAISE Discretionary Grant Program
On December 14, 2022, the U.S. Department of Transportation (USDOT) published a Notice of Funding
Opportunity (NOFO) to announce $1.5 billion in discretionary funding for the Rebuilding American
Infrastructure with Sustainability and Equity (RAISE) grant program. Projects for RAISE funding will be
evaluated based on merit criteria that include safety, environmental sustainability, quality of life,
economic competitiveness and opportunity, state of good repair, partnership, innovation, mobility, and
community connectivity. Additionally, projects designated “Reconnecting Extra” during the new FY 2022
Reconnecting Communities Program competition and submitted for consideration under the FY 2023
RAISE NOFO will have a greater opportunity to be advanced during the FY 2023 RAISE evaluation
process, as described in the NOFO. The application deadline is February 28, 2023. More information is
available here.
USDOT Announces $274 Million in Awards for the Rural Surface Transportation Grant Program
On December 21, 2022, the USDOT announced approximately $274 million in awards for the Rural
Surface Transportation Grant Program. The USDOT awarded funding to 12 projects in 12 States to help
increase connectivity, improve safety and reliability, support regional economic growth, and improve
the quality of life for people living in rural areas. More information is available here.
FHWA Publishes Implementation Guidance for the National Highway Freight Program
On December 14, 2022, the FHWA Office of Operations published implementation guidance for the
National Highway Freight Program (NHFP) under the Infrastructure Investment and Jobs Act (IIJA) (also
known as the Bipartisan Infrastructure Law (BIL)). The NHFP is focused on improving the condition and
performance of the National Highway Freight Network (NHFN) and ensuring the network provides the
foundation for the U.S. to compete in the global economy. The implementation guidance provides
information on funding, eligible activities, and requirements of the NHFP.
BTS Publishes New Resources to Help Communicate National Transportation Statistics
The USDOT’s Bureau of Transportation Statistics (BTS) recently published two new resources to help
communicate national transportation statistics to practitioners, elected officials, and the public. On
November 28, 2022, BTS published the 2023 Pocket Guide to Transportation to share national
transportation data trends involving infrastructure, moving people and goods, safety, performance, the
economy, and the environment. On December 30, 2022, BTS published the Transportation Statistics
Annual Report to share an overview of the U.S. transportation system and key indicators, including data
and statistics on passenger travel, freight movement, transportation and the economy, system
reliability, safety, energy use, and the environmental impacts of transportation.
28
NCHRP Publishes Policy and Planning Toolkit for Shared Automated Vehicles
The National Cooperative Highway Research Program (NCHRP) recently published a research report
entitled, “Shared Automated Vehicle Toolkit: Policies and Planning Considerations for Implementation.”
The report provides resources that identify key stakeholders and partnerships, offers emerging lessons
learned, and provides sample regulations that can be used to help plan for and integrate emerging
modes. More information is available here and here.
January 23rd Webinar on Success Strategies for Metropolitan Planning Organizations
On Monday, January 23, 2023 at 2:00 pm Eastern, the Transportation Research Board (TRB) is hosting a
webinar entitled, “Success Strategies for Metropolitan Planning Organizations.” This webinar is based on
NCHRP Research Report 1002 and will share a searchable database and 12-topic toolkit that agencies
can access to enhance their success delivering products and services. Registration information is
available here.
29
2023 to 2022
Project Updates
RED Thomasville
FTA Direct Recipient Project– final stages of 2023 2022 Difference
1st Quarter 4,698 3,933 765
Civil Rights program review. Development 2nd Quarter 4,547 3,610 937
3rd Quarter 0 0 0
of DBE goals/policy next step.
4th Quarter 0 0 0
Total 9,245 7,543 1702
GMV Syncroma cs installa on of new tech- GREEN Thomasville to DCCC
2023 2022 Difference
nologies such as CAD/AVL, Automa c 1st Quarter 6,519 4,035 2484
Passenger Coun ng (APC) System, Covert 2nd Quarter 6,869 4,032 2837
3rd Quarter 0 0 0
Alarm, Automated Voice Annunciator 4th Quarter 0 0 0
Total 13,388 8,067 5321
(AVAS) System, Voice Connect VIOP Radio
System complete. Working out some bugs BLUE Lexington
with the GMV staff. 2023 2022 Difference
1st Quarter 12,976 9,344 3632
2nd Quarter 11,342 8,719 2623
3rd Quarter 0 0 0
Community Transporta on Service Plan 4th Quarter 0 0 0
Total 24,318 18,063 6255
(CTSP) update has been put on hold while
the IMD Planning Division develops a ORANGE Lexington to DCCC
2023 2022 Difference
replacement plan for the CTSPs. 1st Quarter 6,768 4,912 1856
2nd Quarter 6,288 4,693 1595
3rd Quarter 0 0 0
4th Quarter 0 0 0
Total 13,056 9,605 3451
Saturday Thomasville
2023 2022 Difference
1st Quarter 490 243 247
2nd Quarter 512 290 222
3rd Quarter 0 0 0
4th Quarter 0 0 0
Total 1,002 533 469
FY2023
2023 2022 Difference
RED 9,245 7,543 1702
GREEN 13,388 8,067 5321
Administra ve Staff BLUE 24,318 18,063 6255
Richard Jones Transporta on Director 336-242-2925
ORANGE 13,056 9,605 3451
David Allen Safety & Compliance 336-236-3332
Wonne e Sparks Route Supervisor 336-242-2252 Saturday 1,002 533 469
Holly Lapish DAPM, Office Support 336-236-3116 Total 61,009 43,811 17,198
Joy Means Administra ve Asst. 336-236-3013
% Difference FY2022 to FY2023 39.25%
30
PARTiculars
Piedmont Authority for Regional Transportation January 2023
The Ride Begins At A Bus Stop.
According to an article published by TransitCenter, “From Sorry to Superb: Everything You Need to Know About
Better Bus Stops,” “nearly half of all public transit rides in the US begin at a bus stop. Yet our bus stops are woefully
underfunded”. The report compares US transit agencies that provide both bus and rail services. Within those agencies,
bus facilities receive one-tenth the funding given to rail facilities on a per-trip basis. This is just one example stated in
the report that outlines barriers associated with public transit funding associated with bus rider amenities.
A few years ago, PART was ahead of this issue and developed a Bus Stop Amenities Program to address this barrier for
our riders. The program includes identifying, funding, and installing bus shelters at strategic locations that best serve our
riders. PART being the Regional Transit Authority serving nine counties, this can be a significant undertaking.
Our leadership team put in place general guidelines for deciding whether or not a bus shelter is needed, and working
with planners, PART assesses stops that have the most need and will benefit the most riders.
In a creative approach to secure sustainable funding, PART is working with a firm, Street Level Media, offering
advertising on our PART Express bus tails and inside our vehicles. PART put in place a plan to allocate this advertising
revenue solely for our rider amenities. Placing our riders at the core of our mission, PART is currently working to develop
this advertising program further so we can, in turn,
offer more amenities, like bus shelters and paved
platforms, at our key stops.
Learn more about this program at
partnc.org/234/Bus-Stop-Amenities-Program.
PARTnc.org
Spectrum N Regional
at Business
Park
Truist 2 Truist 1
2 ECPI
MAP NOT
TO SCALE
LEGEND
Explore with Express Airpark North
(Burgess Rd) 1
BUS STOP
SEE SCHEDULE
Route 24 Burgess Regional Road is one of our early BUS STOP
morning to late evening routes, running 6:15am-9:15pm. DEVIATED STOP
This hard-working route has nine stops along the way and 1
two Deviated Stops, which are available by reservation only. Coble
Transportation
Deviated Stops can be scheduled by contacting our Call Center
Center at 336.883.7278.
Cessna &
Arby’s Boeing Twisted
Paper
3 Citation &
International
31
Transit Agency Coordination: Progress and Possibilities
Technology, bus procurement, bus advertising, and a regional call center have been significant initiatives achieved, but
much more could be done. Most recently, technology has been at the forefront. For example, three regional agencies now
use the same digital fare payment system, Umo. And a fourth is considering it.
Six agencies in the region have or are in the process of implementing real-time bus tracking through a web-based
platform, GMV Syncomatics. It also coordinates on-bus announcements and route signage. It provides valuable
information to improve the performance and efficiency of the transit service. All agencies utilize the same bus advertising
company, Street Level Media, which enables advertisers to maximize their advertising dollars with one phone call.
What’s next?
Making public transportation a valued mobility option for more people comes down to how driving a car compares to
taking the bus. The two main comparisons are cost and convenience. In our region, you can travel from Winston-Salem to
Greensboro for $2.50. Local systems are $1.00 to $1.50 per trip, with monthly passes as low as $30.00. Riders find that
public transportation cost is far less than the total cost of owning and operating a car. When it comes to convenience,
trip length and trip execution are critical. The solution is to get more people on the bus and offer more service and
connections. It’s feasible, plausible, and has been shown to work.
What makes it happen?
Getting more people on the bus comes down to removing barriers like knowing when the bus is coming and which bus
to take. With currrent technology, riders can track their bus, plan their trip, and pay their fare digitally across the region.
The Umo digital faring system also makes it easy to provide local government employees with free transit across all
systems and offers all riders Fare Capping.
Some parts of a transit trip, like getting to the stop, making multiple stops, transferring to another bus, waiting for the
next bus, and getting to the final destination, make riding public transit inherently take longer than driving a car. Increasing
bus frequency and giving buses priority over cars are two ways to help a transit trip compete with driving a car. The only
way to significantly improve the service is to provide more funding. Federal public transportation grant funds offer 50%-
80% of operating and capital costs for public transportation. State contributions and local dollars account for as little as
10% of capital cost. This places a heavy emphasis on local funding to improve the operation of local transit services.
In the Piedmont Triad, between
1%-2% of the population use
transit. Yet most studies indicate
that 20%-40% of people prefer
not to drive or should not drive
and will use non-auto modes if
they are convenient, comfortable,
and affordable. Addressing
transportation equity and making
meaningful improvements to
public transportation in our region
will take a firm commitment
starting with more local funding.
North Carolina provides a ¼-½
cent sales tax option for public
transportation in Guilford and
Forsyth Counties. This could
produce over $54M, significantly
improving local and regional
transit systems. This option has
been available since 2009, but
the willingness to act has not
materialized.
The options exist, and the
future does hold the opportunity
to enhance mobility in the
Piedmont Triad.
PARTnc.org 32
Get email alerts for High Point
A daily email when new agendas and minutes are posted.