A. Village Board & Board Committee
Regular MeetingLake Zurich, IL · December 5, 2012
Agenda
Village of
Lake Phone: (847)4313-514"1
70 E. Main Street Zurich Fax (847) 540-1768
Lake Zurict1. ll 60047 Web: www volz.orsJ
PUBLIC NOTICE OF SPECIAL MEETING
OF THE LAKE ZURICH COMMITTEE OF THE WHOLE
Public Notice is hereby given that there will be a special meeting of the
Lake Zurich Village Board Committee of the Whole on December 5, 2012 at
7:00 P.M. This meeting will be held at the Lake Zurich Police Facility, 200
Mohawk Trail, Lake Zurich, Illinois, in accordance with the Illinois Compiled
State Statutes.
AGENDA
1. Call to Order and Roll Call: President Branding, Trustees Halen,
Mastandrea, Poynton, Rzeznik, Sprawka, and Sustich.
2. Approval of minutes, October 23, 2012
3. Discussion on consolidation of Fire Stations
4. Adjournment
The Village of Lake Zurich is subject to the requirements of the
Americans with Disabilities Act of 1990. Individuals with disabilities who
plan to attend this meeting and who require certain accommodations so that
they can observe and/or participate in this meeting, or who have questions,
regarding the accessibility of the meeting or the Village's facilities, should
contact the Village's ADA Coordinator at (847) 438-5141 (TDD# 847·438-2349)
promptly to allow the Village to make reasonable accommodations for those
persons.
~aA~-£~
Susan T. Ragsdale
Deputy Village Clerk
Faxed: November 29, 2012 Herald, Courier
Posted: November 29, 2012 Web site
C: Packets
Village of
Lake Phone (84 7)438-5141
70 E. Main Street Zurich Fax: (847) 540-1768
Lake Zurich, IL 60047 Web: www.volz.org
MEMORANDUM
Date: November 30,2012
To: Mayor and Village Board of Trustees __\$
From: Jason T. Slowinski, Village Mana~
Subject: Village Board Workshop-Discussion of Station Consolidation
Issue: A Committee-of-the-Whole workshop meeting has been scheduled to discuss a plan
presented by the Fire Chief for consolidation of fire stations. Station consolidation presents the
opportunity for some significant long-term cost savings. A separate report from Fire Chief
Wheelock with details on station consolidation will be forwarded to the Board for consideration.
In meeting with the Chief and other Command staff to review this plan, the concept of
incorporating Village Hall offices into the station consolidation plan was discussed. This
memorandum addresses the potential benefits of the concept of incorporating Village Hall
offices into the overall consolidation plan.
Analysis: As will be presented in more detail, the fire station consolidation plan involves
closing two stations (Station #1 and Station #4) and building a new station (including fire
headquarters) at a location roughly in between the existing station locations. Staff considered
broadening the scope of the project to include the construction of space sufficient to house the
Village Hall offices at the new station location.
This concept leverages existing Village assets (primarily Village Hall and Station #I) to build a
project that considers additional needs of the Village that will:
1. Enhance the operational functionality for both fire department operations and
Village Hall operations.
a. The Fire department would have greater flexibility in staffing a single station
rather than two separate stations and can more readily adjust staffing based on
RE: Village Board Workshop-Discussion of Station Consolidation
November 30, 2012
Page2
operational conditions and requirements. In addition, station configuration is
more "ideal" than current locations. Chief Wheelock's report will address these
points in more detail.
b. An opportunity would exist to create a "one stop shop" for permitting/inspections.
Builders/developers/business owners could obtain necessary permits, arrange for
all inspections, meet with inspectors (both building and fire), and pay for permits
all at one location and one counter. Creates the opportunity for cross training
personnel thereby allowing for greater operational flexibility.
2. Reduce existing and long term maintenance expenses on aging facilities.
a. The burden of maintaining three aging facilities (two Village owned; one
LZRFPD) would be reduced to one new facility thereby reducing significant
maintenance expenses (roof, HVAC equipment, carpet, etc.) over the course of a
I 0-15 year period.
b. Existing normal facility expenses (heating, lighting, minor repair, etc.) would be
reduced in the same manner.
3. Generate new revenues for the Village in both the TIF Fund and General Fund by
adding more taxable property to the tax rolls.
a. The current Village Hall site would be transferred to a private (rather than public)
entity thereby generating new taxable property within the TIF district. Since the
property was publicly owned at the inception of the TIF district, it generated no
property taxes and, therefore, taxes were frozen at "zero". Any new property
taxes generated from the parcel would be categorized as 100 percent TIF
increment.
b. Add additional taxable property to our tax rolls outside of the TIF District from
the sale of Station #1. This would benefit the Village's general fund.
4. Create a desirable parcel for new development in the downtown TIF District
without the need to acquire additional parcels.
a. The current Village Hall site has the appropriate size and prominent location for a
new development project without the need to acquire additional parcels and
without immediate adjacent single-family residential parcels with which to
contend. The parcel is made more attractive with high traffic counts (and
enhanced exposure) near the traffic light at Church and Main.
5. Create a more safe, healthy, and positive experience for Village employees,
residents, and guests that use and visit Village Hall.
a. The proposed arrangement presents an opportunity for the Village to create a
government complex worthy and representative of our community-the hub and
regional center of southwest Lake County and the northwest suburbs.
b. There are numerous safety deficiencies in the current Village Hall that pose
increased liability for the Village. There are no immediately accessible public
RE: Village Board Workshop-Discussion of Station Consolidation
November 30, 2012
Page 3
restrooms in the Village Hall building and none on the main public floor (1 ''
floor).
c. There have been previous health concerns in Village Hall, including the presence
of mold in the basement
d. Village Board meetings--our most public interactions-ate held in a windowless,
damp basement, and are not representative of the values of which our Village
aspires (e.g. transparency, etc.)
6. Creatively finance our capital improvement needs without adding and additional
debt burden to the Village or depleting our reserves.
a. Utilizing funding from the LZRFPD and potentially from the sale of Station #I,
the Village could contribute to the construction of the new facility without the
need to issue new debt or deplete existing precious reserves.
7. Demonstrate our commitment to utilizing intergovernmental agreements to plan for
critical existing and future capital, operational, and staffing needs.
a. An intergovernmental arrangement of this nature would be a model for local
governments throughout our area and demonstrates to our stakeholders that we
are thinking creatively to get the "biggest bang for our buck."
Recommendation: The concept outlined above will be reviewed in more detail on December
s'h. Obviously, this plan is very conceptual and more analysis will be required should the Board
wish to explore further. This item is presented for discussion and consideration at this point in
time.
I
I
I
I
I
I
I
I
I
I
I
I
Village of
Lake Phone: (847) 438-5141
70 E. Main Street Zurich Fax: (847) 540-1768
Lake Zurich, IL Web: www.volz.org
60047
MEMORANDUM
Date: November 29,2012
To: Jason T. Slowinski, Village Manager
From: David P Wheelock, Fire Chief/EMA Director
Subject: Station Consolidation/Options
Issue: In an ongoing process of reviewing department operations, it was identified that there may
be opportunities to adjust our current 4 station model. In addition, after initial discussions with
you and your staff, some additional options have been broached to explore.
A detailed report covering this project is attached.
Analysis: The attached report lays out our analysis and all facets of the project.
Recommendation: The Committee of Whole Meeting scheduled for December 51h is essentially
where we are at in the recommendation process. We need to establish the Village Board's desire
and intent to pursue this project.
w/Attachments: Consolidation Report
Lake Zurich Fire Rescue Station Consolidation Concept 1
Consolidation of Lake Zurich Fire Rescue Department
Station # 1 and The Lake Zurich Rural Fire Protection
District Station # 4
Concept Overview
The Village of Lake Zurich Fire Rescue Department is in a position to increase efficiency,
productivity, and provide for long-term departmental operational and financial sustainability
through the process of fire station consolidation. The Village of Lake Zurich Fire Station #1 and
the Lake Zurich Rural Fire Protection District Fire Station #4 are the subjects of consolidation, into
one large centralized station. The location desired is near the intersection of US Highway 12
between Cuba and South Old Rand roads, with collaboration efforts focusing on co-locating the
new fire station within the development of a new retail center and realignment of South Old Rand
roads. Consolidation of the services provided by these two stations can be a cost effective way to
provide appropriate level of service while covering the greatest populations, within our geographic
service area.
To date, this concept has been broached with the Rural Fire District Board and they are willing to
review the concept further. In addition, The District Board has sought out a potential buyer for the
current station # 4 located on Field Parkway in Deer Park. There is interest in working out the
details of a sale/purchase.
The next step is to identizy if the Board of Trustees of the Village of Lake Zurich support this
conceptual idea and begin to clarizy details.
There are a number of reasons that this project is being presented. One of the greatest reasons is
the belief that Station #4 is not in the best location to serve the entire fire district. Given National
Fire protection Association (NFPA) and Insurance Services Office (ISO) response parameters, The
majority of station #4's main response area is not even within the fire district. Ultimately, better
placement of those resources could lead to more efficient response to a greater area.
Secondly, the department continues to come under funding scrutiny with very little room to
maneuver given that four (4) physical locations are being staffed at this time. The Fire District
clearly invested into trying to provide adequate response times to a district area of 25 square miles
by building 3 district stations. The Village of Lake Zurich has operated one fire station since the
department went full-time in 1988. The District is not amenable to dropping staffing at any ofit's
current locations as that would impact response in those areas significantly. After having dropped
two (2) people per day at station 1 back in 2009, the contract was amended to ensure that the
Village provides at least three (3) people per day at station 1. Thus, any further drop in staffing
would not meet the contract, and if it came from station 1, response in the Village areas would be
greatly diminished.
Lake Zurich Fire Rescue Station Consolidation Concept 2
Locating a new facility along a specific Rt. 12 corridor would allow the department to maintain
response times to a greater area from the consolidated location and only be maintaining three (3)
facilities. The concept is to continue running four (4) companies district wide, but if funding of
department operations is not maintained from the Village side, some further reductions in daily
staffing could probably be instituted, with all parties acknowledging the reduced numbers.
Essentially this would relate to monitoring over-time costs by not filling the four company slots if
that model is not supported. There is no recommendation to drop below the accepted four (4)
company staffing as a permanent model. This is only relative to a daily assessment of
capabilities. Ultimately, the Village of Lake Zurich must determine the size, quality and
scope of Fire and EMS services it wishes to provide to its residents. The continued
uncertainty is problematic. This concept is covered in depth in the following pages.
Relative to the station concept itself, there are several areas to cover in regards to this project:
Funding of the capital costs
Facility concepts
Cost savings potential
Staffing
Funding of Capital Costs
At this early stage of planning the following assumptions are being worked with.
• The Lake Zurich Rural Fire Protection District, in concept would like to be the
owner and primary operator of the new facility. The District is financially stable
and able to commit to this project.
• The anticipated proceeds from the eventual sale of the two decommissioned stations
could provide some of the funding needed for the new construction.
• The first option is to research potential private/public land transfers or donations as
the primary goal for the land. If we are unable to work out a deal on the land,
research all potential sites and costs.
• Going forward new parameters on cost sharing would be brought into the District
and Village contractual agreements. This is based upon the fact that as a
headquarters station, the Village is a large user and benefactor of this new facility.
• Explore the newest concept of possibly co-locating the Village of Lake Zurich
Village Hall within the new complex.
Facility Concepts
The new facility will be constructed as a new Headquarters station, accommodating the
Administrative, Operations, and Fire Prevention services' for the Fire Rescue Department. The
building would include 18,000 square feet of office space divided between two floors over a full
walkout basement intended for storage of records, a public meeting room, and fire safety center.
Additionally, approximately 8000 square feet of accommodations for operations of shift personnel
will be over a full basement. The apparatus arrangement would be centered between the office
Lake Zurich Fire Rescue Station Consolidation Concept 3
space and operations area consisting of four full drive through bays and a training/hose tower.
This would support the four (4) company operation and all other department needs.
In addition, the Fire District is open to discussions on how the building could be expanded to co-
locate the village hall operations into the new location. It has been mentioned that for this to occur
the land would need to be within the Village of Lake Zurich Corporate boundaries. Public areas
such as the public meeting room would simply need adjusting to accommodate Board meetings, so
that was essentially already in place. Part ofthe Fire Prevention offices included possible co-
location of Building and Zoning operations. So the remaining administration offices is where we
would likely require an additional floor.
I can't stress enough that the concept needs approval first and then progress to more concrete
planning.
Cost saving potential
A review of cost saving on an annual basis was undertaken. Annually, the operating budget for the
Fire Rescue Department includes utilities; office supplies; station supplies; station maintenance;
and lease agreements for phones, copy machines, and the like. When consolidating from two
stations down to one, there is potentially small incremental savings on these items currently
estimated at $40,000.00 annually. Additionally, with the removal of one facility, there are long-
term capital cost/improvements that are eliminated from future budgets. For example, as
submitted in the Capital Improvement plan through FY18, we have identified that in the next three
fiscal years, the Village of Lake Zurich Fire Station #1 needs more than $184,000 in
updates/repairs.
Additionally, the construction features of a new facility, that follow the U.S. Green Building
Council recommendations, may lead to other efficiencies in water, energy, and indoor
environmental qualities.
The inclusion of the Village Hall has not been examined yet. Certainly some significant savings
could be projected by eliminating another physical building, especially one that has maintenance
issues arising also. Efficiencies in office equipment and such are also likely.
Having this building located within the Village could also afford additional savings to the District
through Com Ed, NICOR, and Village water utility agreements as one example.
Staffing
Staffing of any fire station is based upon a cost-benefit analysis that every entity must consider
when looking to provide emergency services.
Village of Lake Zurich Fire Station #1 is currently staffed minimally by three career
Firefighter/Paramedics that provide for a jump company between an Ambulance or Engine. The
current Aerial Truck is scheduled for removal from service in mid December 2012 and will no
longer be a part of the jump company response as of then. On occasion, the station drops to a two
Lake Zurich Fire Rescue Station Consolidation Concept 4
person ambulance, during non-peak overnight hours, to meet over-time budget expectations. On a
long term basis, the ultimate desired level of service needs to be determined and funded.
Additionally, this station houses' a Shift Commander and other unmanned specialty equipment.
The Fire Rescue Administration operates out of this facility with four day staff positions and an
Office Manager.
Lake Zurich Rural Fire Protection District Station #4 is currently staffed by three career
Firefighter/Paramedics that provide for a jump company between an Ambulance and Engine.
One reason for considering the consolidation of Station's #1 and #4 into a new headquarters
station, in relation to staffing, is the inefficiencies of the current Station # 1 facility and the
separation of the Fire Prevention Bureau, currently located at Lake Zurich Rural Fire Protection
District Station #3. Future consideration of incorporating Building and Zoning and instituting a
Community Development Office under the Fire Rescue Department may be something for
consideration also. This may not be as viable if the facility is not located within the Village
boundaries. The statements above in italics were considered before the Village Hall option was
broached
Operational staffing in the new Headquarters Station would allow for, minimally six
Firefighter/Paramedics that would provide two companies to respond to any type of incident on a
response priority basis. Additionally, this station will accommodate the Shift Commander and
provide storage for other unmanned specialty equipment. Essentially, having multiple companies
in one facility, we could provide a combination of staffing alternatives based on call type, location,
and resources required. This would also include anticipated improved response times, of a
multiple unit response, within the stations established still districts.
Historically, the Fire Rescue department has allocated considerable amounts of resources toward
minimally staffing four facilities. During the past five fiscal years, the average expenditure has
been more than $375,000.00 annually to support minimum operations. When considering a three
station (four companies) model, different strategies may be employed to reduce the overtime
expenditures if the Village chooses a funding level that cannot support the current operations. An
issue that would also be cause for contract negotiations with the District Board.
New Opportunities
Education & Safety
There is tremendous potential for the Fire Rescue Department to partner with local entities to
collaborate with safety training, public education, and fire prevention within the confines of the
new facility. Additionally, the Fire Safety Center could double as a public meeting room. This is
an area to explore and expand upon as more is known as to the exact location and nature ofthe
project. As an example, if we were to be fortunate to develop a relationship on the land, and if it
falls within a development, perhaps the anchor vendor may wish to receive recognition of such by
assisting with the Fire Safety Center. Shared naming rights so to speak.
Analysis of the consolidation concept
Lake Zurich Fire Rescue Station Consolidation Concept 5
Levels of Service-Evaluation
The first step in analyzing if a combined station system would benefit the residents and visitors of
the Village of Lake Zurich and the Lake Zurich Rural Fire Protection District was to understand
issues associated with Levels of Service (LOS), standards and mandates regarding fire rescue
service, and if a combined station would improve these levels of service. It is important to
recognize that when a fire rescue station is established within a particular geography, some of the
citizenry protected will be "next door" to the fire station and some will be at the far-reaching area
of that station, however, still within an expected "LOS" delivery area. It should also be recognized
that placement of a fixed fire station building alone does not guarantee a more rapid response to
any particular area. Other important factors that must be recognized in providing an expected LOS
include, but are not limited too:
• Number of incidents that may keep a station's unit (unavailable) or total committed time.
• Number of separate apparatus able to respond, from any one station.
• Natural or man-made barriers, such as railroad crossings, water masses and inaccessible
roadways.
• Are apparatus in a station at a time of call or are they in the community training,
responding from a secondary location (another distant station), or Automatic Aid
Units/Agreements.
• Back-up time from any of the nearest available emergency unit.
An accurate diagnostic of our LOS is measured by utilizing an annual review of all calls within a
specific geographical zone and the average ability in which Fire Rescue resources were able to
arrive at the emergency within a prescribed time benchmark. The data collected and researched has
been recorded and calculated for a period of20 months.
Level of Current Service
Process
The following standards are used when developing a Fire Rescue service delivery response model:
• Emergency Medical Service (EMS) studies have indicated that patients who have suffered
cardiac arrest, trauma, or stopped breathing must receive life sustaining treatment within
four to six minutes to prevent permanent damage to the body system and brain damage
(Meyers, 1994 \American Heart Association, 1999).
• The National Fire Protection Agency (NFPA) recommends, the first fire due engine should
be within 2 miles of residential, 1.5 miles within commercial areas and within I mile of
buildings that require more than 5,000 gallons per minute fire flow and service level
objectives should be established by the jurisdiction for technical rescue, hazardous
materials response, emergency medical services (EMS) as well as fire suppression. In each
of these criteria, apparatus and equipment objectives should be identified, along with
response times and staffing.
Lake Zurich Fire Rescue Station Consolidation Concept 6
• The Insurance Services Office (ISO) recommends that first due fire engine should be
located within 1.5 miles of major built up areas. Travel distances of 5 road miles or more.
• The International City Management Association advocates utilizing a compass to plot
response times as one-minute gradients around existing stations. (One fault identified with
this method is that fire engines and trucks must use the existing roadways, and cannot reach
an emergency scene "as the crow flies").
• The Commission on Fire Accreditation International (CFAI) defines a fire management
zone as "An area used to define or limit the management of a risk situation" and "A
geographic area that is classified according to one or more risk categories". CFAI also
recognizes a first due area as "The portion of a jurisdiction that each response company has
been assigned to be the first unit to arrive."
Undertaking the task of meeting adequate LOS performance, our staff performed a study of the
average response times and the occupancies potentially affected by consolidation. Our department
uses the Lake County Geographical Grid System to map our service district into small
geographical targets.
Lake Zurich Fire Rescue Station Consolidation Concept 7
Districts
LAKE ZURICH GRIDS
CJSTATION1
0STATION2
CJSTATION3
c:JSTATION4
The Grid map establishes 4 response Districts and l mile square target grids.
Lake Zurich Fire Rescue Station Consolidation Concept 8
The Grid is further broken down into quarter sections at .50 miles.
2122 c
Lake Zurich Fire Rescue Station Consolidation Concept 9
Current Fire Station Locations
LAKE ZURICH FIRE/ RESCUE
AREA MAP
""'
Legend
• STATIONS
DISTRICTS
REC_NUM
STATION 1
c=JsrATION2
!____ .; STATION 3
i , STAT!ON4
LANDINGZONES
DRYHYDRANT
Lake Zurich Fire Rescue Station Consolidation Concept 10
Consolidation of VLZ #1 and LZRFP #4 to New Headquarters
LAKE ZURICH FIRE/ RESCUE
AREA MAP
Legend
• STATIONS
DISTRICTS
REC_NUM
STATION 1
CJsTATION2
r '"""STATION$
l STATION4
LAND1NGZONES
DRYHYDRANT
Lake Zurich Fire Rescue Station Consolidation Concept 11
Observation
Given the current build-out of our four fire stations, you may see that the Lake Zurich Rural Fire
Protection District Station #4 is not placed correctly to provide the best Standard of Cover for the
geographic region. Clearly, more than one third of its coverage is outside of the boundary of Fire
District.
In reviewing the new station location map, the red circles indicate a 1.5 mile radius which is
accepted for commercial development. A 2 mile radius is accepted for residential, and if applied
to the map would close in some of the areas which is primarily residential in nature, as each station
would expand.
Our current ISO report indicated we needed seven (7) engine companies to cover our area. That is
not an attainable number and thus balancing ISO parameters versus reality is a must.
Lake Zurich Fire Rescue Station Consolidation Concept 12
Response Times
As noted in the recent Organizational review, the department needs to monitor and implement
some specific benchmarks in regards to our response times.
We need to better our turn-out time; the time from the point the call is paged out to the en-route
time of the vehicle, and ultimately improve some of our response times overall.
Given a twenty month call review the data below represents our response data for a 2 mile area
from the edge of our district. The first data indicates the response time of the first arriving
apparatus in the D (station 4) response area.
FIRE.AREA Still District D
YEAR (All)
ORDER 1
Table 1
Average of
Average of Response2 0:06:05 0:06:51 0:07:47
This table represents an average of all first arriving units to the Deer park area.
Lake Zurich Fire Rescue Station Consolidation Concept 13
FIRE.AREA Still District D
YEAR (All)
MONTH (All)
TRUCK (Multiple Items)
ORDER 1
Table 2
Count of
Response2 TYPE
ASSIST NON
GRID OTHER EMS FIRE EMERGENT SRT #N/A Total Count
2021A 59 40 50 149
2021B 50 49 77 176
2021C 19 15 25 1 60
2021D 24 15 14 53
2022A 3 11 2 16
2022B 22 4 3 29
2022C 10 7 17
2022D 1 16 5 2 24
2023A 8 3 1 12
2023B 15 4 2 21
2023C 1 19 5 1 26
2023D 13 6 4 23
2121A 14 5 7 26
21218 7 3 1 11
2121C 28 3 2 33
21210 10 4 1 15
2122C 58 16 14 88
2122D 23 5 4 32
2123D 18 3 5 26
22210 4 1 6 11
Total 420 204 221 1 848
Lake Zurich Fire Rescue Station Consolidation Concept 14
Table 3
FIRE.AREA Still District D
YEAR (All)
MONTH (All)
TRUCK 32am4, 32e4
ORDER 1
Average of
0:05:50 0:06:42 0:07:23
The above data reflects station 4 equipment being first on scene and the average response time.
From the data listed in the Table 1, which is all units, only a few areas are improved upon.
Lake Zurich Fire Rescue Station Consolidation Concept 15
Table 4
FIRE.AREA Still District D
YEAR (All)
MONTH (All)
TRUCK 32am4, 32e4
ORDER 1
Count of
Response2 TYPE
ASSIST NON
GRID OTHER EMS FIRE EMERGENT #N/A Total Count
2021A 44 29 45 118
20218 37 34 63 134
2021C 17 13 20 50
2021D 21 13 14 48
2022A 3 7 2 12
20228 14 2 3 19
2022C 8 5 13
2022D 1 13 3 2 19
2023A 6 3 1 10
20238 14 4 1 19
2023C 1 13 3 1 18
2023D 12 5 4 21
2121A 9 3 5 17
21218 7 1 8
2121C 23 1 1 25
21210 8 3 1 12
2122C 47 7 13 67
2122D 20 2 3 25
2123D 13 1 4 18
2221D 2 1 5 8
Total 331 139 189 0 661
Out of the 848 totals calls being used in the data set, 661 are handled by station 4 companies.
Other
8%
78%
Lake Zurich Fire Rescue Station Consolidation Concept 16
Table 5
FIRE.AREA Still District D
YEAR (All)
MONTH (All)
TRUCK 32am1, 32e1, 32tr1
ORDER 1
Average of
o. TYPE
~~;'}~'""'
>vvo-.> I NON
GRID VI Ht:K EMS FIRE EMI::"I.:>I:" I #N/A
2021A 0:07:13 u:uo;.< 1 0:10:16 0:06:17
20218 u:u1 .:>o 0:10:49 0:08:05
2021C u:u1:ou u:u1 .:>o 0:03:53 0:07:50
20228 U.UO ..>.> u.uo ..><l
2022C u;uo;u" 0:11:05
0:11:55 0:10:57
20238 0:07:10 0:07:10
2023C U.UO. .>L u:uo. .>.<
2121A 0:06:14 0:09:15 0:06:14
21218 u:u1:4u 0:07:40
2121C 0:11:50 0:10:00 0:11:50
21210 0:07:26 u:u1 ..<o
2122C 0:06:17 0:06:54 0:06:17
O·OR;::\R
2122D 0:09:13 ~
2123D
2221D O·O< ;t;~
0:07:22 0:08:32 0:09:09
If we select only station I equipment responding into station 4' s area, the response times are
longer. However, these times can be expected to decrease by 1.5 to 2 minutes per incident based
upon the relocation of station 1.
The route from Buesching Rd. toRt 12 and SOld Rand is just around 1 mile and with curves,
stops and traffic, adds considerably to time out toRt 12.
Lake Zurich Fire Rescue Station Consolidation Concept 17
Table 6
FIRE.AREA Still District D
YEAR (All)
MONTH (All)
TRUCK 32am1, 32e1, 32tr1
ORDER 1
Count of
Response2 TYPE
ASSIST NON
GRID OTHER EMS FIRE EMERGENT #N/A Total Count
2021A 5 3 3 11
20218 8 4 10 22
2021C 1 3 1 5
20228 4 4
2022C 1 1 2
2022D 1 1 2
20238 1 1
2023C 1 1
2121A 1 1 2
21218 1 1
2121C 2 1 3
21210 2 2
2122C 5 1 6
2122D 1 2 1 4
2123D 3 3
2221D 1 1
Total 37 12 20 1 70
Lake Zurich Fire Rescue Station Consolidation Concept 18
Summary
The response data indicates that given a new location on Rt 12, we should be able to adequately
cover the Deer Park area. The information that we need to relay from the Fire Districts standpoint,
is the essence of greater coverage for the entire southern area.
With two responding companies more strategically placed, the overall response profile should
improve.
There are a number of opportunities for us to increase our emergency services, better our
operational efficiency and provide new services such as the fire safety house.
If the Village Hall concept were to move forward we would be creating a unique inter-
governmental relationship that would foster savings for both entities. This coordination of efforts
and facilities would be a great example of governmental entities working together to create overall
efficiencies in service to its citizens. Municipal complexes are not new, but co-locating two
different governmental entities on this scale is much rarer. An opportunity to set a very positive
example of cooperation exists.
Actions:
We have established that part of this project is based upon perceived improvements to the Fire and
EMS operations.
The other important action needed is for the Village to determine the level of emergency services
(Fire & EMS) it can fund. That decision alone impacts a number of areas within this project. The
Fire Department's Operational Analysis Report address' many of the facets that should go into
making that decision and it does provide an understanding of where the Fire Administration stands
on recommendations.
This will be a substantial undertaking and much planning is ahead us if the Village Board agrees to
pursue it further.
Lake Zurich Fire Rescue Station Consolidation Concept 19