C. Village Board
Regular MeetingLake Zurich, IL · September 16, 2024
Minutes
VILLAGE OF LAKE ZURICH
Board of Trustees
7O East Main Street
Monday, September 16, 2024 7100 p.m.
APPOVED MINUTES
H CALL TO ORDER by Mayor Tom Poynton at 7:00 pm.
ROLL CALL: Mayor Thomas Poynton, Trustee Mary Beth Euker, Trustee Jake Marx,
Trustee William Riley, Trustee Roger Sugrue, Trustee Greg Weider.
Absent: Trustee Spacone
Also 1'11 attendance: Village Manager Ray Keller, Assistant Village Manager Michael
Duebner, Finance Director Amy Sparkowski, Public Works Director Mike Brown,
Community Development Director Sarosh Saher, Police Chief Steve Husak, and
Village Attorney Scott Uhler.
PLEDGE OF ALLEGIENCE
PRESIDENT’S REPORT / COMMUNITY UPDATE
I Advice and Consent of the Village Trustees to Appoint Greg DuBose to the Fire
Pension Board
Mayor Poynton made a motion to approve, second by Trustee Euker.
- Advice and Consent of the Village Trustees to Appoint Vladimir Kovacevic to
the Planning & Zoning Commission
Mayor Poynton made a motion to approve, seconded by Trustee Riley.
I
Recognition of Rail Safety week for September 23-29.
I
Recognition of the Lake Zurich Flames 50th Anniversary.
PUBLIC COMMENT
o Al Silcroft, 964 Manchester Road, addressed the Board regarding concerns over
the proposed development at Meadow Wood East on the agenda tonight. The
stated their concerns of flooding, stormwater runoff, elevation & topography
challenges, the size of the development, existing utilities being damaged during
the construction process, multiple trucks and construction vehicles being parked
in the street, and safety concerns form increase overall traffic.
o Mike Hornacek, 975 Manchester Court, addressed the Board regarding the
proposed development at Meadow Wood East on the agenda tonight. He expressed
similar concerns of the site development, mainly stormwater runoff, potential
flooding issues of the existing properties, safety concerns with increased traffic.
CONSENT AGENDA
A. Approval of Minutes from the Village Board Meeting of September 3, 2024
Approval of Semi-Monthly Warrant Register Dated September 16, 2024,
Totaling $1,698,252.99
Approval of Executive Session Minutes from the Village Board Meeting of June
17, 2024
Ordinance Establishing a Recapture Fee for Certain Sanitary Sewer
Improvements at 1256 Country Club Road (Assign 0rd. #2024-09-587)
Summary: The owners of 1265 Country Club Road request approval of
recapture costs associated with public sanitary sewer improvements in
connection with the construction of their new house, which required the 38-
foot extension of an 8-inch public sanitary sewer main to their property. The
proposed ordinance will be effective for a period of 25 years and provide for an
annual increase in the recapture amounts at the rate of 5%.
Memorandum of Understanding between the Village of Lake Zurich and Lake
Zurich Community Unit School District #95 for Shared Reunification Sites
Summaryi Staff proposes Board approval of a memorandum of understanding
(MOU) between the Village and School District 95 to provide for public spaces
for sheltering during community emergencies. The proposed MOU formalizes
a partnership for the Village to access Seth Paine, Isaac Fox, and May Whitney
elementary schools, Middle School South, and Lake Zurich High School.
Actions: A motion to approve the Consent Agenda as presented was made by
Mayor Poynton, seconded by Trustee Marx.
AYESI 5 Trustees Euker, Weider, Marx, Riley, Sugrue.
NAYSI 0
ABSENT: 1 Trustee Spacone
MOTION CARRIED.
7. NEW BUSINESS
A. Courtesy Review for Proposed Residential Flamed Unit Development at
Meadow Wood East
Summary: Mr. Mike Naumoowicz and Mr. Kirk Rustman request a Courtesy
Review with the Village Board to consider a Planned Unit Development of
single-family homes on the property known as Meadow Wood East. The
existing 8-acre portion of the Meadow Wood Subdivision was originally created
in 2004 and includes 76 townhouses that are accessible from Rand Road. The
remaining rear portion of this property on the east side was originally platted
for 9 single-family homes.
The proposed new concept would only be accessible from Manchester Road to
the south and consists of increasing the number of single-family lots on the
rear east side of this property from 9 to 15 lots, as well as rezoning the property
from R-4 to the R-5 single-family zoning district.
The developers and village staff seek to understand the Village Board’s
preferences towards the proposed development prior to moving forward with
review by the Planning and Zoning Commission.
Dir. Saher introduced Mr. Mike Naumoowicz, the developer for Meadow Wood
East planned unit development. Mr. Naumoowicz, addressed the Board
regarding the proposed development with their intentions work with the
neighborhood — become part of the subdivision, preliminary engineering for
concerns to runoff and would make on site detention that was required by Lake
County. He addressed the concerns of the grade changes by saying the homes
would have walk out basements. He said the homes will be stylized as
craftsman/farmhouse, put up a privacy fence between the new development
and the existing subdivision on Manchester, and was asking for a zoning
change to R4 to be consistent with the surrounding area. He said there would
eb two cul-de-sacs and sidewalks added for safety and easy truck turn around
and was open to suggestions from the Board on how to design the development.
Mayor Poynton addressed the Board that the subdivision proposal is for a
courtesy review and not a voting item this evening. — curtesy review —— not
voting on
Trustee Marx raised a concern about the density creating impacts on traffic
and congestion with the development, how the developer would prevent trucks
in front yards of residents and where construction vehicles would be stationed.
Mr. Naumoowicz addressed Trustee Marx that the impact of extra traffic
would be minimal, that the construction would be done in phases to minimize
construction vehicles at the site.
Trustee Riley raised a concern over how the developer would alleviate the
elevation concerns, he suggested to create a natural berm to help with
stormwater runoff if possible. He asked for a more substantial presentation of
materials, prices, construction materials to showcase help present the end
product
Mr. Naumoowicz address Trustee Riley that the new grade would match the
existing subdivision, all the engineering will be managed through stormwater
management, and would provide more details to PZC board.
Trustee Euker raised concerns over the elevation differences and drainage,
suggested the developer have a soil engineer that is well versed in drainage —
speak to the stormwater issues.
Trustee Sugrue inquired about the overall timeframe on how long it will take
to build the homes and how soon they would start building; he raised concerns
about the drainage issues and would like to see more items showcased in a
presentation.
Trustee Weider raised concerns on serval items for the development, such as
whether the lots would be available to sale to custom home builders,
stormwater management, the substantial grade differences between
Manchester Road and the proposed development, and construction traffic
staged in the existing neighborhood.
Mayor Poynton said he would like the developer to consider paving entire road
after construction is finished and address issues with stormwater, flooding, and
wetlands protection.
Actions: This is a non-voting item at this time. The developer and Village Staff seek
to understand the Board’s preferences towards the proposed use at this site.
TRUSTEE REPORTS
o Trustee Riley commented thanked the sponsors and volunteers for the Rock
the Block event.
o Trustee Marx thanked the Public Works staff on their clean up after the
Rock the Block event, obtaining the rebate from ComEd for the Ford
Lightening vehicle purchase, and also commended the Styrofoam recycling
program on how well the program was doing.
VILLAGE STAFF REPORTS
I
Village Manager & Finance Director Fiscal Year 2024 Budget Update
o Finance Director Amy Sparkowski addressed the Board about preliminary
2024 budget projections, that general revenues were 2% higher than expected
from sales taxes and investment incomes, overall expenditures were kept low,
infrastructure project costs being lower than expected. As of now, no budget
amendments for 2024 are needed.
o Mayor Poynton commended the public works staff on clean up after Rock the
Block and also all of Village staff working well managing public resources and
advancing Lake Zurich’s financial stability.
I Monthly Operating Data Metric Reports
10. ADJOURNMENT
Motion to adjourn the meeting was made by Trustee Marx, seconded by Trustee
Euker.
AYES: 5 Trustees Euker, Marx, Riley, Sugrue, Weider.
NAYSI O
ABSENTI 1 Trustee Spacone
MOTION CARRIED.
The meeting was adjourned at 8:03 pm
Respectfully submitted:
Erin Rauscher, Assistant to the Village Manager
Approved by:
/0-7*g0ajz/
Date
Get email alerts for Lake Zurich
A daily email when new agendas and minutes are posted.