Board of Works
Regular MeetingLafayette, IN · October 17, 2023
Minutes
BOARD OF PUBLIC WORKS AND SAFETY
MINUTES
October 17, 2023
Regular Session:
The Board of Public Works and Safety met in regular session on Tuesday, October 17, 2023 at 9:00 a.m. in the
Common Council Chambers. Members present were: Gary Henriott, Cindy Murray, Amy Moulton, Eric Rody
and Ron Shriner.
*Audio was not audible until 2 minutes, 14 seconds*
Jacque Chosnek, City Attorney, was also present.
President Henriott called the meeting to order.
The Pledge of Allegiance was given to the flag of our Country.
MINUTES
Mrs. Moulton moved for approval of the minutes from the October 10, 2023 regular meeting. Mrs. Murray
seconded. Passed. Mr. Rody abstained.
BID OPENING
Sagamore Parkway Trail
President Henriott stated that Addendum #4 was issued and the new Bid Opening Date will be October 24, 2023
at 9:00am.
NEW BUSINESS
Engineering
Change Order #1-S. 24th Street Concrete Project
Jeromy Grenard, Public Works Director, presented to the Board and recommended approval of Change Order #1
for the S. 24th Street Concrete Project with Dixon Construction. The change order includes removal and
replacement of damaged curb. The change order is an increase in the amount of $1,500.00 which brings the
revised contract amount to $50,842.50. Mr. Shriner moved for approval. Mr. Rody seconded. Passed.
Change Order #1-Miscellaneous Concrete Projects-1
Mr. Grenard presented to the Board and recommended approval of Change Order #1 for the Miscellaneous
Concrete Project-1 with Dixon Construction. The change order includes additional ramps and sidewalk transition.
The change order is an increase in the amount of $2,796.00 which brings the revised contract amount to
$39,485.00. Mrs. Moulton moved for approval. Mr. Rody seconded. Passed.
2023 Paving Loop Replacement Contract with Midwestern Electric
Mr. Grenard presented to the Board and recommended approval of the 2023 Paving Loop Replacement Contract
with Midwestern Electric. The scope of the work is to install loops and signal detector housing for the annual
paving project with the majority of these on Main Street from 5 Points to Sagamore Parkway. The contract is in
Board of Public Works and Safety
October 17, 2023
Page 2
the amount of $58,550.00 with Midwestern Electric. Mr. Grenard stated that five (5) companies were solicited for
this project that include Hawk Enterprises, James H. Drew, Michiana Contracting, Hoosier Company; and
Midwestern Electric. Discussion ensued regarding the quote and bid processes. Mrs. Murray moved for approval.
Mr. Rody seconded. Passed.
Purchasing
Resolution 01-2023 A Resolution Authorizing the Purchase of a Surplus Police Vehicle from the Town of
Otterbein, Indiana
Dave Payne, Purchasing Director, presented to the Board and recommended approval of Resolution 01-2023 A
Resolution Authorizing the Purchase of a Surplus Police Vehicle from the Town of Otterbein, Indiana. The
vehicle is a 2016 Ford Police Interceptor with 37,911 miles in the amount of $9,500.00. Mrs. Moulton moved for
approval. Mr. Shriner seconded. Passed.
Declaration of Surplus Property-Lafayette Renew
Mr. Payne presented to the Board and recommended approval of a Declaration of Surplus Property that includes a
2014 Tymco/Isuzu Street Sweeper Model #435 VIN #JALE5W169E7900504 City Id #31153-1 Sweeper Serial
#201412SNC45510. Mr. Payne stated that the item will be traded in on an upcoming purchase of a new street
sweeper. Mrs. Murray moved for approval. Mr. Rody seconded. Passed.
CLAIMS
Jeremy Diehl, Controller, presented for Board approval of Claims in the amount of $770,378.38. Mrs. Murray
asked a question on Page 11 regarding the Advance Repair & Machine Inc Invoice for Wood Platform for Grey
Training Towers at the Training Center. Mr. Diehl stated that is at the Fire Department Training Center on VMP.
Discussion ensued. President Henriott asked a question on Page 9 regarding the Osburn Associates Inc for Green
Sheeting. Mr. Diehl stated that he will get back to the Board with an answer. President Henriott asked a question
on Page 9 regarding the Motorola Solutions Inc for Radios and Device Programming. Mr. Diehl stated that the
radios are renewed annually. This a purchase funded by some of the township money that was received from
Fairfield and Perry Townships. Discussion ensued. Mr. Rody moved for approval. Mr. Shriner seconded. Passed.
Time: 9:14 a.m.
BOARD OF PUBLIC WORKS AND SAFETY
Gary Henriott s/s
President
ATTEST: Sue Scott s/s
Sue Scott, Deputy Clerk
Minutes written by Mindy Miller Riehle, 1st Deputy Clerk
*A digital audio recording of this meeting is available in the Lafayette City Clerk’s Office or online at
http://www.lafayette.in.gov/agendacenter.
**A list of all permits issued for the preceding month is available at
http://www.lafayette.in.gov/DocumentCenter/Index/375
Get email alerts for Lafayette
A daily email when new agendas and minutes are posted.