Muyni
← Back to La Mesa

Mobility Commission

Regular Meeting

La Mesa, CA · May 6, 2026

AgendaVideo Recording

Agenda

LA MESA MOBILITY COMMISSION AGENDA A Regular Meeting Date: Wednesday, May 6, 2026, 9:00 a.m. Location: City Council Chambers, 8130 Allison Avenue La Mesa, California Commissioners: Chair Mike Calandra Vice Chair Dinah Justice Commissioner Philip Cavello Commissioner Emma McClees Commissioner Alex Mueller Commissioner David Nichols Commissioner Shaun Sumner The public may view the meeting in-person or live using the following remote options: Teleconference Meeting Webinar https://www.zoomgov.com/j/1618000374 Telephone (Audio only) (669) 216-1590 or (669) 254-5252 Webinar ID: 161 800 0374 Copy and paste the webinar link into your internet browser if the webinar link does not work directly from the agenda. PUBLIC COMMENTS • In-Person comments during the meeting: Join us for the Commission meeting at the time and location specified on this agenda to make your comments. Comments will be limited to three (3) minutes. • How to submit eComments: eComments are available once an agenda is published. Locate the meeting in "upcoming meetings" and click the comment bubble icon. Click on the item you wish to comment on. eComments can be submitted when the agenda is published and until 24 hours prior to the meeting. eComments are limited to 3700 characters (approximately 500 words). eComments may be viewed by the Commission and members of the public following the close of the eComment submission period (24 hours prior to the meeting). Email your comment to traffic@cityoflamesa.gov if you have difficulty submitting an eComment. eComments will not be read aloud as a regular meeting item; however any member of the Commission or member of the public may do so during their respective comment time. PLEASE NOTE: Public Comment will be limited to 3 minutes per item. The timer begins when the participant begins speaking. Time cannot be combined or yielded to another speaker. Citizens who wish to make an audio/visual presentation pertaining to an item on the agenda, or during Public Comments, should contact the Public Works Department at 619.667.1166, no later than 12:00 p.m., the business day prior to the meeting day. Advance notification will ensure compatibility with City equipment and allow Commission meeting presentations to progress smoothly and in a consistent and equitable manner. Please note that all presentations/digital materials are considered part of the maximum time limit provided to speakers. Agenda reports for items on this agenda are available for public review at the Public Works Department, 8130 Allison Avenue, during normal business hours. Materials related to an item on this agenda submitted to the Commission after distribution of the agenda packet are available for public inspection at the Public Works Department, 8130 Allison Avenue, during normal business hours. ACCESSIBILITY: The City of La Mesa encourages the participation of disabled individuals in the services, activities and programs provided by the City. Individuals with disabilities, who require reasonable accommodation in order to participate in the Commission meetings, should contact the Human Resources Department 48 business hours prior to the meeting at 619.667.1175, fax 619.667.1163, or BCruz-Rivera@cityoflamesa.gov. Hearing assisted devices are available for the hearing impaired. A City staff member is available to provide these devices upon entry to City Council meetings, commission/board meetings or public hearings held in the City Council Chambers. A photo ID or signature will be required to secure a device for the meeting. Pages 1. CALL TO ORDER 1.1 INVOCATION Commissioner McClees 1.2 PLEDGE OF ALLEGIANCE Commissioner McClees Page 2 of 15 2. ADDITIONS AND/OR DELETIONS TO THE AGENDA 3. PRESENTATION 3.1 STREET MAINTENANCE PROGRAM PRESENTATION 4 Presented by: Chandler Kern, Assistant Engineer 3.2 LA MESA TROLLEY PRIORITIZATION PRESENTATION 5 Presented by: Cecily Taylor, Sr. Regional Planner 4. PUBLIC COMMENTS – (TOTAL TIME – 15 MINUTES) NOTE: In accordance with state law, an item not scheduled on the agenda may be brought forward by the general public for comment; however, the Mobility Commission will not be able to discuss or take any action on the item at this meeting. If appropriate, the item will be referred to Staff or placed on a future agenda. 5. CONFLICT DISCLOSURES 6. CURRENT BUSINESS 6.1 APPROVAL OF MINUTES FOR THE MOBILITY COMMISSION 6 REGULAR MEETING HELD WEDNESDAY, MARCH 4, 2026 Recommended Motion: Approve 6.2 APPROVAL OF 2025 NEIGHBORHOOD TRAFFIC MANAGEMENT 9 PROGRAM (NTMP) ANNUAL REPORT AND THE 2026 WORK PLAN Recommended Motion: Approve 7. STAFF AND COMMISSIONER ANNOUNCEMENTS Subcommittee and community engagement reports. 8. ADJOURNMENT The next regularly scheduled meeting is on Wednesday, June 4, 2026. The Invocation and Pledge of Allegiance will be led by Chair Calandra. Page 3 of 15 REPORT to the LA MESA MOBILITY COMMISSION From PUBLIC WORKS DATE: May 6, 2026 SUBJECT: Street Maintenance Program Presentation ISSUING DEPARTMENT: Public Works Staff will give a presentation on the annual street maintenance program. The program occurs in sequential zones every year with the aim of maintaining roads before they fall beyond their critical point. Staff will cover the variety of factors which lead to streets being selected, including but not limited to arterial and major collector designation, pavement condition index, PW Operations observation, and field visits conducted by engineer and inspector. Staff will also identify common constraints when planning pavement projects such as conflicting projects, availability of funding, and treatment choices. Staff will introduce the upcoming slurry project which will occur in the upcoming summer into the fall. The project will cover major arterials in zone 2 around Grossmont Center. Respectfully submitted by: Chandler Kern_______ Chandler Kern Assistant Engineer Page 4 of 15 DATE: May 6, 2026 TO: Mobility Commission FROM: Carly Cubberley, Engineering Project Manager VIA: Michael Throne, Director of Public Works SUBJECT: Downtown La Mesa Trolley Prioritization Project Planning Study Presentation SANDAG in partnership with the City of La Mesa is finalizing the Downtown La Mesa Trolley Prioritization Project, a planning study that evaluated solutions to improve connections to La Mesa and support more efficient trolley service. SANDAG staff will share an overview of preliminary concepts that can reduce or eliminate barriers to circulation at at-grade trolley crossings and improve access for all users. A link to the complete project report will be provided ahead of the meeting. This study is funded with a Caltrans Sustainable Transportation Planning Grant. Page 5 of 15 La Mesa Mobility Commission Minutes of a Regular Meeting Date: March 4, 2026, 9:00 a.m. Location: City Council Chambers, 8130 Allison Avenue La Mesa, California Present: Chair Mike Calandra Vice Chair Dinah Justice Commissioner Philip Cavello Commissioner Emma McClees Commissioner Alex Mueller Commissioner David Nichols Commissioner Shaun Sumner Staff: Director of Public Works/City Engineer Michael Throne Engineering Project Manager Michael Kinnard Senior Management Analyst Noemi Becerra Management Analyst Shauntenee Bradford Administrative Coordinator Vivian Macias _____________________________________________________________________ 1. CALL TO ORDER *Audio and video meeting recordings are available on the City website after approval of Minutes. Chair Calandra called the meeting to order at 9:00 a.m. 1.1 INVOCATION Commissioner Cavello Due to Commissioner Cavello's absence, an Invocation was not given. 1.2 PLEDGE OF ALLEGIANCE Commissioner Cavello Given by Chair Calandra 1 Page 6 of 15 2. ADDITIONS AND/OR DELETIONS TO THE AGENDA None. 3. PUBLIC COMMENTS – (TOTAL TIME – 15 MINUTES) NOTE: In accordance with state law, an item not scheduled on the agenda may be brought forward by the general public for comment; however, the Mobility Commission will not be able to discuss or take any action on the item at this meeting. If appropriate, the item will be referred to Staff or placed on a future agenda. None. 4. CONFLICT DISCLOSURES None. 5. CURRENT BUSINESS 5.1 APPROVAL OF MINUTES FOR THE MOBILITY COMMISSION REGULAR MEETING HELD WEDNESDAY, FEBRUARY 4, 2026 Recommended Motion: Approve Moved by Chair Calandra Seconded by Vice Chair Justice Yes (5): Chair Calandra, Vice Chair Justice, Commissioner McClees, Commissioner Mueller, and Commissioner Sumner Abstain (1): Commissioner Nichols Absent (1): Commissioner Cavello Motion Approved (5 to 0) 5.2 RECOMMENDATION FOR APPROVAL OF TEMPORARY SPEED HUMP PILOT PROGRAM Presented by: Brian Damiani, Traffic Engineering Consultant Recommended Motion: Approve Brian Damiani presented a pilot program for implementing temporary speed humps as an effective tool for traffic calming. Significant feedback, comments and questions ensued from the Commission. 2 Page 7 of 15 Moved by Commissioner Nichols Seconded by Commissioner Sumner Yes (6): Chair Calandra, Vice Chair Justice, Commissioner McClees, Commissioner Mueller, Commissioner Nichols, and Commissioner Sumner Absent (1): Commissioner Cavello Motion Approved (6 to 0) 6. STAFF AND COMMISSIONER ANNOUNCEMENTS Subcommittee and community engagement reports. 7. ADJOURNMENT The next regularly scheduled meeting is on Wednesday, April 1, 2026. The Invocation and Pledge of Allegiance will be led by Commissioner McClees. Chair Calandra adjourned the meeting at 9:28. 3 Page 8 of 15 REPORT to the LA MESA MOBILITY COMMISSION From the DIRECTOR OF PUBLIC WORKS DATE: May 6, 2026 SUBJECT: 2025 Neighborhood Traffic Management Program (NTMP) Annual Report and the 2026 Work Plan ISSUING DEPARTMENT: Public Works SUMMARY: Recommendation: That the Mobility Commission recommend to City Council adoption of the 2025 Neighborhood Traffic Management Program (NTMP) Annual Report and the 2026 Work Plan. BACKGROUND: The Neighborhood Traffic Management Program, which was originally adopted by City Council on January 13, 2004, requires that the list of streets requesting traffic calming be updated each year and that a traffic calming program status report be prepared. Traffic Calming Projects in Phase 1 (Initial Measures): For 2025, the following phase 1 measures were completed. 1. 7921 La Mesa Boulevard, Speed Radar Installation 2. Lemon Avenue (West of Bancroft), Edgelines 3. Wood Street at Lemon Avenue, No left turn restrictions 4. Murray Drive (East of Wakarusa), speed limit reduction 5. Orange Ave to Date Ave, raised marker installation 6. Spring Street (north of High Street), Speed Radar Installation, Signing, and Striping 7. City Hall, Temporary Speed Humps (Pilot Program) Page 9 of 15 Report to Mobility Commission Date: May 6, 2026 Page: 2 of 4 Traffic Calming Projects in Phase 2 (Design/Planning and Approval): Phase 2 measures typically consist of meetings with the neighborhood, designing, and obtaining consensus for permanent traffic calming elements. For 2025, Two streets were proposed for the design/planning and approval phase, Lois Street between Boulevard Drive and King Street and Dugan Ave between Laird Street and Lake Murray Blvd. Both segment plans were approved by their respective neighborhoods. Traffic Calming Projects in Phase 3 (Construction): Phase 3 is the construction of traffic calming elements planned and approved in Phase 2. For 2025 the following streets were proposed for Phase 3 construction, and have an anticipated completion by summer of 2026: Highwood Avenue – Installation of a speed table, chicanes, edgelines, speed radar, and updated striping and signage. El Paso Street – Installation of a roundabout, pedestrian island, flashing crosswalk, and updated striping and signage. DISCUSSION: Annual Traffic Management Work Plan The Work Plan for 2026 is based on both the completion of previous phases of work, and prioritized new requests that have been received from the community since the past adopted plan. Although these are summarized in Attachment A, the following discussions provide highlights of the progress and updates at each step of the evaluation and implementation process. The terminology in this report reflects the titles of the proposed revised phase descriptions. Requests, Petitions, and Ranking for Traffic Calming: Three completed petitions were received since the previous approved work plan. Data is being collected for all these locations and then ranked using the current policy. Traffic Calming Projects in Phase 1 (Initial Measures): Phase 1 measures typically consist of installation of signs and striping. However, temporary vertical elements are considered and installed, if applicable. For 2026, staff Page 10 of 15 Report to Mobility Commission Date: May 6, 2026 Page: 3 of 4 have proposed the following phase one project, with additional projects anticipated as they are received from public requests: Lake Murray Blvd (Marengo Avenue to Dugan Avenue) mobility study, due to community concerns with bicycle access, parking, and vehicular volume and speed study. Traffic Calming Projects in Phase 2 (Design and Approval): Phase 2 measures typically consist of meetings with the neighborhood, designing, and obtaining consensus for permanent traffic calming elements. Two streets are proposed for the design and approval phase: Bob Street (Between Lake Murray and El Paso Street) Jessie Avenue (Between El Cajon Blvd and Seneca). Traffic Calming Projects in Phase 3 (Construction): Phase 3 is the construction of traffic calming elements designed and approved in Phase 2. There are two segments that have completed Phase 2 design and received neighborhood approval (voting) and are awaiting Phase 3 construction as follows: Lois Street (Between King Street and Boulevard Dr) – The City has met with the neighborhood and developed a Traffic Calming plan (Phase 2) based on the consensus expressed at the meeting. The plan includes installing four speed humps and is ready for Phase III final design and construction. Dugan Avenue (Between Lake Murray Blvd and Laird Street) – The City has met with the neighborhood and developed a Traffic Calming plan (Phase 2) based on the consensus expressed at the meeting. The plan includes installing six speed humps and is ready for Phase 3 final design and construction. Temporary Speed Hump Pilot Program: The Temporary Speed Hump pilot program is anticipated to be studied over the next year for consideration, for future integration into the Neighborhood Traffic Management Program Policy. As part of the pilot program study, the previously mentioned two approved Phase 2 segments along Lois Street and Dugan Avenue will receive temporary speed humps this summer with anticipation to have permanent humps installed approximately 6 months later. CONCLUSION: Staff requests the Mobility Commission recommend to the City Council support of the following actions: 1. Approve the 2025 Neighborhood Traffic Management Program (NTMP) Annual Page 11 of 15 Report to Mobility Commission Date: May 6, 2026 Page: 4 of 4 Report. 2. Approve the 2026 Neighborhood Traffic Management Program work plan, which would include the following items: A. Begin Phase 3 construction on Lois Street between King Street and Boulevard Drive. B. Begin Phase 3 construction on Dugan Avenue between Lake Murray Boulevard and Laird Street C. Begin Phase 2 design on Bob Street between Lake Murray Blvd and El Paso Street. D. Begin Phase 2 design on Jessie Avenue between El Cajon Blvd and Seneca. E. Implement a Phase 1 design study for potential improvements along Lake Murray Drive between Marengo Avenue and Dugan Avenue Respectfully submitted by: ______________________ _Michael Kinnard __ Michael Throne, PE Mike Kinnard Director Public Works Engineering Project Manager Attachments: A. Ranked List of Streets – 2026 Work Plan Page 12 of 15 (Matrix Style) List of Streets for 2026 Neighborhood Traffic Management Program Attachment B Calming Element Current Phase Rank Street (Date petition submitted) Points 2026 Work Plan Phasing Detail Provided Completed Quadrant I (85th percentile speed is at least 7 mph over the speed limit AND the volume exceeds 50% of the target volume) Pedestrian Island, Speed Radar Signs, Striping, In 1 El Paso St. (Kelton to Amarillo) (05/07) 38 Progress Phase 2 Phase 3 Flashing Crosswalk, All- Way Stop or Roundabout, Reconfigured Striping, In 2 El Paso St. (Lake Murray to Jackson) (2005?) 38 Progress Phase 2 Phase 3 Chicanes, Speed Table, Edgeline Striping, Speed 3 Highwood Ave. (Eastridge to Cinthia) (03/14) 10 Radar Signs, In Progress Phase 2 Phase 3 4 Dugan Ave. (Lk Murray to Laird) (07/15) 12 In Progress Phase 1 Phase 2 5 Lois St. (King St to Boulevard Dr) (09/17) 54 In Progress Phase 1 Phase 2 Quadrant II (85th percentile speed is at least 7 mph over the speed limit BUT the volume does NOT exceed 50% of the target volume) 1 Bob St. (El Paso to Lake Murray) (10/06) 32 Legends, Signage Phase 1 2 Jessie Ave. (El Cajon Blvd to Seneca) (6/07) 33 Striping, Signage, Legends Phase 1 3 Harris St. (Pearson to Carmenita) (06/10) 19 Signage Phase 1 4 Gateside Rd. (05/12) 41 Striping, Legends Phase 1 5 Severin Dr. (Manor Dr. N to Louise) (07/18) 41 Striping, Legends, Signage Phase 1 6 Garfield St (Alpine St. to Alpine St.) (07/18) 16 Striping, Legends Phase 1 7 Henderson (Fernwood Dr. to Gregory Street.) (11/18) 40 Legends Phase 1 8 Maryland Ave (between Oakland and Guessman) (06/21) 24 Legends, Signage Phase 1 Quadrant III (85th percentile speed is NOT 7 mph over the speed limit BUT the volume exceeds 50% of the target volume) 1 Glen St. (Lemon to Alpine) (03/02) 23 Design Phase Phase 1 Phase 1/AB 43 2 Normal Ave. (Dale to Lemon) (09/01) 31 Crosswalks, Legends Phase 1 3 NB Yale Ave. (Sono to Orien) (07/08) 25 Striping, Legends, Signage Phase 1 4 Sacramento Dr. (06/10) 19 Striping, Legends, Signage Phase 1 5 Maple Ave. (Normal to Cinnabar) (04/11) 15 Signage Phase 1 6 Violet St. (Waite to Hoffman) (03/13) 15 Crosswalks, Striping, Legends Phase 1 7 Yale Ave. (University to Stanford) (11/13) 21 Legends, Signage Phase 1 8 Lemon Ave (Garfield to Wood) (11/17) 46 Striping, Signage, AB 43 Phase 1 9 El Paso St. (Cowles Mtn to Kimberly) (05/18) 15 Striping, Legends Phase 1 10 Orange Ave (Date Ave to Acacia Ave) (9/18) 14 Striping, RPMs None (New) Phase 1 11 Lemon Ave (Schuyler and Grant) (09/18) 32 Striping, Signage, Legends None (New) Phase 1 12 Lemon Ave (Nebo to Acacia) (02/19) 39 Striping None (New) Phase 1 13 Pomona (Univ to Colony) (10/19) 15 Striping, Speed Humps, Signage Phase 1 14 Stanford Ave (Pomona and Harbinson) (10/18) 23 Legends, Signage Phase 1 15 Date Ave (Between Orange and Allison) (11/21) 31 RPMs Phase 1 16 Lake Murray Blvd (Bob to Aztec) (5/22) 43 Design Phase None (New) Phase 1 17 Murray Hill/Waite Dr (Eastridge Dr to High St) (11/2022) 36 None (New) None (New) 18 Jackson Drive (Lemon Ave to La Mesa Blvd) (4/24) 43 Striping Phase 1 19 Glen St. (La Mesa to Lemon) (11/2023) 40 Design Phase None (New) Phase 1 20 La Mesa Blvd (Culowee St to University Ave) (7/2024) 48 Speed Radar None (New) 21 Jackson Drive (Dallas St to El Paso St) (10/24) 55 None (New) None (New) Page 13 of 15 22 Palm Ave (Echo Drive to High Street) (1/2024) 38 Design Phase None (New) Phase 1 23 Laird Street (Marengo to Jackson Dr) (12/24) 24 None (New) None (New) 24 Nagel Street (Mellmanor to Sarita) (03/26) 14 None (New) None (New) Quadrant lV (85th percentile speed is NOT 7 mph over the speed limit AND the volume does NOT exceed 50% of the target volume) 1 Aztec Drive (Baltimore Dr to Lake Murray Blvd) (1/19) 36 None (New) None (New) 2 Southern Rd. (Fletcher Parkway to Dixie) (08/08) 24 Legends, Signage Phase 1 3 Garfield St (Lemon to Mckinley Ct)(11/21) 26 Legends Phase 1 4 71st St. (Tower to Stanford) (01/11) 10 Signage Phase 1 5 Marian St. (Hoffman to Stuart) (9/14) 13 Legends, Signage Phase 1 6 Olive Ave. (University to Seneca) (05/15) 23 Speed Hump, Signage, Legends Phase 1 7 Hayes St./Washington Ave. (09/00) 14 Legends, Signage Phase 1 8 68th St. (Tower to Alamo to end) (09/21) 11 Legends, Signage Phase 1 9 Paula St. (Pearson St to Court) (01/18) 11 Signage Phase 1 10 Toni Lane (Between Tower and Alamo) (8/23) 15 Legends, Signage None (New) Phase 1 11 Randlett Dr (between La Mesa to Hayes)(09/20) 9 Legends Phase 1 12 Rolando Knolls (70th St to Gordon Wy) (12/19) 13 Legends Phase 1 13 73rd (Colony to Vassar) (08/21) 8 Legends Phase 1 14 Ohio Pl. (Jessie to Parks) (08/01) 11 Legends, Signage Phase 1 15 Beverly Dr. (09/03) 5 Legends Phase 1 16 Merritt Blvd (Mariposa-Panorama) (04/19) 8 Legends Phase 1 17 Bellflower Drive (Mariposa Street to end) (8/24) 7 Signage None (New) 18 Dana Dr. (Bonita to Camellia) (05/11) 6 Signage Phase 1 19 Blackton/Paula (12/14) 6 Striping Phase 1 20 Tanglerod Ln. (Cowles Mountain to Manon) (02/10) 5 Legends Phase 1 21 Broadmoor Drive (Kathy St to Jericho Rd) (11/24) 5 None (New) None (New) 22 Lubbock Ave (Elden St and Van Horn St) 4 Striping Phase 1 23 Van Horn St. (Lubbock-Odessa) (04/19) 3 Legends Phase 1 24 Bruce Ct (10/23) 2 Signage, Legends None (New) Phase 1 25 Lambda Lane (2/23) 2 Signage, Legends None (New) Phase 1 26 Sarita Street (Nagel St to end) (9/23) 2 None (New) None (New) 27 Elden St. (03/13) 1 Striping Phase 1 28 Lakeview Drive (Poppy to Amaya) (08/25) 18 None (New) None (New) 29 Eastridge Drive (Cinnabar to Rosarita) 11/25 7 None (New) None (New) Phase 1 30 34 Parks Ave (El Cajon Blvd to Seneca) (5/2024) WIP Speed Humps None (New) No petition provided. Pasadena (12/24) C:\Program Files\eSCRIBE\TEMP\16463975665\[16463975665,,,Attachment A - NTMP Matrix snapshot for MC 0526 mtg.xls]Sheet1 Revised 10/13/2025 Page 14 of 15 Street Comments Pasadena Ave Placed on matrix, but no petition provided 68th (Alamo to end) Merged with 68th (Alamo to Tower) Marguerita Lane Street from 2001. No petition found. Street removed from NTMP matrix New Classifications New Streets Quad 2 Quad 2 Maryland Ave (between Oakland and Guessman) (06/21) La Mesa Blvd (Culowee St to Quad 3 Murray Hill/Waite Dr (Eastridg Orange Ave (Date Ave to Acacia Ave) (9/18) Quad 3 Date Ave (Between Orange and Allison) (11/21) Jackson Drive (Dallas St to E Murray Hill/Waite Dr (Eastridge Dr to High St) (11/2022) Quad 4 La Mesa Blvd (Culowee St to University Ave) (7/2024) Bellflower Drive (Mariposa Str Laird Street (Marengo to Jackson Dr) (12/24) Broadmoor Drive (Kathy St to Sarita Street (Nagel St to end Lakeview Drive (Poppy to Am Page 15 of 15

Get email alerts for La Mesa

A daily email when new agendas and minutes are posted.

Report an issue with this meeting