A. Village Board & Board Committee
Regular MeetingLake Zurich, IL · June 2, 2025
Agenda
VILLAGE OF LAKE ZURICH
Board of Trustees
70 East Main Street
Monday, June 2, 2025 7:00 p.m.
AGENDA
1. CALL TO ORDER
2. ROLL CALL: Mayor Thomas Poynton, Trustee Sujatha Bharadwaj, Trustee Jake
Marx, Trustee William Riley, Trustee Marc Spacone, Trustee Roger Sugrue, Trustee
Greg Weider.
3. PLEDGE OF ALLEGIANCE
4. PUBLIC COMMENT
This is an opportunity for residents to comment briefly on matters included on the
agenda and otherwise of interest to the Board of Trustees. Public Comment is limited
to 30 minutes total and up to 5 minutes per speaker.
5. PRESIDENT’S REPORT / COMMUNITY UPDATE
• Proclamation – Gun Violence Awareness Day
6. CONSENT AGENDA
These titles will be read by the Village Clerk and approved by a single Roll Call Vote.
Any item may be pulled from the Consent Agenda for discussion by any Village
Trustee.
A. Approval of Minutes from the Village Board Meeting of May 19, 2025
B. Approval of Executive Session Minutes from the Village Board Meeting of
April 7, 2025
C. Approval of Semi-Monthly Warrant Register Dated June 2, 2025 Totaling
$2,161,141.67
D. Ordinance Granting a Variation for a Front Porch at 17 Lake Street (assign
Ord. #2025-06-612)
2
Summary: Mr. Ronald Vindell has filed a zoning application for a variation for
a front porch located at 17 Lake Street. The property is located within the
Village’s R-5 Single-Family Residential District that requires porches be
located no less than 25 feet from any front lot line. The proposed plan provides
that the porch will be constructed 11 feet from the front lot line which will
encroach into the front yard setback by 14 feet and run along the entire length
of the front of the home.
At their May 21, 2025 meeting, the Planning and Zoning Commission
commended approval of the variation for the front porch setback. Staff
recommends approval of the ordinance granting the variation.
E. Ordinance Granting a Variation for an Outside Stairway at 287 Sunrise Lane
(assign Ord. #2025-06-613)
Summary: Ms. Jerrett Sita has filed a zoning application for a variation to
allow the construction of an outside stairway within the front and side yard
setbacks. The home on the property was completed in the early part of 2025
and had met requirements of the zoning code. Upon final inspection of the site,
Village staff found work completed without permits including an outside
stairway installed within the side yard setback, expansion of the driveway and
reconfiguration of the retaining wall into the side yard setback. Staff will
assess applicable fines for the work completed without prior permit approval
and will inspect for compliance with all other applicable codes and ordinances.
The Planning and Zoning Commission meeting on April 16, 2025 recommended
approval of the variation request for the outside stairway built, to remain as
constructed. Staff recommends approval of the ordinance granting the
variation.
F. Agreement with Chicagoland Paving for the 2025 Patching Program in the
Amount Not-to-Exceed $150,000
Summary: The FY 2025 budget includes $150,000 in the Non-Home Rule Sales
Tax fund for the 2025 Patching Program. To ensure cost-effective street
maintenance, the Village participates in a cooperate bid agreement through
the Municipal Partnership Initiative (MPI). The MPI Pavement Patching
Program was bid on March 24, 2025, yielding six bids. Staff recommends
awarding a contract for the 2025 Patching Program to Chicagoland Paving
Contractors in the amount not-to-exceed $150,000.
G. Agreement with Pipeview America for Extension of the 2025 Sanitary and
Storm Sewer Televising Contract in the Amount Not-to-Exceed $100,000
Summary: The FY 2025 budget includes $100,000 in the water and sewer fund
for televising Village infrastructure. Closed-circuit television inspection is the
most cost efficient and effective method to inspect the internal conditions of
underground utilities.
The current televising contract was bid in 2023 as a one-year contract, with
the option to extend for two additional years. A bid opening on September 20,
3
2023 yielded five bids. Staff recommends extending the contract for the final
year for the 2025 Sewer Televising Inspection project to Pipeview America in
the amount not-to-exceed $100,000.
H. Agreement with Layne Christensen Company to Repair Well No. 8 in the
Amount Not-to-Exceed $119,675
Summary: During normal operations on April 9, 2025, the motor protection for
Well No.8 pump motor tripped indicating a locked rotor condition. The well is
currently out of service to determine if the locked rotor is within the
submersible pimp or the motor.
Layne Christensen Company as the sole provider of parts and service for the
pumping assembly of the well has provided a partial Phase 1 cost estimate for
inspection and diagnosis of the pumping equipment. A phase 2 cost estimate
and updated project totals will be provided after inspection and diagnosis for
board approval.
Staff recommends authorizing the phase 1 proposal form Layne Christensen
Company to inspect and diagnose the pumping equipment from Well No. 8 in
the amount not-to-exceed $119,675.
I. Ordinance Amending Chapters of Title 8 of the Lake Zurich Municipal Code
(assign Ord. #2025-06-614)
Summary: From time to time, staff reviews the codes to ensure they are
updated, accurate, and serve the needs of the community. Staff have filed an
application for amendments to the text of the Lake Zurich Municipal Code to
amend sections of Zoning Code Chapter 8-11-1. The proposed amendment
changes the maximum allowable height of fences in interior side and rear
yards from five feet to six feet, to accommodate fences that are more commonly
available commercially and are considered adequate for residential privacy.
The Planning and Zoning Commission held a public hearing on May 21, 2025
and voted unanimously in favor of the proposed amendment. Staff recommend
approval of the ordinance enacting the code amendment.
J. Agreement with Patriot Pavement Maintenance for the 2025 Crack Sealing
Program in the Amount Not-to-Exceed $60,000
Summary: The FY 2025 budget includes $60,000 in the Motor Fuel Tax fund
for preventative street maintenance. The bid opening for the crack sealing
program occurred on March 27, 2025 with the Village receiving two bids. Staff
recommends awarding a contract for the 2025 Crack Sealing Program to
Patriot Paving Maintenance in the amount not-to-exceed $60,000.
Recommended Action: A motion to approve the Consent Agenda as presented.
7. NEW BUSINESS – None at this time.
8. TRUSTEE REPORTS
4
9. VILLAGE STAFF REPORTS
10. EXECUTIVE SESSION called for the purpose of:
• 5 ILCS 120 / 2 (c) (21) review of executive session minutes
• 5 ILCS 120 / 2 (6) setting price for sale/lease of real estate
11. ADJOURNMENT
The next regularly scheduled Village Board meeting is on Monday, June 16, 2025.
The Village of Lake Zurich is subject to the requirements of the Americans with Disabilities Act of 1990.
Individuals with disabilities who plan to attend this meeting and who require certain accommodations so that
they can observe and participate in this meeting, or who have questions regarding the accessibility of the
meeting or the Village’s facilities, should contact the Village’s ADA Coordinator, Kyle Kordell, at 847.438.5141
(TDD 847.438.2349) promptly to allow the Village to make reasonable accommodations for those individuals.
*Agenda posted on May 29, 2025
Get email alerts for Lake Zurich
A daily email when new agendas and minutes are posted.