Leominster Conservation Commission Meeting
January 9, 2024
Nick Venti, Chair Chuck Raymond, Vice-Chair Rich Gullick,
Jim Chambers, Bob Sicard, Mike Cichy, and Conservation Agent Nick Kremp present.
Meeting started at 6:02 PM
Pursuant to MGL CH 131 § 40, Massachusetts Wetlands Protection Act, the Leominster
Conservation Commission will hold a Public Hearing on a Notice of Intent for the
construction of an industrial building in a wetland buffer zone. Address: 21 Jungle Road.
Map and parcel 301-1 . DEP File #199-1189.
Chris Anderson, Hannigan Engineering, presented on the project. The applicant is proposing the
construction of an industrial warehouse. There are existing wetlands to the west on land owned
by National Grid. The project will alter the buffer zone only with the closest disturbance to the
wetland line being approximately 25 feet away.
Currently, water flows from the south toward Old Mill Road to the west of the site where it pools
and dissipates back underground through the sandy medium on site. Therefore, proposed
activity will not affect water flowing into the nearby wetland. In high rain events, water seeping
out of the ground flows onto Jungle Road. Post construction, water falling onto the site will be
directed into the constructed detention basin and from there into the stormwater infrastructure
along Jungle Road.
Currently wetlands to the west are situated at a higher elevation than the existing site. There will
have to be a cut into the existing grade to level out the site for construction. The building is
being designed for general industrial use but there is no specific tenant yet signed on.
Because of ongoing legal matters regarding the ownership of a part of the proposed project
area, the agent, Mr. Kremp, recommended that the Commission add a special condition
specifying the responsibility of the detention basin to be constructed will be that of the
warehouse property owner. With that added condition, Mr. Kremp recommended approval of the
order of conditions.
Dr. Gullick made a motion to end the public portion of the discussion. Mr. Sicard seconded.
Motion passed 6-0.
Mr. Cichy made a motion to approve the order of conditions with the added condition as
described by the agent. Mr. Chambers seconded. Motion passed 6-0.
Certificate of Compliance –
1775 Lock Drive (DEP File #199-1036)
Matt Marro, of Matthew Marro Environmental Consulting, presented on the request. The request
is for a partial certificate of compliance for lot 1, Map and parcel 323-1 (currently occupied by
The Botanist cannabis dispensary) while the ongoing issues surrounding lot 2, Map and parcel
323-13 (which contains the warehouse) are worked out. Some trees and meadow mix have
been planted on lot 2 to bring it back into compliance but there are some remaining areas being
utilized by the truck repair business which were not permitted. Mr. Marro pointed out on the site
plan a row of trees to the south of the warehouse (on lot 2) which have not been planted and an
access road on lot 1. Both of these are outside of the bufferzone and riverfront area.
Mr. Kremp agreed with the two issues but also pointed out that there are trucks and equipment
which are parked on lot 1 which are in the bufferzone. Mr. Marro said that he would take these
concerns back to the property owner. Once a plan to address the issues raised in this meeting
has been formed, Mr. Marro will return for the next available meeting to present the request
again to the Commission.
There was no action taken by the Commission at this time.
16 Wildflower Road Appeal, Info session
Started at 6:39 PM
John Plifka (McCarty Engineering) led the presentation. He stated that the project was first
introduced to the Leominster Conservation Commission in August, 2022 where it was
subsequently denied. This informational session is part of the appeals process as the applicant
(McCarty Engineering) pursues a superseding order of conditions from the Massachusetts
Department of Environmental Protection.
Chair Chuck Raymond briefly interjected to point out the other house represented on the plans
as the other project which had an NOI submitted at the same time but has been approved and
almost completely built as of this meeting.
Mr. Plifka went on to say that there has been a DEP site walk with some of the Commission.
They (MassDEP) had asked for soil samples which have since been provided. MassDEP had
recommended that the rain garden be moved away from the resource area, which you can see
on the presented plans moved about 30 feet further away from the wetland boundary. This
saves about 1100 square feet of forested area from the original plan. Also the applicant is
proposing a pea stone diaphragm for pretreatment of stormwater before it hits the rain garden.
The proposed location for the house has not been moved due to other site constraints and
setback requirements.
Dr. Gullick asked Mr. Plifka to point out the 100-foot wetland buffer line on the site plans, which
he did, showing the entirety of the proposed build within this buffer. Dr. Gullick asked Mr. Plifka
if he’s aware of where DEP is in their decision making process. Mr. Plifka said he only knew
what had been asked of McCarty up to this point, which was to update the Commission with
this presentation.
Mr. Kremp asked Mr. Plifka to repeat the detail about the pea stone diaphragm, which he did.
With no further questions, info session ended at 6:44 PM.
883 Pleasant Street (DEP File #199-1142)
Mr. Kremp explained that he was unable to confirm the grass had been established due to
recent snowfall and requested the Commission wait until a time that the grass is visible to vote
on the certificate.
The Commission took no action at this time.
Emergency Certification – None
Communications –
FEMA / MEMA update
Mr. Kremp briefly explained the recent history but had no new updates at this time.
School Sewer Reroute, MESA update
Mr. Kremp briefly explained the recent history and that the DPW was still working on acquiring a
wildlife biologist to draft an endangered species protection plan prior to start of work per MESA
requirements. Other than that, Mr. Kremp had no new updates at this time.
Oak Hill Solar - Fitchburg project
Mr. Kremp explained that the next Fitchburg Conservation Commission meeting won’t be until
February 7. Currently, LEC, an environmental contractor, has been hired by the City of Fitchburg
to review the wetland delineation. There seems to be a discrepancy between the original
delineation and that done by LEC but Fitchburg is still awaiting the final report from LEC before
proceeding with discussion or a vote on the order of conditions.
Mr. Kremp went on to explain that although Leominster is not a direct abutter to the project,
there may be a route for an appeal, pending the Fitchburg Conservation Commission’s vote, if
the City of Leominster can show that it has been negatively impacted by the approval of the
project, which it may have a case for with Notown Reservoir being downstream of Shea Brook.
Commission Policy -
Winter delineation review
Mr. Kremp briefly described the points laid out in the official written policy as well as the
exceptions for it.
Wetlands protection Violation Policy
Following the realization that there was an official policy on winter delineation, Mr. Kremp
proposed a vote on an official written policy, complete with exceptions, on wetland violation
follow up to bring about a higher level of consistency across cases.
There followed a brief discussion of what this policy should include. The Commission agreed
that Mr. Kremp should draft a written policy to share with the Commission which they can then
vote on at the next meeting.
Adjournment
Mr. Cichy made a motion to adjourn the meeting. Mr. Chambers seconded. Motion passed 6-0.
Meeting adjourned at 7:12 PM.