HPMPO Transportation Advisory Committee (TAC)
Regular MeetingHigh Point, NC · August 25, 2015
Minutes
Attachment 1
MINUTES
TRANSPORTATION ADVISORY COMMITTEE
August 25, 2015
TAC MEMBERS PRESENT:
Jim Myers –Lexington
Neal Grimes – Thomasville
Larry Warlick – Archdale
Cheryl McQueary – NCDOT Board Division 7
Fred McClure – Davidson County
Clyde Lyn Reece – Wallburg
Larry Ward – Denton
Keith Volz - Jamestown
TCC MEMBERS PRESENT: Greg Venable, Guy Cornman, Hemal Shah, Bryan
Fulbright, Roger Jones, Jeff York, Zeb Holden, Jesse Day, Ed Lewis, Heidi Galanti,
Diane Hampton, Mark McDonald, Mike Mills, Pat Ivey, John Gray, Jen Britt, Mark
Kirstner, Fred Haith, Chuck George, Chuck Smith, Wayne Davis, Oliver Bass, Angela
Wynes and Carrie Spencer.
OTHERS PRESENT: John Hanes (Transportation Planning), Vickie Embry (COHP
Transportation), Cynthia Davis (HP City Council), Cary Kanoy (Citizen), Taruna Tayal
(Consultant VHB), Sarah McGuire (PART), Randy McCaslin (High Point)
RECORDING SECRETARY: Marianne Janiszewski, City of High Point
Item 1: Reading of the Ethics Statement.
Neal Grimes read the Ethics Awareness and Conflict of Interest Reminder. No one had
any conflicts.
Item 2: Public Comment Period
Neal opened up the public comment period. No one spoke. Neal closed the public
comment period.
ACTION ITEMS
Item 3: Consideration of the June 23, 2015 TAC meeting minutes.
There were no corrections to the minutes.
Motion by: Cheryl McQueary
Seconded: Jim Myers
1
Attachment 1
Vote:
For: Unanimous
Against: None
Item 4: Consideration of amendments to the 2012-2018 Metropolitan
Transportation Improvement Program.
There are is two additions to the 2012-2018 STIP. The first addition is a CMAQ project
on Oakdale Rd. in Jamestown which was added at the request of the Division 7 Planning
Branch, and the second is a statewide addition. There are also two transit additions.
There are several modifications; one is a new pedestrian bridge and approaches at the
Piedmont Environmental entrance in High Point and Jamestown. The next is East Main
St. in Jamestown and the other is I-74/US 311 NC 68 reconstruction of the interchange.
The first two are delayed construction from FY 2015 to FY 2016 and the third is a
delayed construction from FY 2017 to FY 2018.
Motion by: Jim Myers
Seconded: Cheryl McQueary
Vote:
For: Unanimous
Against: None
Item 5: Recommendation of Support to split the NC109 into three parts and
the NC62 Projects into two parts.
This action item is an addition to the agenda. The first section of NC 109 will go from
I40 to just north of Teague Rd., the middle section will go from just north of Teague Rd.
to Motsinger Rd., and the southern section from Motsinger Rd. to NC 109. This was
done in the hopes that they will score better in SPOT 4.0. There is a possibility of one
section making it on the list and others not.
Motion by: Larry Warlick
Seconded: Jim Myers
Vote:
For: Unanimous
Against: None
Information Items:
2
Attachment 1
Item 6: Review of programming available for FY 2017 congestion Mitigation
Air quality (CMAQ) funds for HPMPO projects.
In June MPO staff requested member jurisdictions to submit projects to be considered for
CMAQ funding for FY 2016 and FY 2017. The deadline for MPOs to submit FY 2016
projects were July 15, 2015. High Point submitted the Deep River Greenway connection
for FY 2016 CMAQ funding. MPO staff is requesting member jurisdictions to submit
projects to be considered for CMAQ funding for FY 2017. We have the same amount of
money which is approximately $1.1,000,000-1.2,000,000. The deadline for MPOs to
submit FY 2017 projects to NCDOT is October 15, 2015. The funds are eligible to be
programmed for projects in Fiscal Year 2017, which runs from October 1, 2016 through
September 30, 2017. Funding awarded for any project will require a 20% local match to
be paid by the member jurisdiction.
Item 7: Review of SPOT 4.0 process and schedule.
Greg presented a map of existing projects that were once in the SPOT 3.0 and are
automatically moved to SPOT 4.0. The map also shows projects that are projects that are
committed by NCDOT. A couple of projects that are going to be modified are NC109
and NC 62. This modification has been added to today’s action items. This year for
SPOT 4.0 we have an additional 13 projects in each transportation mode that can be
submitted. Greg stated the projects need to come either from a long range plan or a CTP.
Cheryl asked that the MPO create a table showing the pros and cons of keeping the
project as one road and the pros and cons of dividing the road into sections.
September 1, 2015 – Project Modifications and anticipated Intersection/Interchange
projects due via email to SPOT
October 1, 2015 – Alternate Criteria for Regional Impact and Division Needs scoring
due
October 2015 – SPOT Online available for Entering Projects for 1 month (exact date
tbd)
End of March 2016 – Quantitative Scores and Draft list of Programmed Statewide
Mobility Projects released
April 1, 2016 – Regional Impact Local Input Point window opens for 2 months; Deadline
for Approval of Local Input Point Assignment Methodologies
End of July 2016 – Draft list of Programmed Regional Impact Projects released
August 1, 2016 – Division Needs Local Input Point window opens for 2 months
October 2016 – Final P4.0 Scores released
December 2016 – 2017-2027 Draft STIP released
Item 8: 2040 Metropolitan Transportation Plan Public Review update.
MPO staff has been going through the public review process for the three document
mention above. We have held three of five public drop in meetings that were advertised
in all local papers and the local public access station. Our remaining meetings are listed
3
Attachment 1
below. Please notice that we have added an additional meeting at the Piedmont Triad
Farmers Market on Saturday August 22, 2015 from 10:00am until 2:00pm.
Meeting 4
DATE: Thursday August 20, 2015
LOCATION: Community and Neighborhood Development Center – High Point
201 Fourth Street, High Point, NC
TIME: 5:00 pm – 7:00 pm
Added
Meeting DATE: Saturday August 22, 2015
LOCATION: Piedmont Triad Farmers Market
2914 Sandy Ridge Road
TIME: 10:00 am – 2:00 pm
Meeting 5
DATE: Tuesday August 25, 2015
LOCATION: Davidson County Library – Thomasville Branch
14 Randolph Street, Thomasville, NC
TIME: 5:00 pm – 7:00
MPO staff has created Facebook and Twitter pages for public outreach and information.
The sites are:
https://www.facebook.com/highpoint.mpo
https://twitter.com/hpmponc
The comment period will run until August 31 and the document will be available for
approval at the September 22 meeting.
Item 9: Presentation on the Second Strategic Highway Research Program
(SHRP2), Freight Demand Modeling and Data Improvement Study.
Winston Salem submitted a grant application to the FHA and received some money to do
a freight study in the Triad which will eventually go into the regional model.
Mark Kirstner (PART) and Fred Haith (Winston-Salem MPO) gave a presentation.
Cheryl McQueary had five questions that she asked.
1. How can you project 200% growth at the ports when right now our ports cannot
support the super tanker? Unless the bond passed there will be no dredging done.
Because of the labor issues on the west coast the statistics are showing that China
is routing to Charleston, Savannah, and Norfolk.
2. Did Polo Ralph Lauren participate in the High Point multimodal 80 trucks per day
statistic? Is this from their data.
4
Attachment 1
3. In Alamance County when Walmart comes on next August they are projecting
500 trucks a day. How do you project oncoming freight services? There is a
statistic around that gives the number of trucks per NC person and with the
growth of 3,000,000 population is there a statistic of the number of trucks per day
with this increase included?
4. You show a growth of 3,000,000 over 25 years and the State planning is
3,000,000 over ten years. How did you get this information?
Most of this is actual numbers not projections. Building this into the travel demand
model will help answer some of these questions.
AGENCY REPORTS
Item 11: NCDOT Board of Transportation Report.
Cheryl McQueary reported that there has been a leadership change. Secretary Tata has
resigned and Nick Tennyson was appointed by the Governor. Nick is the former Mayor
of Durham. The resolution from this TAC that was sent to the General Assembly asking
them to approve that the citizens be allowed to vote on the bond on November 15 has
been denied. The House passed that we get the vote on the bond but not until 2016.
Item 13: Division Engineer’s Reports.
Division 7
Ed Lewis reported that project C-5558 (High Point Signal System) is on the board
meeting agenda and they are going to be considering $450,000 for this project to handle
some utility relocation. The U-5169 project (I-74/US 311 and NC 68 interchange
improvements) the maps for the public workshop in the Fall are out for staff to review.
Also for the boards consideration is $250,000 for pedestrian improvements on
Yanceyville in Jamestown.
Division 8
Jen Britt was there representing Jeff Loflin. There was nothing to report.
Division 9
Diane Hampton reported that there are several bridge projects and resurfacing projects
underway. R-4750 (Bus. 85-52) is still underway with a completion date of December 7.
The let date for the airport project in Lexington is 2020. ROW acquisition for the
interchange at Davidson Community College is in FY19. The turn lane at Hickory Tree
Rd. and Mendenhall Rd. is scheduled to be advertised soon. The widening of NC 8
(Winston Rd) is scheduled to be let in FY 19. Fred McClure stated that the work on the
secondary roads is very poor. Diane said she will speak with whoever is in charge.
Cheryl McQueary stated that she will speak to the Board Member for Division 9.
Item 10: Triad Air Awareness.
No one was present.
5
Attachment 1
Item 13: NCDOT Transportation Planning Branch Report.
Hemal Shah had nothing to report.
Item 14: Hi tran Report
Angela reported that Hi-tran was awarded the grant for bus replacement and is expecting
delivery of the new fleet in the fall of 2016. Ridership for FY 15 was down slightly
which is attributed to the snow and ice over the winter months. High Point is
participating in the Piedmont Triad Resources Call Center and has been a smooth
transition for the passengers and customers who use the services. The same number is
called but they can receive information about not only High Point but PART and
Greensboro transit.
Item 15: PART Report
Mark Kirstner introduced Sarah McGuire who is part of the NCDOT Apprenticeship
Program. There are significant changes being made over the next six months to route 9
in Davidson County. The route is no longer going all the way into Greensboro but is
coming into High Point and Thomasville.
Item 16: Other Business
The next meeting will be Tuesday, September 22, 2015.
There was no other business. The meeting was adjourned.
6
Get email alerts for High Point
A daily email when new agendas and minutes are posted.