City Council
Regular MeetingKentland, IN · January 4, 2021
Minutes
Kentland Airport Board
MINUTES
To: Jim, Debby, Mike, Pat, Ken Ross, IN Dept. of Aviation
From: Jim Butler
Subject: Airport Board Meeting, Monday, January 4, 2021
The Airport Board met on the date shown above, at 6:30 PM at the airport. The first
Monday of the month is our regular meeting time and we have posted this on the
bulletin board at the airport as well as notified the newspaper.
Board members present were Jim Butler, Terry Haffstrom and Terry Dieter. Chuck
Classen, FBO, was also present.
Old business:
In the August meeting Jim reported that the FAA does not have the funds to build the
entire Stormwater/West Ramp project this year, but does have the funds for the
Stormwater part of the project as well as grading for the West Ramp part of the project.
Those portions of the project have been sent out for bids. The balance of the project is
expected to be completed next year. At this time we believe the local matching funds
required will be 5% of that portion of the project, or approximately $55,000.00.
At the August meeting Chuck reported he had consulted with a foam insulation
contractor regarding the roof leakage on hangar 4. After examining the roof the
contractor told Chuck the holes around the nails have worn quite large and the roof
needs to be replaced. Chuck is going to get a cost for a steel roof.
At the August meeting Jim reported that we have the opportunity to ugrade the weather
station to include ceiling and visibility. He also mentioned that Hangar 4 needs a new
roof and that there is a possibility that we could have some local match funding needed
for the Stormwater/West Ramp project portion that will be completed next year. After
discussion the board authorized Jim to speak with the Town Council and if they are in
favor to obtain the costs for all three of these projects and approach the county for a
grant. These costs won’t be known until late this year or maybe even into the first or or
second quarter of next year. This discussion is just for planning purposes at this time.
Chuck reported he worked with Denny Richie to adjust the hangar doors and grind away
some concrete that has heaved and was interfering with the door. Other doors were
inspected as well. This task is considered complete.
Page !1 of ! 3
At the October meeting Jim reported that he and Chuck inspected the runway and found
a place where apparently lightning had struck, causing 4 holes. These holes are much
smaller than the previous lightning strike and should be easily repaired by filling with
hydraulic cement. Chuck will talk to TJ and ask him to repair the holes with hydraulic
cement. During this inspection several holes in the mastic sealant between the concrete
slabs were also found. Terry made a motion to authorize Jim to work with Seal Pro to
get the sealant replaced/repaired up to an amount of $5,000.00. Jake seconded the
motion which passed unanimously. Jim will work with the Town Council prior to incurring
any expense to make sure funds are available to cover this amount. This wasn’t able to
be accomplished before the weather turned cold and will be addressed in the spring.
Ken Ross is working on the update to our 5 year Capital Improvement Plan. This is a
rolling 5 year plan that has to be updated yearly. The airport is not eligible for grants if
this plan is not kept up to date. Once completed, this plan will be reviewed and adopted
by the board and submitted to the FAA.
New Business:
1) Fuel sales for December were $1,152.60. Year to date fuel sales in dollars were
$24,110.91. This was 67% of the 2019 fuel sales in dollars. The fuel sales in gallons
was 92% of the 2019 fuel sales. Given the many problems of 2020 we felt this was a
pretty good showing for the airport fuel sales. Most of the drop in revenue is from the
lower pricing, however, the fixed cost portion of the price per gallon remained the same
as in 2019 so the airport income will have remained close to the same with the cost to
purchase the fuel being less than in 2019.
2) Chuck’s written report indicated the amount of AvGas on hand as of the end of
December is 2201 gallons and the amount of JetA was 11786 gallons.
3) There were 52 observed or evidenced aircraft movements for the month of
December. It should be noted that of the 1134 aircraft movements for the year, 388 were
for people flying in to do business at the airport, i.e. purchasing fuel, getting repairs
done on their airplanes, etc. There have been 60 flights so far this year for people flying
here to do business off the airport in the community. Another 213 aircraft movements for
the year were for aircraft based at Kentland flying for business reasons. There have
been 150 operations for aerial applicators. The total operations for 2020 was 92% of the
total operations for 2019. Not bad for such an odd year.
The board would like to remind all pilots to please register their flights on the form next
to the weather computer. These numbers are shown monthly to the Kentland Town
Council as well as the people of Kentland so they will know how much their airport is
being used and what it means to the economy of the surrounding area. Please list if
your flight is for business, pleasure, training, etc.
Chuck’s written report indicated the airport income for the month of December was
Page !2 of ! 3
$100.00 from Global Aeronautics and $664.80 from an aerial applicator.
Chuck’s written report indicated the expenses for November were $1,495.86 to Pemco
which was for fuel pump repairs and $40.00 from AirNav for fuel price advertising and
$180.00 from Dennie’s Repair for hangar door repairs and asjustments. This Pemco
repair was approved at a previous meeting. Terry Deiter made a motion to approve the
expenses, Terry Haffstrom seconded the motion which passed unanimously.
Jim reported there are 6 florescent light fixtures in hangar 1. These are standard
fixtures, mounted on the ceiling, which is too high for a normal ladder to reach to
change the light tubes, resulting in the lights being out until Hopkins can bring their
man-lift for safe replacement. Jim requested these fixtures be changed to LED for much
longer bulb life and reduced operating cost. This should cost around $350.00 plus labor.
Terry Deiter made a motion to authorize Chuck to have this work completed by Hopkins
Electric. Terry Haffstrom seconded the motion which passed unanimously.
Jim reported the Engineer’s report, which was relayed to him via email from Ken Ross.
The West Ramp/Stormwater project is proceeding. Ken expects construction to
commence in as soon as the easement for the Simmonds property is signed. This
easement is now complete and has been sent to Pat Ryan for review. Ken expects work
to commence within four weeks. Ken is also working on the annual report which will be
submitted to the FAA, per their requirements.
Jim reported that we have a candidate for Airport Manager that is willing to train with
Chuck and take over those duties when Chuck retires at the end of December, 2021. He
will discuss this with the Town Council to further develop the opportunity.
There being no further business, Terry Deiter motioned to adjourn, seconded by Terry
Haffstrom. Motion carried unanimously.
Sincerely,
Jim
Page !3 of ! 3
Get email alerts for Kentland