City Council
Regular MeetingLiberty Lake, WA · May 20, 2014
Agenda
CITY COUNCIL MEETING
TUESDAY, MAY 20, 2014
CITY HALL
22710 E. COUNTRY VISTA DRIVE
7:00 P.M.
1. INVOCATION
2. PLEDGE OF ALLEGIANCE
3. CALL TO ORDER
4. ROLL CALL
5. AGENDA APPROVAL
6. CITIZEN COMMENTS
7. MAYOR AND CITY COUNCIL COMMITTEE REPORTS
8. CITY ADMINISTRATOR REPORT
9. WORKSHOP DISCUSSION
I-90 Interchange in Liberty Lake – Katy Allen, City Administrator / Larry
Larson, Project Engineer Washington State Department of Transportation
Transportation Improvement Program for 2014-2020 – Andrew Staples, City
Engineer
10. ACTION ITEMS
A. Consent Agenda
i. Approve May 6, 2014 City Council Minutes
ii. Approve May 20, 2014 Vouchers in the amount of $295,354.30
B. General Business
i. Award Town Square Construction Contract
** City Administrator, Katy Allen, will give a presentation prior to action
11. INTRODUCTION OF UPCOMING AGENDA ITEMS
12. CITIZEN COMMENTS
13. ADJOURNMENT
The public is invited to attend. Parking and meeting rooms are accessible for persons with disabilities. Contact the
City at 755-6700 with 24-hours advance notice for special accommodations.
City Council
Subcommittee
Agendas
Finance Committee Meeting
Agenda – City Hall Conference Room
May 20, 2014
6:00 PM
I. Follow up questions from 5-6-2014
II. Townsquare Park Contract Award
a. Budget Review
b. Bid Review
III. 2013 Annual Report Review
IV. IT Contract Renewal
V. SSB 5173 – Unpaid Holidays
VI. AWC Wellness Networking Event – City is hosting
VII. Voucher Review
Liberty Lake Municipal Library
April 2014
Statistics
Circulation April 2013 April 2014*
Checkouts 6,844 6,205
Checkins 7,397 7,064
Renewals 735 972
In-House 598 238
ILL filled 5 10
Digital 272 649
CIN Loans 1,191 1,021
Total items 17,042 16,159
Friends' Tea 2014
Borrowed by CIN 620 500
Author Dawn Nelson
Patrons
Total Visits: 4,237 Difficulty w/
Patron Counter
Program visits:
Story/Craft times: 312 272
Adult programs: 32 30
Patrons added: 102 97
Total patrons: 6,022 5,694
Outreach, Events, Training
Kid’s Crafts
LEGO Club
SCTU: Personal Finance Class
Friends of the Library Annual Tea @ Meaddowwood Technology
Center
Literacy & Technology for Parents/co-sponsored with Lisa Wardian,
Reading Teacher, Greenacres Elementary School
Computer classes
Knitting club
National Library Week declared by Mayor for 2014
*National Library Week Closure
On Tuesday, April 15th, work crews on the roof discovered six trusses in the library's ceiling to
have rotted through and evacuated the building. Staff was allowed to enter under restricted
access, but the library was closed to the public until jacks where in place and the library declared
safe by the city engineer on Monday April 21st. It is expected that repairs will be complete by
Monday May 5th.
The week-long closure has had a significant effect on our statistics. It would not be unreasonable
to estimate what would have transpired for the month at numbers 25% higher.
Reading Garden
Workers from Environment West began work on the Reading Garden on Wednesday, April 30.
The project is expected to be completed in two to three weeks.
Public Safety Meeting Agenda
May 13th, 2014 @ 5:00 P.M.
LLPD Small Conference Room
Library Report/Updates
Pamela Mogen
Spokane Valley Fire Department Report/Updates
Larry Rider
Police Report/Updates
Brian Asmus
Gibson Memorial Service and Family Support
City Hall Open House – May 15th.
Hiring Process and timeline for positions and testing
Line of Duty Death Policy and Family Resource Guide
Officer Meeting with spouses on May 21st
Emergency Management Training ‐ COOP
WASPC conference next week in Spokane
Too Good For Drugs Program – every Wednesday
Speeding concern on Winrock and Autumn Crossing
Phone system update
2013 Annual Report presentation at June council meeting
I‐502 options – June 17th meeting
Old Business
New Business
Follow up items
Adjourn
ACTION ITEMS
City of Liberty Lake
Consent Agenda for May 20, 2014
City Council Meeting
Report from the Mayor for pending claims and payment of previously‐approved obligations through May 20, 2014
Payee Description Amount
See attached voucher report.
Total vouchers through May 20, 2014 $ 293,898.86
Check dated May 14, 2014
Association of Washington Cities Check No. 18944 $ 1,455.44
TOTAL $295,354.30
RECOMMENDATION: Approve and Authorize for Payment
ATTACHMENTS: All original invoices are on file with the City Treasurer.
SIGNATURES:
City Clerk Mayor
Finance Committee
AGENDA ITEM NO.: 10Bi
BUSINESS OF THE CITY COUNCIL, LIBERTY LAKE, WASHINGTON
SUBJECT: Bid Award for Town Square Park FOR THE AGENDA OF: May 20, 2014
DEPT. HEAD DEPT. OF ORIGIN:
APPROVAL:
EXHIBIT: Low Bidder’s Packet, Clean Contract, Bid Tabulation
EXPENDITURE REQUIRED: Yes
BUDGETED: Yes
SUMMARY STATEMENT
Bids were solicited through our through public competitive bidding for the Town Square Park project.
We received five bids for this work. This project provides for the installation of two acres of sidewalk,
turf, trees, lighting, restroom, stormwater and parking. We have allowed 60 working days for this
project.
The apparent low bid for the Town Square Park project is Bacon Concrete, Inc. The Engineer's Estimate
for this work was $681,440.30. The work under this Agreement is subject to Washington State
prevailing wage law.
The total for each of the Schedules is shown below:
Schedule 1 – Town Square Park $603,046.00
Schedule 2 – On Street Parking $ 22,609.60
Schedule 3 – Entry Arch $ 23,914.00
The Grand Total for the Bid Proposal submitted by the low bidder is six hundred forty nine five hundred
sixty nine and 60/100 dollars ($649,569.60). No discrepancies were found on the low bid.
The Grand total for construction cost of this project is within the budget set by Council. In addition to
the award of the Contract, staff requests that Council authorize a 5% contingency ($35,500) to be
managed by staff.
RECOMMENDED ACTION
Staff recommends awarding all three schedules since the Grand Total is within budget, and authorizing
the Mayor to sign the contract with Bacon. Staff also recommends providing a 5% contingency to be
used by staff to effectively manage the construction phase.
BUDGET SET BY COUNCIL - $785,000
---
DESIGN $ 29,500.00
CONSTRUCTION MGMT $ 15,000.00
CONTINGENCY $ 35,500.00
CONSTRUCTION CONTRACT $649,569.60
TOTAL $729,569.60
FUNDING SOURCES
---
REET $580,000.00
STA $ 81,000.00
GREENSTONE $ 22,690.00
APA/STORM $ 25,000.00
GENERAL FUND $ 20,960.00
TOTAL $729,569.60
\\Nas-01\cad\Civil3D Projects\51016\Production Drawings\51016PL04.dwg, 3/21/2014 2:59:24 PM, julie, 1:2
CITY OF LIBERTY LAKE TOWNS SQUARE
SITE OVERVIEW
51016
SCHEDULE 1 SCHEDULE 3 SCHEDULE 2 D.R.H.
J.A.L.
MAIN PARK ENTRY ARCH STREET PARKING 51016PL04.DWG
03-20-14
$603,046.00 $23,914.00 $22,609.60
SECTION 00 5200 - EJCDC SUGGESTED FORM OF
AGREEMENT
BETWEEN OWNER AND CONTRACTOR
FOR CONSTRUCTION CONTRACT (STIPULATED PRICE)
THIS AGREEMENT is dated as of the day of , in the year 2014 by and
between CITY OF LIBERTY LAKE, WASHINGTON (hereinafter called the OWNER) and BACON
CONRETE, INC. (hereinafter called the CONTRACTOR).
OWNER and CONTRACTOR, in consideration of the mutual covenants set forth, agree as follows:
Article 1. WORK.
CONTRACTOR shall complete all Work as specified or indicated in the Contract Documents titled “BID OF
THE LIBERTY LAKE TOWN SQUARE PROJECT,” dated April, 2014 and is generally described as follows:
Schedule 1 - Town Square Park - Includes a 39-stall asphalt parking lot and park with, water &
sewer services, restroom facility, decorative landscaping, trees with tree grates, irrigation, concrete
flatwork, pavers, grading, and decorative park entry arch. Contractor shall include in this lump sum
item the bid pricing for Purchase and Assembly of Restroom ‘Kit’ per manufacturer’s construction
documents and allowing for full coordination of utilities and other associated project work. This
information is included in the Appendix.
Schedule 2 - On-street Parking Area - Includes 17 on-street parking stalls along Meadowwood
Lane. This schedule includes curb, base rock, asphalt and concrete valley gutter.
Schedule 3 – Entry Arch - Includes entry arch as shown on the Contract Documents. This schedule
includes foundation, and all other labor, materials and equipment to furnish and install Entry Arch as
shown on the Plans.
Article 2. ENGINEER.
The Project has been designed by Welch Comer & Associates, Inc. The OWNER will function as the
ENGINEER who is to act as OWNER’s representative, assume all duties and responsibilities and have the
rights and authority assigned to ENGINEER in the Contract Documents.
Article 3. CONTRACT TIMES.
3.1 The Work will be substantially completed within Sixty (60) working days after the date when the
Contract Times commence to run as provided in paragraph 2.03 of the EJCDC General Conditions,
and completed and ready for final payment in accordance with paragraph 14.07 of the General
Conditions within ten (10) calendar days after the date of substantial completion.
3.2 Liquidated Damages: OWNER and CONTRACTOR recognize that time is of the essence of this
Agreement and that OWNER will suffer financial loss if the Work is not completed within the times specified
in paragraph 3.1 above, plus any extensions thereof allowed in accordance with Article 12 of the General
Conditions. They also recognize the delays, expense and difficulties involved in proving the actual loss
suffered by OWNER if the Work is not completed on time. Accordingly, instead of requiring any such proof,
OWNER and CONTRACTOR agree that as liquidated damages for delay (but not as a penalty)
CONTRACTOR shall pay OWNER ONE THOUSAND TWO HUNDRED dollars ($1,200.00) for each
calendar day that expires after the time specified in paragraph 3.1 for Substantial Completion until the Work
is substantially complete.
3.3 After Substantial Completion, if CONTRACTOR shall neglect, refuse or fail to complete the
remaining Work within the time specified in paragraph 3.1 for completion and readiness for final payment
or any proper extension thereof granted by OWNER, CONTRACTOR shall pay OWNER ONE THOUSAND
TWO HUNDRED dollars ($1,200.00) for each calendar day that expires after the time specified in paragraph
3.1 for completion and readiness for final payment.
Article 4. CONTRACT PRICE.
4.01 Owner shall pay Contractor for completion of the Work in accordance with the Contract Documents
P:\Public_Works\Public_Projects\TownSquarePark\Contract\Final Plans 040814\51116C B.docx INDEX - PAGE 18 5/13/2014
an amount in current funds equal to the sum of the amounts determined pursuant to Paragraphs 4.01.A
below:
A. For all Work other than Unit Price Work, a lump sum of: $
All specific cash allowances are included in the above price in accordance with Paragraph 11.02 of the
General Conditions.
Article 5. PAYMENT PROCEDURES.
5.1 CONTRACTOR shall submit Applications for Payment in accordance with Article 14 of the General
Conditions. Applications for Payment will be processed by OWNER as provided in the General Conditions.
5.2 Progress Payments: Retainage. OWNER shall make progress payments on account of the
Contract Price on the basis of CONTRACTOR’s Applications for Payment as recommended by OWNER
during construction on a duly certified estimate of the work complete, less five percent (5%) retainage. All
such payments will be measured by the schedule of values established in paragraph 2.07.A of the General
Conditions. Payment of Owner approved applications for payment shall be made within forty-five (45)
calendar days from the date of approval.
5.3 Final Payment. Upon final completion and acceptance of the Work in accordance with paragraph
14.07 of the General Conditions, OWNER shall pay the remainder of the Contract Price as recommended
by ENGINEER as provided in said paragraph 14.07. Payment of OWNER approved final application for
payment shall be made within sixty (60) calendar days from date of approval.
Article 6. CONTRACTOR’S CERTIFICATIONS
6.1 Contractor certifies that it has not engaged in corrupt, fraudulent, collusive, or coercive practices in
competing for or in executing the Contract. For the purposes of this Paragraph 6.01:
A. “corrupt practice” means the offering, giving, receiving, or soliciting of anything of value likely to
influence the action of a public official in the bidding process or in the Contract execution;
B. “fraudulent practice” means an intentional misrepresentation of facts made (a) to influence the
bidding process or the execution of the Contract to the detriment of Owner, (b) to establish Bid
or Contract prices at artificial non-competitive levels, or (c) to deprive Owner of the benefits of
free and open competition;
C. “collusive practice” means a scheme or arrangement between two or more Bidders, with or
without the knowledge of Owner, a purpose of which is to establish Bid prices at artificial, non-
competitive levels; and
D. “coercive practice” means harming or threatening to harm, directly or indirectly, persons or their
property to influence their participation in the bidding process or affect the execution of the
Contract.
Article 7. PREVAILING WAGES
The laborers, workers, or mechanics in each trade or occupation required to complete this Contract hired
or working within the State of Washington, shall be paid an amount not less than Washington State
Prevailing Wage Rate established by the Department of Labor and Industries.
Article 8. CONTRACT DOCUMENTS.
The Contract Documents which comprise the entire agreement between OWNER and CONTRACTOR
concerning the Work consist of the following:
8.1 This Agreement (pages 1 to 4 inclusive)
8.2 Performance, Payment, and other Bonds identified as such
8.3 Notice of Award
8.4 The Contract Documents and drawings as itemized in the Index to Contract Documents
8.5 Supplementary General Conditions (pages 1 to 6 inclusive)
8.6 EJCDC General Conditions (pages 1 to 62 inclusive)
P:\Public_Works\Public_Projects\TownSquarePark\Contract\Final Plans 040814\51116C B.docxINDEX - PAGE 19 5/13/2014
8.7 Addenda numbers 1 to 6 inclusive
8.8 CONTRACTOR’s Bid Package as identified
8.9 Documentation submitted by CONTRACTOR prior to Notice of Award (pages _n/a_ to _n/a_,
(inclusive).
8.10 The following which may be delivered or issued after the Effective Date of the Agreement and are
not attached hereto: Notice to Proceed and all Written Amendments and other documents amending,
modifying or supplementing the Contract Documents pursuant to paragraph 3.04 of the General Conditions.
The documents listed in Article 7 et seq. above are attached to this Agreement (except as expressly noted
otherwise above).
There are no Contract Documents other than those listed above in this Article 7. The Contract Documents
may only be amended, modified or supplemented as provided in paragraph 3.04 of the General Conditions.
Article 9. MISCELLANEOUS.
9.1 Terms used in this Agreement will have the meanings indicated in the General Conditions and the
Supplementary Conditions.
9.2 No assignment by a party hereto of any rights under or interests in the Contract Documents will be
binding on another party hereto without the written consent of the party sought to be bound; and, specifically
but without limitation, monies that may become due and monies that are due may not be assigned without
such consent (except to the extent that the effect of this restriction may be limited by law), and unless
specifically stated to the contrary in any written consent to an assignment no assignment will release or
discharge the assignor from any duty or responsibility under the Contract Documents.
9.3 OWNER and CONTRACTOR each binds itself, its partners, successors, assigns and legal
representatives to the other party hereto, its partners, successors, assigns and legal representatives in
respect to all covenants, agreement and obligations contained in the Contract Documents.
9.4 Any provision or part of the Contract Documents held to be void or unenforceable under any Law
or Regulation shall be deemed stricken, and all remaining provisions shall continue to be valid and binding
upon OWNER and CONTRACTOR, who agree that the Contract Documents shall be reformed to replace
such stricken provision or part thereof with a valid and enforceable provision that comes as close as
possible to expressing the intention of the stricken provision.
P:\Public_Works\Public_Projects\TownSquarePark\Contract\Final Plans 040814\51116C B.docx INDEX - PAGE 20 5/13/2014
IN WITNESS WHEREOF, OWNER and CONTRACTOR have signed this Agreement in triplicate. One
counterpart each has been delivered to OWNER and CONTRACTOR. All portions of the Contract
Documents have been signed, initialed or identified by OWNER and CONTRACTOR or identified by
ENGINEER on their behalf.
OWNER: City of Liberty Lake CONTRACTOR:
By: By:
Name/Title: Steve Peterson, Mayor Name/Title:
Date: Date:
[CORPORATE SEAL] [CORPORATE SEAL]
Attest: Attest
Address for giving notices: Address for giving notices:
22710 E. Country Vista Drive
Liberty Lake, WA 99019
License No.
P:\Public_Works\Public_Projects\TownSquarePark\Contract\Final Plans 040814\51116C B.docx INDEX - PAGE 21 5/13/2014
TOWN SQUARE PARK PROJECT
BID TABULATION
CITY OF LIBERTY LAKE, WA
DATE: MAY 13, 2014
Main Park Street Parking Entry Arch
Bidder Schedule 1 Schedule 2 Schedule 3 Total
$ $
Stone Creek
$ 768,194.37 21,519.99 25,001.91 $ 814,716.27
$ $
WM Winkler
$ 711,985.00 41,306.00 52,176.00 $ 805,467.00
$ $
Cameron Reilly
$ 721,769.09 36,122.09 40,763.58 $ 798,654.76
$ $
Bacon Concrete
$ 603,046.00 22,609.60 23,914.00 $ 649,569.60
$ $
KRCI $ 714,594.89 29,567.49 37,611.29 $ 781,773.67
Engineer’s $ $
Estimate $ 614,481.10 34,349.20 32,610.00 $ 681,440.30
Introduction of Upcoming
Agenda Items
DRAFT CITY COUNCIL
ADVANCED AGENDAS
For Planning Discussion Purposes Only
As of May 15, 2014
Please note: This is a work in progress; items are tentative
June 3, 2014 DUE Wed, May 28
1. PRESENTATIONS:
a. Liberty Lake Police Department Annual Report
b. Spokane Conservation District Project Updates – Walt Edelen, Water Resources
Manager
2. Consent Agenda (minutes, vouchers)
3. General Business
a. Renewal of HiTechnique Agreement for Services
b. Award Consultant Contract to Studio Cascade RE: Signage Policy
4. PUBLIC HEARINGS:
a. Closed Record Public Hearing on the Courtyard at River District Preliminary Plat
b. 2014-2020 Transportation Improvement Plan
5. Resolution – Authorizing and adopting a six (6) year Transportation Improvement Program for
2014-2020
June 10, 2014 DUE Tue, June 3
Special City Council Meeting – City Council Applicant Interviews / Selection / Appointment
June 17, 2014 DUE Wed, June 11
1. PRESENTATION - Liberty Lake Municipal Library Annual Report – Board of Trustees
2. WORKSHOPS
a. River District TIF / LIFT, RJ Stevenson
b. Marijuana Regulation Options, Chief Asmus & Attorney Boutz
3. Consent Agenda (minutes, vouchers)
July 1, 2014 DUE Wed, June 25
1. Consent Agenda (minutes, vouchers)
July 15, 2014 DUE Wed, July 9
1. MAYOR’S RECOGNITION – Katy Dolan, AWC Center for Qualified Communities award and
scholarship recipient
2. WORKSHOPS
a. 2014 Open Government Trainings Act; Open Public Meetings / Public Records – City
Attorney, Sean Boutz
b. Knowing Your Roles – Elected Officials and Emergency Management – Chief Asmus
3. Consent Agenda (minutes, vouchers)
4. Second Quarter Report / Budget / Forecast– RJ Stevenson
5. PUBLIC HEARING – 2015 City Budget
August 5, 2014 DUE Wed, July 30
1. WORKSHOP: 2014 City Comprehensive Plan & Development Code Amendment
2. Consent Agenda (minutes, vouchers)
3. FIRST READ ORDINANCE – 2014 City Comprehensive Plan & Development Code Amendment
August 19, 2014 DUE N/A
COUNCIL RETREAT
September 2, 2014 DUE Wed, Aug 27
1. WORKSHOPS:
th
a. Recap and Outcomes from August 19 , 2014 City Council Retreat
b. 2015 Budget Update
2. Consent Agenda (minutes, vouchers)
3. RESOLUTION – Adopting the Liberty Lake City Council’s 2015 Priorities
September 16, 2014 DUE Wed, September 10
1. WORKSHOP – Utility Tax Options
2. Consent Agenda (minutes, vouchers)
3. PUBLIC HEARINGS:
a. City of Liberty Lake 2014 Comprehensive Plan & Development Code Amendment
(open public hearing)
b. City of Liberty Lake 2014 Comprehensive Plan & Development Code Amendment
(zone change - closed record public hearing)
4. SECOND READ ORDINANCE – 2014 City Comprehensive Plan & Development Code
Amendment
October 7, 2014 DUE Wed, October 1
1. WORKSHOP – Mayor Peterson’s proposed 2015 budget
2. Consent Agenda (minutes, vouchers)
October 21, 2014 DUE Wed, October 15
1. Third Quarter Report – RJ Stevenson
2. WORKSHOP – Proposed 2015 Budget – Update on Council Priorities
3. Consent Agenda (minutes, vouchers)
November 4, 2014 DUE Wed, October 29
1. PUBLIC HEARING –2015 Proposed City Budget
2. Consent Agenda (minutes, vouchers)
November 18, 2014 DUE Wed, November 12
1. PUBLIC HEARING –2015 Proposed City Budget
2. Consent Agenda (minutes, vouchers)
3. RESOLUTION – Levying the regular property taxes for the City of Liberty Lake
4. FIRST READ ORDINANCE – Adopting 2015 Budget
December 2, 2014 DUE Wed, November 26
1. Consent Agenda (minutes, vouchers)
2. SECOND READ ORDINANCE – Adopting the 2015 Budget
December 16, 2014 DUE Wed, December 10