City Council
Regular MeetingLakewood, WA · March 14, 2022
Agenda
LAKEWOOD CITY COUNCIL
STUDY SESSION AGENDA
Monday, March 14, 2022
7:00 P.M.
City of Lakewood
Council Chambers
6000 Main Street SW
Lakewood, WA 98499
Residents can virtually attend City Council meetings by
watching them live on the city’s YouTube channel:
https://www.youtube.com/user/cityoflakewoodwa
Those who do not have access to YouTube can call in to
listen by telephone via Zoom: Dial +1(253) 215-8782 and
enter meeting ID: 868 7263 2373
________________________________________________________________
Page No.
CALL TO ORDER
ITEMS FOR DISCUSSION:
(3) 1. Review of South Sound Military and Communities Partnership
(SSMCP) Work Plan. – (Memorandum)
(6) 2. Information Technology Strategic Plan Update. – (Memorandum)
ITEMS TENTATIVELY SCHEDULED FOR THE MARCH 21, 2022 REGULAR
CITY COUNCIL MEETING:
1. Proclamation recognizing March as Women’s History month.
2. Authorizing the award of a construction contract for the JBLM North
Access Improvement Phase 2 project.
3. Authorizing the execution of an agreement for City Hall architectural,
engineering, and workspace design services. – (Motion – Regular
Agenda)
4. Review of FY 2022 Community Development Block Grant (CDBG) Annual
Action Plan. – (Reports by the City Manager –Regular Agenda)
5. Clover Creek Flood Mitigation Alternative Study Update. – (Reports by the
City Manager – Regular Agenda)
Persons requesting special accommodations or language interpreters should contact the City Clerk,
253-983-7705, as soon as possible in advance of the Council meeting so that an attempt to provide the
special accommodations can be made.
http://www.cityoflakewood.us
Lakewood City Council Agenda -2- March 14, 2022
Page No.
6. Review of the 2021-2040 Tacoma-Pierce County Solid & Hazardous
Waste Management Plan. – (Reports by the City Manager – Regular
Agenda)
REPORTS BY THE CITY MANAGER
CITY COUNCIL COMMENTS
ADJOURNMENT
Persons requesting special accommodations or language interpreters should
contact the City Clerk, 253-983-7705, as soon as possible in advance of the
Council meeting so that an attempt to provide the special accommodations can
be made.
http://www.cityoflakewood.us
Return to Agenda
2021-22 SSMCP Work Plan
Recast Social Services Work Group to prioritize work on child care initiatives
Formalize new Work Group for attainable/affordable housing for lower enlisted
Assess the continued relevance of the 2010 Growth Coordination Plan - conduct GCP Impact survey, publish
new GCP in 2022
Secure federal and state funding, modify / manage Cooperative Agreement to resolve McChord Airfield
Clear Zone Encroachment while assisting City of Lakewood in regulating and enforcing NCZ activities
Implement strategies for traffic congestion management to improve JBLM access
Enhance & Expand Regional SSMCP Coordination & Participation – serve as a convener of resources
promoting collaboration between community and military leaders
Inform & Educate Stakeholders on Military Impacts across the South Puget Sound – use Regional Economic
Impact Analysis as a marketing tool
Inform and educate state legislators about SSMCP priorities and participate & advocate in State Level
Activities
3
Return to Agenda
Draft 2023-24 SSMCP Work Plan
2022 Growth Coord. Plan
Strategy
Support Development of and Access to Attainable Off-base Housing* (Housing)
Advocate for Occupational Licensure (Cross-Discipline)
Pursue Funding for I-5 improvements* (Transportation)
Measure and Communicate the Economic Benefits of JBLM in the Region* (Economics)
Increase communication between JBLM, Child Care providers and military families* (Childcare)
Improve resiliency planning (Climate Change)
Inform/educate state legislators about SSMCP and advocacy in state-level activities* (Cross-Discipline)
Pursue military compatibility measures such as clear zone encroachment* (Land Use)
* Reworded initiatives that are also on the 2021-22 work
4 plan
Return to Agenda
clarification of SSMCP role
SSMCP Role:
SSMCP serves as a regional resource convener and, when desired,
legislative advocate on behalf of local governments and the JBLM
military community while promoting information sharing and
regional collaboration.
5
Return to Agenda
To: Mayor and City Councilmembers
From: Kenneth White, Chief Information Officer
Through: John J. Caulfield, City Manager
Tho Kraus, Deputy City Manager
Date: March 14, 2022
Subject: Information Technology Strategic Plan Update
BACKGROUND
The 6‐Year Information Technology Strategic Plan for 2023‐2028 is currently under development for the 2023/2024
biennial budget. The purpose of this memo is to provide the City Council with a status update of the current
2021/2022 projects. As the global pandemic continued throughout 2021, the Technology department prioritized
its workload based on ability to obtain equipment and available vendor assistance. Several 2021 scheduled projects
were pushed out towards the latter part of 2021 and some into 2022.
2021 Projects – Completed
503.0000 Phone System Upgrade
Completion Date: November 2021
2021 Budget $0 / 2021 Actual $0
Major operating system update was performed on the City’s phone system which provided enhanced capabilities
for the Shortel clients. In addition, a second update was performed to the Shortel mobility router which now
provides remote call capability on city issued cell phones using IOS and Android mobile apps. This feature will allow
City employees to utilize the installed application to make and receive calls as if they are coming from their assigned
desk phone. As this project was performed under existing maintenance contracts no additional funding was required.
503.0025 Redundant Voice/Data Connection, Police Station
Completion Date: August 2021
2021 Budget $10,000 / 2021 Actual $5,596
In order to provide redundancy within the City’s network infrastructure a secondary internet gateway at the ATMS
building to ensure network redundancy in the event of a primary circuit outage. This project was delayed over a
year and a half due to the inability of third‐party providers to install fiber circuits directly into the police station.
Working with Verizon, technology team members were able to negotiate new fiber installation located at the ATMS
building which would then be cross connected to the police station using existing city dark fiber. The project has
been completed and services are currently active.
503.0041 Radio Antenna Replacement, Police
Completion Date: September 2021
2021 Budget $22,000 / 2021 Actual $24,886
A new emergency communications radio repeater was installed replacing the previous cellular radio which had
reached its end of life and was no longer functional. This was a critical project as the outage prevented officers from
utilize the basement and gun rage due to the inability to receive radio calls. This prevented officers from receiving
radio communications within the basement and gun range.
6
Return to Agenda
503.0043 Enterprise Vault
Completion Date: December 2021
2021 Budget: $10,000 / 2021 Actual $10,463
The city’s existing solution for long term archival had reached its end of life and support was to be discontinued for
the product. This was a complex project that required third party assistance to complete the task successfully.
Technology staff partnered with one of the leading third‐party vendors in this space to assist with the upgrade to
ensure minimal downtime and successful migration and configuration occurred. The upgrade was successful and
system returned to normal operation for city staff.
2021 Projects – In Progress/Carried Over to 2022
503.0005 Website Update/Redesign
Estimated Completion Date: December 2022
2021 Budget $7,499 / Actual $2,421
In continuation of the City’s website redesign project, the Information Technology Division (IT) will be working
directly with the Communication Manager to enhance the City’s website. This process will modernize the system;
provide additional enhancements to include video, enhanced customer service options and to provide a solution,
which not only looks better, but one that works better for both visitors and search engines.
503.0011 Server/Hardware Upgrades
Estimated Completion Date: December 2022
2021 Budget: $30,000 / Actual $0
Physical Server/hardware Replacement. Maintain information technology equipment that is performing critical
processing functions at a level to ensure their reliability and availability to support the business process for the City.
Objectives related to energy efficiency, performance & operating system migration will be thoroughly considered
prior to procurement. Further analysis related to the separation of processing capability and data management will
be evaluated as well as positioning to improve our security, disaster recovery and continued business operations.
Numerous servers will reach their end of life and require replacement. The estimated cost of $30,000 was to replace
2021 hardware that reached end of life warranty renewal periods. Project balance is requested to be carried over.
503.0018 Document Management System
Estimated Completion Date: June 2023
2021 Budget: $296,406 / Actual $194,613
Working in partnership with GRM, City employees are working with the vendor to implement the document
management system. This process will take some time to complete as the project spans across all departments
across the city. This system is a collection of technologies that work together to provide a
comprehensive solution for managing the creation, capture, indexing, storage, retrieval, and disposition of records
and information assets within the city. Due to the critical nature of the PALS permitting system project, this was
placed on hold until 2020, which pushed the project out to 2021.
503.0021 Rental Housing Updates
Estimated Completion Date: March 2022
2021 Budget: $75,000 / Actual $17,836
In an effort to streamline the Rental Housing Safety Program (RHSP) software, resolve outstanding bugs and
implement newly requested features the Technology department along with partnership with Community &
Economic Development departmental leadership team hired a third‐party developer to review the existing software
code and make appropriate changes as necessary. Over the past several months the developer has been working
hand in hand with the RHSP team to address these issues and provide new code to be implemented on the city’s
production system. Total budget for this project was set at $75,000 and is expected to be completed end of March,
2022.
LPD Body Cameras and Video Storage Portion Only, by ARPA and Police Reform Funds
Estimated Completion Date: December 2022
2021 Budget: $101,121 / Actual $101,000
In 2021 the Lakewood Police department proposed to council implementation of a new city‐wide body worn camera
solution for officers which encompassed multiple departments across the city to include Police, Legal and
7
Return to Agenda
Information Technology. The proposal included 80 body worn cameras, dockings stations, software and a five‐year
service plan totaling $336,304. The IT portion of the project totals approximately $101,000 for additional storage
due to the increased demand for both short and long‐term storage for the new body worn cameras. Two new
enterprise storage devices were purchased and installed at the police station which will provide additional storage
for the project. At the present time, the Technology team has completed the initial setup of both storage solutions
which are located at the Police station however one unit is destined to be located at the new data center in Hillsboro
upon full implementation of the remote offsite location. Completion of the project will provide 80 body worn
cameras complimenting the existing in‐car video solutions along with robust expandable storage for current and
future expansion as necessary.
503.0000 Pals (CED+) Permitting System
Estimated Completion Date: December 2022
2021 Budget: $50,000 / Actual $0
In 2019, working in collaboration with the Community & Economic Development division, Administrative Services
and the Executive Leadership Team, the city approved a move to partner with Pierce County to utilize the county’s
cloud hosted PALS solution to become the primary permitting solution for the city. Over the past several months,
Community & Economic Development, Public Works Engineering, Finance and IT have been working together with
the Pierce County to complete the initial setup & functionality required to access the county’s PALS system. The
project is now complete and the PALS system is currently in use by CED staff. In addition to the initial Pierce County
estimated cost of $50,000 / year, the City of Lakewood will be required to pay the actual hard costs for Amazon Web
Services of roughly $4,000 / month. This additional cost was unknown during the initial project kickoff however has
been recently provided to the city by county project leaders. Pierce County is currently updating the draft interlocal
agreement to incorporate this change and once completed it will be presented to City Council for review and
consideration (tentatively scheduled for April 4, 2022).
2022 Projects Currently Budgeted
(does not include 2021 projects to be carried over – see above)
503.0009 Video Surveillance
Estimated Completion Date: September 2022
2021 Budget: $20,000 / Actual $0
Cameras to provide law enforcement visibility at locations such as parking lots, high crime areas and city parks such
as the boat launch at American Lake Park and Harry Todd Park. Over the past few years, IT implemented 99 cameras
located throughout the City. This deployment consists of numerous locations to include City Hall, Police, Front Street
O&M, Fort Steilacoom Park, ATMS (Advanced Traffic Management System) building and the skate park. In addition
to the existing cameras, in 2020 two additional cameras were installed at City Hall garage to provide real time viewing
and recording of inmate transfers for court appearances. One existing camera at the Police Station has been
replaced with a Pan‐Tilt‐Zoom camera with an additional 3 scheduled to be installed in the near future. This will
provide additional viewing capacity in the event of a protest or large gathering at the station.
Currently, there is a total of 93 cameras at the following locations:
16 City Hall 9 Front Street O&M Shop 1 ATMS (Advanced Traffic Mgmt. System) Building
7 Municipal Court 17 Fort Steilacoom Park 1 Sound Transit Train Station Elevator
46 Police Station 1 Skate Park
8
Return to Agenda
503.0015 Computer Replacement
Estimated Completion Date: Ongoing
2022 Budget: $138,750 / Actual $68,807
Computer desktop, laptop & mobile device replacement is a necessity within the City as the aging life of PCs and
mobile devices will drive replacements. Older computers are unlikely to support newer generation operating
systems in the future. Whether by hardware failure or software obsolescence the city will need to replace computers
and mobile devices to continue to function and provide services to the general public. Funds should be set aside
yearly to ensure a proper refresh cycle exists. Continued investments in the city's virtual infrastructure should be a
priority as this will drive the cost down for hardware replacements and provide a platform agnostic solution for
mobile devices throughout the city. Investment in mobile technology will provide robust tools and decrease costs
associated with full laptop or desktop stations. Continued use of mobile technology within the Police Department
such as tablets and enhanced smartphones will also cut costs and provide tools necessary for officers in the field.
Current replacement cycle for existing systems is 4 years thus the need to set aside $138,750 each year will allow
for replacements of aging laptops, mobile devices & desktop computers. Information Technology team will continue
to rollout equipment in 2022 replacing all outdated desktops, laptops and mobile devices to ensure technology is
functional and up‐to‐date.
503.0037 Co‐Location / Cyber Security
Estimated Completion Date: September 2022
2022 Budget $103,000
In a proactive effort to ensure business continuity during a major outage, the Information Technology department
will be setting up a data center located 155 miles from Lakewood in Hillsboro Oregon. The implementation of this
offsite data center will strengthen the City’s network environment by providing an additional external location to
host production systems externally from the city during an outage or cyber‐attack that affects both City Hall and the
Police Station. In the event of a major disaster or cyber‐attack, this location can be brought online to provide real‐
time access to city resources and critical systems. This data center will provide a robust, secure location hosting
critical server replication and data storage. Benefits of this data center: Reliable power and redundancy, heating
and cooling systems, humidity control systems, redundant and diverse communication lines from multiple carriers
and sophisticated fire protection not available at City Hall. As the city moves forward, investment in external
resources and virtual infrastructure is crucial.
503.0042 MS Exchange Server Upgrade & Client Licenses
Estimated Completion Date: February 2022
2022 Budget $50,000
The existing e‐mail solution utilized within the city has reached its EOL (End of Life) and had to be replaced. In
addition, the newly upgraded Enterprise Vault solution required the mail server to be updated as well. Technology
staff successfully performed both updates and have met the requirements of both systems at one time. The system
is online and operational at this time. Licenses have been requested and pending purchase is forthcoming.
196.6008 ARPA Funded ‐ Municipal Court Audio & Video
Estimated Completion Date: December 2022
2022 Budget $141,750 ($135,000 Project Cost + $6,750 Direct Admin Cost)
The City of Lakewood's primary courtroom has an existing installation of outdated audio equipment which has been
experiencing technical issues impacting daily court proceedings. The court is mandated to store all audio recordings
during any proceeding. The existing solution continues to require extensive support to ensure everything is recording
correctly however it does not integrate directly with any online remote video solutions such as Zoom, LifeSize Cloud,
etc. In addition to audio, the court does not have any video solutions in place which greatly impact the court's ability
to provide a robust online solution for the general public. At the moment there is no integration for online services
into existing mandated audio recording solutions like For the Record (FTR). The court places the highest priority on
achieving an improved audio & video solution that is user‐friendly, allows for seamless integration of online services
to provide remote court options for the public and allow greater expansion to in‐custody hearings for all jail services
contracted by the City.
9
Return to Agenda
Preliminary 6‐Year (2023‐2028) STRATEGIC PLAN
Below is the preliminary 6‐year strategic plan for 2023‐2028.
Ref # Project Name 2023 2024 2025 2026 2027 2028 Total
503.0003 Wi‐Fi Expansion $ ‐ $ 50,000 $ ‐ $ 50,000 $ ‐ $ ‐ $ 100,000
503.0009 Video Camera Upgrades 10,000 ‐ 15,000 ‐ 15,000 ‐ 40,000
503.0011 Server Replacements ‐ 70,000 ‐ ‐ ‐ 50,000 120,000
503.0015 Computer Replacement 100,000 100,000 100,000 100,000 100,000 100,000 600,000
503.0019 Vulnerability & Pen Test 30,000 ‐ 30,000 ‐ 30,000 ‐ 90,000
503.xxxx Exchange Server Upgrade ‐ ‐ 50,000 ‐ ‐ ‐ 50,000
503.xxxx Firewall Replacement ‐ ‐ ‐ 125,000 ‐ ‐ 125,000
503.xxxx Phone System Replacement ‐ ‐ 250,000 ‐ ‐ 60,000 310,000
503.xxxx Storage Area Network ‐ 150,000 45,000 45,000 45,000 45,000 330,000
503.xxxx Video Storage/Archival ‐ 100,000 45,000 45,000 45,000 45,000 280,000
503.xxxx Core Switch Upgrade ‐ ‐ 250,000 ‐ ‐ 50,000 300,000
503.xxxx CyberSecurity Refresh ‐ 100,000 25,000 25,000 25,000 125,000 300,000
503.xxxx Disaster Recovery Hardware ‐ 50,000 ‐ ‐ 50,000 ‐ 100,000
503.xxxx UPS Battery Refresh / PD ‐ ‐ ‐ ‐ ‐ 70,000 70,000
Total Project Costs $ 140,000 $ 620,000 $ 810,000 $ 390,000 $ 310,000 $ 545,000 $ 2,815,000
503.0003 Wi‐Fi Expansion
Initial One‐Time Cost = $50,000 in 2024 / $50,000 in 2026
Ongoing M&O = $0
Wi‐Fi access continues to be a critical item for city employees, especially police. With the implementation of recent
body‐worn cameras which complement the in‐car video system it is imperative that officers have the ability to
upload video at high speed throughout the city versus coming back to the station. The technology team, in
partnership with West Pierce Fire & Rescue and other public agencies will be working to install wi‐fi access points
throughout the city to provide additional resources and locations for police officers to upload videos. In addition,
technology team members will be working to implement public wi‐fi access in additional areas throughout the city
to enhance public access.
503.0009 Video Camera Upgrades
Initial One‐Time Cost = $10,000 in 2023 / $15,000 in 2025 / $15,000 in 2027
Ongoing M&O = $0
Existing cameras will have reached their expected end‐of‐life and will need to be replaced. These cameras are
located across the city providing security both within city buildings and public spaces such as parks and transit
stations. Cameras should be replaced with higher definition units and integrated into the enterprise software
solution.
503.0011 Server Replacements
Initial One‐Time Cost = $70,000 in 2024 / $50,000 in 2028
Ongoing M&O = $0
Physical Server/hardware Replacement. Maintain equipment that is performing critical processing functions at a
level to ensure their reliability and availability to support the business process for the City. Server replacements will
be evaluated prior to replacement. Objectives related to energy efficiency, performance and operating system
migration will be thoroughly considered prior to procurement. Further analysis related to the separation of
processing capability and data management will be evaluated as well as positioning to improve our security, disaster
recovery and continued business operations.
503.0015 Computer Replacements
Ongoing Costs = $100,000 per Year
Computer desktop/laptop & mobile device replacement is a necessity within the City as the aging life of PCs and
mobile devices will drive replacements. Older computers are unlikely to support newer generation operating
10
Return to Agenda
systems in the future. Whether by hardware failure or software obsolescence the city will need to replace computers
and mobile devices to continue to function and provide services to the general public. Funds should be set aside
yearly to ensure a proper refresh cycle exists. Continued investments in the city's virtual infrastructure should be a
priority as this will drive the cost down for hardware replacements and provide a platform agnostic solution for
mobile devices throughout the city. Investment in mobile technology will provide robust tools and also decrease
costs associated with full laptop or desktop stations. Continued use of mobile technology within the Police
Department such as tablets and enhanced smartphones will also cut costs and provide tools necessary for officers
in the field. Current replacement cycle for existing desktops is 4 years.
503.0019 Vulnerability & Penetration Tests
Initial One‐Time Cost = $30,000 in 2023 / $30,000 in 2025 / $30,000 in 2027
The Information Technology Division will continue to work with FR Secure to perform additional external penetration
tests as required. Internal vulnerability sans and penetration tests will be done on a quarterly basis. These are also
required to meet CJIS (Criminal Justice Information Systems) requirements.
503.0019 Exchange Server Refresh
Initial One‐Time Cost = $50,000 in 2025
Ongoing M&O = $0
The current exchange server will reach its end of life Oct 14, 2025 and will need to be refreshed. This is the city’s
primary mail server which will need to be upgraded for on site hosting.
503.xxxx Firewall Replacements
Initial One‐Time Cost = $125,000 in 2026
Ongoing M&O = $0
Existing firewalls located at the primary and secondary data centers will need to be replaced as they would have
reached their expected end of life. These are critical items which protect the city from unauthorized access and
cyber security attacks.
503.xxxx Phone System Replacement
Initial One‐Time Cost = $250,000 in 2025 /$60,000 in 2028
Ongoing M&O = $0
The city’s existing Mitel Voice Over I/P phone system will have reached its scheduled end‐of‐life and will need to be
replaced as it will have been in production for 10 years. An evaluation of other options and solutions will occur as
part of the process.
503.xxxx Storage Area Network
Initial One‐Time Cost = $150,000 in 2024
Ongoing M&O = $45,000
Replacement of the city’s existing storage area network solution will need to occur as the system will have reached
its end of life. This is a critical solution as it hosts the majority of the city’s virtual infrastructure.
503.xxxx Video Storage/Archival
Initial One‐Time Cost = $100,000 in 2024
Ongoing M&O = $45,000
Due to the increase in body‐worn cameras and in‐car cameras it’s imperative that the city expand the existing
solutions to meet the storage demand of these units. The system must also be able to handle long term archival to
meet state requirements for storage and public records requests. This increase in storage is critical to ensure proper
operation and storage requirements.
503.xxxx Core Switch Replacement
Initial One‐Time Cost = $250,000 in 2025 / $50,000 in 2028
Ongoing M&O = $0
The city’s primary core switch located at city hall will have reached its end‐of‐life and is scheduled to be replaced as
its life expectancy is 10 years from time of installation.
11
Return to Agenda
503.xxxx Cybersecurity Refresh
Initial One‐Time Cost = $100,000 in 2024 / $100,000 in 2028
Ongoing M&O = $25,000
Replacement and/or addition of new cybersecurity software and hardware solutions is critical to ensure the city
maintains its security posture in an ever‐changing world. Cybersecurity is the most important item that the city can
invest in to ensure its network infrastructure and first responder network is protected and secure from outside
intrusions. Investment in software and hardware will help to ensure the safe continued operation of the city’s
network infrastructure and services to internal and external services to the public.
503.xxxx Disaster Recover Hardware
Initial One‐Time Cost = $50,000 in 2024 / $50,000 in 2027
Ongoing M&O = $0
Existing backup and recovery solutions such as tape drives and long term storage solutions will have reached their
end of life and must be upgraded to ensure proper operation and recovery in the event of a disaster. As technology
changes, it is imperative that Lakewood’s systems are kept up‐to‐date to ensure proper operation and long term
recovery in the event of a disaster.
503.xxxx UPS Battery Refresh, Police Station
Initial One‐Time Cost = $70,000 in 2028
Ongoing M&O = $0
The city’s primary battery backup solution located at the police station will need its batteries refreshed. These
batteries typically last 7‐10 years in production thus for proper operation they will need to be removed and replaced
with new units.
Next Steps
As technology changes and security threats continue to grow, infrastructure requirements within the City are
constantly being assessed. Items such as antivirus, perimeter security, intrusion detection systems and storage
capacity are constantly reviewed to ensure the City of Lakewood maintains a secure and reliable network
infrastructure. The Information Technology 6‐Year Strategic Plan continues to be an evolving document and further
updates for 2023‐2028 will occur as part of the 2023/2024 biennial budget process.