Lake Structure Appeals Board Regular Meeting
Regular MeetingLake Lure, NC · April 28, 2026
Minutes
MINUTES OF THE REGULAR MEETING OF THE TOWN
OF LAKE LURE LAKE STRUCTURE APPEALS BOARD
REGULAR MEETING
Tuesday, April 28, 2026 at 1:30 p.m.
THIS MEETING WAS HELD AT LAKE LURE TOWN HALL
CALL TO ORDER
Al Joyner called the meeting to order at 3:15 pm.
I. ROLL CALL
Board Members Present:
Al Joyner
Mark Windfeldt
David Lusk
Melvin Owensby
Kimberly Sayles
David DiOrio, Council Liaison
Anthony Steffel, Alternate
Kathleen Hatfield, Alternate
Andrew Knowles, Alternate
Absent:
Town Council Members present:
Commissioner David DiOrio, Council Liaison
Town Hall Staff Members Representative Present:
Michael Williams, Community Development Director
Richard Carpenter, Development and Environmental Review Specialist
Kimberly Martin, CDD Administrative Specialist/Town Clerk
II. APPROVAL OF AGENDA
Melvin Owensby made a motion to approve the agenda as presented. David Lusk
seconded the motion and all were in favor.
III. Approval of March 24 Meeting Minutes
Melvin Owensby made a motion to approve the minutes as presented. David Lusk
seconded the motion and all were in favor.
IV. Public Comments
No public comments were made.
VI. Old Business
No old business to discuss
VII. New Business
A. Brief review of Section 6-51 of Lake Structures Ordinances: Design and
Construction Standards
The board reviewed key lake structure ordinance standards and emphasized the
need for strict adherence despite recent natural disaster impacts.
Ordinance details clarify shoreline and structure limits with a minimum shoreline
requirement of 100 feet for constructing lake structures, set since December 15, 1992.
Properties with less than 100 feet shoreline face limits, allowed only docks without
covered structures. Covered structures like boathouses must stay within 45 feet or
45% of shoreline width, whichever is less. These rules explain why some owners feel
frustrated when neighbors have boathouses, but they cannot build their own.
Restrictions on structure projection and setbacks are strictly enforced with a
maximum projection of 30 feet from shoreline lines and a 15-foot height limit
measured from full pond level to roof peak. Structures destroyed involuntarily by
storms can be rebuilt within original setbacks. Variances can be requested but no
exceptions beyond 30 feet projection are allowed. The height limit includes decks but
excludes railings, and accessory structures require separate review. The town
extended the rebuilding deadline for Helene-damaged structures to December 31,
2026 to accommodate contractor shortages and storm recovery delays. Normal
rebuilding time is typically six months to one year, but extensions reflect realities of
post-storm conditions. About 30 to 40 boathouses have been removed or lost due to
storm damage. Remaining older structures are monitored closely for safety and may
be condemned if hazardous. Pre-1992 structures lack engineering standards and pose
erosion and safety risks leading to increased scrutiny on older boathouses.
Engineering standards requiring pile driving to point of resistance or bedrock began
in 1992. Older boathouses suffered more erosion during extreme lake level drops and
severe weather events. The board expects stricter enforcement and possible
condemnation of unsafe structures, especially on upland property. The discussion
clarified construction standards and engineering requirements for lake structures,
highlighting gaps and practical realities.
Typical boathouse construction targets pile driving to resistance or bedrock, with a
minimum embedment of four feet. Some builders stop driving piles when resistance
is met, which varies by soil and water conditions. Engineering calculations consider
soil friction and water saturation for structural stability. There is no universal
requirement, but good practice involves reaching resistance to ensure safety
Lake Lure building codes require engineered designs only if a domicile exists on the
property. Accessory structures like boathouses do not always require professional
engineering unless attached to a dwelling. This discrepancy raises concern since
boathouses can pose navigation and safety hazards like other structures. The board
noted this as a gap in regulation that might need future review. Board members
expressed challenges balancing practical construction limits with ordinance
restrictions. The 30-foot maximum projection can limit boathouse usability on narrow
or curved shorelines. Variances are rare and complex due to the ordinance’s strict
wording. The approach aims to protect views and shoreline use fairness despite
property shape variations. The board reviewed the ongoing impact of recent storms
on lake structures and recovery progress.
V. ADJOURNMENT
Melvin Owensby made a Motion to adjourn the meeting. David Lusk seconded the
motion and all voted in favor.
ATTEST:
____________________________ ____________________________
Kimberly Martin, Town Clerk Al Joyner, Chair
Agenda
TOWN OF LAKE LURE
Lake Structure Appeals Board
Tuesday, April 28, 2026 at 1:30 PM
Community Development Dept, 920 Buffalo Creek Rd.
Agenda
I. Roll Call
II. Approval of Agenda
III. Approval of March 24 Meeting Minutes
V. Public comments (if any)
VI. Old Business (none scheduled)
VII. New Business
A. Brief review of Section 6-51 of Lake Structures Ordinance: Design and Construction
Standards.
VII. Adjournment