Village Board
Regular MeetingHuntley, IL · July 25, 2019
Minutes
VILLAGE OF HUNTLEY
VILLAGE BOARD
July 25, 2019
MEETING MINUTES
CALL TO ORDER:
A meeting of the Village Board of the Village of Huntley was called to order on Thursday, July 25, 2019
at 7:00 p.m. in the Municipal Complex, Village Board Room, 10987 Main St., Huntley, Illinois 60142.
ATTENDANCE:
PRESENT: Mayor Charles Sass; Trustees: Ronda Goldman, Tim Hoeft, Niko Kanakaris, Harry
Leopold, John Piwko, and JR Westberg.
ABSENT: None
IN ATTENDANCE: Village Manager David Johnson, Assistant Village Manager Lisa Armour,
Management Assistant Barbara Read, Director of Development Services Charles Nordman, Director of
Public Works and Engineering Timothy Farrell, and Village Attorney John Cowlin.
PLEDGE OF ALLEGIANCE: Mayor Sass led the Pledge of Allegiance.
SPECIAL RECOGNITION:
a) Huntley HS Girls Softball Team – State Champions
The Huntley High School Girls Softball Team was recognized as Huntley’s first State Champions.
Mayor Sass stated that we are very proud of our State Champions. The video of the last out of the
championship game was shown as well as the video of the welcome home at the high school. Each
member of the team then received a Certificate of Recognition and a key to the Village. The coach then
said a few words of thanks on behalf of the team. A group picture was taken with the Village Board.
PUBLIC COMMENTS: None.
ITEMS FOR DISCUSSION AND CONSIDERATION:
a) Consideration — Approval of the July 25, 2019 Bill List in the amount of $209,350.16
Mayor Sass reported that $98,825.00 (or 47.2%) of the total bill list is attributable to the payment of
development impact fees to other taxing bodies.
Mayor Sass asked if the Village Board had any comments or questions; there were none.
A MOTION was made to approve the July 25, 2019 Bill List in the amount of $209,350.16.
MOTION: Trustee Leopold
SECOND: Trustee Piwko
AYES: Trustees: Goldman, Hoeft, Kanakaris, Leopold, Piwko and Westberg
NAYS: None
07.25.19VB Meeting 1
ABSENT: None
The motion carried: 6-0-0
b) Consideration — An Ordinance Approving a Simplified Residential Zoning Variance for
Rear Yard Building Setback Relief in the "SF-2 (PDD)" Garden Residential - Planned
Development District for Barry and Gloria Newman, 13673 Roosevelt Drive
Director of Development Services Charles Nordman reviewed a Power Point presentation and reported
that the petitioners, Barry and Gloria Newman, are requesting ±5.59 feet relief from the twenty (20’)
foot minimum rear yard building setback to accommodate the construction of a three-season room
addition to the rear of their home located at 13673 Roosevelt Drive. The property is zoned “SF-2
(PDD)” Garden Residential – Planned Development District. The Sun City Community Association of
Huntley reviewed the request for variance on May 22, 2019 and has approved the project per their
Covenants and pending final approval by the Village Board.
Staff Analysis
The proposed ±12’ x ±13.5’, ±162 square foot addition is located on the rear (south side) of the single-
family residence. The proposed addition will encroach ±5.59 feet into the requisite 20-foot rear yard
building setback. The elevations show the siding, roofing materials and colors will match the existing
home.
The petitioners cited the relatively small size of their lot and depth of their rear yard as reasons for
requesting the subject relief from the rear-yard setback requirement. In addition, the lot backs up to a
bike path and is located close to a creek. The addition will add privacy from persons utilizing the path,
and will improve quality of life with the protection against insects.
Zoning Board of Appeals
The Zoning Board of Appeals reviewed the petitioners’ request at a public hearing on July 10, 2019,
with no members of the public speaking in opposition to the request, the Zoning Board of Appeals
unanimously recommended approval of the request by a vote of 4 to 0 subject to the following
condition:
1. No building permits or Certificates of Occupancy are approved as part of the Simplified
Residential Zoning Variation.
Director Nordman reported that the petitioners were in attendance to answer questions.
Mayor Sass asked if the Village Board had any comments or questions; there were none.
A MOTION was made to approve an Ordinance for a Simplified Residential Zoning Variation for
an addition encroaching into the Rear Yard Building Setback – Barry and Gloria Newman, 13673
Roosevelt Drive.
MOTION: Trustee Kanakaris
SECOND: Trustee Leopold
AYES: Trustees: Goldman, Hoeft, Kanakaris, Leopold, Piwko and Westberg
NAYS: None
ABSENT: None
The motion carried: 6-0-0
07.25.19VB Meeting 2
c) Consideration – A Resolution Approving a Temporary Use Permit to Hold an Outside
Event on Village Property and Temporary Sign Request; Huntley High School Athletic
Boosters/ RAIDERFest 2019
Special Events Manager Barbara Read reported that the Village has received a request from the Huntley
High School Athletic Boosters (Boosters) to hold RAIDERFest 2019 in the James C. Dhamer Town
Square on Saturday, August 17, 2019 from 5:00 – 10:00 p.m.
The proposed event will include:
1. A .26 micro-marathon around the Square on the sidewalk
2. Dunk Tank
3. Three (10x20 ft.) canopy tents
4. Huntley Community Radio broadcasting from the Gazebo
5. To post temporary signage before the event as follows: To post 15 (3’ x 10’) banners as
indicated on the event signage exhibit included in the packet. The banners would be posted two
weeks prior to the event. The Boosters acknowledge that some sites may not be under the
Village’s jurisdiction and others may not be feasible in the noted location. If these sites are not
feasible, the petitioner requests permission for other sites with the approval of the Village
Manager. No signs will be posted on private property without prior authorization of the property
owner.
Staff Analysis
The Zoning Ordinance allows temporary signs, which are subject to the following conditions: 1) not to
exceed 30 days, 2) maximum size of 50 square feet and no more than 8 feet above ground, 3) not to be
displayed on a fence or tree, and 4) not to be located in the rights-of-way.
A variation from the Ordinance is required to locate the signs in the Village’s rights-of-way.
Recommended Conditions of Approval:
1. The petitioner and any vendor that they use shall provide the Village with a valid Certificate of
Insurance naming the Village as an additional insured.
2. The petitioner agrees to enter into an agreement to indemnify and hold the Village harmless from
and against any and all claims arising from the event.
3. A Sound Amplification permit must be applied for and received.
The $500 Special Events Deposit shall be received a minimum of two (2) weeks prior to the
event. The deposit is to cover unanticipated costs of Village personnel for safety, set up and/or
clean up.
4. The site shall be kept free of trash throughout the event.
5. All signage must be removed by 8:00 a.m. on August 19, 2019.
Financial Impact
Any unused funds from the $500 Special Event deposit/fee will be returned within 30 days of the event.
If additional funds are required, an itemized invoice will be issued.
Manager Read reported that representatives from the Huntley High School Athletic Boosters were in
attendance to answer questions.
Mayor Sass asked if the Village Board had any comments or questions.
Trustee Westberg asked if this event was held on Coral Street last year; Ms. Read stated that it was.
07.25.19VB Meeting 3
Trustee Westberg asked if it was going to also be on Coral Street this year. Trustee Kanakaris asked if
the Boosters wanted it on Coral Street. Ms. Read stated that the Athletic Boosters amended their request
as Staff is trying not to close Coral Street for events such as these so the businesses will not be harmed.
Trustee Kanakaris noted that there could be a lot of people in attendance and asked how many were in
attendance in 2018. Ms. Read stated that they did not have a count of how many people attended the
event last year.
Trustee Westberg asked about fitting everything inside the Town Square. Ms. Read stated that she was
told that they would hold their micro-marathon on the sidewalks around the Square and then they would
patronize the businesses around the Square.
Trustee Westberg stated his concern for the grass in the Square and how it might be damaged with the
dunk tank and other activities.
Trustee Goldman asked if the representatives from the Boosters could come to the podium.
Bruce Krich, president of the Athletic Boosters stated that Coral Street was closed last year because
BBQ King was not yet open and also stated that he estimated that at the 2018 event they had between
300 to 400 people and hope that it will be bigger. Mr. Krich stated that he also was concerned about
damaging the Square with the tents and dunk tank water.
Village Manager Johnson stated that he appreciates the event but that the Village has received
complaints about the timing of the closure of the street. Village Manager Johnson stated that Staff
appreciates the safety issue but with the increased number of events on Coral Street we want to be
considerate of the businesses. Village Manager Johnson stated that in the near future that there should
be a discussion about the closing of Coral Street for events.
Trustee Leopold stated that the grass gets trampled at the Memorial Day Parade and every time there is a
concert or other event; we would repair any damage for those events. Trustee Leopold stated that when
the Banjo Buddies were playing during the farmers market people were all over the Square. Village
Manager Johnson reported that as a point of reference that during the recent Blooze Brothers concert
there were 1,200 people in the Square. Village Manager Johnson reiterated that for the upcoming year,
there should be an understanding of the use of Coral Street as there is a different dynamic of activity as
what we have seen in the past.
Trustee Leopold suggested that they use the Municipal Complex parking lot. Village Manager Johnson
said that the Boosters would like to patronize the businesses downtown. Mr. Krich stated that they had
discussed having it out at the high school but wanted to bring the community together and help the
businesses.
Mayor Sass suggested that they consider asking the Congregational Church to use their grassy area in
the future. Village Manager Johnson also stated that the Catty gravel area worked well for the music
fest and could also be considered for them in 2020.
Trustee Kanakaris stated that he thinks Coral Street should be closed as long as the Legion and BBQ
King do not have a problem with it. Trustee Kanakaris asked the Legion Commander Mike Stojak
(sitting in the audience) if he had a problem with Coral Street being closed; Commander Stojak stated he
did not have a problem with Coral Street being closed.
07.25.19VB Meeting 4
Village Manager Johnson stated that if the Board approves the closure of Coral Street, Staff will work
with the Boosters so that the times of the closure can be communicated to the businesses.
Mr. Krich stated that last year it closed down at 11:00 pm but felt that this year it would be closer to
10:00 p.m.
Trustee Hoeft stated that he would agree to the closing of Coral Street for this event but agrees with
Village Manager Johnson that moving forward guidelines for when Coral Street is to be closed should
be established.
Mayor Sass stated that four (4) Trustees want to close Coral for this event and that for 2020 a policy will
be established. Mayor Sass also stated that he liked the idea of using the gravel area on the Catty site.
Mr. Krich stated that he will be president again next year and would be happy to move next year’s event.
There were no other comments or questions.
A MOTION was made to approve a Resolution Authorizing a Temporary Use Permit to Hold an
Outside Event on Village Property, the closure of Coral Street, and Temporary Sign Permit to
Huntley High School Athletic Boosters for RAIDERFest 2019 subject to the following conditions:
1. The petitioner and any vendor that they use shall provide the Village with a valid Certificate
of Insurance naming the Village as an additional insured.
2. The petitioner agrees to enter into an agreement to indemnify and hold the Village harmless
from and against any and all claims arising from the event.
3. A Sound Amplification permit must be applied for and received.
The $500 Special Events Deposit shall be received a minimum of two (2) weeks prior to the
event. The deposit is to cover unanticipated costs of Village personnel for safety, set up
and/or clean up.
4. The site shall be kept free of trash throughout the event.
5. All signage must be removed no later than 8:00 a.m. on August 19, 2019.
MOTION: Trustee Leopold
SECOND: Trustee Westberg
AYES: Trustees: Goldman, Hoeft, Kanakaris, Leopold, Piwko and Westberg
NAYS: None
ABSENT: None
The motion carried: 6-0-0
d) Consideration – An Ordinance Approving a Special Use Permit for an Indoor Recreation
Facility in the "M" Manufacturing District for Huntley Cheer Association, 10721 Wolf
Drive
Director of Development Services Charles Nordman reviewed a Power Point presentation and reported
that Huntley Cheer Association, petitioner, and Property Dynamics, LLC XXXII, owner, have applied
for a Special Use Permit for Indoor Recreation within the “M” Manufacturing zoning district. The
Special Use Permit will allow the Huntley Cheer Association to train and store their equipment within
the 10,000 square foot lease space. Huntley Cheer is currently located in the building directly to the east
in Wolf Business Park and the move will assist in reducing costs for the mostly volunteer organization.
The space was previously leased by Huntley Gymnastics Academy & Academy of Cheer (which closed
07.25.19VB Meeting 5
in early 2019). Huntley Cheer supports over 200 athletes within grades first through eighth.
Cheerleading training takes place primarily Monday through Friday between 5:00 p.m. and 9:00 p.m.
Staff Analysis
The facility will serve as a practice facility with most athletes being dropped-off and picked-up for
practice sessions. Huntley Cheer is not proposing to host competitions at the facility. According to the
petitioner, there are typically between ten (10) to fifteen (15) parking spaces needed to accommodate
parents and instructors. The center parking lot provides 178 parking spaces that are shared by the
nearby tenants. The entire Wolf Business Park has 482 parking spaces.
Plan Commission Recommendation
The Plan Commission reviewed the petitioner’s request on July 8, 2019, and, with no members of the
public offering comments in favor or opposition to the request, recommended approval of the petition by
a vote of 6 to 0, subject to the following conditions:
1. No building unit construction permits, plans or Certificates of Occupancy are approved as part of
this submittal.
2. No products shall be sold on the subject premises except such products distributed in the normal
course of business of the principal use and no outdoor display is permitted and/or approved as
part of this submittal.
3. No Signage is approved as part of the Special Use Permit.
Strategic Plan Priority
The 2016-2020 Strategic Plan identifies “Promote New Business Development, Retention, and
Expansion” as a Strategic Priority, “Attract and Retain Businesses to Enhance Tax Base and Create
New Jobs” as a goal.
Director Nordman stated that representatives of the petition were in attendance to answer questions.
Mayor Sass asked if the Village Board had any comments or questions; there were none.
A MOTION was made to approve an Ordinance for a Special Use Permit for an indoor recreation
facility in the “M” Manufacturing zoning district for Huntley Cheer Association, 10721 Wolf
Drive.
MOTION: Trustee Kanakaris
SECOND: Trustee Goldman
AYES: Trustees: Goldman, Hoeft, Kanakaris, Leopold, Piwko and Westberg
NAYS: None
ABSENT: None
The motion carried: 6-0-0
e) Consideration – An Ordinance Granting Relief for Additional Wall Signage for PSS
Huntley Self Storage, 11200 Kiley Drive
Director of Development Services Charles Nordman reviewed a Power Point presentation and reported
that on September 28, 2017, the Village Board approved the site plan and Special Use Permit for the
±3.78-acre PSS Huntley Self Storage development located at the northwest corner of Ruth Road and
Kiley Drive. At the time of review, the developer/operator did not have the complete sign package for
the self-storage facility; however, they did submit a ground sign design which met the Sign Standards.
The petitioner recently submitted the sign plan which includes five (5) wall signs and one ground sign.
07.25.19VB Meeting 6
All but one of the signs (west side tower) have already been installed, without sign permits. The sign
ordinance allows one ground sign and one wall sign. The petitioner is requesting relief for the four
additional wall signs. The ribbon cutting ceremony for PSS Huntley Self Storage is scheduled for July
30th.
The petitioner’s attorney, Eric J. Miller Law Group, submitted a letter (see exhibit) explaining the mix-
up on installing the signs without a permit, their reasoning for the signage, and their formal request for
approval by the Village Board. In addition, the petitioner stated they would be willing to remove the
wall signage on the east and west elevations (upon request by the Village Board) after the development
of the lots to the east and west of the site.
Staff Analysis
The wall signage includes three LED illuminated “SELF STORAGE” signs constructed of red channel
letters, flush-mounted to the east, south, and west facades of the tower portion of the building A. Each
illuminated sign measures 17.76’ by 1.83’ (32.5 square feet). Two additional non-illuminated “BOXES
& MOVING SUPPLIES” wall signs are proposed for the single-story facades facing east on Building A
and west on Building C. The signs are constructed of 12” formed plastic red letters and are stud
mounted into the brick. The non-illuminated signs each measure 24.14’ by 1.05’ (25.34 square feet).
Sign-type # Signs # Signs Sign Face SF Total Total Allowed
Proposed Allowed Signage SF SF
Illuminated Wall Sign, “Self 3 32.50 SF ea. 97.50 SF
Storage”
Non-Illuminated Wall Sign, 2 25.34 SF ea. 50.68 SF
“Boxes & Moving Supplies”
Total Wall Signs 5 1 148.18 SF 195.00 SF
Ground Sign 1 1 32.00 SF 32.00 SF 80.00 SF
The Sign Ordinance allows for one wall sign, with the total square footage not to exceed one square foot
for each lineal foot of the building’s frontage (195 square feet). The total square footage for the five
wall signs measure 148.18 square feet and meets the Code requirements. Relief from the Village Board
will be required to allow for the four additional wall signs.
The petitioner also constructed a 6’-10’’ tall double-sided ground sign, located along Kiley Drive. The
monument sign was reviewed by the Village Board as part of the Special Use permit when the project
was approved in 2017. At that time, the sign plan showed the finished height of the sign (with base and
cap) at 6-feet. The installed monument sign is 10-inches taller, but does meet all Sign Code
requirements. The sign face measures 4.0 feet in height and 8.0 feet in width (32 square feet), which is
less than the 80 square feet allowed by Code. The sign base is brick which matches the building, and is
wrapped with decorative 18-inch stone columns, and a limestone cap. The required landscaping has also
been installed at the base of the monument sign. The monument does not require relief.
Staff recommends the following conditions be applied should the Village Board approve the relief for
five wall signs:
1) No sign permits are approved as part of this submittal. Sign permits must be applied for with the
Development Services Department.
07.25.19VB Meeting 7
2) The petitioner shall be required to pay all penalties and fees as required by Section 150.40,
Chapter 150, Building Regulations, of the Village Code of Ordinances for installing signs
without a permit.
3) After development of the lots to the east and west, the Village Board has the right to require the
petitioner to remove any or all wall signage on the east and west elevations.
Director Nordman reported that representatives from the petition were in attendance to answer
questions.
Mayor Sass asked if the Village Board had any comments or questions; there were none.
A MOTION was made to approve an Ordinance Approving Relief for Five Wall Signs for PSS
Huntley Self Storage.
MOTION: Trustee Piwko
SECOND: Trustee Hoeft
AYES: Trustees: Goldman, Hoeft, Kanakaris, Leopold, Piwko and Westberg
NAYS: None
ABSENT: None
The motion carried: 6-0-0
f) Consideration – An Ordinance Approving a Final Planned Unit Development for a
±3,261 Square Foot Building, including any necessary relief, and a Special Use Permit
for Automobile Repair (Minor) for Jiffy Lube, on Outlot 3 of Huntley Grove Commercial
Subdivision
Director of Development Services Charles Nordman reviewed a Power Point presentation and reported
that Guggenheim Development is proposing to construct a 3,261 square foot Jiffy Lube with five service
bays on Outlot 3 (1.01 acres) of Huntley Grove, immediately east of Auto Zone. The development also
includes a 1,093 square foot basement, bringing the total building floor area to 4,354 square feet. The
parcel is zoned “B-3 (PUD)” Shopping Center Business – Planned Unit Development.
The Annexation Agreement approved in 2007 for the subject property established the Preliminary
Planned Unit Development and framework for the development of the Huntley Grove Commercial
Subdivision stipulating that the Plan Commission and Village Board is to review and approve the Final
Planned Unit Development plan for each Lot/Outlot. The Village’s Commercial Design Guidelines,
which is an exhibit to the Annexation Agreement, provide further standards for development throughout
the commercial subdivision.
Staff Analysis
Site Plan
As proposed, the site plan is in adherence to the building and parking setback requirements, including
the proposed 50.5-foot front building setback, and the 26-foot front parking setback from Kreutzer
Road. The proposed plan utilizes a shared driveway entrance (with Auto Zone) at the southwest corner
of the site, and facilitates two-way traffic along the west side. The west side of the building serves as
the main parking lot and the entrance for vehicles to enter the service bays. After servicing, the vehicles
will leave the building through the east bay doors, and will drive south back to the shared access point.
07.25.19VB Meeting 8
The site plan includes 14 parking spaces, including two required ADA stalls. The covenants for Huntley
Grove dictate 4 spaces per 1,000 square feet of building area, thereby requiring fourteen (14) parking
spaces. Furthermore, the proposed 10’ x 19’ parking stalls meet the new parking requirements.
Building Elevations
The building will be primarily constructed of egret white face brick, a brown stone veneer wainscot,
bronze anodized aluminum garage doors, and bronze aluminum awnings. As required by the Huntley
Grove PUD, the front (facing Kreutzer Road) includes enhanced architectural elements, including stone
veneer accent columns, decorative accent windows and awnings. The parapet wall is designed to fully
screen all mechanicals. In accordance with the Commercial Design Guidelines, the dumpster enclosure
is constructed of brick materials to match the Jiffy Lube building façade, and includes ribbed steel gates.
Landscaping Plan
The proposed site plan depicts foundation landscaping and plantings within the parking lot islands and
bump-outs as required by the Village’s Commercial Design Guidelines. Sixteen trees are included in the
landscape plan, including eight skyline thornless honey locust, four common hackberry, three Krichspire
littleleaf linden, and one autumn brilliance serviceberry. The proposed landscaping at the base of the
monument sign is in conformance with the Sign Regulation requirements.
Lighting
Parking lot lighting proposed for the site utilizes the Steinberg 1230 Prairie Series fixtures. This
matches the light fixtures installed within the other developed lots in Huntley Grove. The lighting
fixtures will be required to provide the requisite 2.0 foot-candle average for the parking area and the 0.5
foot-candle maximum at the property line.
Signage
The site plan delineates a monument sign at the northwest corner of the site. The sixteen square foot (16
SF) illuminated “Jiffy Lube Multicare” sign face measures 4’ x 4’ and will be wrapped with egret white
face brick and a stone cap and will match the materials utilized on the building. When built, the entire
monument structure will measure 36 square feet (6’ x 6’).
The proposed wall signage includes nine wall mounted signs including four illuminated “Jiffy Lube”
logo signs on the front (north), rear (south), and side (east) and main entrance (west) side. The
remaining five are flat fascia panel signs, including one sign on the east side above the exit for the
service bays, and four signs listing services (i.e., oil changes, brakes) above the service bay doors on the
west side of the building. In accordance with the Sign Regulations, the building would be permitted one
wall sign; therefore, relief will be required to allow eight additional wall signs. The Plan Commission
recommended upgrading the sign package on the south elevation to include “Jiffy Lube” as the original
submittal only included the “J” logo. This was added as a condition, and the petitioner did upgrade the
sign plan as recommended.
Required Relief
The plans, as presented, require the following relief from Zoning Ordinance requirements:
Signage
1. In accordance with the Sign Regulations, the building is allowed one wall sign; therefore, relief
will be required to allow eight additional wall signs.
07.25.19VB Meeting 9
Village Board Conceptual Review
The Village Board reviewed conceptual plans for the project on June 27, 2019. Questions predominantly
focused on the dumpster location.
Plan Commission Recommendation
The Plan Commission reviewed the petitioner’s request on July 8, 2019, and, with no members of the
public offering comments in favor or opposition to the request, recommended approval of the petition by
a vote of 6 to 0, subject to the following conditions:
1. All public improvements and site development must occur in full compliance with the submitted
plans and all other applicable Village Municipal Services (Engineering, Public Works, Planning
and Building) site design standards, practices and permit requirements.
2. The petitioners will comply with all final engineering revisions to be approved by the Village
Engineer and Development Services Department.
3. The petitioner is required to meet all development requirements of the Huntley Fire Protection
District.
4. The petitioner shall obtain final landscape approval of the Landscape Plan from the Development
Services Department.
5. All permanent and seasonal plantings must be replaced immediately upon decline.
6. The lighting fixtures will be required to provide the minimum 2.0 foot-candle average for the
parking area and the 0.5 foot-candle maximum at the property line.
7. No building plans or permits are approved as part of the submittal.
8. No sign permits are approved as part of the submittal.
Condition added by the Plan Commission:
9. The Petitioner shall upgrade the signage on the south elevation to include “Jiffy Lube” in
addition to the already proposed “J” logo. The petitioner has revised the south elevation to
address this condition.
Strategic Plan Priority
The 2016-2020 Strategic Plan identifies “Promote New Business Development, Retention, and
Expansion” as a Strategic Priority, “Attract and Retain Businesses to Enhance Tax Base and Create New
Jobs” as a goal, and “Work with commercial property owners to attract additional restaurants and
shopping opportunities” as an objective.
Director Nordman reported that a representative from the petition was in attendance to answer questions.
Mayor Sass asked if the Village Board had any comments or questions.
Trustee Kanakaris asked if the driveway on the north side was one way; Director Nordman stated that it
was one-way.
There were no other comments or questions.
A MOTION was made to approve an Ordinance for a Final Planned Unit Development for a
±3,261 Square Foot Building, including any necessary relief, and a Special Use Permit for
Automobile Repair (Minor) for Jiffy Lube, on Outlot 3 of Huntley Grove Commercial
Subdivision.
MOTION: Trustee Leopold
07.25.19VB Meeting 10
SECOND: Trustee Hoeft
AYES: Trustees: Goldman, Hoeft, Kanakaris, Leopold, Piwko and Westberg
NAYS: None
ABSENT: None
The motion carried: 6-0-0
g) Consideration – An Ordinance Approving a (i) a Special Use Permit for a Thorntons
Gasoline Station; (ii) a Special Use Permit for a Car Wash; (iii) Preliminary and Final
Plat of Subdivision; and (iv) Site Plan Review for ±6.45-Acres Generally Located at the
Northwest Comer of Route 47 and Kreutzer Road
Director of Development Services Charles Nordman reviewed a Power Point presentation and reported
that Thorntons has submitted plans for a proposed ±4,515 square foot convenience store/gasoline station
at the northwest corner Route 47 and Kreutzer Road. The site includes ten (10) fueling dispensers which
provide twenty (20) fueling positions for vehicles. Additionally, a ±5,000 square foot car wash is
proposed to the north of the Thorntons. The proposed 6.45-acre site includes area for stormwater
detention and compensatory storage for the modified floodplain.
Staff Analysis
The site is zoned C-2 Regional Retail and is subject to the Regency Square Development Guidelines.
Site Plan Review
The Thorntons site plan proposes a ±4,515 square foot convenience store with parking for 40 vehicles,
which exceeds the required 19 parking spaces. The site plan also includes parking stalls that are 10 feet
in width and up to 20 feet in depth, which exceeds the minimum required dimensions. The width of the
parking lot drive aisle is also greater than required and will measure at least 28 feet in width. The
building’s main entrance will be oriented toward Route 47 and a secondary entrance to the convenience
store will be provided along the rear elevation of the building. Pedestrian connections will be provided
from the Thorntons site to the existing multi-use paths on both Route 47 and Kreutzer Road and a
bicycle rack is provided at the southwest corner of the building. A proposed outdoor sales pavilion for
propane and ice is proposed along the south elevation. The proposed trash enclosure for Thorntons will
be located at the northwest corner of the site so as not to be easily visible from Route 47 or Kreutzer
Road.
The proposed car wash would consist of a ±5,000 square foot building with parking/vacuums for
eighteen (18) vehicles along the north elevation of the building. Stacking for the car wash will be
provided in three (3) lanes that can accommodate stacking for approximately 27 vehicles prior to the pay
canopy. The trash enclosure for the car wash is located northwest of the building, away from Route 47.
In conjunction with the development of the site, the Village’s Subdivision Ordinance requires the burial
of overhead utility lines across the Route 47 frontage of the property. The overhead utility lines across
the frontage of the southern portion of Regency Square were previously buried with the original
development.
Site Access
Access to the two sites would be provided by a right-in/right-out on Route 47, a right-in on Kreutzer
Road, and a full access at the intersection of Kreutzer Road and Princeton Drive. Right turn lanes will
also be added on both Route 47 and Kreutzer Road for each of the access points. A left turn lane will
be created at the intersection of Kreutzer Road and Princeton Drive for vehicles traveling east on
Kreutzer Road. A traffic impact study was prepared by the petitioner, and reviewed by the Village’s
07.25.19VB Meeting 11
traffic consultant, to ensure the proposed access points are properly located and adequate to
accommodate anticipated traffic. The Illinois Department of Transportation (IDOT) has reviewed the
plans and has provided conceptual approval of the access and road improvements.
Stormwater/Floodplain
In order to develop the site, a modification to the existing floodplain is required. The modification of
the floodplain by filling the area requires a Conditional Letter of Map Revision based on Fill (CLOMR-
F) to be issued by FEMA. The developer’s engineer has started the process of receiving this
authorization from FEMA. Additionally, in order to be in compliance with the regulations, the
development provides for compensatory storage to offset the displacement of the storage within the
floodplain. This additional volume would be constructed at a ratio of 1.5 to 1 and is in addition to the
stormwater detention volume that is required for the development of the site improvements. The total
compensatory storage volume required is 1.56 acre-feet. The proposed development will construct 2.23
acre-feet of storage, which results in a surplus of 0.67 acre-feet. The remaining stormwater management
is in compliance with the Stormwater Ordinance.
Building Elevations
The proposed elevations for the Thorntons include the use of brick as the primary material and stacked
stone at the base of the building. The main entrance to the store would be surrounded with a red raised
parapet and aluminum canopy. A red awning with gooseneck light fixtures above would be located over
the storefront window to the south of the main entrance. The gooseneck light fixtures would also be
located on the north, south and west building elevations. The rear of the building (west elevation) would
also include a secondary entrance to the convenience store with a red panel accent similar to that used on
the main entrance. The south elevation (facing Kreutzer Road) would have a faux window with an
aluminum trellis canopy above. Roof-top mechanical equipment would be screened by the height of the
building’s parapet wall. The Thorntons canopy used to cover the gas pumps will have columns to match
the building and bronze panel and red coping on the canopy roof.
The proposed elevations for the car wash would also utilize brick as the primary material and stacked
stone at the base of the building and for vertical columns, although the color of the brick would differ
slightly from that used on the Thorntons building. The front of the car wash building would include a
red standing seam aluminum roof and red aluminum canopies above each of the windows along the
north elevation adjacent to the vacuums.
Both Thorntons and the car wash would have trash enclosures that are constructed of materials to match
each building and each would have metal gates in accordance with the Village’s Commercial Design
Guidelines.
Landscaping
The proposed landscape plan provides landscaping in accordance with ordinance requirements. The
frontage of Route 47 and Kreutzer Road will include the use of Hedge Maples, Sugar Maples, and
Autumn Blaze Maples and ‘Autumn Brilliance’ Serviceberry and Glenleven Littleleaf Linden trees.
Trees are also provided internally to the site and along the perimeter of the stormwater management
area. Landscaping has also been provided around the ground signs in accordance with the ordinance.
Staff notes, the four existing trees located along the Route 47 frontage of the site would be removed to
accommodate site work.
Lighting
07.25.19VB Meeting 12
Parking lot lighting on both the Thorntons and car wash site will utilize the CreeEdge Series LED style
fixtures mounted on 20-foot tall poles. Additional site lighting will be provided by under mounted
canopy lights and wall fixtures on both buildings. The proposed light levels within the parking areas
meet the minimum 2-footcandle average and do not exceed allowable light levels at the lot lines.
Signage
The proposed Thorntons sign plan includes six (6) wall signs stating “Thorntons.” One wall sign would
be located over the building’s front entrance, one on the south elevation (facing Kreutzer Road), one on
the west (rear) elevation and three would be located on the fueling canopy (north, east, and south sides
of the canopy). The proposed signage for the car wash includes two (2) wall signs which state “$3.00
Car Wash.” Both signs would measure 3’-4” by 22’-0” (73 sq. ft)
Proposed ground signs are located at the Route 47 right-in/right-out access and near the right-in access
along Kreutzer Road. Both would be constructed of stacked stone to match the Thorntons building. The
ground signs will advertise both Thorntons and the car wash and would stand 10’-3” in height, which is
comparable to the height of other ground signs within Regency Square. One directional sign, three (3)
feet in height, is proposed at the Kreutzer Road/Princeton Drive intersection entrance. This sign will
include a stacked stone base to match the other ground signs.
Required Relief
The plans, as presented, shall require the following relief from Zoning Ordinance requirements:
1. The number of wall signs requires relief from the Sign Regulations, which allow one wall sign
per street frontage. The Thorntons site has frontage on Route 47 and Kreutzer Road, thus
allowing two (2) signs. Relief would be required for four (4) additional signs for Thorntons.
The car wash site has frontage on only Route 47, therefore only one (1) wall sign is allowed.
The car wash will require relief to allow one (1) additional wall sign.
Preliminary/Final Plat of Subdivision
A Preliminary/Final Plat of Subdivision is required to create the lots necessary for the proposed gasoline
station and car wash. The proposed two (2) lot subdivision will create a ±3.13-acre lot for Thorntons
and a ±3.32-acre lot for the car wash. The two lots will share stormwater management by establishment
of an easement which is reflected on the plat. The two lots will also share access to Route 47 and
Kreutzer Road. The Declaration of Easements, Covenants, Conditions and Restrictions (CCRs) for
Manke’s Subdivision provides for the reciprocal easements necessary for access as well as the shared
detention pond, utilities, and ground signs. A copy of the CCRs is provided as an attachment to this
report.
The Regency Square Development Guidelines require a minimum lot area of 0.6 acres and lot width of
135 feet for a gasoline station or car wash. Both proposed lots exceed the minimum lot area and width
required by the Guidelines.
Village Board Conceptual Review
The Village Board reviewed conceptual plans for the project on October 25, 2018, and requested the
petitioner to make improvements to the overall building elevations. Since that time, the petitioner has
added the following features to the building elevations:
• A rear entrance was added to Thorntons.
07.25.19VB Meeting 13
• A faux window and canopy were added to the south elevation (facing Kreutzer Road). Faux
windows were also added to the west and north building elevations at the recommendation of the
Plan Commission.
• The height of the parapet wall was increased to fully screen the roof-top equipment.
• Gooseneck light fixtures were added to all elevations of Thorntons.
• A red awning was added above the window to the south of the main entrance.
• Wall signage was added to the west (rear) and south (facing Kreutzer Road) elevations of the
Thorntons building.
• The CMU block was removed from the car wash elevations and replaced with Harvard brick.
Plan Commission Recommendation
The Plan Commission reviewed the petitioner’s request on June 24, 2019, and, with no members of the
public offering comments in favor or opposition to the request, recommended approval of the petition by
a vote of 5 to 0, subject to the following conditions:
1. All public improvements and site development must occur in full compliance with the
submitted plans and all other applicable Village Municipal Services (Engineering, Public
Works, Planning and Building) site design standards, practices and permit requirements.
2. The petitioners will comply with all final engineering revisions to be approved by the Village
Engineer and Development Services Department.
3. The petitioner shall be required to obtain Illinois Department Transportation (IDOT)
approval prior to the issuance of a building permit.
4. The petitioner shall not begin site work until a Conditional Letter of Map Revision based on
Fill (CLOMR-F) is issued by FEMA.
5. The burial of the existing overhead utilities shall be completed prior to the issuance of a
certificate of occupancy for Thorntons or the car wash, whichever occurs first.
6. The petitioner shall obtain final landscape approval of the Landscape Plan from the
Development Services Department.
7. The Techny Arborvitae shall be replaced with a different species of shrub.
8. All permanent and seasonal plantings must be replaced immediately upon decline.
9. The petitioner is required to meet all development requirements of the Huntley Fire
Protection District.
10. In accordance with Section 155.221 of the Subdivision Ordinance, the Final Plat of
Subdivision shall be recorded with McHenry County within three (3) months of approval by
the Village Board. No building plans or permits are approved as part of the submittal. (Due
to the requirement of approvals from FEMA and IDOT, it is likely that the petitioner will
require additional time to record the plat and to commence construction. Therefore, it is
recommended that the timeframe for recording the plat and commencing the special uses be
extended to December 31, 2020.)
11. No building plans or permits are approved as part of the submittal.
12. No sign permits are approved as part of the submittal.
Condition added by the Plan Commission:
13. An additional wall sign may be added to the west elevation of the car wash, if desired by the
owner.
07.25.19VB Meeting 14
14. The petitioner will work with staff to add faux windows to the north and west building
elevations. The petitioner has revised the building elevations to add the windows to the north
and west building elevations.
Additional Condition:
15. The petitioner shall add directional signage at the egress point on Route 47 to direct
southbound traffic to Route 47.
Strategic Plan Priority
The 2016-2020 Strategic Plan identifies “Promote New Business Development, Retention, and
Expansion” as a Strategic Priority, “Attract and Retain Businesses to Enhance Tax Base and Create New
Jobs” as a goal.
Director Nordman reported that representatives of the petition were in attendance to answer questions.
Mayor Sass asked if the Village Board had any comments or questions.
Trustee Goldman stated that she was concerned about the route into the car wash from Kreutzer Road.
Director Nordman stated that there is an additional right turn lane into the property.
Trustee Piwko asked if there was a designated right turn into the property from southbound Route 47;
Director Nordman stated that there was also an additional right turn lane from southbound Route 47.
Trustee Leopold asked about the objection to the use of Arborvitae; Village Manager Johnson stated that
Arborvitae have been difficult to establish in some recent development.
There were no other comments or questions.
A MOTION was made to approve an Ordinance approving a (i) a Special Use Permit for a
Thorntons Gasoline Station; (ii) a Special Use Permit for a Car Wash; (iii) Preliminary and Final
Plat of Subdivision; and (iv) Site Plan Review, including any necessary relief.
MOTION: Trustee Kanakaris
SECOND: Trustee Hoeft
AYES: Trustees: Goldman, Hoeft, Kanakaris, Leopold, Piwko and Westberg
NAYS: None
ABSENT: None
The motion carried: 6-0-0
h) Consideration – A Resolution Authorizing the Purchase of a Polymer Blending System
for the East Wastewater Treatment Plant from Drydon Equipment in the amount of
$25,000 and Waiving Competitive Bidding
Director of Public Works and Engineering Timothy Farrell reported that a polymer blending system is
used in a wastewater treatment plant to feed a blend of polymer and water-to-waste activated sludge
prior to thickening and dewatering process equipment. The polymer blend improves waste sludge
thickening and dewatering process performance by coagulating solids and improving dry solids content.
The East Wastewater Treatment Plant existing polymer blending system is nearly twenty years old and
has reached the end of its useful life. Advancements in polymer blending technology have produced
more reliable and efficient systems.
07.25.19VB Meeting 15
Staff Analysis
The Village chose the VeloBlend polymer blending system for the recent upgrade at the West
Wastewater Plant. After working with this particular system for the past year, Village plant operators
observed several process improvements. The new blending system significantly increases the efficiency
of the polymer. Ultimately, this will translate into decreased chemical use, reducing sludge volume for
storage and disposal and lower operating costs. For instance, VeloBlend states the unit can reduce
polymer usage up to 30% depending on plant conditions. Using 2018 polymer purchase costs for the
East Wastewater Plant, the potential chemical cost savings could be up to $4,800 per year.
Drydon Equipment, Inc. is the manufacturer’s representative and therefore the sole vendor for this
product. Village staff will remove the existing polymer blending system and install the new piping and
equipment.
Financial Impact
The FY19 budget includes $25,000 in the Wastewater Equipment Fund 525-00-00-8124 for this item.
Mayor Sass asked if the Village Board had any comments or questions; there were none.
A MOTION was made to approve a Resolution Authorizing the Purchase of a Polymer Blending
System for the East Wastewater Treatment Plant from Drydon Equipment in the Amount of
$25,000 and Waiving Competitive Bidding.
MOTION: Trustee Leopold
SECOND: Trustee Westberg
AYES: Trustees: Goldman, Hoeft, Kanakaris, Leopold, Piwko and Westberg
NAYS: None
ABSENT: None
The motion carried: 6-0-0
i) Consideration – Approval of Payout Request No. 1 to Globe Construction, Inc. for the
2019 Curb & Sidewalk Replacement Program in the amount of $73,935.42
Director of Public Works and Engineering Timothy Farrell reported that on March 15, 2018 the Village
of Cary received bids from six contractors for the Municipal Partnering Initiative (MPI) Curb &
Sidewalk Replacement Program. The MPI is a municipality-based buying initiative where communities
join forces to procure a wide range of public services in an effort to tap economies of scale. The Village
of Cary was the lead MPI community for this project and prepared the necessary contract bid
documents. The other three participating communities included the Village of Huntley, the City of
Woodstock, and the Village of Fox River Grove. The bid included contract extensions for 2019 and
2020.
On March 28, 2019, the Village Board approved a resolution awarding a contract extension to Globe
Construction, Inc. for curb & sidewalk replacement and saw cutting in the target areas.
Globe Construction, Inc. has submitted the first payout request for the Curb & Sidewalk Replacement
project. Village staff has reviewed the request and all is in order for approval of the payout request No.
1.
Staff Analysis
07.25.19VB Meeting 16
Pay Request Total Previous Amount
Retainage
Completed Work Payments Requested
#1 $73,935.42 $0.00 $0.00 $73,935.42
Financial Impact
The FY19 Budget includes $75,000 in the Streets Improvement and Roads & Bridges Fund, line item
420-00-00-8001 for the Sidewalk Replacement Program.
Mayor Sass asked if the Village Board had any comments or questions.
Trustee Leopold asked if the repair of the landscaping had been completed; Director Farrell reported that
it was completed.
There were no other comments or questions.
A MOTION was made to approve Payout Request No. 1 to Globe Construction, Inc. in the
amount of $73,935.42 for the work completed under the Curb & Sidewalk Replacement project.
MOTION: Trustee Kanakaris
SECOND: Trustee Leopold
AYES: Trustees: Goldman, Hoeft, Kanakaris, Leopold, Piwko and Westberg
NAYS: None
ABSENT: None
The motion carried: 6-0-0
j) Consideration – Approval of Payout Request No. 2 to Geske & Sons, Inc. for the 2019
MFT Street Program in the amount of $424,958.16
Director of Public Works and Engineering Timothy Farrell reported that on February 28, 2019, the
Village Board approved a resolution appropriating $985,000.00 in Motor Fuel Tax Funds for
Maintenance of Streets and Highways for the 2019 Street Improvement Program and a Resolution
Authorizing a Bid Award and Construction Contract to Geske & Sons, Inc. in the amount of
$1,538,779.75 for the resurfacing of Georgian Place Subdivision for a total length of 18,960 ft. (3.6
miles). On June 27, 2019, the Village Board approved a Change Order in the amount of $26,900 to
complete Potomac Court modifications, bringing the awarded contract amount to $1,565,679.75.
Geske & Sons, Inc. has submitted the second payout request for the 2019 MFT Street Program. The
Village’s project engineer, CBBEL, has reviewed the request and all is in order for approval of payout
request No. 2.
Staff Analysis
Total Previous Amount
Pay Request Retention
Completed Work Payments Requested
#1 $285,589.15 $28,558.91 (10%) $0.00 $257,030.24
#2 $757,764.88 $75,776.48 (10%) $257,030.24 $424,958.16
Financial Impact
The FY19 Budget includes funding for the 2019 program in the amount of $915,000.00 for engineering
07.25.19VB Meeting 17
and partial construction costs from the Streets Improvements and Roads & Bridges Fund, 420-00-00-
8000 and $985,000.00 for construction costs from the MFT Fund, 460-00-00-8001. The full amount of
the MFT appropriation will be used for construction. Any unexpended budget funds will remain in the
Streets Improvements and Roads & Bridges Fund.
Mayor Sass asked if the Village Board had any comments or questions; there were none.
A MOTION was made to approve Payout Request No. 2 to Geske & Sons, Inc. in the amount of
$424,958.16 for the work completed under the 2019 Street Improvement Program.
MOTION: Trustee Kanakaris
SECOND: Trustee Goldman
AYES: Trustees: Goldman, Hoeft, Kanakaris, Leopold, Piwko and Westberg
NAYS: None
ABSENT: None
The motion carried: 6-0-0
k) Consideration – A Resolution Appointing Thomas R. Burney, Attorney at Law, as
Special Legal Counsel in the Matter of Huntley Investment Partners, LLC v. the Village
of Huntley and Authorizing the Village Manager to Execute a Fee Agreement
Village Manager David Johnson reported that Huntley Investment Partners, LLC (“HIP”), owner of
the former Huntley Outlet Center, has filed suit against the Village as a result of the failure of HIP’s
development application to be approved by the Village on April 11, 2019.
Staff Analysis
Per Village Board direction, a resolution is being presented to appoint Thomas R. Burney, Attorney
at Law, as Special Legal Counsel in the Matter of Huntley Investment Partners, LLC v. the Village
of Huntley and authorizing the Village Manager to execute a fee agreement.
Mayor Sass asked if the Village Board had any comments or questions; there were none.
A MOTION was made to approve a Resolution Appointing Thomas R. Burney, Attorney at
Law, as Special Legal Counsel in the Matter of Huntley Investment Partners, LLC v. the
Village of Huntley and Authorizing the Village Manager to Execute a Fee Agreement.
MOTION: Trustee Leopold
SECOND: Trustee Piwko
AYES: Trustees: Goldman, Hoeft, Kanakaris, Leopold, Piwko and Westberg
NAYS: None
ABSENT: None
The motion carried: 6-0-0
VILLAGE ATTORNEY’S REPORT: None
VILLAGE MANAGER’S REPORT:
Trustee Leopold asked about the work status in Sun City N6; Director Farrell reported that currently
concrete work is being completed.
Trustee Kanakaris asked about a possible Craft Beer / Cocktail business and asked if it included gaming.
07.25.19VB Meeting 18
Village Manager Johnson stated that it would be a tasting room only.
VILLAGE PRESIDENT’S REPORT:
Mayor Sass wished Trustee Kanakaris a happy birthday.
UNFINISHED BUSINESS: None
NEW BUSINESS: None
EXECUTIVE SESSION: None
POSSIBLE ACTION ON ANY CLOSED SESSION ITEM: None
ADJOURNMENT:
There being no further items to discuss, a MOTION was made to adjourn the meeting at 8:21 p.m.
MOTION: Trustee Piwko
SECOND: Trustee Leopold
The Voice Vote noted all ayes and the motion carried.
Respectfully submitted,
Barbara Read
Recording Secretary
07.25.19VB Meeting 19
Get email alerts for Huntley
A daily email when new agendas and minutes are posted.