Board of Directors
Regular MeetingHot Springs, AR · March 2, 2010
Minutes
MINUTES
BOARD OF DIRECTORS MEETING
MARCH 2, 2010, AT 7:00 P.M.
The regular meeting of the Board of Directors was held on Tuesday, March 2,
2010, at 7:00 p.m., Board Chambers, City Hall, with Mayor Mike Bush presiding.
The invocation was given by Mr. Bryan Sligh, and Pledge of Allegiance to the
Flag was led by Mayor Bush.
Mayor Bush called the meeting to order at 7:00 p.m.
1 Roll Call
Roll call was as follows: Present: Directors Peggy Maruthur, Elaine Jones,
Cynthia Keheley, Pat McCabe, Rick Ramick, Tom Daniel, and Mike Bush, total 7.
2 Approval of Agenda
A motion was made by Director Jones, duly seconded by Director Keheley, that
the agenda be approved; and upon voice vote, the motion unanimously carried.
3 Approval of Minutes of February 16, 2010 Board Meeting
A motion was made by Director Daniel, duly seconded by Director Maruthur, that
the minutes of the February 16, 2010 Board Meeting be approved; and upon voice
vote, the motion unanimously carried.
4 Recognition of Guests
Mayor Bush read a Proclamation proclaiming the third Monday in March as Arbor
Day.
Mr. Bob Lathrop, City’s Urban Forester, stated the City has been a Tree City
USA for ten years and presented the ten-year award given to the City by the National
Arbor Day Foundation in recognition of the Board’s support for all of its efforts in urban
forestry.
5 Board of Directors Announcements
Director Maruthur announced that Clean Sweep will start on March 15. In District
No. 1, it is bounded by Walnut on the west, Park on the south, Bower on the east, and
to the city limits on the north. She stated there are approximately 400 households that
will be helped. Week 1 (March 15 thru March 19, Neighborhood Services personnel
will drop off informational packets door-to-door and identify any possible code violations.
Week 2 (March 22 through March 26), Sanitation will pick up and other departments
will clean up. Week 3 (March 29 through April 2), Neighborhood Services personnel will
follow up. She also gave an update on the Majestic Hotel stating the property is under
contract for purchase by the ARC of Arkansas. She advised the renovation of this
historic downtown property into 148 apartments is being financed by Berkadia
Commercial Mortgage, LLC, which is a newly formed entity owned by Berkshire
Halfway, Inc. and Leucadia National Corporation. She added Leucadia provides its
clients with access to capital as the approved lender for the FHA, Freddie Mac and
Fannie Mae, backed by the financial strength of Berkshire Halfway and Leucadia. She
said Leucadia is well-positioned to provide its clients with solid, dependable commercial
real estate financing and servicing solutions. She mentioned Leucadia, which is an
affiliate of Warren Buffett, is providing $13.5 million in a loan for the Majestic profit, with
the balance of the project cost coming from historic and new market’s tax credit equity
and loans from the Arkansas Development Finance Authority. She added the architect
is David French of Hot Springs, and the general contractor is Kinco Constructors of
Little Rock. She advised they are expecting to close in April.
6 Acknowledgment of Financial Statement Notices for December 2009 and
January 2010.
Mayor Bush announced that the Financial Statements for December 2009 and
January 2010 are on file in the Finance Department for review by the Board and the
public.
CONSENT AGENDA
The Consent Agenda consisted of the following:
7 Proposed Resolution No. R-10-43 Approving Certain Bid Awards Pursuant to
Ordinance No. 5387 (Purchasing Procedures)- [a] Ford Compact Pickup-Utility
Administration (awarded to Landers Ford in the amount of $12,937); [b] Dodge
Compact Pickup Truck - Utility Administration (awarded to Landers Dodge in the
amount of $14,198); [c] Lead Based Paint Testing - All Departments (annual
supply contract awarded to Lead Technologies); and [d] Title Search/Abstractor
Services - All Departments (annual supply contract awarded to Hot Springs Title).
8 Proposed Resolution No. R–10-44 Authorizing the Mayor to Execute a Lease
Agreement Between the City of Hot Springs, Arkansas, and X-Tra Lighting
Manufacturing Partnership, LTD., for Space at the East End of the Terminal
Building at the Airport.
9 Proposed Resolution No. R-10-45 Amending Resolution No. 6494, as
Amended by Resolution No. 7092 (Approving Certain Revisions to Municipal
Airport Property Management Policy), by Adopting a New Appendix “K” (Airport
Property Rates).
10 Proposed Resolution No. R-10-46 Awarding a Contract for Real Estate
Acquisition Services Related to the Higdon Ferry Road Improvement Project,
Phase II (AHTD Job Number 061113), to Right of Way USA, Inc.
11 Proposed Resolution No. R-10-47 Approving Change Order No. 1 to an
Existing Contract with Frank Manzer and Associates for Real Estate Appraisal
Services Related to the Higdon Ferry Road Improvement Project, Phase II
(AHTD Job Number 061113).
12 Proposed Resolution No. R-10-48 Authorizing Purchase of Twenty (20)
Environment One Grinder Pumps from Jack Tyler Engineering Company of
Arkansas in Accordance with Ordinance No. 5563 that Establishes Jack Tyler
Engineering Company as the City’s Sole-Source Supplier of Environment One
Grinder Pumps.
13 Proposed Resolution No. R-10-49 Authorizing Revisions to the 2009 Budget.
A motion was made by Director Keheley, duly seconded by Director Jones, that
the Consent Agenda be approved; and upon roll call, the following voted “aye”:
Board of Directors Meeting 3 March 2, 2010 at 7:00 P.M.
Directors Maruthur, Jones, Keheley, McCabe, Ramick, Daniel, and Bush, total 7;
motion unanimously carried.
NEW BUSINESS
14 Claim from Mr. Tim Winston and Mr. Max Balke Regarding the Burger
King Development at the Corner of Central and Colombia Hills
Mr. Steve Mallett, Deputy City Manager for Public Works and Utilities, explained
that the claim from Mr. Tim Winston and Mr. Max Balke in regard to the Burger King
development at the corner of Central and Columbia Hills, is in the amount of
$11,579.68, which was submitted to the City on November 25, 2009; and according to
the claim was filed as this work was forced to be bonded after approved plans to the site
were completed and inspected. He advised that on June 12, 2008, the Planning
Commission approved a lot split request from Shaw Construction, LLC, with
amendment requiring sidewalk and curb and gutter on Central, Columbia Hills and
Mangum; and the three sides of the property actually front a street. He noted the other
side does not front a street. Sometime after that meeting, but prior to November 2008, it
was sold by Mr. Shaw, the previous owner, to Mr. Max Balke. He said Mr. Balke
purchased the property in order to construct a Burger King Restaurant. He advised
that it is unknown to city staff if the conditions placed upon the lot by the Planning
Commission were relayed to the new owner by the previous owner. In February 2009,
plans for the Burger King development were received by the City’s staff for review.
These original plans included sidewalk on all three sides that bordered the property but
only included curb and gutter on Central and Columbia Hills. He said curb and gutter
on Mangum was not shown on the plans, and the plans were approved as submitted by
the City at that time; and the building permit was issued. In May 2009, Mr. Denny
McPhate, Public Works Operations Director, made a site visit and informed the
contractor of the requirements for curb and gutter on Mangum Street. He said that was
not listed on the previous plans as approved, but it was noted to the contractor at that
time. It was also noted that the existing drainage ditch along Mangum would need to
be modified to accommodate the curb and gutter. After some discussion, it was decided
to install approximately 60 feet of 18-inch culvert along Mangum to alleviate the issue
and install the curb. He said Mr. McPhate decided to allow this as a field change and
Board of Directors Meeting 4 March 2, 2010 at 7:00 P.M.
not require a modification to the plans in an effort to safe the owner some money as far
as the engineering costs. He stated that the timing of the notification was unfortunate;
however, it was early in the construction stage; and the City staff feels it should not
have had an impact in the overall completion of the project. Shortly after that, Mr.
McPhate was contacted regarding water ponding on Colombia Hills due to the newly
constructed curb on Columbia Hills. He mentioned there was a curb on Columbia Hills
that was ponding water, and it was looked at by the city. City staff spoke to B&F
Engineering, and they developed a plan to cut curb cuts to allow water to leave
Columbia Hills and get into the ditch, which was done in June 2009. He said the
approved plans for the revision by B&F Engineering were received by the staff in June;
and on July 6, 2009, the contractor began work in accordance with those plans. Those
plans, as revised, had all the changes that had been made up to that point, which
included the curb and gutter on Mangum Street, the drainage on Mangum Street, and
the curb cuts on Columbia Hills. In early August, after a heavy rainfall, it was noted by
Mr. Denny McPhate, during a site visit, that the installation of the curb cuts on Colombia
Hills were now causing erosion of the ditch. Therefore, that was an issue that had to
be addressed by the contractor. In additional conversations with B&F Engineering,
they agreed to install a concrete flume in the ditch to keep from having erosion and
brought it down to the existing box, which was on August 3, 2009, when the contractor
was informed of that field change to require concrete swale; and that was approved by
the engineer. At that time, the contractor was aware of any and all plan revisions or
field changes regarding that development. He stated they were planning on opening
on Friday, August 7; and the City felt they had ample time to provide a bond for that in
time to make the opening on August 7. On August 7, Ms. Kathy Sellman, Planning and
Development Director, informed the developer that he did not have a Certificate of
Occupancy as of that morning and could not open without addressing the outstanding
items. He advised that a bond was posted for $4,500 to cover the remaining work
which was some drainage and sod requirements, but the City did not receive that bond
until August 11. However, the City did allow them to proceed and have their grand
opening without the bond in-hand. He noted this claim includes a portion related to
the erosion issue and curb cuts which staff feels, regardless of the curb on Mangum
Street that was pointed out to them after the plans were approved, and staff feels all
that work would have been necessary as originally submitted. Regarding the $3,000 to
$4,000 range, staff feels that amount should not even be considered as part of the claim
since that work would have to taken place regardless because that was part of the
original plans and had to be done to accommodate those plans. However, as far as
the whole plan, staff admits to the unfortunate timing of the items not originally on the
plans; but it is still staff’s position that all of the expenses listed in the claim were
necessary to construct the development in accordance with the requirements; and the
Board of Directors Meeting 5 March 2, 2010 at 7:00 P.M.
City should not award payment to the contractor for any of that work. He advised that
in regard to the sidewalk that was placed on all three sides, the City did allow them to
fill up over the property, which was a much less expensive option than staying along
the curb line of Columbia Hills and Mangum Street. He noted that would require
closing in all the drainage ditches and probably a retaining wall as those two slopes
are very steep. He said to compromise and save the owner some money to facilitate the
requirements of the plan, the City allowed them to take the sidewalk next to the parking
lot and come down the back side at a substantial cost savings. Whereas, the City could
have required them to put it along the curbside as it does other developments. He
pointed out that the City feels like it has compromised with them on several items; and
the fact that the City had the bond before it actually had it in hand so they could open,
the City feels like it has been fairly accommodating throughout this entire process.
Mr. Ray Owen, Jr., attorney representing Mr. and Mrs. Max Balke, said his office
address is 209 Hobson. He stated this property is located at Central Avenue and
Columbia Hills, and the back of the property abuts Mangum Street. He noted the
Master Plan for the City does not require any curb and gutter or sidewalks to be put on
Mangum Street under a typical development. He mentioned this property and adjacent
property were previously owned by Shaw Construction. In 2008, they sought to have
the property divided into two separate tracts and went to the Planning Commission to
request a lot split. The Planning staff report made the recommendation to approve
the lot split with no conditions. At the Planning Commission meeting on June 12, 2008
(former Planning Commission whose members no longer serve on the Commission),
one of the commissioners whose home is located on Columbia Hills, Mr. David
Campbell, moved to approve the lot split on a condition that curb and gutter and
sidewalk be placed on Mangum at the rear of the property despite the fact that the
Master Plan does not call for that; and that motion was approved by the Planning
Commission. Later, Mr. Balke purchased this Burger King site for the location of the
new restaurant; and he was unaware that condition was placed upon the approval of the
lot split. After he purchased the property, he hired B&F Engineering to draw up a set of
plans; and it covers the detail of the building, the grading, the outside drainage, etc. He
mentioned while these plans were being developed by B&F Engineering, Mr. Felenz,
of B&F Engineering, told him that he regularly met with members of the Planning staff
(Rick Stauder and Jeff Griffin); and they helped him develop this plan to where it would
be appropriate. Based on these meetings, the final plans were supplied to the City in
January 2009. After review by many department heads and their staff, including a
specific review of these plans according to the permit review comment by Planning,
Engineering, and Stormwater, they all reviewed these plans very carefully. With very
Board of Directors Meeting 6 March 2, 2010 at 7:00 P.M.
minor comments, the plans were approved; and the permit was issued. At that time,
Mr. Balke had a set of approved plans and was ready to go forward with his permit. He
took bids, based on the plans that had already been approved, and was ready to start
construction, which he did. He pointed out the problem is the plans because B&F
Engineering was not aware of the lot split condition either and did not contain any curb
and gutter requirement for Mangum Street. He commented someone called that to the
City’s attention that the curb and gutter was not being put in. He added there is an
e-mail in the Board packet from Mr. David Campbell, who said they were not doing it.
He advised that the City said even though it had already approved these plans, it was
going to require that he put in curb and gutter on Mangum Street, which is not on the
plans. He added they also had the additional 18-inch reinforced concrete pipe that had
to be added even though that was not on the approved plans and a concrete swale on
Mangum which was not on the approved plans. He mentioned the question is whether
or not that was even necessary because rainwater had been draining naturally along
Mangum to Columbia Hills for many years. The plans approved by the City show
natural drainage along Columbia Hills and along Mangum to the existing drainage box,
which is to be modified slightly to accommodate the changes. However, they had to
make more modifications to that box which were expensive as a result of these
supplemental additions to the approved plans. He mentioned there is a new retaining
wall along Columbia Hills, and all the drainage from the site goes to the back and to
this new retention pond; and that is where the drainage that originates on that site goes.
He added it slowly seeps into a discharge after it has been held in the proper amount
of time there and goes into the existing box at the corner of Columbia Hills and Mangum
that has already been there. He said there is no new runoff caused by the
development of this site other than what is going through that retention pond. He
mentioned there were threats that he was told from time-to-time that a Certificate of
Occupancy would not be issued unless these things were done.
Mayor Bush questioned who had made such a threat, and Mr. Owen replied they
did not come to him. He said he did not get involved in this until last December, but
his understanding is that it came to someone who worked for the contractor or maybe
the contractor himself who was working for Mr. Balke doing the work on the site.
Mayor Bush pointed out that is a serious statement, and he did not like to hear
that unless he has some proof. Mr. Owen replied that he was stating what he was told.
He said he realized if he was in a court of law, it would be hearsay; but he was
disturbed by that comment as well.
Board of Directors Meeting 7 March 2, 2010 at 7:00 P.M.
Director Ramick stated he was looking at a series of e-mails between Mr. Tim
Winston, Mr. Steve Mallett and City Attorney Brian Albright. He then read some of the
e-mails. Mr. Owen said he could not respond to what some of the e-mails meant and
is representing Mr. Balke, who is the developer of the site and is the person who put the
money up and had to pay the extra money because of the changes that were made.
He pointed out Mr. Balke has been hurt by the changes that were made after the plans
were reviewed and approved by the City, and the City caused the changes to be
made; and it cost Mr. Balke money out of his pocket after he had already planned on a
budget of a certain amount.
Director Ramick said he does not know if Mr. Winston was trying intimidate the
Planning Department, but he does not think he was trying to get along with them.
Mr. Owen replied that he is not here tonight to defend Mr. Winston but is here to
ask the Board to do what is right for Mr. Balke.
Director Maruthur commented that she read the e-mails, and there were many
complaints about City staff. She mentioned that Mr. Owen is being paid to get
$11,479.68 from the taxpayers of the City. Mr. Owen replied that he is being paid to
make a presentation to the Board, explain why the claim is being made, and why he
believes the claim is appropriate. Director Maruthur asked if the condition was ever
removed, whether someone was on the Planning Commission now or was on the
commission, even though the engineering company did not mention it. Mr. Owen
replied that the engineering company did not know the condition was there, and they
submitted plans based upon not having the requirement of that condition in the plans.
He pointed out every city department reviewed those plans or had the opportunity to
review those plans. He added there was approval on them as they were, and that is
what his client depended on when he went to get the money to do the construction. He
pointed out an approved set of plans is what is taken to various bidders, and he bid this
job and took that set of plans. He commented that later, the City began to make
changes to what it had previously approved.
Director Maruthur questioned if they read the minutes of the meeting where the
condition was placed on there for the curb, gutter and sidewalk. Mr. Owen replied that
he does not think they probably read that because he did not think they were aware of
those, at least Mr. Balke was not aware of them. He commented when the plans were
submitted and reviewed, the plans without the curb and gutter on Mangum Street were
reviewed by the Planning Department that signed off and approved them. He stressed
Board of Directors Meeting 8 March 2, 2010 at 7:00 P.M.
they approved a set of plans without a condition that had been set by the Planning
Commission itself; and the Planning staff did not catch that.
Director Maruthur asked if it was withdrawn, and Mr. Owen advised that it was
not.
Mr. Owen pointed out there is a retaining wall along Columbia Hills; and when
those cuts had to be made in there to alleviate some ponding, it was probably already
occurring to some extent before the curb and gutter was put in. He explained that
Columbia Hills has a slope on it at first and then flattens out, and he is sure there has
been sheeting, as a sheet of water, for years during heavy rainstorms. When that
happened, they had to do some cut-ins through the new curb and gutter, and then the
City said that they had to go through and excavate out this drainage ditch better. When
they did that, it exposed the new retaining wall to possible erosion. He said they had
to put in geotextiles material and spend additional money to do that, which was not
planned in the beginning. Also, after the plans had been approved, the City required the
addition of stainless steel catch baskets on all drainage structures on site even though
the original plans did not provide for those. He advised there were some problems on
the last day because the contractor and owner thought there would be a Certificate of
Occupancy issued on Friday before noon because Burger King required Mr. Balke to
have that store open at noon on August 7. The evening before, the contractor met with
the Building Department of the City; and the contractor was of the opinion there was a
Certificate of Occupancy that was essentially issued. He said the Planning Director
came out the next morning and advised they did not have a Certificate of Occupancy,
and he could not open. He stated that Raymond Haynie Insurance issued the bond to
Mr. Balke, who told Ms. Sellman that he would have the bond in her hand as soon as
he could get it from the insurance company. She then authorized the release of the
Certificate of Occupancy.
Mayor Bush asked if it was normal that original plans that are approved are
changed after the fact, and Ms. Sellman replied that during the period of time when
there was a lot of development activity going on in the City because they work with a
limited number of local engineers, many things were done on good faith that should
have been documented. She mentioned there was a note on the final plat (the
recorded document) with regard to the sidewalk requirement. She pointed out it was
not necessary for anyone to read any minutes or anything else.
Board of Directors Meeting 9 March 2, 2010 at 7:00 P.M.
Director Daniel questioned what individuals had a copy of the recorded plat, and
Ms. Sellman replied that it is a document of public record; and she has no way of
knowing who had a copy of it.
Director Keheley questioned if she stated somewhere in the documents
submitted to the Board that this was not a commercial subdivision, and a lot split does
not require curb and gutter on all streets; and then in the middle of the project, it was
changed by the Planning Commission. Ms. Sellman replied that she did not. She
added if that is the way it came across, then that was inartfully stated. She advised the
requirement came from the Planning Commission at the time the lot split was done, and
the lot split could not be approved over the counter because the lot was a double
frontage lot and did not meet the requirements for a simple split. Therefore, it went to
the Planning Commission. At that time, the condition for the sidewalk was placed on the
project and became of record when it was recorded in a specific note on the plat.
Director Keheley asked if the lot split exempted those requirements of a
commercial, and Ms. Sellman replied that it does not. She added it did not come in as
a specific commercial lot split. Director Keheley asked if the Planning Commission
could supersede, and Ms. Sellman advised that the Planning Commission has authority
to determine, based on site-specific conditions and considering the type of project that
is proposed, whether additional requirements are appropriate. In this case, she said
there is something in the Code that says if people are within 500 feet of a church,
school or other assembly place, then a sidewalk should be required. She advised it
was not in the staff recommendation, but it could have been. She commented when it
was added, the other Planning Commissioners approved the motion; and it became a
part of the project.
City Attorney Brian Albright pointed out on June 12, 2008, the Planning
Commission placed those conditions; and those conditions run with the land. He said
whether the Board would agree or disagree with the findings of the Planning
Commission, that decision was not appealed.
Director Maruthur commented when Ms. Sellman said the plat had a note on it,
anybody who would be doing the construction or doing the research would have the
burden of looking at the final plat before they do it. She stressed they are being paid,
and this has nothing to do with the Balkes. She stated these are the people who were
paid to do the project, and a notation was on there; and the June 12 decision was not
appealed.
Board of Directors Meeting 10 March 2, 2010 at 7:00 P.M.
Mr. Ray Owen stated that the Balkes own and operate two Burger Kings inside
the city limits and in Hot Springs Village, Arkadelphia, Malvern and Hope. He advised
they estimate this Burger King will produce between $1.6 million and $1.7 million in
gross revenue each year, which translates into $16,000 to $17,000 per year in sales tax
to the City and $50,000 in tax to the Convention and Visitors Bureau every year. He
emphasized they had to pay money they did not expect to pay to do additional
construction work over and above what was provided. He said in addition to the curb
and gutter on Mangum, there were a lot of other issues that were added which were not
part of these conditions: (1) the 60-foot extension of the 18-inch reinforced concrete
pipe along Mangum; (2) 24-foot swale along Mangum; (3) excavation of the natural
drainage ditch; (4) placement of the swale in that ditch; (5) additional excavation
causing the developer to have to install the geotechnical material; (6) stainless steel
baskets; and (7) modifications to the existing box structures. He pointed out that is
probably $8,000 of the $11,000 anyway, and the City’s actions in this case have cost
Mr. and Ms. Balke this additional money. He said it is only fair to allow them to be
reimbursed for this expenditure they did not expect to have to pay on the front-end
based on the fact that the City approved those plans. He emphasized the City
approved those plans even though the conditions that were required were not in there.
He said this additional amount they had to spend ($11,579.68) was as a result of the
fact that the City did not require additionals or whatever they needed to do if they were
going to do it, they should have done it. He said he did not believe this sends a good
message to other people.
Director Daniel stated they have been very good corporate citizens of Hot
Springs. He said that he goes back to the contractor, and he was on top of it everyday.
He commented he did not know if Mr. Balke was there everyday, but most of the time
they are not and rely on the developer and contractor to do those things. He pointed
out that Mr. Max Shaw got the property from Mr. Earl Williamson, and they just kept
filling it in; and probably in three or four years, there were some problems that set up
that nobody knew about. He stressed that the contractor knew about it through the
entire process and should have been present tonight. He said that he did not have a
problem with the $3,500 but could not see paying $11,000 because he believes the
contractor should be present tonight explaining why he did not keep them abreast and
aware of all the things that were taking place.
Mr. Owen stated the plans were drawn by B&F Engineering before the contractor
was even involved in it; and they were approved by the City and all of those
departments in getting the permit before the contractor was even involved. He said it
was only after the approval that they did the bidding process, and all of this happened
Board of Directors Meeting 11 March 2, 2010 at 7:00 P.M.
before the contractor got there. With regard to the $3,500, he said that is what he would
guess would be the cost for the curb and gutter down Mangum. He stated the other
$8,000 is the amount he is estimating the Balke’s had to spend for the rest of those
items which were not shown on the approved plans and are not part of the condition;
and the City determined they had to be done. However, they were in addition to and
over and above what was an approved plan already by the City. He said it was money
the Balke’s had to spend that they did not anticipate having to spend.
Director McCabe said it does not seem that Mr. Balke was well-served by
professionals in advance of coming to the City, and there was a previous owner of the
property. He stated when he has property, he always fill out a disclosure statement
and whether that disclosure could address that or not, he is not uncertain. He noted if
there was a requirement that the City placed on the property, perhaps if he had the
property, he would have disclosed that. He pointed out that possibly the previous
owner had some responsibility and maybe the realtor who was representing the Balke’s
might have some responsibility to have thoroughly checked this. He mentioned those
are players in this picture well before the City gets involved, and he believes it is
premature to come to City to ask for restitution when there are other players involved in
advance of the City’s being even brought into the picture. He said there may be a
reason for the City to reimburse some portion of this, but he is not certain the City is at
that point now because he believes there are some other players who would need to be
addressed or looked to for some assistance in that area.
Ms. Carol Scholp, 301 Stearns Point Road, said she has no interest in this
property; but when a person buys a property from someone, it is their responsibility to
disclose to the conditions on that. She noted there was a permit of $757,000 pulled on
this property; and in another letter, either from Mr. Winston or Mr. Balke, it said $1.5
million. She questioned the difference in the cost of a $757,000 permit versus a $1.5
million permit. She also asked if that has that been collected by the City.
Director Daniel explained that the City does not collect that.
Ms. Sellman explained that the fee that was paid was based upon the $757,000
figure, and it is the duty of the person pulling the permit to accurately disclose the
value of the project because that is the basis of the fee that is charged for the permit.
Director Ramick asked who pulled the permit, and Ms. Sellman replied that she
did not know.
Board of Directors Meeting 12 March 2, 2010 at 7:00 P.M.
Ms. Scholp asked if there was some way she could find out what the difference is
between a $757,000 and a $1.5 million, and Mayor Bush requested that City Manager
Lance Hudnell check into that.
Ms. Scholp said she believes this could have been avoided if the City had a
system whereby when a person applies for the permit application, that the rules and
regulations and the Planning Commission conditions are included so that individuals
can then direct their questions properly and a cover letter that says “no one under any
circumstances will be granted any exceptions to these rules.”
Mayor Bush said he did not believe the City could do that by law. Ms. Scholp
commented if the City has governing conditions and those regulations are printed by the
City, they have to be legally adhered to.
Director Keheley said she first visited the Burger King project last year when the
issue came before the Board and then she visited again last week when the claim was
presented in the Board packet. She stated the site development for the restaurant was
wonderful, but the public improvements consisting of those curbs, gutters, storm
drainage, the flume, there were assortment of changes covering the whole construction
period. She pointed out how a project could end up like this is a cause of concern.
She said from what she has learned, there is certainly enough blame to go around.
She noted this construction did not enhance the investment of Mr. Balke and what he
has done for the project. She mentioned the Board received 40 pages in our Board
packet, memos, e-mails, and other records attempting to explain all of these actions,
and Mr. Mallett stated that staff admitted the timing of the notifications to the owners
were unfortunate. She added it is very clear that better communications between the
city departments and all of the staff could have prevented some of the issues before the
Board tonight and also from those two Planning Commissions. She stated it is also clear
that the simple act of following the City’s own requirements of proper engineering of all
public improvements before a project begins will greatly reduce the circumstances of
this claim. She apologized to Mr. and Mrs. Balke for the breakdown in the
development process. She stated since this project was completed, the City hired a city
engineer to be in charge of looking after public improvements in Hot Springs and
hopefully we can avoid this happening in development. She mentioned that she
believes all of the Directors are advocates for building and developing business
opportunities in Hot Springs and want Hot Springs to be a development friendly city.
She stressed that everyone should join efforts to find some ways to improve the user
friendliness in all of the business development activities.
Board of Directors Meeting 13 March 2, 2010 at 7:00 P.M.
Director Maruthur said she agreed with that statement and pointed out that Mr.
Steve Mallett, Deputy City Manager for Public Works and Utilities, has recommended
that the Board deny the claim from Mr. Winston and Mr. and Mrs. Balke because of the
way things were handled and the consequences that have been suffered. She stated it
would be the taxpayers who would have to pay the bill for the people who did not look at
the documentation and follow the proper process. She said the people who did the
work did not follow the rules and regulations that were set forth on June 12, 2008; and
nothing was appealed and nothing was changed. She stated as a representative of the
people, she recommends improving communications and do what the staff
recommends.
Director Daniel said it was brought up about checking into the difference in the
permits and if the City is going to do something about this if the appeal is denied. He
added it will be six months before it can be considered by the Board. He pointed out if
the issue were tabled and get the questions answered, then it could be brought back
at the next meeting. He stated that the Mayor gave a directive to the City Manager;
and if the Board votes on it tonight, then there is no reason for his checking out
anything, which will be after the fact.
Director McCabe pointed out that is a different issue, and Director Daniel stated it
still pertains to that project; and the Mayor asked the City Manager to do it.
Director McCabe said he understands what Director Daniel is saying, but they
are two different issues.
Director Jones commented she would like to see the Board take some kind of
action. She said that she believes in Ms. Sellman and has a lot of confidence in her,
as well as Mr. Mallett. She said she feels the City is as much to blame as Mr. Winston.
She suggested tabling this issue and arrive at some solution.
Director McCabe stated that Mr. Balke may not have been well served by
professionals in advance of coming to the City, and that is where he believes that initial
restitution should be looked at. He said he believes the Board could table this and let
that process proceed, but right now it is early coming to the Board.
Mr. Owen said he could get B&F Engineering to do a computation as to how
much it would have cost to install curb and gutter on Mangum Street, and the City could
deduct that from the $11,500, which would solve the problem that Director McCabe had
Board of Directors Meeting 14 March 2, 2010 at 7:00 P.M.
with regard to the curb and gutter on Mangum Street because there are five or six other
issues.
A motion was made by Director Maruthur, duly seconded by Director Jones, to
table this issue to the May 4 Board Meeting; and upon roll call, the following voted “aye”:
Directors Maruthur, Jones, Keheley, McCabe, Ramick, Daniel, and Bush, total 7; motion
unanimously carried.
15 Proposed Resolution No. R-10-50
A resolution entitled, “A RESOLUTION AUTHORIZING A CONTRACT FOR
SERVICES WITH THE HOT SPRINGS AREA COMMUNITY GARDEN NETWORK,”
was taken from the agenda and read by title only.
A motion was made by Director Daniel, duly seconded by Director Maruthur,
that the resolution be adopted as read.
Upon discussion, Ms. Jean Wallace, Parks and Recreation Director, stated that
the recommendation from staff is to enter into a contract for services with the Hot
Springs Area Community Garden Network to provide the City’s community garden
program. She said this organization desires to provide a community garden program for
the public and will operate currently under the umbrella of another local nonprofit while
they are applying for a nonprofit number. She noted the first property they would like to
garden is at 120 Palm Street and is a city-owned lot behind the Convention Center
parking lot. She stated their proposal includes leasing the property, designing and
building the garden plots, and educating the public on the value and the benefits of
gardening, which is a very important component of their organization. She mentioned
they have asked that the City provide compost several times during the year, provide
a water supply, and pay the monthly water bill, which is estimated on an annual basis of
$250. She then introduced the vice president of the Master Gardeners, Ms. Sharon
Dent, who recognized two other Board Members, Mr. Bob Byers and Ms. Denise
Parkinson, and others citizens interested in the project.
Ms. Sharon Dent, vice president of the Master Gardeners, stated that the new
president for the Network is Mr. Bill Staton. She explained that community gardens
around the country is a force of interest because people are concerned about the quality
Board of Directors Meeting 15 March 2, 2010 at 7:00 P.M.
of food, but many people cannot afford the fresh vegetables and fruits that they hope to
be able to provide on a wide scale to people who are willing to come out and learn
about how to produce their own food. She mentioned they have set up a rental scale
that is comparable to what people in this market can pay, and it will be reviewed on an
annual basis. She explained that people join the Network by paying an annual fee and
from that are elected board members and from that are elected officers from the board.
She said there are people who will be appointed to manage each of the garden plots in
addition to the oversight. She stated each garden plot will have communal areas
where everybody can work on them together, and there will be individual plots where
people can grow their own food. She advised that their second garden is most likely
going to be at the Quapaw Community Center, and they have started negotiations and
building a group at Roanoke Baptist Church on Whittington Avenue and are excited
about the possibility of an edible landscape frontage on Whittington. She commented
they hope as soon as they can finally get this plot up and get some experience, they will
possibly be able to move onto the Airport with a larger plot. She said they will be back
to the Board in less than a year to ask for an extension on their contract beyond the
one-year period and to look at additional sites. She noted they will submit annual
reports as specified in the contract.
Ms. Carol Scholp spoke in support of the program and said programs such as
this have been started all over the country. She noted that Ms. Alice Waters, from
California, started a program all over the country and invested $500,000 in New Orleans
after Hurricane Katrina to do gardens like this. She mentioned she applied for a grant
with one of the larger corporations here to do it for the Boys and Girls Club and the
Childrens’ Home.
Mayor Bush then called for vote on the motion to adopt; and upon roll call, the
following voted “aye”: Directors Maruthur, Jones, Keheley, McCabe, Ramick, Daniel,
and Bush, total 7; motion unanimously carried. Whereupon the resolution was
declared adopted.
16 Proposed Ordinance No. O-10-18
An ordinance entitled, “AN ORDINANCE WAIVING THE REQUIREMENTS OF
COMPETITIVE BIDDING FOR THE REPAIR OF CERTAIN SOLE-SOURCE ITEMS
(ENVIRONMENT ONE GRINDER PUMPS); AND FOR OTHER PURPOSES,” was
taken frm the agenda for consideration.
Board of Directors Meeting 16 March 2, 2010 at 7:00 P.M.
A motion was made by Director Daniel, duly seconded by Director Ramick, that
the rules be suspended and the ordinance be read for the first time by title only; and
upon voice vote, the motion unanimously carried. The ordinance was then read for the
first time by title only; and upon the question “Shall the ordinance be passed as read?”
and upon motion of Director Daniel, duly seconded by Director Jones, that the
ordinance be passed as read.
Upon discussion, Mr. Steve Mallett, Deputy City Manager for Public Works and
Utilities, stated that Ordinance No. 5536 establishes Jack Tyler Engineering as the
sole-source provider of Environment One pumps. He said this ordinance does not
address the repairs of these pumps so the City had an existing backlog of pumps at
the Adams Street facility and could not keep up. He said staff is asking that the Board
waive competitive bidding for the repair service on these same pumps with the same
company that is the sole-source provider of these pumps and also request to proceed
with the repair of 40 pumps at a cost of $800 per pump. He said any future repairs in
excess of $20,000 would come back to the Board for approval.
Mayor Bush then called for a vote on the motion to adopt; and upon roll call, the
following voted “aye”: Directors Maruthur, Jones, Keheley, McCabe, Ramick, Daniel,
and Bush, total 7; motion unanimously carried. Whereupon the ordinance was
declared passed.
17 Proposed Ordinance No. O-10-19
An ordinance entitled, “AN ORDINANCE WAIVING THE REQUIREMENTS OF
COMPETITIVE BIDDING AND AUTHORIZING A RENEWAL AGREEMENT WITH CGI
COMMUNICATIONS, INC. FOR CERTAIN WEB-BASED STREAMING VIDEO
PROMOTIONS,” was taken from the agenda for consideration.
A motion was made by Director Ramick, duly seconded by Director Jones, that
the rules be suspended and the ordinance be read for the first time by title only; and
upon voice vote, the motion unanimously carried. The ordinance was then read for the
first time by title only; and upon the question “Shall the ordinance be passed as read?”
and upon motion of Director Daniel, duly seconded by Director Ramick, that the
ordinance be passed as read.
Upon discussion, Ms. Terry Payne, Public Information Director, stated this is for
the acceptance of a three-year renewal of a contract which took place in 2006, when the
City entered into an agreement with CGI Communications, Inc. for an updated web
Board of Directors Meeting 17 March 2, 2010 at 7:00 P.M.
streaming video promotional package. She said people can go to the city’s website
(cityhs.net) and click on the CGI icon, which is currently entitled, “Community Video
Showcase” but are renaming it “Community Movie Tour Book Agreement.” It involves
hotlinks to a series of ten locally produced videos on Hot Springs that showcase Hot
Springs assets to residents, visitors and businesses who might be interested in
relocating to Hot Springs. She noted the first one is the welcome video with footage by
Mayor Bush and a number of other videos that showcase various aspects of Hot
Springs, and they are all locally shot. She commented the Public Information
Department oversaw the production of these videos in 2006, but it is time to consider a
renewal of this program and at the same time an upgrade. She pointed out in satellite
fashion around the hot links to the ten videos on Hot Springs are also videos
showcasing various types of businesses who are the sponsors that actually pay for this
program. She explained there is no cost to the City in the past, and there will not be in
the future. She added this is a program that is completely funded by the local business
sponsors; and currently, there are ten custom videos; and the City has complete control
over the video content of those videos. CGI’s package currently provides video storage
and streaming on a dedicated server, but they also take care of the recruitment of local
business sponsors and the production of the sponsor videos. She said this updated
package being considered tonight will give a new look to what is being seen. She
stated anything on the web has a short shelf life, and it needs to be updated and will
have a new modern interface. She added there will be new production in online posting
of all the ten videos that showcase Hot Springs. There will be better video quality
through flash technology and also a detailed visitor tracking package that will allow the
City to be able to better judge who is coming to visit these videos and what their
interests might be. She noted since the City signed on in 2006, CGI has grown from a
company with 50 employees to 260 employees serving 2,000 communities nationwide
as their customers. CGI is additionally endorsed by the National League of Cities, as
well as the U. S. Conference of Mayors.
Director Keheley questioned how the business sponsors are chosen, what the
criteria is, if there are any restrictions on these business sponsors, and the cost. Ms.
Payne advised that CGI completely takes care of the recruiting, and the City does not
select the businesses. She mentioned in the Board packet is an introductory letter
from the City Manager that CGI uses and takes to local businesses if this package is
approved for renewal, and it explains the services that CGI has to offer. She said they
take care of the recruitments, and the City has no knowledge of the cost that is
assessed to the businesses nor does the City recommend businesses to recruit. She
mentioned this is completely taken care of by CGI Communications.
Board of Directors Meeting 18 March 2, 2010 at 7:00 P.M.
Mayor Bush then called for a vote on the motion to adopt; and upon roll call, the
following voted “aye”: Directors Maruthur, Jones, Keheley, McCabe, Ramick, Daniel,
and Bush, total 7; motion unanimously carried. Whereupon the ordinance was
declared passed.
18 Proposed Resolution No. R-10-51
A resolution entitled, “A RESOLUTION AUTHORIZING EXTRAORDINARY
MEASURES AND ACTIONS RELATED TO THE 2010 APPLE BLOSSOM
INVITATIONAL,” was taken from the agenda and read by title only.
A motion was made by Director Keheley, duly seconded by Director Maruthur,
that the resolution be adopted as read.
Upon discussion, City Manager Lance Hudnell pointed out there is a substitute
resolution which has been distributed that added the sanitation rates that failed to be
included in the resolution. This resolution takes some extraordinary actions in several
different areas, and the first is in regard to the Transportation Code to allow the local
transportation providers to equip themselves better to take care of this event. He
pointed out this is being treated as a once-in-a-lifetime event. The second is the street
and parking regulations which allow for anyone in the City to provide parking just for
those two days in support of this event assuming they do not block the street. Also, staff
is asking the Board to declare a moratorium on special events which will be on city
property or in the entertainment districts or areas that the City controls and not on
private property. He said the reason for that is the resources will already be stretched
and do not want to deal with any other events that are on the Transportation Plaza, the
Exchange Street Parking Facility, in the entertainment districts, or closing a street and
having a block party during these days. Regarding transient merchants, the City does
not allow transient merchants within the City except in certain specific categories.
Anyone who happens to meet one of those specific categories should have their
application in by March 26. The private parking is in regard to parking on other areas
within the City that are not normally allowed. Regarding sidewalk obstructions, the City
requires various businesses, etc. to come on a case-by-case basis and request to put
out tables, chairs, etc. He pointed out this is a blanket approval, particularly for the
downtown area for tables and chairs in support of dining and entertainment facilities.
Regarding shrubs, flowers and other plants, the Downtown Merchants have some
things going with regard to that and trash receptacles, etc. Regarding sanitation rates,
there are some community-wide efforts underway for clean-up in advance of this event.
He said this is not for individuals or individual merchants or businesses; but this is if it is
Board of Directors Meeting 19 March 2, 2010 at 7:00 P.M.
a cooperative effort such as downtown or a particular neighborhood. The City would
then place a dumpster there at no charge.
Director Daniel pointed out that the State of Arkansas has a sales tax
requirement on seasonal parking, and those who have parking lots around the race
track pay a sales tax each year on that where a year-around business does not. He
requested that in the notifications that are made, the owners be notified that they have
to pay any state and federal taxes.
Mr. George Pritchett, 125 Carl Drive, stated that the City Manager and staff are
doing a great job; and in getting ready for this is a big event, he commended the
newspaper, the Board, and everyone involved. He mentioned that phone calls are
being received from all over the country from people looking for a place to stay, and the
highest one he has heard of is a limo service and chef around the clock for $35,000 for
the week.
Director Maruthur stated she received by e-mail an Apple Blossom Invitational
talking points bulletin from the Advertising and Promotion Commission, which placed all
the information on one page and expressed appreciation to the Advertising and
Promotion Commission for providing it. She said she has sent this to 75 people and
plans to send it all over the country.
Mayor Bush then called for a vote on the motion to adopt the resolution; and
upon roll, the following voted “aye”: Directors Maruthur, Jones, Keheley, McCabe,
Ramick, Daniel, and Bush, total 7; motion unanimously carried. Whereupon the
resolution was declared passed.
OTHER BUSINESS
19 Board of Directors Items for Discussion
Director Jones reminded everyone that Saturday is the Pleasant Street
Neighborhood Association meeting at 12 noon for board members and 1 p.m. for the
public meeting. She announced that she has two friends visiting from Boston,
Massachusetts, Mary Francis Mitchell and her sister Ora.
Board of Directors Meeting 20 March 2, 2010 at 7:00 P.M.
20 City Manager’s Report
City Manager Lance Hudnell gave the following report:
1. He urged everyone to fill out their Census forms as it is important to the City
that those are all returned.
2. During the budget discussion, one of the items that was discussed was
cutting back on the “City in Progress” newsletter that goes out to all of the citizens via
the utility bills. The Public Information Department has created a new document that is
now totally web-based and allows the department to do more with it, and citizens can
sign up for an e-subscription on the City’s website.
3. Employee awards banquet will be held on April 15, and the Directors need to
let Margaret Parris, administrative secretary, know if they will be attending because she
has some special slots for the Directors on the program.
4. Because of the cut-back in some training, the Animal Control Department
held training in Hot Springs on behalf of other animal control departments. There were
three cities that participated in remote chemical capture that was led by Elgin Simmons,
Animal Control Field Supervisor, and expressed appreciation to him. Animal Services
also had a home booth show and adopted out nine animals.
5. There was a Street Department crew that removed ice off the roof of City Hall
during the ice storm and expressed appreciation to them. They worked about ½ day
getting the ice off so the leaks would stop.
6. The City’s Urban Forester, Mr. Bob Lathrop, has been appointed to the
Arkansas Urban Forestry Council Board of Directors. This is an advisory group to the
Arkansas Forestry Commission and expressed appreciation to him for doing that.
7. Regarding the advisory committee appreciation dinner, this will not be held
this year. It was not really a budget issue since the City had determined sometime ago
that it wanted to start doing that every other year in order to coincide when the members
rotate off so the banquet can be a little more special and honor those who have served
and are rotating off every other year.
Board of Directors Meeting 21 March 2, 2010 at 7:00 P.M.
8. The City received early notification that it received the Certificate of Excellence
for the 2008 Financial Report, and there will be a presentation at a later Board Meeting.
9. A thank-you was received commending the Police Department for assisting
with the Dr. Cooper family funeral recently, and thoughts and prayers continue to go out
to that family, as well as to the family of Dr. Martin Draper.
10. The Fall City Collegiate Classic NCAA Women’s Fast Pitch Tournament
was held last weekend. There were eight teams from four states and 150 players. The
players were from all over the United States, but the universities were from Arkansas,
Texas, Oklahoma, and Missouri. Mr. Nathan Neighbors, Recreation Supervisor, is
doing a good job in attracting those types of high-quality events.
11. Apple Blossom preparations continue, and there have been several staff
meetings in regard to that. He has a weekly phone call with the principals involved.
He noted there is a special website (AppleBlossomInvitational.com), and there is a
transportation page, news page, update page, lodging, and is being handled by the
Advertising and Promotion Commission. He expressed appreciation to Mr. Arrison and
his staff in assisting with this.
12. He met with the Finance Committee of the Quorum Court last night, and
they have agreed to recommend to the full Quorum Court that they increase the Animal
Control contract for this year to provide some additional support to the Sheriff’s Office
that the City had to cut out. They are going to add about $33,000 of funding which will
allow the City to give a dedicated officer back to the Sheriff, and this will be a County
issue.
13. A display case has been placed in the foyer, and the plaque received
tonight will be added to that case.
14. If the Directors see any of the City’s Congressional delegation, they need to
encourage them to pass the continuing resolution on the transit funding soon because
until they do that, the City cannot submit any more grant requests. The Transportation
Bill is re-authorized every six years, and this has been expired for a while and they have
been doing a series of Congressional resolutions. He stated this does impact the City’s
transit funding should they not pass that.
Board of Directors Meeting 22 March 2, 2010 at 7:00 P.M.
Mayor Bush questioned when the SunBelt Conference starts, and Director
Ramick replied that it is March 6 through March 9.
21 ADJOURNMENT
There being no further business to come before the Board, the meeting
adjourned at 8:35 p.m., to meet again on Tuesday, March 16, 2010, at 7:00 p.m.
ATTEST: _____________________
APPROVED:__________________
Lance Spicer, City Clerk
Mike Bush, Mayor
Board of Directors Meeting 23 March 2, 2010 at 7:00 P.M.
Agenda
REGULAR MEETING OF THE BOARD OF DIRECTORS
MEETING NO. 5
CITY OF HOT SPRINGS, ARKANSAS
TUESDAY, MARCH 2, 2010, 7:00 P.M.
BOARD CHAMBERS, CITY HALL
133 CONVENTION BOULEVARD
In order to ensure fairness to all who wish to be heard, while maintaining orderly and timely meetings, the Board of Directors
has established a uniform policy for receiving public input. Anyone wishing to comment on a specific agenda item should
place one's name on the sign-up sheet, available at the entrance to the Board Chambers. Comments will be limited to three
minutes for each person. Discussion by the Board Members or questions to the person will not be included in this time limit.
At the pleasure of the Board, action may or may not be considered by the Board of Directors for matters listed in the Citizen
Item Section. The Board of Directors request and appreciate your cooperation with these procedures.
INVOCATION - Mr. Bryan Sligh
PLEDGE OF ALLEGIANCE
CALL TO ORDER
Order of
Business Subject
BOARD BUSINESS SECTION
1 Roll Call of Board of Directors.
2 Consider Approval of the Agenda.
3 Consider Approval of Minutes for February 16, 2010.
4 Recognition of Guests.
a. Presentation of Arbor Day Proclamation and Award.
b. Other Guests.
5 Board of Directors Announcements.
6 Consider Acknowledgment of Financial Statement Notices for December 2009
and
January 2010.
Order of
Business Subject
Items placed in this section are a matter of routine business which are expected to involve little or no discussion by the Board or the public. The
Consent Agenda is usually voted on in mass. However, if any two Directors so desire, individual items may be discussed and/or voted on as a
separate matter of business.
CONSENT AGENDA SECTION
7 Resolution No. R-10-43 Approving Certain Bid Awards.
a. Ford Compact Pickup - Utility Administration;
b. Dodge Compact Pickup - Utility Administration;
c. Lead Based Paint Testing - All Departments (ASC)*;
d. Title Search/Abstractor - All Departments (ASC)*.
* ASC - Annual Supply Contract
8 Resolution No. R-10-44 Authorizing the Mayor to Execute a Lease Agreement
Between the City and X-TRA Lighting Manufacturing Partnership, LTD, for
Space at the East End of the Terminal Building at the Airport.
9 Resolution No. R-10-45 Amending Resolution No. 6494, as Amended by
Resolution No. 7092 (Approving Certain Revisions to Municipal Airport
Property Management Policy), by Adopting a New Appendix “K” (Airport
Property Rates).
10 Resolution No. R-10-46 Awarding a Contract for Real Estate Acquisition
Services Related to the Higdon Ferry Road Improvement Project, Phase II,
(AHTD Job Number 061113) to Right of Way USA, Inc.
11 Resolution No. R-10-47 Approving Change Order No. 1 to an Existing
Contract with Frank Manzer and Associates for Real Estate Appraisal Services
Related to the Higdon Ferry Road Improvement Project, Phase II (AHTD
Job Number 061113).
12 Resolution No. R-10-48 Authorizing Purchase of Twenty (20) Environment One
Grinder Pumps from Jack Tyler Engineering Company of Arkansas in
Accordance with Ordinance No. 5563 that Establishes Jack Tyler Engineering
Company as the City’s Sole-Source Supplier of Environment One Grinder
Pumps.
13 Resolution No. R-10-49 Authorizing Revisions to the 2009 Budget.
Order of
Business Subject
NEW BUSINESS
14 Consider Claim from Mr. Tim Winston and Mr. Max Balke Regarding
Burger King Development at the Corner of Central and Colombia Hills.
15 Consider Resolution No. R-10-50 Authorizing a Contract for Services with
the Hot Springs Area Community Gardens Network.
16 Consider Ordinance No. O-10-18 Waiving Requirements of Competitive
Bidding for the Repair of Certain Sole-Source Items (Environment One
Grinder Pumps).
17 Consider Ordinance No. O-10-19 Waiving Requirements of Competitive
Bidding and Authorizing a Renewal Agreement with CGI Communications, Inc.
for Certain Web-Based Streaming Video Promotions.
18 Consider Resolution No. R-10-51 Authorizing Extraordinary Measures and
Actions Related to the 2010 Apple Blossom Invitational.
OTHER BUSINESS
19 Consider Board of Directors’ Items for Discussion.
20 Consider City Manager’s Report.
21 ADJOURNMENT