Muyni
← Back to Lakewood

City Council

Regular Meeting

Lakewood, WA · April 22, 2019

Agenda

Agenda

LAKEWOOD CITY COUNCIL SPECIAL MEETING AGENDA Monday, April 22, 2019 7:00 P.M. City of Lakewood City Council Chambers 6000 Main Street SW Lakewood, WA 98499 CALL TO ORDER ROLL CALL R E G U L A R A G E N D A PUBLIC HEARINGS AND APPEALS (2) This is the date set for a public hearing to consider the formation of a Lake Management District for American Lake. – Engineering Services Manager UNFINISHED BUSINESS (5) Motion No. 2019-22 – continued from April 15, 2019 Authorizing the award of a construction contract to Miles Resources, LLC, in the amount of $973,921.25, for the construction 123rd Street SW – Bridgeport Way to 47th Avenue project. – Public Works Engineering Director ADJOURNMENT The Council Chambers is accessible to persons with disabilities. Persons requesting special accommodations or language interpreters should contact the City Clerk, 253-983-7705, as soon as possible in advance of the Council meeting so that an attempt to provide the special accommodations can be made. http://www.cityoflakewood.us City Hall will be closed 15 minutes after adjournment of the meeting. Return to Agenda STAFF REPORT CITY COUNCIL PUBLIC HEARING MONDAY April 22, 2019 Background American Lake is infested with Eurasian watermilfoil, a state listed noxious weed. According to a diver survey conducted in summer 2018, milfoil is covering 118 acres of the lake’s shoreline. This is up from 106 acres in 2017. Without control measures in place, milfoil will continue to spread, ultimately covering approximately 236 acres of shoreline (see attached milfoil survey map). In 2017, the City was awarded a $30,000 grant from the state Department of Ecology to prepare an Integrated Aquatic Vegetation Management Plan (Plan) for American Lake. The Plan was prepared with the assistance of representatives from WA Military Department (Camp Murray), JBLM, the Veterans Affairs medical center, and lakefront private property owners. The plan recommends treating the lake with a chemical herbicide as the first step to control or eradicate the invasive Eurasian watermilfoil. Other measures include public education and outreach. The Plan was submitted to the state Department of Ecology for review and approval on June 18, 2018 and received approval on August 31, 2018. The City recently secured a $75,000 Ecology grant to help with the costs to treat the lake with a chemical herbicide. The total estimated project cost for the first year of control is $142,250. Annual control effort costs should decrease significantly after the initial treatment to approximately $25,000 and with inflation to approximately $30,000 three years after initial treatment. Lake Management District Petition A group of lakefront property owners submitted a petition to form a lake management district (LMD) to the City Council in March 2019 with sufficient property owner signatures to meet the requirements of Chapter 36.61 RCW: Lake and Beach Management Districts. A LMD would be paid for by property owners on the lake, including the City, at a calculated rate of $0.66/foot to fund lake treatment and other Plan recommendations over a period of 10 years. The LMD would tax all lakefront properties except the federal properties. In accordance with the provisions in Chapter 36.61 RCW, the state property encompassing Camp Murray has been included in the district boundary as approved by the Pierce County Council per County Resolution R2019-21, and affirmed by the Lakewood City Council per City Resolution 19-08 (see attached proposed district boundary map). Public Hearing On April 1, 2019, the Lakewood City Council passed Resolution No. 2019-08 establishing April 22, 2019, as the date for a public hearing to be held before the City Council on the proposed formation of the American Lake – Lake Management District No. 1. In accordance with Section 36.61.040 RCW, all property owners of record within the proposed district boundary were notified by mail of the time, place and purpose of the hearing, the nature of work intended for the LMD, and the annual assessment for their property. A notice of the hearing was published in the Tacoma News Tribune on April 4, 2019, and April 11, 2019. The state Departments of Fish & Wildlife, Natural Resources, and Ecology were notified about the hearing. 1 2 VETERANS DR SW Return to Agenda Map Date: SW E AV ® D GRAVELLY W LAKE EDGE OO RD S W ZA March 01, 2019 GR NY AVELL AN Y LAKE DR SW SW Y HW FI C CI PA S 5 TE AMERICAN LAKE STA T ER CARTER IN LAKE N 5 TE TA RS NORTH TE T HORNE IN L SW VE N SW A ND LA EMERSON SILVERTIP D RT LAKE PO R SW E AV MURRAY RD SW N EST THORNE LN SW IO UN BE W RK EL 150TH ST SW EY ST SW CAMP MURRAY 0 0.125 0.25 Miles American Lake This product was prepared with care by City of Lakewood GIS. Proposed Lake Management District City of Lakewood expressly disclaims any liability for any inaccuracies which may yet be present. This is not a survey. Proposed Lake Management District Tax Parcel Datasets were collected at different accuracy levels by various sources. Data on this map may be shown at scales larger than its Lakewood City Limit 3 original compilation. Call 253-589-2489 for further information. :\Projects\Eng\Maps\PLMD-2.mxd Return to Agenda 4 Return to Agenda REQUEST FOR COUNCIL ACTION DATE ACTION IS TITLE: Motion authorizing award of a TYPE OF ACTION: REQUESTED: construction contract to Miles Resources, LLC in the amount of $973,921.25 plus a ten percent ORDINANCE April 22, 2019 rd contingency for the construction of the 123 Street – Bridgeport Way to 47th Ave project. RESOLUTION REVIEW: ATTACHMENTS: X MOTION #2019-22 April 15, 2019 Vicinity Map Bid Tabulations OTHER SUBMITTED BY: Paul A. Bucich, P.E., Public Works Engineering Director/City Engineer. RECOMMENDATION: It is recommended that the City Council authorize award of a construction contract to Miles Resources, LLC in the amount of $973,921.25 plus a ten percent contingency ($97,392.13) for the construction of the 123rd Street SW – Bridgeport Way to 47th Avenue project, City Project 302.0053. DISCUSSION: Through this project, the City will construct curb, gutter, sidewalk, and extend 123rd Street between Bridgeport Way and 47th Avenue. The intersection of 123rd and Bridgeport will be relocated south to move it away from the Interstate 5 ramp terminal intersection. A new left turn lane will be installed for southbound Bridgeport Way to 123rd Street. It is anticipated that construction will begin in May 2019 with completion in July 2019. 123rd Street SW east of Bridgeport Way exists today as a local access street servicing the James Apartment Homes in the Springbrook Neighborhood. The road currently extends only 600’, approximately half the distance between Bridgeport Way and 47th Avenue to the east. For the residents living at the south end of 47th Avenue SW, access is restricted to a state owned and maintained bridge over Interstate 5, leaving the residents and developable properties isolated and heavily dependent upon this single access. (Discussion continued on Page 2) Troy Pokswinski Prepared by City Manager Review Paul A Bucich Department Director 5 Return to Agenda DISCUSSION: (continued from page 1) As part of the 2017/2018 budget cycle, the City was able to obtain $550,000 in Community Development Block Grant funds to extend 123rd Street SW from Bridgeport Way to 47th Avenue SW to provide local residents and potential developers with a second and more efficient access to their homes and businesses. For the City to retain this money under this program, the funds must be expended by May, 2020 or the City will lose the funding. The improvements proposed in the grant applications included a complete streetscape with curbs, gutters, sidewalks separated by planters with sod and street trees, wide pavement for shared bicycle and vehicular use, an industrial pavement section, and street lighting. Lakewood Water District Anticipated Fire Flow Needs There are two private development projects proposed that are along the City’s 123rd Street SW project alignment. Public Works Engineering was recently informed by Lakewood Water District of their anticipated requirements for increased pipe sizing based on fire flow for a proposed development on the 47th Avenue Pierce County Gravel Pit site. The larger of the two, the gravel pit project is the driver for the water main upsizing, and it is in the SEPA phase. A pre-application meeting was held on February 22, 2018 for a 264 unit apartment complex (Cloverbrook) that was to be constructed on the north side of 123rd Street SW Lakewood Water District commented that the fire flow for those buildings would need to be checked. After the developer paid a fee for the District to perform tests on the flow, the District informed the developer and City that fire flow is sufficient and no further improvements to the existing water mains along 123rd Street SW would be required. A second developer is working with Pierce County to acquire the Pierce County Gravel Pit property and construct warehouses. In a pre-application meeting on April 19, 2018, Lakewood Water District indicated that development of structures totaling 498,000 SF would need to confirm fire flow availability. On August 23, 2018, the gravel pit developer submitted SEPA documents for the development of 605,000 SF of industrial warehouse space, a significant increase in floor space. Lakewood Water District replied on October 4, 2018 that the existing fire flow has yet to be tested and that the developer would need to work closely with the District as additional or new infrastructure may be required. During finalization of roadway design for the City’s 123rd Street project, Public Works Engineering reached out to Lakewood Water District on March 20, 2019 to discuss relocation of a hydrant. We were informed by District staff at that time of the high potential for the gravel pit project to be required to improve the existing water system by increasing the pipe in 123rd Street SW from 8-inch to 12-inch. Lakewood Water District notified the City on March 21, 2019 that they would require the gravel pit developer to upgrade the existing main along 123rd Street SW for the development along 47th Avenue SW to support the proposed project by the developer after they conducted flow testing of the lines following the March 20th meeting. The existing water main along 123rd Street SW is not within the 6 Return to Agenda immediate replacement plans for Lakewood Water District. The District has stated it is not their policy to upgrade a water main based solely on speculative development such as the proposal at the gravel pit. The District board met on April 4, 2019 and determined that there is not sufficient time or funds available to get in and replace the line in advance of our project even if they changed their standard policy to support our project. The sanitary sewer facilities are sized appropriately to accommodate any currently anticipated development. Typical Utility Approach to Development: Utilities (e.g. water sewer, stormwater, electric, gas) typically require developers to pay for upgrades in services and mains that are needed for their development. There are occurrences where it may be in the utility’s interest to provide financial assistance in an effort to extend or expand existing infrastructure to serve development. Typical sequences for development of infrastructure improvements are as follows: • Pre-application meeting: Notify applicants of known problems and their processes which include file testing for larger projects due to high fire flow requirements. • SEPA: Comments provided on potential issues for applicant to investigate and plan to resolve; comments on known utility infrastructure issues likely to impact development (i.e. fire flow) • Application: Detailed analysis and requirements based on application; fees identified. ALTERNATIVE(S): Council could reject all bids and rebid the project at a future time to include a new water main. We would expect higher costs. It is not anticipated that rebidding the project would result in lower bids. FISCAL IMPACT: This project is funded from the following sources: • $570,493 from Community Development Block Grants • $45,000 from a Port of Tacoma Grant • $17,000 from a Developer Contribution • $395,000 from the City’s Surface Water Fund • $182,507 from City Funds identified in the proposed 2019 Carryforward Budget Adjustment With the 10% contingency, design and construction administration costs provided by City Staff, total project costs are expected to be $1,210,000.00. 7 Return to Agenda 8 Tuesday, April 9, 2019 BID TABULATIONS 123rd Street SW Note: We hereby certify that these tabulated bids represent all bids received 302.0053 and that the additions of all prices shown have been checked and corrected. April 9, 2019 Bid Schedule ENGINEER'S ESTIMATE MILES RESOURCES TUCCI & SONS CECCANTI REED TRUCKING PRO GRADE ENTERPRISES ITEM UNIT UNIT UNIT UNIT UNIT UNIT NO. DESCRIPTION QTY UNIT PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT 1 Mobilization 1 LS $91,000.00 $91,000.00 $39,500.00 $39,500.00 $50,000.00 $50,000.00 $67,800.00 $67,800.00 $85,000.00 $85,000.00 $74,600.00 $74,600.00 2 Minor Change 25,000 FA $1.00 $25,000.00 $1.00 $25,000.00 $1.00 $25,000.00 $1.00 $25,000.00 $1.00 $25,000.00 $1.00 $25,000.00 3 Roadway Surveying 1 LS $20,000.00 $20,000.00 $15,200.00 $15,200.00 $13,000.00 $13,000.00 $11,190.00 $11,190.00 $15,000.00 $15,000.00 $13,800.00 $13,800.00 4 SPCC Plan 1 LS $1,500.00 $1,500.00 $875.00 $875.00 $250.00 $250.00 $300.00 $300.00 $500.00 $500.00 $2,750.00 $2,750.00 5 Project Temporary Traffic Control 1 LS $35,000.00 $35,000.00 $24,700.00 $24,700.00 $45,000.00 $45,000.00 $48,800.00 $48,800.00 $16,000.00 $16,000.00 $36,900.00 $36,900.00 6 Clearing and Grubbing 1 LS $20,000.00 $20,000.00 $15,100.00 $15,100.00 $28,800.00 $28,800.00 $25,454.00 $25,454.00 $12,500.00 $12,500.00 $13,800.00 $13,800.00 7 Removal of Structures and Obstructions 1 LS $10,000.00 $10,000.00 $8,950.00 $8,950.00 $6,000.00 $6,000.00 $14,400.00 $14,400.00 $8,000.00 $8,000.00 $31,400.00 $31,400.00 8 Sawcutting 400 LF $6.00 $2,400.00 $5.05 $2,020.00 $10.00 $4,000.00 $1.50 $600.00 $4.00 $1,600.00 $3.50 $1,400.00 9 Roadway Excavation Incl. Haul 2,800 CY $35.00 $98,000.00 $13.50 $37,800.00 $24.00 $67,200.00 $26.00 $72,800.00 $40.00 $112,000.00 $35.70 $99,960.00 10 Shoring or Extra Excavation Class B 1 LS $1,000.00 $1,000.00 $545.00 $545.00 $250.00 $250.00 $500.00 $500.00 $1,000.00 $1,000.00 $1,000.00 $1,000.00 11 Crushed Surfacing Base Course 750 TN $50.00 $37,500.00 $24.50 $18,375.00 $26.00 $19,500.00 $28.00 $21,000.00 $40.00 $30,000.00 $43.50 $32,625.00 12 Crushed Surfacing Top Course 300 TN $50.00 $15,000.00 $47.00 $14,100.00 $64.00 $19,200.00 $28.00 $8,400.00 $50.00 $15,000.00 $42.30 $12,690.00 13 HMA Cl. 1/2", PG 64 -22 2,100 TN $85.00 $178,500.00 $75.25 $158,025.00 $80.00 $168,000.00 $81.00 $170,100.00 $90.00 $189,000.00 $84.50 $177,450.00 14 Asphalt Cost Price Adjustment 5,000 CALC $1.00 $5,000.00 $1.00 $5,000.00 $1.00 $5,000.00 $1.00 $5,000.00 $1.00 $5,000.00 $1.00 $5,000.00 15 Commercial HMA 50 TN $150.00 $7,500.00 $140.00 $7,000.00 $150.00 $7,500.00 $163.00 $8,150.00 $200.00 $10,000.00 $170.00 $8,500.00 16 Plaining Bituminous Pavement 2,500 SY $6.00 $15,000.00 $5.30 $13,250.00 $5.75 $14,375.00 $5.00 $12,500.00 $6.00 $15,000.00 $7.45 $18,625.00 17 Gravel Backfill for Drain 2,600 LF $25.00 $65,000.00 $30.50 $79,300.00 $16.50 $42,900.00 $34.80 $90,480.00 $30.00 $78,000.00 $29.10 $75,660.00 18 Sch. A Storm Sewer Pipe, 12 Inch Diam. 900 LF $40.00 $36,000.00 $23.50 $21,150.00 $35.00 $31,500.00 $30.00 $27,000.00 $30.00 $27,000.00 $39.00 $35,100.00 19 Catch Basin Type 1 14 EA $1,000.00 $14,000.00 $1,450.00 $20,300.00 $1,800.00 $25,200.00 $1,100.00 $15,400.00 $1,200.00 $16,800.00 $1,450.00 $20,300.00 20 Install Thru Curb Inlet Rim 2 EA $500.00 $1,000.00 $1,300.00 $2,600.00 $400.00 $800.00 $1,350.00 $2,700.00 $1,000.00 $2,000.00 $420.00 $840.00 21 Adjust Manhole 5 EA $600.00 $3,000.00 $1,300.00 $6,500.00 $850.00 $4,250.00 $566.00 $2,830.00 $500.00 $2,500.00 $650.00 $3,250.00 22 Resolution of Utility Conflicts 10,000 FA $1.00 $10,000.00 $1.00 $10,000.00 $1.00 $10,000.00 $1.00 $10,000.00 $1.00 $10,000.00 $1.00 $10,000.00 23 Adjust Valve Box 3 EA $500.00 $1,500.00 $930.00 $2,790.00 $800.00 $2,400.00 $566.00 $1,698.00 $350.00 $1,050.00 $330.00 $990.00 24 Erosion/Water Pollution Control 5,000 FA $1.00 $5,000.00 $1.00 $5,000.00 $1.00 $5,000.00 $1.00 $5,000.00 $1.00 $5,000.00 $1.00 $5,000.00 25 Topsoil Type A 600 CY $65.00 $39,000.00 $56.00 $33,600.00 $65.00 $39,000.00 $44.00 $26,400.00 $70.00 $42,000.00 $51.70 $31,020.00 26 PSIPE Steeple Maple (2-In. Cal.) 50 EA $600.00 $30,000.00 $410.00 $20,500.00 $500.00 $25,000.00 $675.00 $33,750.00 $500.00 $25,000.00 $720.00 $36,000.00 27 Sod Installation 1,600 SY $10.00 $16,000.00 $14.00 $22,400.00 $8.00 $12,800.00 $10.00 $16,000.00 $9.00 $14,400.00 $13.80 $22,080.00 28 Bark Mulch 100 CY $70.00 $7,000.00 $56.00 $5,600.00 $70.00 $7,000.00 $44.00 $4,400.00 $80.00 $8,000.00 $78.40 $7,840.00 29 Irrigation System Complete 1 LS $40,000.00 $40,000.00 $52,000.00 $52,000.00 $50,000.00 $50,000.00 $82,000.00 $82,000.00 $51,000.00 $51,000.00 $76,100.00 $76,100.00 30 Cement Concrete Traffic Curb and Gutter 3,350 LF $15.00 $50,250.00 $18.00 $60,300.00 $20.00 $67,000.00 $21.00 $70,350.00 $25.00 $83,750.00 $19.10 $63,985.00 31 Extruded Curb 50 LF $25.00 $1,250.00 $60.00 $3,000.00 $60.00 $3,000.00 $57.00 $2,850.00 $50.00 $2,500.00 $60.50 $3,025.00 32 Cement Concrete Pedestrian Curb 90 LF $25.00 $2,250.00 $28.50 $2,565.00 $22.00 $1,980.00 $34.00 $3,060.00 $35.00 $3,150.00 $25.30 $2,277.00 33 Cement Concrete Driveway Entrance Type 1 131 SY $50.00 $6,550.00 $39.00 $5,109.00 $85.00 $11,135.00 $44.00 $5,764.00 $80.00 $10,480.00 $63.10 $8,266.10 34 Black Vinyl Chain Link Fence/Gate Modification 1 LS $5,000.00 $5,000.00 $3,250.00 $3,250.00 $3,300.00 $3,300.00 $3,072.00 $3,072.00 $3,000.00 $3,000.00 $3,300.00 $3,300.00 35 Cement Concrete Sidewalk 1,715 SY $30.00 $51,450.00 $32.00 $54,880.00 $42.00 $72,030.00 $35.00 $60,025.00 $55.00 $94,325.00 $41.00 $70,315.00 36 Cement Concrete Sidewalk with Integral Curb 43 SY $50.00 $2,150.00 $140.00 $6,020.00 $160.00 $6,880.00 $147.00 $6,321.00 $150.00 $6,450.00 $140.00 $6,020.00 37 Cement Concrete Sidewalk Ramp Type Parallel 5 EA $1,750.00 $8,750.00 $1,350.00 $6,750.00 $2,250.00 $11,250.00 $1,520.00 $7,600.00 $26,000.00 $130,000.00 $1,940.00 $9,700.00 38 Illumination System Complete 1 LS $90,000.00 $90,000.00 $101,200.00 $101,200.00 $120,000.00 $120,000.00 $116,800.00 $116,800.00 $105,000.00 $105,000.00 $117,600.00 $117,600.00 39 Electrical Conduit System (By Electrician) 1 LS $15,000.00 $15,000.00 $13,750.00 $13,750.00 $7,700.00 $7,700.00 $7,200.00 $7,200.00 $13,500.00 $13,500.00 $7,560.00 $7,560.00 40 Permanent Signing 1 LS $7,500.00 $7,500.00 $16,700.00 $16,700.00 $3,400.00 $3,400.00 $4,700.00 $4,700.00 $3,500.00 $3,500.00 $11,000.00 $11,000.00 41 Profiled Plastic Line 5,275 LF $3.00 $15,825.00 $3.05 $16,088.75 $3.00 $15,825.00 $3.00 $15,825.00 $3.25 $17,143.75 $3.05 $16,088.75 42 Profiled Plastic Wide Lane Line 330 LF $4.00 $1,320.00 $5.45 $1,798.50 $5.60 $1,848.00 $5.00 $1,650.00 $6.00 $1,980.00 $5.50 $1,815.00 43 Plastic Traffic Arrow 3 EA $150.00 $450.00 $355.00 $1,065.00 $350.00 $1,050.00 $337.00 $1,011.00 $350.00 $1,050.00 $360.00 $1,080.00 44 Plastic Stop Line 70 LF $15.00 $1,050.00 $16.50 $1,155.00 $16.50 $1,155.00 $16.00 $1,120.00 $16.00 $1,120.00 $16.50 $1,155.00 45 Plastic Crosswalk Line 160 SF $10.00 $1,600.00 $16.50 $2,640.00 $16.50 $2,640.00 $16.00 $2,560.00 $16.00 $2,560.00 $16.50 $2,640.00 46 Plastic Bicycle Symbol 3 EA $250.00 $750.00 $490.00 $1,470.00 $500.00 $1,500.00 $475.00 $1,425.00 $500.00 $1,500.00 $500.00 $1,500.00 47 Gravity Block Wall 150 SF $40.00 $6,000.00 $60.00 $9,000.00 $38.50 $5,775.00 $48.00 $7,200.00 $30.00 $4,500.00 $45.70 $6,855.00 TOTAL $1,097,045.00 $973,921.25 $1,066,393.00 $1,128,185.00 *$1,308,858.75 $1,213,861.85 Deductive Alternate ENGINEER'S ESTIMATE MILES RESOURCES TUCCI & SONS CECCANTI REED TRUCKING PRO GRADE ENTERPRISES ITEM UNIT UNIT UNIT UNIT UNIT UNIT NO. DESCRIPTION QTY UNIT PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT 1 Mobilization 1 LS $8,000.00 $8,000.00 $1,050.00 $1,050.00 $100.00 $100.00 $100.00 $100.00 $1,000.00 $1,000.00 $5,000.00 $5,000.00 3 Roadway Surveying 1 LS $5,000.00 $5,000.00 $1,650.00 $1,650.00 $1,000.00 $1,000.00 $750.00 $750.00 $2,000.00 $2,000.00 $1,000.00 $1,000.00 5 Project Temporary Traffic Control 1 LS $15,000.00 $15,000.00 $5,250.00 $5,250.00 $8,600.00 $8,600.00 $3,500.00 $3,500.00 $6,000.00 $6,000.00 $10,000.00 $10,000.00 13 HMA Cl. 1/2", PG 64 -22 225 TN $85.00 $19,125.00 $75.25 $16,931.25 $90.00 $20,250.00 $81.00 $18,225.00 $90.00 $20,250.00 $84.50 $19,012.50 16 Plaining Bituminous Pavement 2,000 SY $6.00 $12,000.00 $3.35 $6,700.00 $1.50 $3,000.00 $0.50 $1,000.00 $2.50 $5,000.00 $5.00 $10,000.00 30 Cement Concrete Traffic Curb and Gutter 250 LF $15.00 $3,750.00 $32.00 $8,000.00 $20.00 $5,000.00 $31.00 $7,750.00 $30.00 $7,500.00 $19.10 $4,775.00 32 Cement Concrete Pedestrian Curb 18 LF $25.00 $450.00 $28.50 $513.00 $22.00 $396.00 $28.00 $504.00 $40.00 $720.00 $25.30 $455.40 35 Cement Concrete Sidewalk 400 SY $30.00 $12,000.00 $32.00 $12,800.00 $85.00 $34,000.00 $31.00 $12,400.00 $60.00 $24,000.00 $41.00 $16,400.00 37 Cement Concrete Sidewalk Ramp Type Parallel 1 EA $1,750.00 $1,750.00 $1,350.00 $1,350.00 $2,250.00 $2,250.00 $1,310.00 $1,310.00 $3,200.00 $3,200.00 $1,940.00 $1,940.00 39 Electrical Conduit System (By Electrician) 1 LS $15,000.00 $15,000.00 $11,000.00 $11,000.00 $2,500.00 $2,500.00 $7,200.00 $7,200.00 $10,000.00 $10,000.00 $7,560.00 $7,560.00 40 Permanent Signing 1 LS $3,000.00 $3,000.00 $4,100.00 $4,100.00 $800.00 $800.00 $4,700.00 $4,700.00 $1,000.00 $1,000.00 $3,000.00 $3,000.00 41 Profiled Plastic Line 2,605 LF $3.00 $7,815.00 $3.05 $7,945.25 $3.00 $7,815.00 $3.00 $7,815.00 $3.25 $8,466.25 $3.05 $7,945.25 42 Profiled Plastic Wide Lane Line 330 LF $4.00 $1,320.00 $5.45 $1,798.50 $5.60 $1,848.00 $5.00 $1,650.00 $6.00 $1,980.00 $5.50 $1,815.00 43 Plastic Traffic Arrow 3 EA $150.00 $450.00 $355.00 $1,065.00 $350.00 $1,050.00 $337.00 $1,011.00 $350.00 $1,050.00 $360.00 $1,080.00 9 46 Plastic Bicycle Symbol 3 EA $250.00 $750.00 $490.00 $1,470.00 $500.00 $1,500.00 $475.00 $1,425.00 $500.00 $1,500.00 $500.00 $1,500.00 TOTAL $105,410.00 $81,623.00 $90,109.00 $69,340.00 $93,666.25 $91,483.15 1 of 2 printed 4/9/2019 Tuesday, April 9, 2019 BID TABULATIONS 123rd Street SW Note: We hereby certify that these tabulated bids represent all bids received 302.0053 and that the additions of all prices shown have been checked and corrected. April 9, 2019 Bid Schedule SOUND PACIFIC ROAD CONSTRUCTION NORTHWEST CASCADE ACTIVE CONST. (ACI) RODARTE RW SCOTT CONSTRUCTION NORTHWEST ITEM UNIT UNIT UNIT UNIT UNIT UNIT NO. DESCRIPTION QTY UNIT PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT 1 Mobilization 1 LS $100,000.00 $100,000.00 $69,950.00 $69,950.00 $115,000.00 $115,000.00 $128,000.00 $128,000.00 $87,300.00 $87,300.00 $70,000.00 $70,000.00 2 Minor Change 25,000 FA $1.00 $25,000.00 $1.00 $25,000.00 $1.00 $25,000.00 $1.00 $25,000.00 $1.00 $25,000.00 $1.00 $25,000.00 3 Roadway Surveying 1 LS $11,000.00 $11,000.00 $14,000.00 $14,000.00 $12,000.00 $12,000.00 $14,000.00 $14,000.00 $14,000.00 $14,000.00 $16,000.00 $16,000.00 4 SPCC Plan 1 LS $175.00 $175.00 $150.00 $150.00 $1,000.00 $1,000.00 $125.00 $125.00 $1,700.00 $1,700.00 $1,500.00 $1,500.00 5 Project Temporary Traffic Control 1 LS $51,500.00 $51,500.00 $35,000.00 $35,000.00 $55,000.00 $55,000.00 $30,000.00 $30,000.00 $40,000.00 $40,000.00 $25,000.00 $25,000.00 6 Clearing and Grubbing 1 LS $33,000.00 $33,000.00 $64,400.00 $64,400.00 $24,000.00 $24,000.00 $14,000.00 $14,000.00 $24,000.00 $24,000.00 $20,000.00 $20,000.00 7 Removal of Structures and Obstructions 1 LS $45,000.00 $45,000.00 $45,000.00 $45,000.00 $20,000.00 $20,000.00 $22,500.00 $22,500.00 $28,700.00 $28,700.00 $12,000.00 $12,000.00 8 Sawcutting 400 LF $3.50 $1,400.00 $2.75 $1,100.00 $3.50 $1,400.00 $3.25 $1,300.00 $3.50 $1,400.00 $5.00 $2,000.00 9 Roadway Excavation Incl. Haul 2,800 CY $28.00 $78,400.00 $25.50 $71,400.00 $36.00 $100,800.00 $28.00 $78,400.00 $45.00 $126,000.00 $35.00 $98,000.00 10 Shoring or Extra Excavation Class B 1 LS $500.00 $500.00 $1,200.00 $1,200.00 $1,000.00 $1,000.00 $100.00 $100.00 $800.00 $800.00 $2,000.00 $2,000.00 11 Crushed Surfacing Base Course 750 TN $26.00 $19,500.00 $36.50 $27,375.00 $45.00 $33,750.00 $30.00 $22,500.00 $45.00 $33,750.00 $45.00 $33,750.00 12 Crushed Surfacing Top Course 300 TN $26.00 $7,800.00 $33.00 $9,900.00 $58.00 $17,400.00 $40.00 $12,000.00 $50.00 $15,000.00 $50.00 $15,000.00 13 HMA Cl. 1/2", PG 64 -22 2,100 TN $77.00 $161,700.00 $84.00 $176,400.00 $79.00 $165,900.00 $85.00 $178,500.00 $89.00 $186,900.00 $85.00 $178,500.00 14 Asphalt Cost Price Adjustment 5,000 CALC $1.00 $5,000.00 $1.00 $5,000.00 $1.00 $5,000.00 $1.00 $5,000.00 $1.00 $5,000.00 $1.00 $5,000.00 15 Commercial HMA 50 TN $190.00 $9,500.00 $159.00 $7,950.00 $160.00 $8,000.00 $200.00 $10,000.00 $180.00 $9,000.00 $165.00 $8,250.00 16 Plaining Bituminous Pavement 2,500 SY $3.50 $8,750.00 $7.00 $17,500.00 $6.50 $16,250.00 $8.00 $20,000.00 $4.60 $11,500.00 $6.00 $15,000.00 17 Gravel Backfill for Drain 2,600 LF $40.00 $104,000.00 $49.00 $127,400.00 $47.00 $122,200.00 $81.00 $210,600.00 $69.00 $179,400.00 $104.00 $270,400.00 18 Sch. A Storm Sewer Pipe, 12 Inch Diam. 900 LF $30.00 $27,000.00 $30.00 $27,000.00 $55.00 $49,500.00 $40.00 $36,000.00 $44.00 $39,600.00 $60.00 $54,000.00 19 Catch Basin Type 1 14 EA $1,500.00 $21,000.00 $1,400.00 $19,600.00 $1,500.00 $21,000.00 $1,450.00 $20,300.00 $1,450.00 $20,300.00 $1,500.00 $21,000.00 20 Install Thru Curb Inlet Rim 2 EA $1,650.00 $3,300.00 $1,050.00 $2,100.00 $1,600.00 $3,200.00 $650.00 $1,300.00 $600.00 $1,200.00 $450.00 $900.00 21 Adjust Manhole 5 EA $625.00 $3,125.00 $675.00 $3,375.00 $700.00 $3,500.00 $750.00 $3,750.00 $775.00 $3,875.00 $600.00 $3,000.00 22 Resolution of Utility Conflicts 10,000 FA $1.00 $10,000.00 $1.00 $10,000.00 $1.00 $10,000.00 $1.00 $10,000.00 $1.00 $10,000.00 $1.00 $10,000.00 23 Adjust Valve Box 3 EA $625.00 $1,875.00 $200.00 $600.00 $500.00 $1,500.00 $650.00 $1,950.00 $600.00 $1,800.00 $400.00 $1,200.00 24 Erosion/Water Pollution Control 5,000 FA $1.00 $5,000.00 $1.00 $5,000.00 $1.00 $5,000.00 $1.00 $5,000.00 $1.00 $5,000.00 $1.00 $5,000.00 25 Topsoil Type A 600 CY $59.00 $35,400.00 $63.00 $37,800.00 $55.00 $33,000.00 $65.00 $39,000.00 $67.50 $40,500.00 $60.00 $36,000.00 26 PSIPE Steeple Maple (2-In. Cal.) 50 EA $451.00 $22,550.00 $490.00 $24,500.00 $425.00 $21,250.00 $500.00 $25,000.00 $525.00 $26,250.00 $425.00 $21,250.00 27 Sod Installation 1,600 SY $7.50 $12,000.00 $8.00 $12,800.00 $15.00 $24,000.00 $9.00 $14,400.00 $8.75 $14,000.00 $14.00 $22,400.00 28 Bark Mulch 100 CY $66.00 $6,600.00 $71.00 $7,100.00 $58.00 $5,800.00 $75.00 $7,500.00 $75.00 $7,500.00 $60.00 $6,000.00 29 Irrigation System Complete 1 LS $52,000.00 $52,000.00 $50,000.00 $50,000.00 $63,000.00 $63,000.00 $55,000.00 $55,000.00 $50,400.00 $50,400.00 $66,000.00 $66,000.00 30 Cement Concrete Traffic Curb and Gutter 3,350 LF $20.00 $67,000.00 $20.25 $67,837.50 $25.00 $83,750.00 $30.00 $100,500.00 $27.25 $91,287.50 $22.00 $73,700.00 31 Extruded Curb 50 LF $41.00 $2,050.00 $60.00 $3,000.00 $60.00 $3,000.00 $60.00 $3,000.00 $65.00 $3,250.00 $60.00 $3,000.00 32 Cement Concrete Pedestrian Curb 90 LF $33.00 $2,970.00 $28.50 $2,565.00 $36.00 $3,240.00 $40.00 $3,600.00 $38.25 $3,442.50 $26.00 $2,340.00 33 Cement Concrete Driveway Entrance Type 1 131 SY $77.00 $10,087.00 $80.00 $10,480.00 $46.00 $6,026.00 $75.00 $9,825.00 $42.00 $5,502.00 $64.00 $8,384.00 34 Black Vinyl Chain Link Fence/Gate Modification 1 LS $4,500.00 $4,500.00 $3,250.00 $3,250.00 $3,200.00 $3,200.00 $3,500.00 $3,500.00 $3,500.00 $3,500.00 $3,500.00 $3,500.00 35 Cement Concrete Sidewalk 1,715 SY $46.00 $78,890.00 $40.50 $69,457.50 $40.00 $68,600.00 $45.00 $77,175.00 $34.25 $58,738.75 $40.00 $68,600.00 36 Cement Concrete Sidewalk with Integral Curb 43 SY $150.00 $6,450.00 $161.00 $6,923.00 $145.00 $6,235.00 $160.00 $6,880.00 $150.00 $6,450.00 $140.00 $6,020.00 37 Cement Concrete Sidewalk Ramp Type Parallel 5 EA $2,600.00 $13,000.00 $2,150.00 $10,750.00 $1,900.00 $9,500.00 $2,000.00 $10,000.00 $1,400.00 $7,000.00 $2,000.00 $10,000.00 38 Illumination System Complete 1 LS $110,725.00 $110,725.00 $102,150.00 $102,150.00 $105,000.00 $105,000.00 $100,000.00 $100,000.00 $124,200.00 $124,200.00 $125,000.00 $125,000.00 39 Electrical Conduit System (By Electrician) 1 LS $14,000.00 $14,000.00 $13,700.00 $13,700.00 $14,000.00 $14,000.00 $15,000.00 $15,000.00 $16,200.00 $16,200.00 $12,500.00 $12,500.00 40 Permanent Signing 1 LS $15,000.00 $15,000.00 $11,450.00 $11,450.00 $2,000.00 $2,000.00 $9,000.00 $9,000.00 $6,000.00 $6,000.00 $8,000.00 $8,000.00 41 Profiled Plastic Line 5,275 LF $4.00 $21,100.00 $3.00 $15,825.00 $4.00 $21,100.00 $3.25 $17,143.75 $3.25 $17,143.75 $3.00 $15,825.00 42 Profiled Plastic Wide Lane Line 330 LF $7.00 $2,310.00 $5.50 $1,815.00 $6.00 $1,980.00 $6.00 $1,980.00 $5.75 $1,897.50 $5.50 $1,815.00 43 Plastic Traffic Arrow 3 EA $351.00 $1,053.00 $350.00 $1,050.00 $300.00 $900.00 $375.00 $1,125.00 $375.00 $1,125.00 $400.00 $1,200.00 44 Plastic Stop Line 70 LF $25.50 $1,785.00 $16.00 $1,120.00 $15.00 $1,050.00 $18.00 $1,260.00 $18.00 $1,260.00 $16.00 $1,120.00 45 Plastic Crosswalk Line 160 SF $15.50 $2,480.00 $16.00 $2,560.00 $10.00 $1,600.00 $18.00 $2,880.00 $18.00 $2,880.00 $16.00 $2,560.00 46 Plastic Bicycle Symbol 3 EA $301.00 $903.00 $494.00 $1,482.00 $460.00 $1,380.00 $500.00 $1,500.00 $525.00 $1,575.00 $500.00 $1,500.00 47 Gravity Block Wall 150 SF $50.00 $7,500.00 $58.00 $8,700.00 $60.00 $9,000.00 $25.00 $3,750.00 $75.00 $11,250.00 $60.00 $9,000.00 TOTAL $1,223,878.00 $1,232,715.00 $1,306,011.00 $1,359,343.75 $1,372,577.00 $1,398,214.00 Deductive Alternate SOUND PACIFIC ROAD CONSTRUCTION NORTHWEST CASCADE ACTIVE CONST. (ACI) RODARTE RW SCOTT CONSTRUCTION NORTHWEST ITEM UNIT UNIT UNIT UNIT UNIT UNIT NO. DESCRIPTION QTY UNIT PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT 1 Mobilization 1 LS $1.00 $1.00 $1.00 $1.00 $100.00 $100.00 $7,500.00 $7,500.00 $9,000.00 $9,000.00 $6,000.00 $6,000.00 3 Roadway Surveying 1 LS $1.00 $1.00 $1,090.00 $1,090.00 $1,500.00 $1,500.00 $3,500.00 $3,500.00 $1,100.00 $1,100.00 $7,500.00 $7,500.00 5 Project Temporary Traffic Control 1 LS $1.00 $1.00 $12,000.00 $12,000.00 $1,500.00 $1,500.00 $4,500.00 $4,500.00 $5,500.00 $5,500.00 $14,000.00 $14,000.00 13 HMA Cl. 1/2", PG 64 -22 225 TN $76.75 $17,268.75 $71.50 $16,087.50 $77.00 $17,325.00 $95.00 $21,375.00 $89.00 $20,025.00 $100.00 $22,500.00 16 Plaining Bituminous Pavement 2,000 SY $0.05 $100.00 $4.85 $9,700.00 $3.00 $6,000.00 $5.50 $11,000.00 $4.60 $9,200.00 $6.00 $12,000.00 30 Cement Concrete Traffic Curb and Gutter 250 LF $5.38 $1,345.00 $37.50 $9,375.00 $36.00 $9,000.00 $16.00 $4,000.00 $37.25 $9,312.50 $22.00 $5,500.00 32 Cement Concrete Pedestrian Curb 18 LF $7.19 $129.42 $28.25 $508.50 $34.00 $612.00 $27.00 $486.00 $38.25 $688.50 $26.00 $468.00 35 Cement Concrete Sidewalk 400 SY $7.15 $2,860.00 $38.75 $15,500.00 $36.00 $14,400.00 $60.00 $24,000.00 $34.25 $13,700.00 $40.00 $16,000.00 37 Cement Concrete Sidewalk Ramp Type Parallel 1 EA $513.89 $513.89 $2,150.00 $2,150.00 $1,700.00 $1,700.00 $1,600.00 $1,600.00 $1,400.00 $1,400.00 $1,800.00 $1,800.00 39 Electrical Conduit System (By Electrician) 1 LS $10,000.00 $10,000.00 $10,890.00 $10,890.00 $10,000.00 $10,000.00 $11,000.00 $11,000.00 $16,200.00 $16,200.00 $12,500.00 $12,500.00 40 Permanent Signing 1 LS $1.00 $1.00 $3,650.00 $3,650.00 $100.00 $100.00 $1,800.00 $1,800.00 $1,800.00 $1,800.00 $2,000.00 $2,000.00 41 Profiled Plastic Line 2,605 LF $1.75 $4,558.75 $3.00 $7,815.00 $4.00 $10,420.00 $3.25 $8,466.25 $3.25 $8,466.25 $5.00 $13,025.00 42 Profiled Plastic Wide Lane Line 330 LF $4.75 $1,567.50 $5.50 $1,815.00 $6.00 $1,980.00 $6.00 $1,980.00 $5.75 $1,897.50 $7.00 $2,310.00 43 Plastic Traffic Arrow 3 EA $300.00 $900.00 $350.00 $1,050.00 $300.00 $900.00 $350.00 $1,050.00 $375.00 $1,125.00 $400.00 $1,200.00 46 Plastic Bicycle Symbol 3 EA $250.00 $750.00 $494.00 $1,482.00 $460.00 $1,380.00 $500.00 $1,500.00 $525.00 $1,575.00 $500.00 $1,500.00 TOTAL $39,997.31 $93,114.00 $76,917.00 $103,757.25 $100,989.75 $118,303.00 10 2 of 2 printed 4/9/2019

Get email alerts for Lakewood

A daily email when new agendas and minutes are posted.

Report an issue with this meeting