Village Board
Regular MeetingHuntley, IL · February 9, 2023
Minutes
VILLAGE BOARD MEETING MINUTES
February 9, 2023
VILLAGE OF HUNTLEY
CALL TO ORDER:
A meeting of the Village Board of the Village of Huntley was called to order on Thursday, February 9,
2023 at 7:00 p.m. in the Municipal Complex, Village Board Room, 10987 Main St., Huntley, Illinois
60142.
ATTENDANCE:
PRESENT: Mayor Timothy Hoeft; Trustees: Ronda Goldman, Mary Holzkopf, Niko Kanakaris, Curt
Kittel, Harry Leopold, and JR Westberg.
ABSENT: None
IN ATTENDANCE: Village Manager David Johnson, Director of Public Works and Engineering Tim
Farrell, Management Assistant Barbara Read, and Village Attorney Betsy Gates-Alford.
PLEDGE OF ALLEGIANCE: Mayor Hoeft led the Pledge of Allegiance.
SPECIAL PRESENTATIONS:
a) McHenry County Conservation Foundation Presentation
McHenry County Conservation Foundation (Foundation) Executive Director Shawna Flavel and Board
Member Martie Gorman made a brief presentation describing the mission and functions of the
Foundation. Director Flavel stated that the Foundation was established in 1999 and is a partner of
the McHenry County Conservation District (MCCD). She stated that throughout this partnership, they
are able to support and improve various properties throughout McHenry County that are utilized daily
by the residents of McHenry County and pointed out the need for financial assistance to maintain
these properties to keep them updated and safe for the users. Director Flavel said that a primary
focus and mission of the Foundation is to raise awareness and to increase support of the Foundation
and MCCD by not only financial donations but also by making people aware of these amazing
properties and encouraging users to get outside and walk the paths, enjoy the wildlife and beautiful
landscaping. Director Flavel and Board Member Gorman thanked Mayor Hoeft and the Village Board
for their interest.
b) Proclamation: Random Acts of Kindness Week, February 12-18, 2023
Mayor Hoeft read the following proclamation for Random Acts of Kindness Week, February 12 – 18,
2023.
WHEREAS, the Village of Huntley recognizes the value of acts of kindness that are performed
without prompting or reason and how these acts can positively impact the person offering kindness,
the person receiving the act of kindness, and those witnessing acts of kindness; and
WHEREAS, acts of kindness can be performed by any person in Huntley regardless of age,
origin, education, gender, religious beliefs, lifestyle, or abilities for the good around them; and
WHEREAS, kind individuals can create a more caring community and help to perpetuate
genuine acts of kindness within their city, state, and even throughout the world; and
February 9, 2023 Village Board Meeting 1
WHEREAS, we seek to cultivate thoughtful and compassionate residents by teaching our youth
to make a difference through random acts of kindness; and
WHEREAS, Random Acts of Kindness Week is recognized as an international celebration
intended to encourage all of us to practice acts of kindness in our homes, schools, businesses, and
communities.
NOW, THEREFORE, BE IT PROCLAIMED, I, Mayor Timothy J. Hoeft, on behalf of the Village of
Huntley Board of Trustees, do hereby proclaim February 12-18, 2023, as RANDOM ACTS OF KINDNESS
WEEK in the Village of Huntley, and urge all citizens to participate in spreading random acts of
kindness during this week and daily in the future. Dated this 9th day of February 2023.
PUBLIC COMMENTS: None
CONSENT AGENDA:
All items listed under Consent Agenda are considered to be routine by the Village Board and may be
approved and/or accepted by one motion with a Roll Call Vote. If further discussion is needed, any
member of the Board may request that an item be moved off of the Consent Agenda to Items for
Discussion and Consideration.
a) Consideration – Approval of the January 12, 2023 Village Board and January 26, 2023
Village Board Meeting Minutes
b) Consideration – Approval of the February 9, 2023 Bill List in the Amount of $391,785.19
Mayor Hoeft asked if the Village Board had any changes to the Consent Agenda; there were none.
A MOTION was made to approve the February 9, 2023 Consent Agenda.
MOTION: Trustee Leopold
SECOND: Trustee Kanakaris
AYES: Trustees: Goldman, Holzkopf, Kanakaris, Kittel, Leopold, and Westberg
NAYS: None
ABSENT: None
The motion carried: 6-0-0
ITEMS FOR DISCUSSION AND CONSIDERATION:
a) Consideration – Resolution Approving the Residential Parkway Tree Replacement Program for
a Onetime Cost to a Participating Resident of $100 per Parkway Tree
Director of Public Works and Engineering Tim Farrell stated that in 2009, Village staff surveyed the
residential parkway trees to identify Ash trees that were impacted by the Emerald Ash Borer (EAB)
disease. During the same year, the Residential Parkway Tree Replacement Program, providing the
resident the opportunity to replace the impacted parkway tree for a flat fee paid to the Village of
approximately $150 per tree. The Village removed the EAB trees with Public Works staff and managed
the contract with a landscape contractor selected through a formal bidding process year over year up
until 2018 when the trees impacted by EAB were mostly eradicated. There are currently 79 ash trees
left in the Village, with 71 recommended for treatment and eight for removal based on the tree
inventory conducted in early 2022.
February 9, 2023 Village Board Meeting 2
In 2019, the Residential Parkway Tree Replacement Program ended and the Residential Parkway Tree
Reimbursement Program is the only program offered at this time where the Village reimburses the
resident based on caliper size of the tree and up to a maximum amount. Residents are responsible
for hiring their own preferred contactor to plant and warranty the tree. Based on the 2022 program
applications and the current standard reimbursement amount identified below, residents paid on
average $540 per tree after reimbursement.
STAFF ANALYSIS
There are approximately 17,000 parkway trees in the Village and approximately 3,100 vacant
locations where trees can potentially be planted. There are also 134 trees (includes Ash Trees) that
were identified during the tree inventory that require removal, which will be done by Public Works.
Since the end of the EAB initiated Residential Parkway Tree Replacement Program in 2019, the Village
has seen a drastic drop in participation in the current Residential Parkway Tree Reimbursement
Program. In 2022, there were only nine applications, the lowest since the program began.
To encourage more participation and continue the beneficial expansion of the tree canopy, staff is
proposing to revise the Residential Parkway Tree Replacement Program for a onetime cost to a
participating resident of $100 per parkway tree. This would include staff managing the contract with
a landscape contractor who will provide a specific size and species of tree, planting, mulching and
warranty for one year. Trees will be purchased and planted in bulk quantities of 20 to better control
the cost and efficiency of the program.
Healthy and thriving parkway trees, as determined by the Village, will not be permitted for removal
unless authorized by the Village and therefore, will not be considered in this program.
Staff has received quotes from one local landscape contractor, one tree nursery and reviewed receipts
from the 2022 Residential Parkway Tree Reimbursement Program to understand better the current
market for purchasing trees. The Village has budgeted $6,000 dollars over the last few years and now
has $50,000 allocated in the FY23 budget in anticipation of the increased participation. This will allow
for approximately 200 2”- 2.5” caliper parkway trees per year.
2022-2025 STRATEGIC PLAN ALIGNMENT
The Strategic Plan identifies “Healthy, Safe, and Attractive Community” as a strategic focus and the
following goal: “Attractive Community.” Increased participation from the residents will produce a
more robust tree canopy with many other valuable benefits such as: cleanses pollutants from the air,
absorbs carbon dioxide, produces oxygen, controls soil erosion, helps reduce ambient noise, and
certainly beautification and economic value of the community.
February 9, 2023 Village Board Meeting 3
FINANCIAL IMPACT
The FY23 Budget includes funding in the Streets Improvement and Roads & Bridges Fund, line item
420-00-00-8000 for the Tree Replacement Program.
Mayor Hoeft asked if there were any questions. There were none.
A MOTION was made to approve a Resolution Approving the Residential Parkway Tree
Replacement Program for a Onetime Cost to a Participating Resident of $100 per Parkway Tree.
MOTION: Trustee Holzkopf
SECOND: Trustee Leopold
AYES: Trustees: Goldman, Holzkopf, Kanakaris, Kittel, Leopold, and Westberg
NAYS: None
ABSENT: None
The motion carried: 6-0-0
b) Consideration – Resolution Approving a Base Bid Award to Schroeder Asphalt Services, Inc. for
the South Church and Mill Streets Streetscape Improvements in the Amount of $955,475.75
Director of Public Works and Engineering Tim Farrell said that Christopher B. Burke Engineering, Ltd.
(CBBEL) has prepared plans for the South Church and Mill Streets Streetscape Improvements.
Proposed improvements include the following items on South Church Street between Main and Mill
Streets and on Mill Street between the UP Railroad and Church Street:
• Replace existing aging, undersized water main with new 8” water main
• Replace existing aging, undersized storm sewer with new 15” storm sewer
• The sanitary sewers have previously been lined and require only structure adjustments
• Curb and gutter, sidewalk and driveway apron replacement
• Remove existing pavement section and replace with 4.5” of asphalt
• Dry utility relocations including utility pole removals on west side of Church Street
• Decorative street lighting
• Parkway restoration with parkway trees
An alternate bid was required that includes improvements on Mill Street east of Church Street to
Myrtle Street consisting of water main and storm sewer replacements, select curb and gutter,
driveway apron and sidewalk replacements and pavement removal and replacement with a 4.5”
asphalt section.
STAFF ANALYSIS
On Thursday, January 12, 2023 six bids were received for the South Church and Mill Streets
Streetscape Improvements. The bid results are summarized in the bid tabulation summary and in the
bid tab.
February 9, 2023 Village Board Meeting 4
Bid Tabulation Summary:
COMPANY BASE BID AMOUNT ALTERNATE BID AMOUNT
Engineer’s Estimate $1,192,645.00 $1,645,422.50
Schroeder Asphalt Services Inc. $955,475.75 $1,360,527.50
Landmark Contractors, Inc. $1,006,239.25 $1,413,739.10
Martam Construction, Inc. $1,137,374.50 $1,582,838.00
A Lamp Concrete Contractors, Inc. $1,148,436.00 $1,588,312.00
Copenhaver Construction, Inc. $1,207,774.10 $1,684,554.15
Bolder Contractors $1,234,568.00 $1,768,992.00
The bid from Schroeder Asphalt Services, Inc. was reviewed by staff and all is in order to award the
South Church and Mill Streets Streetscape Improvements Bid to Schroeder Asphalt Services, Inc. in
the amount of $955,475.75. The bid is $237,169.25 (20%) under the engineer’s estimate.
The alternate bid from Schroeder Asphalt Services, Inc. in the amount of $1,360,527.50 is the low
alternate bid. Based on the available fund balance after the bid results of the FY23 street
improvement program, staff may submit a change order for Village Board consideration of the
alternate bid work scope at a later date.
2022-2025 STRATEGIC PLAN ALIGNMENT
The Strategic Plan identifies “Strong Local Economy” as a strategic focus and the following goal: “A
Vibrant Downtown Gathering Place.” A new streetscape adjacent to the Cornell Development is
fundamental to complement the residential redevelopment project.
FINANCIAL IMPACT
The FY23 Budget includes funding of $935,000 for the South Church and Mill Streets Streetscape
Improvements including construction and construction engineering in the Downtown TIF Fund 440-
00-00-8007. A budget amendment will be presented for Village Board consideration at a later date,
if necessary.
Mayor Hoeft asked if the Village Board had any comments or questions. There were none.
A MOTION was made to approve a Resolution Approving a Base Bid Award to Schroeder Asphalt
Services, Inc. for the South Church and Mill Streets Streetscape Improvements in the Amount of
$955,475.75
MOTION: Trustee Kanakaris
SECOND: Trustee Kittel
AYES: Trustees: Goldman, Holzkopf, Kanakaris, Kittel, Leopold, and Westberg
NAYS: None
ABSENT: None
The motion carried: 6-0-0
February 9, 2023 Village Board Meeting 5
c) Consideration – Resolution Authorizing a Professional Services Agreement with Christopher B.
Burke Engineering, LTD in an Amount Not to Exceed $82,000 for South Church and Mill Streets
Streetscape Improvements Construction Engineering Services
Director of Public Works and Engineering Tim Farrell said a proposal was received from Christopher
B. Burke Engineering, LTD, (CBBEL) for Construction Engineering services for the work that consists of
the South Church and Mill Streets Streetscape Improvements.
2022-2025 STRATEGIC PLAN ALIGNMENT
The Strategic Plan identifies “Strong Local Economy” as a strategic focus and the following goal: “A
Vibrant Downtown Gathering Place.” A new streetscape adjacent to the Cornell Development is
fundamental to complement the residential redevelopment project.
FINANCIAL IMPACT
The FY23 Budget includes funding of $935,000 for the South Church and Mill Streets Streetscape
Improvements including construction and construction engineering in the Downtown TIF Fund 440-
00-00-8007. A budget amendment will be presented for Village Board consideration at a later date,
if necessary.
LEGAL ANALYSIS
Staff has reviewed the agreement and all is in order for Village Board consideration.
Mayor Hoeft asked if the Village Board had any comments or questions. There were none.
A MOTION was made to approve a Resolution Authorizing a Professional Services Agreement with
Christopher B. Burke Engineering, LTD in an Amount Not to Exceed $82,000 for South Church and
Mill Streets Streetscape Improvements Construction Engineering Services
MOTION: Trustee Westberg
SECOND: Trustee Goldman
AYES: Trustees: Goldman, Holzkopf, Kanakaris, Kittel, Leopold, and Westberg
NAYS: None
ABSENT: None
The motion carried: 6-0-0
d) Consideration - Resolution Authorizing a Professional Services Agreement with Engineering
Enterprises, Inc. for Design and Construction Engineering Services for the West WWTP
Upgrades
Director of Public Works and Engineering Tim Farrell stated that the East and West Wastewater
Treatment Plants (WWTP) have facilities to process and store biosolids. As part of the WWTP process,
each day solids must be removed from the primary waste treatment stream. Waste sludge is diverted
to a solids holding tank and remains under aeration for a minimum of two weeks. Following this
treatment, waste sludge is mixed with polymer before being sent through a belt filter press. The result
of this final process is a sludge cake which is stored onsite within sludge storage pads. The service
contractor removes sludge from the WWTP storage pad, distributes onto agricultural farm fields and
incorporates into the soil in accordance with regulatory land application rates. Included in this
service, the contractor provides the Village with the appropriate laboratory and manifest data needed
February 9, 2023 Village Board Meeting 6
to comply with the regulatory authorities including the IEPA, IEMA, and USEPA. The EPA requires 150
days of sludge storage capacity to allow for sludge to be stored on site during the cold weather
months when the ground is too frozen for land application. The West WWTP storage space is limited
and an additional covered sludge storage facility is necessary to meet capacity requirements.
The Muffin Monster® raw wastewater fine screen is original equipment purchased for the 2007 West
Wastewater Plant Phase 3 upgrade. This particular unit has proven to be maintenance intensive and
prone to frequent breakdowns. The manufacturer's preventative maintenance recommendation is to
replace the screen with a new unit every seven years. This requires staff to remove the screen and
ship it to the manufacturer, which in turn ships out a new cutting element for the unit. Staff is
proposing to replace the screen with a different brand entirely. The Village operates two Lakeside
screens at the East Wastewater Plant and one Lakeside screen for Phase 1 and 2 at the West Plant.
These screens are more effective in removing unwanted debris from the raw waste influent stream.
Also, Lakeside screens are less maintenance intensive and have a longer service life.
STAFF ANALYSIS
Staff has received a proposal from Engineering Enterprises, Inc. (EEI) in the amount of $107,558 for
design and construction engineering services to replace the raw wastewater fine screen and add a
new covered sludge storage pad at the West WWTP. Engineering services will include project
administration, coordinating progress meetings, design, permitting, bidding processing pay
applications, document review including shop drawings, O&M manuals, warranty certificates RFI’s
and change orders, construction observation, field reports and record drawings.
2022-2025 STRATEGIC PLAN ALIGNMENT
The Strategic Plan identifies “Forward Looking Community” as a strategic focus and the following goal:
“Management of Infrastructure Assets for Today and Tomorrow.” Replacing the raw wastewater
screen will significantly reduce resource inefficiencies associated with the existing aging asset and
adding covered sludge storage capacity will address existing on site sludge storage limitations.
FINANCIAL IMPACT
The FY23 Budget includes funding in the Wastewater Capital Improvement and Equipment Fund, 525-
00-00-8005 and 525-00-00-8124 for design and construction engineering services of the West WWTP
Upgrades project.
LEGAL ANALYSIS
Staff has reviewed the agreement and all is in order for Village Board approval.
Mayor Hoeft asked if the Village Board had comments or questions. There were none.
A MOTION was made to approve a Resolution Authorizing a Professional Services Agreement with
Engineering Enterprises, Inc. for Design and Construction Engineering Services for the West WWTP
Upgrades.
MOTION: Trustee Holzkopf
SECOND: Trustee Kittel
AYES: Trustees: Goldman, Holzkopf, Kanakaris, Kittel, Leopold, and Westberg
NAYS: None
ABSENT: None
The motion carried: 6-0-0
February 9, 2023 Village Board Meeting 7
e) Consideration – (i) Resolution Approving the Purchase of an International Single Axle 5-Yard
Dump Truck Cab and Chassis from Rush Truck Centers through the State of Illinois Department
of Central Management Services (CMS) Joint Purchasing Procurement Program in the Amount
of $93,833; and (ii) Ordinance Approving an Amendment to the FY23 Budget in the Amount
of $250,000 for the Purchase of a 5-Yard Dump Truck Cab and Chassis
Director of Public Works and Engineering Tim Farrell said the FY22 Budget included funding for the
purchase of a new single axle 5-yard dump truck equipped with dump body, anti-icing unit, hydraulics,
controls, plow, spreader, chemical tank, GPS, 2-way radio, lights, cameras, and lettering. This vehicle
will replace Vehicle 1691, a 2005 single axle 5-yard dump truck that has reached the end of its useful
life.
STAFF ANALYSIS
On December 16, 2021 the Village Board authorized a resolution approving the purchase of an
International Single Axle 5-Yard Dump Truck Cab and Chassis from Rush Truck Centers through the
State of Illinois Department of Central Management Services (CMS) Joint Purchasing Procurement
Program in the amount of $83,120. On December 17, 2021, staff executed the Retail Service Order
(RSO) and submitted the document to Rush along with a Purchase Order to initiate the purchase and
authorize the build. Given the nationwide vehicle supply chain shortages, most vehicles and some
equipment have not been readily available from either retail or through the procurement programs
since 2021. This is negatively impacting the streamline build and delivery of vehicles and equipment.
Staff has received a revised RSO from Rush confirming a 2023 build date but includes an $10,713 price
increase from $83,120 to $93,833 (12.9%). All is in order for Village Board consideration.
FINANCIAL IMPACT
The FY22 Budget included $222,100 ($111,050 in the Equipment Replacement Fund, 480-60-00-8131;
$55,525 in each of the Water Capital Fund, 515-00-00-8133 and Wastewater Capital Fund, 525-00-
00-8134). The revised cost to purchase the truck cab and chassis is $93,833. The cost to purchase the
dump body, anti-icing unit, hydraulics, controls, plow, spreader, chemical tank, GPS, lights, and
cameras is $138,965. An estimated additional $1,850 will be requested through separate purchase
orders for miscellaneous accessories such as lettering, radio, floor mats and sideboards bringing the
estimated total purchase price to $234,648. The FY22 funds will be carried into the FY23 budget,
requiring an amendment to the FY23 Budget. A FY23 budget amendment is requested at this time in
the amount of $250,000. This includes the unexpended dollars from FY22 and additional dollars for
the remaining equipment to be purchased.
LEGAL ANALYSIS
An ordinance is required for approval of a budget amendment.
Mayor Hoeft asked if there were any questions or concerns. There were none.
A MOTION was made to approve a (i) Resolution Approving the Purchase of an International Single
Axle 5-Yard Dump Truck Cab and Chassis from Rush Truck Centers through the State of Illinois
Department of Central Management Services (CMS) Joint Purchasing Procurement Program in the
Amount of $93,833; and (ii) Ordinance Approving an Amendment to the FY23 Budget in the Amount
of $250,000 for the Purchase of a 5-Yard Dump Truck Cab and Chassis.
February 9, 2023 Village Board Meeting 8
MOTION: Trustee Leopold
SECOND: Trustee Holzkopf
AYES: Trustees: Goldman, Holzkopf, Kanakaris, Kittel, Leopold, and Westberg
NAYS: None
ABSENT: None
The motion carried: 6-0-0
f) Consideration - (i) Resolution Approving the Purchase of an International Tandem Axle Dump
Truck Cab and Chassis from Rush Truck Centers through the State of Illinois Department of
Central Management Services (CMS) Joint Purchasing Procurement Program in the Amount of
$104,479; and (ii) Ordinance Approving an Amendment to the FY23 Budget in the Amount of
$262,000 for the Purchase of an International Tandem Axle Dump Truck Cab and Chassis
Director of Public Works and Engineering Tim Farrell said the FY22 Budget included funding for the
purchase of a new tandem axle dump truck equipped with dump body, hydraulics, controls, plow,
spreader, chemical tank, GPS, 2-way radio, lights, cameras, and lettering. This vehicle will replace
Vehicle 1803, a 1996 tandem axle Dump Truck that will be repurposed for use as a sludge hauling
truck at the East Wastewater Treatment Plant.
STAFF ANALYSIS
On December 16, 2021 the Village Board authorized a resolution approving the purchase of an
International Tandem Axle Dump Truck Cab and Chassis from Rush Truck Centers through the State
of Illinois Department of Central Management Services (CMS) Joint Purchasing Procurement Program
in the amount of $93,216. On December 17, 2021, staff executed the Retail Service Order (RSO) and
submitted the document to Rush along with a Purchase Order to initiate the purchase and authorize
the build. Given the nationwide vehicle supply chain shortages, most vehicles and some equipment
have not been readily available from either retail or through the procurement programs since 2021.
This is negatively impacting the streamline build and delivery of vehicles and equipment.
Staff has received a revised RSO from Rush confirming a 2023 build date but includes an $11,263 price
increase from $93,216 to $104,479 (12%). All is in order for Village Board consideration.
FINANCIAL IMPACT
The FY22 Budget included $246,700 ($123,350 in the Equipment Replacement Fund, 480-60-00-8131;
$61,675 in each of the Water Capital Fund, 515-00-00-8133 and Wastewater Capital Fund, 525-00-
00-8134). The revised cost to purchase the truck cab and chassis is $104,479. The cost to purchase
the dump body, hydraulics, controls, plow, spreader, chemical tank, GPS, lights, and cameras is
$151,038. An estimated additional $1,850 will be requested through separate purchase orders for
miscellaneous accessories such as lettering, radio, floor mats and sideboards bringing the total
purchase price to $257,367. The FY22 funds will be carried into the FY23 budget, requiring an
amendment to the FY23 Budget. A FY23 budget amendment is requested at this time in the amount
of $262,000. This includes the unexpended dollars from FY22 and additional dollars for the remaining
equipment to be purchased.
February 9, 2023 Village Board Meeting 9
LEGAL ANALYSIS
An ordinance is required for approval of a budget amendment.
Director Farrell concluded saying that because of this supply chain shortage the building and delivery
of vehicles and equipment that were approved and ordered in 2022 are being impacted. Director
Farrell stated that some of the vehicles purchased in 2022 or in 2023 may not actually be delivered
until 2024. He provided a status summary of the Village vehicles that have been ordered and the
expectation timeframe of being completed and delivered. Mayor Hoeft asked if the Village Board had
comments or questions. There were none.
A MOTION was made to approve a (i) Resolution Approving the Purchase of an International
Tandem Axle Dump Truck Cab and Chassis from Rush Truck Centers through the State of Illinois
Department of Central Management Services (CMS) Joint Purchasing Procurement Program in the
Amount of $104,479; and (ii) Ordinance Approving an Amendment to the FY23 Budget in the
Amount of $262,000 for the Purchase of an International Tandem Axle Dump Truck Cab and Chassis.
MOTION: Trustee Holzkopf
SECOND: Trustee Kanakaris
AYES: Trustees: Goldman, Holzkopf, Kanakaris, Kittel, Leopold, and Westberg
NAYS: None
ABSENT: None
The motion carried: 6-0-0
VILLAGE ATTORNEY’S REPORT: Village Attorney Betsy Gates-Alford said that the Village has received
several resident comments about a proposed annexation and development of a parcel of land near
the Villages’ of Hampshire and Huntley boundary lines. Attorney Gates-Alford stated that the parcel
of land, which is north of I-90 and approximately a half-mile west of the Village of Huntley corporate
boundary, is currently unincorporated; however, it is located within the jurisdictional boundary area
of the Village of Hampshire. She referenced a Jurisdictional Boundary Agreement that is currently in
place that allows for the annexation and development of land within either the Village of Huntley or
Village of Hampshire that states neither Village can become involved in, or object to the other Village’s
attempt to annex, rezone or develop property within their own jurisdictional boundary. Attorney
Gates-Alford said this information is being provided should the Village Board continue to receive
inquiries about the parcel in question. She stated that she would be happy to answer any questions.
VILLAGE MANAGER’S REPORT: None
VILLAGE PRESIDENT’S REPORT: Mayor Hoeft reported the Farmers Market will be this Saturday in
Fellowship Hall at the Congregational Church from 9am – 1pm. He added that February 20th is
President’s Day so municipal offices will be closed, but garbage and recycling will be picked up on the
regular schedule. Mayor Hoeft said the McCOG membership meeting for February will be held in
Ringwood on February 22nd and anyone wishing to attend should notify Management Assistant Barb
Read.
UNFINISHED BUSINESS: None
NEW BUSINESS: None
February 9, 2023 Village Board Meeting 10
EXECUTIVE SESSION: No
POSSIBLE ACTION ON ANY CLOSED SESSION ITEM: None
ADJOURNMENT:
There being no further items to discuss, a MOTION was made to adjourn the meeting at 7:39 p.m.
MOTION: Trustee Leopold
SECOND: Trustee Kanakaris
The Voice Vote noted all ayes and the motion carried.
Respectfully submitted,
Rita McMahon
Village Clerk
February 9, 2023 Village Board Meeting 11
Get email alerts for Huntley
A daily email when new agendas and minutes are posted.