Muyni
← Back to Lake Park

Third Workshop on the Park Avenue Land Reduction (Road Diet) Project

Regular Meeting

Lake Park, FL · May 6, 2023

AgendaPacketMinutes

Minutes

Lake Park Town Commission, Florida Third Public Workshop Park Avenue Lane Reduction (Road Diet) Project Saturday, May 06, 2023 at 9:00 AM Commission Chamber, Town Hall, 535 Park Avenue, Lake Park, FL 33403 CALL TO ORDER 9:15 A.M. SPECIAL PRESENTATION/REPORT: 1. Third Public Workshop Associated with the Park Avenue Lane Reduction (Road Diet) Project. Public Works Director Roberto Travieso explained what was being presented. He introduced the Commission and Town Manager John D’Agostino. Susan O’Rourke with O’Rourke Engineering & Planning; Adam Swaney with Engenuity Group, Inc. and Hays Henderson with JMorton Planning made a presentation (see Exhibit "A"). Project Manager John Wille explained next steps and timeline. A member of the audience asked staff to address cars parking for extended periods of time on Park Avenue. Ms. O’Rourke stated that staff would review enforcement for extended parking issues. Town Manager D’Agostino explained that signage would be installed along Park Avenue and cars would be towed if they do not follow the parking regulations. The member of the audience asked questions regarding the bioswales maintenance and the type of trees being installed. Ms. O’Rourke stated that the Town would be responsible for maintaining the bioswales. She explained that they would try to be consistent with the type of trees planted along Park Avenue and there were opportunities to discuss trees during this session. A member of the audience asked how the new drainage and bioswales were designed. Mr. Swaney explained that the drainage would be below the bioswales. He stated that particular areas could be identified on the map in the back of the room. Town Manager D’Agostino explained that there are currently bioswales installed on Lake Shore Drive that are working effectively. Mr. Scott Brown, 205 Park Avenue explained that there was a bus stop in front of his home. He noticed that there was no cut-in for buses to pull back onto the road. He asked if buses would block the road when dropping off or picking up passengers. Ms. O’Rourke explained that they are in conversation with Palm Tran for solutions. The street would be designed to slow traffic, so they would not be installing cut-out for buses to pull into while loading and unloading passengers. She stated that bus shelters was also being discussed. Commissioner Mary Beth Taylor asked if shade trees were being installed. Public Works Director Travieso explained that fully grown trees would not be planted, therefore, it would take some time before the trees offer shade. Commissioner Taylor asked if they would transplant trees into personal property. Mr. Henderson explained that it would be a larger task to transplant trees due to responsibilities and liabilities that come along with doing so. He explained that there would be many logistical issues to Regular Commission Meeting May 06, 2023 Page 1 Third Public Workshop on the Park Avenue Lane Reduction (Road Diet) Project EXHIBIT A Public Works Department Saturday, May 6, 2023 Project Team  Members of the Town Commission  John D’Agostino – Town Manager  Roberto Travieso – Public Works Director  Susan O’Rourke, P.E. – Lead Engineer  Adam Swaney, P.E. – Civil Engineer  Hays Henderson, PLA – Landscape Architect  John Wille – Capital Projects Manager Public Workshop Agenda 1. Introductions 8. Project Illustrations 2. Project Background 9. Implementation Timeline 3. What is a Road Diet? and Next Steps 4. Public Input on Design Elements 10. Q&A 5. Civil Design Plans 11. Table Discussions 6. Public Input on Landscape 7. Landscape Design Plans 12. Closing Comments Project Background SUSAN O’ROURKE, P.E. Project Area What is a Road Diet?  Reduction in the travel way  Enhancement of the Corridor  Balance of Needs in the Corridor o Drainage o Beautification o Parking o Other travel modes Should Park Avenue be Reduced?  Park Avenue demand is for two-lane now and in the future  Speed Limit: 25 MPH, School Zone: 20 MPH  History of excessive speeds and traffic accidents—requires mitigation Previous Public Input Definitely Needed Somewhat Needed Not needed 22% Multimodal Path 44% 33% 44% Wide Sidewalk w/ Street Furniture/Landscaping 56% 89% Protected Sidewalk 11% 33% Bike Lanes on Street 11% 56% Previous Public Input Definitely Needed Somewhat Needed Not needed 56% Median in Center of Street 11% 33% 33% Painted Centerline 33% 33% 44% On Street Parking 33% 22% 56% Bio-Swales 33% 11% Previous Public Comments  Consider a phased-in approach to complete project  Include latest safety and lighting technology; paint new lines  Do not change the existing lighting  Add security cameras  Bike lane should not be between travel lanes and street parking  Improve school zone markings  Prefer multi-use path than dedicated bike lanes  Need protected crosswalks 60% Design Plans (Typical Blocks) SUSAN O’ROURKE, PE ADAM SWANEY, PE Preliminary Layout Preliminary Layout Previous Public Input – Landscape HAYS HENDERSON, PLA Previous Public Input – Landscape CANOPY TREE PREFERENCE Bulnesia, 15% Live Oak, 46% Gumbo Limbo, 39% Previous Public Input – Landscape PALM TREE PREFERENCE Sabal Coconut 5% 0% Foxtail 18% Royal 50% Date 27% Previous Public Input – Landscape SMALL TREE PREFERENCE Gieger Tree Green Dahoon Holly 0% Buttonwood 9% 0% Japanese Blueberry 18% Tabebuia 73% Previous Public Input – Landscape SHRUBS & GROUND COVER PREFERENCE Muhly Gtass 13% Society Garlic Thryallis 13% 35% African Iris 15% Coontie 24% Previous Public Input – Landscape BIOSWALE PLANTING PREFERENCE Mulhy Grass 19% Coontie 25% Milkweed 19% Tickseed 18% Sage 19% Landscape Design Plans (Typical Blocks) HAYS HENDERSON, PLA Landscape Plans Landscape Plans Project Design Illustrations HAYS HENDERSON, PLA Park Avenue, between 4th Street and 5th Street (East View) Park Avenue, between 6th Street and 7th Street (East View) Implementation Timeline & Next Steps JOHN WILLE, CAPITAL PROJECTS MANAGER Implementation Timeline & Next Steps Project Team will:  Analyze public input for potential inclusion in project’s design  Develop 90% design plans  Continue to investigate and leverage grant funding opportunities to support project implementation  Final Workshop proposed for Spring 2024  Possible implementation during Calendar Years 2024/2025 Questions & Comments Table Discussion DURATION: UP TO 1 HOUR Table Discussion 1. Discuss available maps/table arrangements 2. Property Owners/Tenants are encouraged to locate their property on the maps and discuss concerns with members of the design team  Table 1: Full complete civil plan (driveways, on-street parking, etc.)  Table 2: Full Landscape Plan Connect with Us!  New Service Request Portal o Request Service o Report Issues (561) 657-3918 publicworks@lakeparkflorida.gov SCAN AND BOOKMARK ME!

Agenda

Third Public Workshop Park Avenue Lane Reduction (Road Diet) Project Saturday May 6, 2023, 9:00 AM – 12:00 PM Commission Chambers, Town Hall Meeting Agenda Facilitator: Roberto Travieso, Director of Public Works WELCOME/OPENING COMMENTS ROBERTO TRAVIESO INTRODUCTIONS PRESENTATIONS SUSAN O’ROURKE, P.E. ADAM SWANEY, P.E. HAYS HENDERSON, PLA IMPLEMENTATION TIMELINE/NEXT STEPS JOHN WILLE Q&A ROBERTO TRAVIESO TABLE DISCUSSION ROBERTO TRAVIESO SUSAN O’ROURKE, P.E. ADAM SWANEY, P.E. HAYS HENDERSON, PLA JOHN WILLE CLOSING COMMENTS JOHN D’AGOSTINO

Get email alerts for Lake Park

A daily email when new agendas and minutes are posted.

Report an issue with this meeting