C. Village Board
Regular MeetingLake Zurich, IL · January 8, 2007
Minutes
Approved
VILLAGE OF LAKE ZURICH
Well #12 ION EXCHANGE LOAN PROJECT
PUBLIC HEARING
JANUARY 8, 2007
Administrator Dixon called the meeting to order and opened the public hearing at 6:35
p.m.
Present: Village Administrator John Dixon, Public Works Director/Engineer Dave
Heyden, Assistant Public Works Director Bob Duprey, Engineer and Consultant Dave
Talbott, Engineer Ravi Jayaraman, Clark-Dietz, and Mia Brown, interested party.
Administrator Dixon indicated the hearing is being held in regard to Project # L172668
Well #12 Ion Exchange Treatment Facilities and Preliminary Environmental Impacts
Determination (PEIA) as required by the Illinois Environmental Protection Agency
(IEPA). He turned the meeting over to Public Works Director/Engineer Heyden.
Public Works Director/Engineer Heyden indicated there was an assessment done by
the IEPA. He then reviewed the assessment dated December 5, 2006, completed by J.
Geoffrey Andres, Manager, Infrastructure Financial Assistance Section, Bureau of
Water, IEPA. In that letter, the IEPA indicated they plan to approve this project as
meeting conditions and at the end of this hearing there will be a 15-day period for public
comments.
The total request for Well #12 is $1,801,180.00 which includes:
Construction costs $1,521,600.00
Construction Contingency (5%) 76,080.00
Design Engineering Fees 103,500.00
Construction Engineering Fees (estimated) 100,000.00
This project completes the fourth of five wells that the Village is converting to Ion
Exchange.
There was a request for any comments from the public. Since there was no comment
from the public, Administrator Dixon closed the hearing after stating the review period
will be open for 15 days.
Meeting was adjourned at 6:40 p.m.
Submitted by: John Dixon, Village Administrator