Muyni
← Back to Kalispell

City Council Agenda

Regular Meeting

Kalispell, MT · February 11, 2019

Agenda

Agenda

CITY COUNCIL WORK SESSION AGENDA February 11, 2019, at 7:00 p.m. City Hall Council Chambers, 201 First Avenue East A. CALL TO ORDER B. DISCUSSION ITEMS 1. Urban Renewal Agency Recommendation on South Kalispell Tax Increment Financing District Traffic Project C. PUBLIC COMMENT Persons wishing to address the council are asked to do so at this time. Those addressing the council are requested to give their name and address for the record. Please limit comments to three minutes. D. CITY MANAGER, COUNCIL, AND MAYOR REPORTS E. ADJOURNMENT UPCOMING SCHEDULE / FOR YOUR INFORMATION City Offices Closed – February 18, 2019 – Presidents Day Next Regular Meeting – TUESDAY, February 19, 2019, at 7:00 p.m. – Council Chambers Next Work Session – February 25, 2019, 7:00 p.m. – Council Chambers Reasonable accommodations will be made to enable individuals with disabilities to attend this meeting. Please notify the City Clerk at 758-7756. Page 1 of 1 City of Kalispell Office of Community & Economic Development 201 First Avenue East Kalispell, MT 59901 www.kalispell.com To: Doug Russell, City Manager From: Katharine King, Assistant Director Community Development Re: Urban Renewal Agency Recommendation on South Kalispell Tax Increment Financing District Traffic Project Meeting Date: February 11, 2019 BACKGROUND: The Urban Renewal Agency (URA) requested a traffic analysis of intersections at 18th Street West/Airport Road/1st Avenue West in 2018 and WGM Group was selected to perform the study and report findings to the URA. The URA reviewed and considered a traffic design report from WGM Group at their September, 2018 meeting then recommended to Kalispell City Council that Concept 9 (now the 16th Street Offset) be constructed with funds from the South Kalispell Tax Increment Finance (TIF) District. When this recommendation was presented to City Council at its October 22, 2018 Work Session the Council requested that WGM conduct further review of both Concept 8 (now referred to as the 18th Street Realignment) and Concept 9 (now the 16th Street Offset). WGM completed this additional analysis and presented the information in its Preliminary Design Alternatives and Costs Memorandum dated January 11, 2019. At the URA January 16, 2019, meeting the Committee voted unanimously to recommend the 16th Street Offset option to City Council for approval. Based on additional analysis provided by WGM Group, the URA supported the 16th Street Offset option as the safest option for improving turns onto Airport Road from 1st Street West by alleviating line of sight obstructions for southward turns; reducing vehicle collisions at the Purdy Mobile Home Park located at the south end of 1st Avenue West; eliminating the offset intersection of 1st Avenue West and 18th Street West at Airport Road. The Committee further preferred the 16th Street Offset option because it does not require the acquisition of additional property which would be required in the 18th Street Realignment resulting in both higher project cost and potential extension of project timeline resulting from the required acquisition process. Finally, the lower cost of the 16th Street Offset option is estimated to allow an additional $250,000 for sidewalk construction reaching down to the new Rankin Elementary School. Both parking designs provided comparable parking numbers. The traffic project utilizing South Kalispell TIF funds must be completed prior to the TIF District’s sunset on July 1, 2020. RECOMMENDATION: It is recommended that Kalispell City Council consider the Urban Renewal Agency recommendation for construction of the 16th Street Offset at a work session. FISCAL IMPACT: The South Kalispell TIF has approximately $2.1 million available for this project. ATTACHMENTS: Draft Minutes from Urban Renewal Agency January 16, 2019 meeting and WGM Preliminary Design Alternatives and Costs Memorandum of January 11, 2019. City of Kalispell Post Office Box 1997 - Kalispell, Montana 59903 Telephone: (406) 758-7701 Fax: (406) 758-7758 Meeting Summary URBAN RENEWAL AGENCY BOARD JANUARY 16, 2019 – 4 P.M. CITY HALL – FIRST FLOOR CONFERENCE ROOM MEMBERS IN ATTENDANCE OTHERS IN ATTENDANCE Chairman Marc Rold Tom Jentz, Planning Director Jeff Zauner Katharine King, Asst. Director Comm. & Econ. Dev. David Girardot Jarod Nygren, Senior Planner Shannon Freix Krista Lammers, Comm. & Econ. Dev. Matt Venturini Mike Brodie, WGM Group Chairman Rold called the meeting to order and welcomed Board, consultant and city staff. PUBLIC COMMENT - None. APPROVAL OF MEETING SUMMARY - Passed unanimously. BUSINESS -None. TIGER/KALISPELL CORE & RAIL REDEVELOPMENT The Kalispell Trail design report is nearly complete and will provide vision, preferred design and background for the project. Expected to have the report for the February URA Board meeting. The stoplight at the intersection of US Hwy 2 East and Flathead Drive is in operation. Final punch list items are being inspected for Glacier Rail Park and monument sign work continues. TIF & TEDD UPDATES Brodie provided an overview of the two options further developed at the request of City Council, 18th Street Realignment and the 16th Street Offset. Design, functionality, acquisition, infrastructure, sidewalks and costs for each option were examined. Zauner moved to recommend the 16th Street Offset option to City Council, Venturini seconded. Passed unanimously. BROWNFIELDS PROGRAM UPDATES Report next month. NEXT SCHEDULED MEETING The Board next meeting is scheduled for Wednesday, February 20th at 4 p.m. Chairman Rold adjourned the meeting. MEMORANDUM DATE: January 11, 2019 TO: Katharine King, Kalispell Community Development Tom Jentz, Kalispell Planning Department FROM: Mike Brodie, P.E. Mark Bancale, P.E., PTOE Jeremy Keene, P.E. RE: Preliminary Design Alternatives and Costs At the October 22, 2018 City Council meeting/work session WGM gave a presentation on the design alternatives that were explored and what the findings were. Per council recommendations, WGM was tasked with performing a site topographic and boundary line survey of the subject property and to perform a preliminary design for both concepts to provide more accurate costs and to address utility conflict concerns raised by City of Kalispell Public Works Department. Included in this memo are preliminary design drawings of both of the alternatives at Airport Road and 18th Street West/1st Avenue West. These designs also included the addition of a parking lot for Legends Stadium & winter snow storage. The parking lots shown were designed to maximize parking, accommodate a City required stormwater facility, and provide sufficient access to both vehicle and pedestrian traffic. Given the Airport TIF fund sunset date of June 2020, it is important that funds being allocated for either project be utilized prior to this date. This means the project will likely need to begin construction by late summer/early fall 2019. Problems with Existing Configuration In its current configuration, traffic approaching the intersection of Airport Road and 18th Street from the east and west are misaligned making the intersection difficult to navigate and potentially dangerous. The following are problems with this configuration or hinderances of redesign that have been noted throughout the process: 1. North and southbound traffic on Airport Road must pass or overlap to make left turns. 2. The angled crossing hinders traffic distribution between US Highway 93 and First Avenue West. 3. Sight distance is obscured due to residential landscaping at the southwest corner of the intersection. Preliminary Design Alternatives and Costs January 11, 2018 Page 2 of 7 4. A sharp left corner exists at the corner of 1st avenue West and 18th Street west (west of the subject intersection) at the mobile home park. 5. A residential driveway has an access point in the middle of the intersection. 6. The entire area is a “spiderweb” of underground utilities. 7. The City does not own the property required to make the proper realignment. Design Alternatives Preliminary design was performed on both alternatives incorporating data from the topographic/boundary line survey performed by WGM. 18th Street Realignment (formerly Concept 8) This concept realigns the east leg of 18th Street to square up the intersection and flattens the curve to 1st Ave W to meet a 25-mph design speed. This improves sight distance at the intersection and eliminates the overlapping left turn movement on Airport Road. Flattening the curve will alleviate problems with vehicles running off the road because of the unexpectedly sharp corner that currently exists. At the middle of the flattened curve, driveways will be consolidated to a single access providing optimal site distance for residents accessing 1st avenue west or 18th Street West. Street lighting is recommended at the intersection of 18th Street and Airport Road but will be subject to FAA regulations. Right-of-way acquisition is required for this alternative. The design layout has been included as an attachment to this memorandum. 18 TH S TREET R EALIGNMENT A DVANTAGES The realignment alternative is optimal in the sense that it solves the existing alignment issue in the simplest way; it matches the centerlines of the east and west leg of the intersection. This provides smoother traffic flow from US Highway 93 to 1st Avenue West in a similar fashion to 1st Avenue East, accomplishing the overall goal of the project to alleviate the US- 93/Main Street bottle neck and distribute traffic throughout downtown. A more gradual curve has been provided in this design to help direct traffic towards the intersection and away from the existing mobile home development. Pedestrian access has been included with a widened path along Airport Road with ADA pedestrian access at all four corners of the intersection. These improvements can be utilized to extend sidewalks/pedestrian Preliminary Design Alternatives and Costs January 11, 2018 Page 3 of 7 access south along Airport Road with either additional funds available in the Airport TIF or at a later date. Bulb outs were included to provide traffic calming, make pedestrians more visible, and to help address the sight distance issue from the eastbound approach. Closure of the northern residential driveway at the southwest corner of the intersection will improve safety at the intersection, and also should help to address the existing sight distance issue at this corner. No land acquisition is anticipated for the closure as it exists within City of Kalispell right of way. 18TH STREET REALIGNMENT DISADVANTAGES One of the main disadvantages of this alternative are the impacts to the surrounding properties. One of the biggest drawbacks with the realignment is that land will need to be purchased at the northeastern corner of the existing intersection to realign this approach. The property owner is known to be a willing seller, but this will add cost and negotiations between the City and the owner have the potential to delay construction. Additionally, this design will require the closure of two driveways at this intersection: The northern residential drive at the southwestern corner, and the southern coffee stand entrance at the northeastern corner. The residential drive is a safety hazard in the existing condition and will need to be addressed if this intersection is improved. Closing the northern driveway entrance does not hinder access to the property, and it is located within the City right of way. At the coffee stand, the realignment makes the southern ingress/egress to the property a safety hazard. A new entrance location is proposed on 18th Street East. At the southwestern corner of the intersection, the existing site distance issue requires east bound traffic from 1st Ave W. to creep out into the intersection to see north bound Airport Road traffic to cross the street. The realignment reduces the sight distance needed to make the crossing and bulbs out the curb line to help protect this movement but does not fully solve this problem. To resolve this problem the existing hedge and willow tree (on private residential property) must be cut back or fully removed. 18TH STREET REALIGNMENT UTILITY CONFLICTS The intersection is filled with City utilities along with private/dry utilities. These utilities include: water, sewer, storm water, power, gas, and cable/fiberoptic. Neither alternative is anticipated to have impacts to the existing City of Kalispell “Mosquito” Lift Station.” Each have been tagged as either “minor” or “major” depending on the amount of work associated with the conflict. Utilizing data from the topographic survey, WGM has identified the following utility conflicts for this alternative: 1. Six storm water manholes will require rim adjustments (minor). 2. One storm water inlet will need to be removed and replaced at the northwest corner of the intersection near the lift station (major). 3. Two culverts become obsolete and will need to be removed as a part of improvements. These are typically not salvageable for reuse (minor). Preliminary Design Alternatives and Costs January 11, 2018 Page 4 of 7 4. Two culverts will need to be added to perpetuate flow patterns under the new road configuration (major). 5. The area to the south of realigned 18th Street East will need to be regraded to perpetuate existing storm water ditch flow (major). 6. One water valve will require the top of the valve box to be adjusted (minor) 7. Hydrant adjustment (minor) 8. 1 sewer manhole in sidewalk (minor). 9. 1 sewer manhole in the parking lot (minor). 10. 1 storm manhole in the parking lot (minor). A layout showing the Utility Conflicts for this alternative has been included in with this memorandum. Preliminary Design Alternatives and Costs January 11, 2018 Page 5 of 7 16th Street Offset (formerly Concept 9) The second design removes the west leg of 18th Street from the intersection and introduces a new street connection approximately 360 feet to the north at 16th Street West. A two- way stop with a free-flow north and south is proposed at the new intersection with 1st Ave W to accommodate the primary traffic movement. Street lighting is recommended on Airport Road at both intersections. Pedestrian access has been included with a widened path along Airport Road with pedestrian access at the west of the 18th Street/Airport Road intersection. These accesses can be utilized to extend sidewalks/pedestrian access south along Airport Road with either additional funds available in the Airport TIF or at a later date. The design layout has been included as an attachment to this memorandum. 16TH STREET OFFSET ADVANTAGES By offsetting west leg of the intersection north to 16th Street West, the angled crossing is eliminated and left turns from Airport Road no longer overlap. Additionally, the reconfiguration of the intersection’s west leg greatly improves the sight distance for east bound traffic from 1st Ave W. and no impacts to the existing residential landscaping would be required. With the closure of 18th St W. the sharp 90-degree corner is eliminated, and the existing mobile home development is protected from potential traffic collisions. Pedestrian access has been included with a widened path along Airport Road with pedestrian access at all three locations at the 18th St E. intersection for future sidewalk or path extensions to the south or east. One of the major positive attributes to this project is that no land acquisition is required, and no existing driveways will need to be closed as a part of the project improvements. This will help with both costs and schedule. 16TH STREET OFFSET DISADVANTAGES One of the major drawbacks with offsetting the western leg of the intersection is that by doing so, you turn one intersection into three intersections. Additional intersections, albeit less confusing intersections, can result in additional collisions. The addition of these intersections makes the transition from US-93 to 1st Avenue West not as smooth and requires up to three separate stops, hence, it does not promote downtown traffic distribution as well as the other alternative. Preliminary Design Alternatives and Costs January 11, 2018 Page 6 of 7 The main disadvantage with this alternative is that you remove an angled crossing at the existing intersection but create a new angled crossing condition at 1st Ave W and 16th St W. The new intersection created at 16th Street/1st Avenue has similar offset attributes to the existing 18th street/Airport Road configuration. It will however experience lower traffic volumes with the majority coming from the north and east legs of the intersection. 16TH STREET OFFSET UTILITY CONFLICTS Though little work is taking place at the 18th Street East/Airport Road intersection, all the same utilities exist. These utilities include: Water, sewer, storm water, power, gas, and cable/fiberoptic. Neither alternative is anticipated to have impacts to the existing City of Kalispell “Mosquito” Lift Station.” Each have been tagged as either “minor” or “major” depending on the amount of work associated with the conflict. To avoid major modifications to the existing sewer line within the 16th Street corridor, the road section was widened to the City’s “collector” standard (17-foot instead of 14-foot lanes). Utilizing data from the topographic survey, WGM has identified the following utility conflicts for this alternative: 1. Adjust existing storm inlet at 16th Street and Airport Road (minor) 2. Three sewer manholes in 16th street west (minor) 3. Relocation of a TV/fiber optic pedestal in intersection of 16th Street West and 1st Avenue West (major) 4. Relocation of existing power pole (major). 5. Adjust rim of Storm manhole in sidewalk along 1st avenue west (minor). 6. Adjust rim of Storm manhole in parking lot (minor). 7. Adjust rim of sewer manhole in parking lot (minor). 8. Adjust rim of sewer manhole in sidewalk at northwest corner (minor) A layout of these utility conflicts has been included as an attachment with this memorandum. Preliminary Design Alternatives and Costs January 11, 2018 Page 7 of 7 Cost Estimates Pre-design cost estimates were developed based on the conceptual alternatives. These estimates include a 15% contingency to reflect the limited amount of design detail at this stage. Estimated Construction costs are summarized below. Until a formal appraisal has taken place, the cost of the land acquisition will be assumed as $75,000 for the 18th Street Realignment. This land cost has been included in the tables below and detailed cost breakdowns are attached. 18th Street Realignment $553,150 16th Street Offset $342,088 Stadium Parking In the design process, parking was laid out to maximize the City property as a parking lot for the Legends Stadium and snow storage. The addition of parking also requires storm water storage and a collection system which has been included in the costs. The location of the ponds shown in the attached layouts have been selected based on required city of Kalispell setbacks and to avoid existing underground utilities. These costs also include a 15% construction contingency. 18th Street Realignment $318,186 $2,027/parking stall 16th Street Offset $319,281 $2,115/parking stall Overall Costs The overall costs shown in the table below include the combined costs of the above parking and intersection redesign. The below costs have also included a 10% engineering design cost and a 10% construction observation and administration cost. 18th Street Realignment $1,045,604 16th Street Offset $793,643 Attachments Design Layouts Design Utility Conflicts Cost Estimates W:\Projects\171118\Docs\Meetings\URA\Design Alternative Update Memo.docx 18TH STREET REALIGNMENT DESIGN AND UTILITY CONFLICTS REALIGN 18TH STREET EAST - DESIGN PLOTTED: 1/11/19 AIRPORT ROAD INTERSECTION IMPROVEMENTS WWW.WGMGROUP.COM 1 OF 2 SAVED: 1/11/19 JAN 11, 2019 KALISPELL, MONTANA WGM GROUP PRELIMINARY LEGEND-EXISTING WGM GROUP WWW.WGMGROUP.COM PRELIMINARY PLOTTED: 1/10/19 SAVED: 1/10/19 AIRPORT ROAD INTERSECTION IMPROVEMENTS REALIGN 18TH STREET EAST - UTILITIES KALISPELL, MONTANA LEGEND-PROPOSED JAN 11, 2019 2 OF 2 16TH STREET OFFSET DESIGN AND UTILITY CONFLICTS 16TH STREET WEST OFFSET - DESIGN PLOTTED: 1/11/19 AIRPORT ROAD INTERSECTION IMPROVEMENTS WWW.WGMGROUP.COM 1 OF 2 SAVED: 1/11/19 JAN 11, 2019 KALISPELL, MONTANA WGM GROUP PRELIMINARY LEGEND-EXISTING WGM GROUP WWW.WGMGROUP.COM PRELIMINARY PLOTTED: 1/10/19 SAVED: 1/10/19 AIRPORT ROAD INTERSECTION IMPROVEMENTS 16TH STREET WEST OFFSET - UTILITIES KALISPELL, MONTANA LEGEND-PROPOSED JAN 11, 2019 2 OF 2 DETAILED COST ESTIMATES OPINION OF PROBABLE COST Project Name: Airport Road Intersection Improvements Project No.: 17-11-18 Prepared By: CZ Reviewed By: MJB Date: 1/11/2019 Description: 16th Street West Offset - Preliminary Design Cost Estimate Item Number Description Quantity Unit Unit Price Total Notes Street Construction 1 Demolition & Removals 9,200 SF $ 2.00 $18,400 2 Unclassified Excavation 950 CY $ 20.00 $19,000 Assume 16" cut under asphalt areas and 8" cut under blvd and sdwk 3 Concrete Curb and Gutter 900 LF $ 18.00 $16,200 4 4" Thickness Asphalt (Type B) 1,200 SY $ 20.00 $24,000 Chipseal on Airport Rd not factored 5 6" Thickness 3/4" Minus Crushed Base Course 225 CY $ 32.00 $7,200 Chipseal on Airport Rd not factored 6 9" Thickness 2" Minus Crushed Sub Base 302 CY $ 28.00 $8,456 7 Chipseal 2,950 SY $ 5.00 $14,750 Chipseal on Airport Rd 8 Concrete Sidewalk 5,210 SF $ 5.00 $26,050 Includes driveways, and ramps 9 ADA Ramp (Truncated Domes) 12 EA $ 500.00 $6,000 10 Storm Drain Inlet 2 EA $ 3,000.00 $6,000 11 Storm Drain Pipe 106 LF $ 50.00 $5,300 12 Connect to Existing Manhole 1 EA $ 800.00 $800 13 Raise or Lower Storm/Sewer Manhole 7 EA $ 740.00 $5,180 14 Street Light 3 EA $ 5,000.00 $15,000 Includes standard pole, wire, conduit, and electrical service 15 Signing and Striping 1 LS $ 15,000.00 $15,000 16 Street Trees 15 EA $ 500.00 $7,500 Per Concept Illustration 17 Topsoil and Seed 1,500 SY $ 9.00 $13,500 blvd and 10' disturbance off curbline 18 Manhole Concrete Collar 6 EA $ 300.00 $1,800 19 Remove Storm Manhole 1 EA $300 $300 Subtotal $210,436 Parking Lot Construction 20 Concrete Curb and Gutter 1,832 LF $ 18.00 $32,976 1655 sqft 21 3" Thickness Asphalt (Type B) 6,255 SY $ 16.00 $100,080 22 4" Thickness 3/4" Minus Crushed Base Course 710 CY $ 32.00 $22,720 23 8" Thickness 2" Minus Crushed Sub Base 1,410 CY $ 28.00 $39,480 24 Storm Drain Inlet 3 EA $ 3,000.00 $9,000 25 Storm Drain Pipe 438 LF $ 50.00 $21,900 26 Raise or Lower Storm/Sewer Manhole 2 EA $ 740.00 $1,480 Per Utility Estimate 27 Signing and Striping 1 LS $ 5,000.00 $5,000 28 Topsoil and Seed 1,800 SY $ 9.00 $16,200 Assumed all landscaping areas not including inside pond area 29 Street Trees 18 EA $ 500.00 $9,000 30 Manhole Concrete Collar/Apron 6 EA $ 300.00 $1,800 31 Detention Pond 1 EA $ 5,000.00 $5,000 32 Stormwater Quality Unit 1 EA $ 10,000.00 $10,000 33 Detention Pond Outlet Structure 1 EA $ 3,000.00 $3,000 Subtotal $277,636 Page 1 of 4 1/11/2019 W:\Projects\171118\Docs\Cost Estimates\Pre-Design Estimate (1.10.19) Miscellaneous Items 34 Mobilization 5% $ 24,404 35 Traffic Control 5% $ 24,404 36 Miscellaneous Work 5% $ 24,404 37 Erosion Control 0.5% $ 2,440 38 Performance/Payment Bonds 0.5% $ 2,440 39 Permits 0.5% $ 2,440 40 Dry Utility Relocation LS $ 6,500 41 Right-of-way Acquisition SF $ - N/A Subtotal $ 87,032 Construction Subtotal $575,104 42 Predesign Contingency 0% $ - 43 Construction Contingency 15% $ 86,266 Construction Total $ 661,369 44 Estimated Professional Services - Design 10% $ 66,137 45 Estimated Professional Services - Construction 10% $ 66,137 PROJECT TOTAL $ 793,643 Page 2 of 4 1/11/2019 W:\Projects\171118\Docs\Cost Estimates\Pre-Design Estimate (1.10.19) OPINION OF PROBABLE COST Project Name: Airport Road Intersection Improvements Project No.: 17-11-18 Prepared By: CZ Reviewed By: MJB Date: 1/11/2019 Description: 18th Street Realignment - Preliminary Design Cost Estimate Item Number Description Quantity Unit Unit Price Total Notes Street Construction 1 Demolition & Removals 28,050 SF $ 2.00 $56,100 2 Unclassified Excavation 1,000 CY $ 20.00 $20,000 Assume 16" cut under asphalt areas and 8" cut under blvd and sdwk 3 Concrete Curb and Gutter 1,506 LF $ 18.00 $27,108 4 4" Thickness Asphalt (Type B) 3,070 SY $ 20.00 $61,400 5 6" Thickness 3/4" Minus Crushed Base Course 578 CY $ 32.00 $18,496 6 9" Thickness 3" Minus Crushed Sub Base 890 CY $ 28.00 $24,920 7 Concrete Sidewalk 6,860 SF $ 5.00 $34,300 Includes driveways, ramps and detectable warnings 8 ADA Ramp (Truncated Domes) 13 EA $ 500.00 $6,500 9 Storm Drain Inlet 1 EA $ 3,000.00 $3,000 10 Storm Culvert 107 LF $ 50.00 $5,350 11 Connect to Existing Manhole 2 EA $ 800.00 $1,600 12 Raise or Lower Storm/Sewer Manhole 8 EA $ 740.00 $5,920 13 Raise or Lower Water Gate Valve 2 EA $ 450.00 $900 14 Street Light 2 EA $ 5,000.00 $10,000 Includes standard pole, wire, conduit, and electrical service 15 Signing and Striping 1 LS $ 9,000.00 $9,000 16 Street Trees 12 EA $ 500.00 $6,000 Per Concept Illustration 17 Topsoil and Seed 1,600 SY $ 9.00 $14,400 10 foot disturbance off curbline 18 Manhole Concrete Collar 5 EA $ 300.00 $1,500 19 Water Gate Valve Concrete Collar 2 EA $ 200.00 $400 Subtotal $306,894 Page 3 of 4 1/11/2019 W:\Projects\171118\Docs\Cost Estimates\Pre-Design Estimate (1.10.19) Parking Lot Construction 20 Concrete Curb and Gutter 1,658 LF $ 18.00 $29,844 1655 sqft 21 3" Thickness Asphalt (Type B) 6,318 SY $ 15.00 $94,770 22 4" Thickness 3/4" Minus Crushed Base Course 710 CY $ 32.00 $22,720 23 8" Thickness 3" Minus Crushed Sub Base 1,420 CY $ 28.00 $39,760 24 Storm Drain Inlet 5 EA $ 3,000.00 $15,000 25 Storm Drain Pipe 530 LF $ 50.00 $26,500 26 Raise or Lower Storm/Sewer Manhole 3 EA $ 740.00 $2,220 Per Utility Estimate 27 Signing and Striping 1 LS $ 5,000.00 $5,000 28 Topsoil and Seed 1,330 SY $ 9.00 $11,970 Assumed all landscaping areas not including inside pond area 29 Street Trees 17 EA $ 500.00 $8,500 30 Manhole Concrete Collar/Apron 8 EA $ 300.00 $2,400 31 Detention Pond 1 EA $ 5,000.00 $5,000 32 Stormwater Quality Unit 1 EA $ 10,000.00 $10,000 33 Detention Pond Outlet Structure 1 EA $ 3,000.00 $3,000 Subtotal $276,684 Miscellaneous Items for Street & Parking Lot Construction 34 Mobilization 5% $ 29,179 35 Traffic Control 5% $ 29,179 36 Miscellaneous Work 5% $ 29,179 37 Erosion Control 0.5% $ 2,918 38 Performance/Payment Bonds 0.5% $ 2,918 39 Permits 0.5% $ 2,918 40 Dry Utility Relocation LS $ 2,500 41 Right-of-way Acquisition 39640 SF $ 1.90 $ 75,316 0.91 ac parcel acquisition Subtotal $ 174,106 Construction Subtotal $757,684 42 Predesign Contingency 0% $ - 43 Construction Contingency 15% $ 113,653 Construction Total $871,337 44 Estimated Professional Services - Design 10% $ 87,134 45 Estimated Professional Services - Construction 10% $ 87,134 PROJECT TOTAL $ 1,045,604 Page 4 of 4 1/11/2019 W:\Projects\171118\Docs\Cost Estimates\Pre-Design Estimate (1.10.19)

Get email alerts for Kalispell

A daily email when new agendas and minutes are posted.

Report an issue with this meeting