PLANNING COMMISSION MEETING MINUTES
WEDNESDAY, JUNE 11, 2025
HELD VIA ZOOM & IN PERSON AT CITY HALL
Planning Commission Members Present: Joe Mann, Tom Sahlberg, Jim Baumker, DG Garcia,
Charlie Jencks and Phil Folyer. Dale Robbins joined the meeting at 4:02 p.m.
Adjunct Member(s) Present: Troy Mullenix and Gene Heuschel
Staff Present: Lisa Key, Amy Mullerleile, Lance Mueller, and Kathy Cummings
Call to Order: Meeting was called to order at 4:01 p.m.
Roll Call: A quorum of members was present.
Commissioner Mann asked that everyone stand for the Pledge of Allegiance.
Review of Agenda: Commissioner Jencks motioned to approve the agenda, seconded by
Commissioner Folyer. The motion was approved unanimously.
Approval of Minutes: Commissioner Mann requested a change to the previous meeting minutes
to include that the absence of Commissioner Dale Robbins was excused. Commissioner Jencks
motioned to approve the amended May 28 meeting minutes, seconded by Commissioner Folyer.
The motion was approved unanimously. No other changes were requested so another motion
was made to approve the minutes as amended by Commissioner Robbins and seconded by
Commissioner Sahlberg. The motion was approved unanimously.
Workshops:
Parks, Recreation & Open Space Plan Update: The Parks and Recreation Master Plan update
was presented by Genevieve Dial, Project Manager for SCJ Alliance, the local consulting firm
hired by the city. She introduced the team and their objectives with further explanation of their
scope of work and initial tasks for the city. The overview included proposed public engagement
methods, timelines and implementation strategies. An assessment of the city’s art inventory and
policies will also be reviewed. Discussion amongst the commission and the consultant included
recommendations for comparable parks and methods of gathering public feedback. Further
discussion between staff and the commission continued regarding future land use planning and
development regulations. In early October the consultant team proposes to present the findings
for the commission to review.
Commissioner Folyer left the meeting at 4:55 p.m.
Natural Environment Chapter Redlines: Senior Planner, Amy Mullerleile presented the
proposed edits to this existing chapter within the comprehensive plan update. The primary
recommended change includes merging this chapter with the new climate element as required by
state law. She requested that the commission review and provide feedback on the language
being presented and not the format as this will change with the incorporation of the climate
resiliency language. After review and some discussion of the proposed changes, the commission
only suggested minor revisions and made recommendations of adding maps of the critical
resource areas and adding language regarding the plume located adjacent to the city limits.
Planning Commission Meeting Minutes Page 1|2
June 11, 2025
Citizens Comments: None
Secretary’s Report: Director Key shared the Updated Planning Commission Calendar which was
included in their meeting packets, and the upcoming Public Engagement Schedule.
She also shared City Council’s comprehensive plan and sign code upcoming workshops and
dates.
Commissioner Reports: None
Adjournment: Commissioner Jencks motioned to adjourn the meeting, seconded by
Commissioner Garcia. The motion carried unanimously. The meeting was adjourned at 5:47 p.m.
Planning Commission Meeting Minutes Page 2|2
June 11, 2025
Agenda
PLANNING COMMISSION MEETING AGENDA
WEDNESDAY, JUNE 11, 2025
4 P.M.
CITY HALL
HELD REMOTELY& IN-PERSON AT CITY HALL
To participate remotely, you can:
• Sign up to provide Public Comment at the meeting via calling in
• Submit Written Public Comment Prior to 2 pm on June 11, 2025
• Join the Zoom Meeting
Questions ? Assistance? Please contact Kathy Cummings at kcummings@libertylakewa.gov .
1. Call to Order – 4:00 pm
2. Roll Call
3. Pledge of Allegiance
4. GENERAL BUSINESS
• Review of Agenda
• Approval of Minutes from May 28, 2025
5. WORKSHOPS:
• Parks, Recreation & Open Space Plan Update
• Natural Environment Chapter Redlines
6. CITIZEN COMMENTS
7. REPORTS
• Secretary’s Report
o Upcoming Engagement Opportunities
o Updated Comp Meeting Calendar
• Planning Commissioner Reports
8. Adjournment
Next Meeting: June 25th, 2025
PUBLIC COMMENT
If you wish to provide oral public comments or testimony during the Planning Commission
meeting, please register through this link:
https://us02web.zoom.us/s/86818958997
WRITTEN PUBLIC COMMENTS
If you wish to provide written public comments for the upcoming council meeting, please
email your comments to kcummings@libertylakewa.gov by 2:00 p.m. the day of the
Planning Commission meeting and include all of the following information with your
comments:
1. The Meeting Date
2. Your First and Last Name
3. If you are a Liberty Lake resident
4. The Agenda Item(s) which you are speaking about
JOIN ZOOM MEETING
To view the meeting live via Zoom Meeting, join the Zoom web meeting:
Meeting Instructions:
To join the Zoom web meeting:
https://us02web.zoom.us/s/86818958997
Dial In Phone Numbers:
• +1 253 215 8782 US (Tacoma)
• +1 253 205 0468 US
Meeting ID: 868 1895 8997
PLANNING COMMISSION MEETING MINUTES
WEDNESDAY, MAY 28, 2025
HELD VIA ZOOM & IN PERSON AT CITY HALL
Planning Commission Members Present: Joe Mann, Tom Sahlberg, Jim Baumker, DG Garcia,
Charlie Jencks and Phil Folyer.
Adjunct Member(s) Present: Troy Mullenix and Gene Heuschel (Joined meeting at 4:28 p.m.).
Staff Present: Lisa Key, Lance Mueller
Call to Order: Meeting was called to order at 4:02 p.m.
Roll Call: A quorum of members was present.
Commissioner Mann asked that everyone stand for the Pledge of Allegiance.
Review of Agenda: Commissioner Jencks motioned to approve the agenda, seconded by
Commissioner Sahlberg. The motion was approved unanimously.
Absences: Commissioner Dale Robbins was unable to attend.
Approval of Minutes: Commissioner Baumker asked for the previous meeting’s discussion
pertaining to the warming of Lake Coeur d’Alene and the potential for release of heavy metals
into the water be added to the minutes. Commissioner Jencks motioned to approve the amended
May 14th meeting minutes, seconded by Commissioner Folyer. The motion was approved
unanimously.
Workshops:
Land Use Chapter Redlines: An overview of the major changes to the Land Use chapter of the
Comprehensive Plan was presented by Community Development Director, Lisa Key. These items
included an expansion of the discussion of historical land uses, the addition of maps and a
description for each specific area plan, an updated annexation discussion, and updated
population projections. After reviewing the proposed changes, the Planning Commission did not
have any edits to suggest. Commissioner Folyer made a motion to remove the redline formatting
and post the proposed chapter edits to the website for the Comprehensive Plan Update. The
motion was seconded by Commissioner Sahlberg. The motion was approved unanimously.
Development Code Checklist: Community Development Director, Lisa Key gave a presentation
which listed the known changes needed to the City’s development code as part of the
comprehensive plan update. These changes reflect changes in state law. It was noted that it is
possible for additional changes to be enacted in the next legislative session, prior to the adoption
of our Periodic Comprehensive Plan Update.
Economic Development Chapter: Director Key presented changes that have been made to the
Economic Development section of the comprehensive plan since the last presentation to the
Planning Commission. These changes included the addition of an implementation section.
Director Key also noted that more data is needed to approach economic development in a data-
Planning Commission Meeting Minutes Page 1|2
May 28, 2025
driven manner. She will be bringing back employment trend data for incorporation into this chapter
at a future Planning Commission meeting.
Citizens Comments: None
Secretary’s Report: Director Key shared the Updated Planning Commission Calendar which was
included in their meeting packets, and the upcoming Public Engagement Schedule. SCJ Alliance
is going to present an update on the parks and open space plan on June 11th. On June 25th, the
Commission will be reviewing greenhouse gas goals and policies. The Comprehensive Plan
booth at the farmer’s market interacted with approximately 50 people over the weekend.
Commissioner Reports: None
Adjournment: Commissioner Jencks motioned to adjourn the meeting, seconded by
Commissioner Folyer. The motion carried unanimously. The meeting was adjourned at 4:59 p.m.
Planning Commission Meeting Minutes Page 2|2
May 28, 2025
City of Liberty Lake
Liberty Lake Parks &
Recreation Master Plan:
Public Participation Plan
April 2025
Table of Contents
1.0 Public Participation Plan Objectives ......................................................................................... 1
2.0 Outreach ................................................................................................................................... 2
2.1 Communication Channels ................................................................................................................... 2
2.2 Engagement Topics ............................................................................................................................. 2
2.3 Engagement Methods ......................................................................................................................... 3
City Staff Stakeholder Interviews .......................................................................................................... 3
Kick-off Workshop................................................................................................................................. 3
Needs Assessment Survey .................................................................................................................... 3
Community Stakeholder Interviews ..................................................................................................... 4
Social Pinpoint Mapping Workshop and Survey ................................................................................... 4
Community Priorities Survey and Pop-ups ........................................................................................... 4
3.0 Deliverables............................................................................................................................... 5
4.0 Timeline..................................................................................................................................... 6
City of Liberty Lake | Parks & Recreation Master Plan Page ii
1.0 Public Participation
Plan Objectives
This document outlines the public participation opportunities for the Liberty Lake Parks and Recreation
Master Plan, including engagement methods, timelines, and implementation strategies. This is a working
document and may be updated over time as needed to reflect the community’s needs.
The objectives for this Public Participation Plan are to:
• Inform residents of the Parks and Recreation Master Plan, the process, and outcomes. Utilize
outreach methods to inform residents and property owners of the variety of participation
opportunities.
• Exchange information by conducting collaborative events that engage the community in
conversation and the exchange of ideas and information. By exchanging information, we can
give participants more ownership in the outcome of planning processes, leading to buy-in, a
sense of pride, and higher-quality planning documents.
• Be inclusive of a range of perspectives, engaging residents in unique ways to reach a broader
audience and understand their goals, needs, and desires.
• Provide access to engagement opportunities, events, and participation for all residents,
including disadvantaged groups and those who historically have not been heard from
throughout community planning processes.
• Be transparent and openly reflect a variety of viewpoints within the community and share the
City’s process for the development and implementation of the PROST Plan.
City of Liberty Lake | Parks & Recreation Master Plan Page 1
2.0 Outreach
2.1 Communication Channels
It is important that information be made available so any interested person can review the materials
and participate. Throughout the planning process, the City and SCJ will coordinate to maintain several
channels for notifying the public and other participants of relevant meetings and events. Regular
opportunities for education and notification include:
• Project website (Hosted by Liberty Lake)
• Social media posts (SCJ/City coordination)
• Mailers and other City communications
• Local newspapers
• Email
• Public Engagement Commission
• Parks & Arts Commission
• Presentations to city staff, commissions and councils
2.2 Engagement Topics
Our goal is to design engagement strategies to maximize the involvement of the largest number of
residents, ensuring that the plan is built upon input from a wide range of opinions among people who
live, work, and recreate in Liberty Lake. The Parks and Recreation Master Plan will be most successful if
all sectors of the community have a say in the future of the parks system. This input will be targeted
toward hearing about the following topics, plus others that may come up through the process:
• Current park, trail, and open space inventory and uses
• Public art displays and opportunities
• Bicycle network and connectivity
• Trail network and connectivity
• Facility use and needs
• Desired system improvements
• Recreation programs and special events
• Expectations and preferences from various user groups
City of Liberty Lake | Parks & Recreation Master Plan Page 2
2.3 Engagement Methods
The specific methods for engagement include workshops, surveys, pop-ups, and stakeholder interviews.
These are each detailed here:
City Staff Stakeholder Interviews
April 2025
SCJ Staff will interview identified City staff to build a foundational understanding of the Liberty Lake
community and its parks and recreation system. This will allow SCJ to enter the planning process with
internal knowledge that can be built upon through the rest of the engagement methods.
Kick-off Workshop
Thursday, May 22, 2025 from 4:00-6:00 pm at the Trailhead
Event Center
We will conduct a kick-off workshop to initiate the public conversation about the Parks and Recreation
Master Plan. This meeting will orient participants to the larger parks and recreation context and vision
and describe how they can influence the process. There will be engagement boards for community
members to provide feedback and help cast a vision for this planning process. Results from this
workshop will establish a foundational understanding of the community’s strengths and issues within
the parks system and will create connections for the remainder of the project. Efforts will be made to
include vulnerable and overburdened populations with specific outreach to faith communities, veterans
groups, HOAs, schools, people with disabilities, and assisted living communities.
Needs Assessment Survey
Open from May 22-June 25, 2025
SCJ will develop and implement a digital needs assessment survey in both English and Spanish to be
administered digitally, with paper copies also made available. We’ll launch the survey at the Kick-off
Workshop. The online survey and public workshop will be used to identify a qualitative snapshot of how
the community currently utilizes the City’s parks, recreation, open spaces, athletic facilities, and
programs, what they believe is missing, and explore the public’s needs for desired park improvements.
Paper versions will be made available for pickup at City Hall and other identified community spaces. The
results will be analyzed and compared with City demographics to ensure we capture an inclusive and
equitable population set.
City of Liberty Lake | Parks & Recreation Master Plan Page 3
Community Stakeholder Interviews
May-June 2025
SCJ Staff will interview community members who have been identified in order to hear more about their
experience of the parks and recreation system in Liberty Lake. These interviews provide a good
opportunity to talk more in depth with people from certain groups who may not be heard from as often
– such as those with lower incomes, racial minorities, youth, people with disabilities, and more.
Conversations will also be prioritized with people who lead community groups that have to do with
parks and recreation, who can provide further insight on use and desired amenities.
Social Pinpoint Mapping Workshop and Survey
Early July 2025
The next workshop and online community input tool will focus on mapping. Participants both in-person
and online will be able to contribute community insights, pinpoint concerns, share comments, upload
images, and participate in discussions with other community members about the areas, issues, and
ideas important to them. Social Pinpoint can be used on any cell phone or computer and can be
distributed out through the identified communication channels for increased visibility and participation.
Our second public workshop will focus on engaging people in these topics and getting specific locations
in mind for needed improvements.
Community Priorities Survey and Pop-ups
August-September 2025
The final coordinated effort for engagement in this part of the plan will involve SCJ creating an
interactive Community Priorities Survey. This will be after a clear set of possible park improvement
projects or policy enhancements have been developed and a rough draft of a Capital Improvements
Program (CIP) has been reviewed. The survey will be live and available online, and we will have an in-
person engagement opportunity that mirrors the online survey. We will have pop-up engagement
sessions in popular locations (such as community events, outside of the grocery store, etc.) in order to
go to where people are instead of making them come to us to provide feedback. People will be able to
share what they would most likely see. This will allow SCJ and the City to confirm and defend
community-wide project priorities as they are implemented.
City of Liberty Lake | Parks & Recreation Master Plan Page 4
3.0 Deliverables
Summaries of engagement events will be compiled by SCJ and made available to the City throughout the
engagement process. Deliverables that can be expected are:
• Stakeholder Interview Summary
o Completed by end of June 2025
• Kick-off Workshop Summary
o Completed by early June 2025
• Needs Assessment Survey Summary
o Completed by early July 2025
• Social Pinpoint Mapping Workshop and Survey Summary
o Completed by end of July 2025
• CIP Engagement Summary
o Completed by September 2025
In the Parks and Recreation Master Plan, all detailed engagement summaries will be included as
appendices and key takeaways will be provided in the text of the plan.
City of Liberty Lake | Parks & Recreation Master Plan Page 5
4.0 Timeline
More specific dates are detailed above along with each engagement method, and this document will
continue to be updated as each method of engagement approaches. This highlights the overall timeline
for engagement for the first phase of this project.
City of Liberty Lake | Parks & Recreation Master Plan Page 6
LIBERTY LAKE PARKS &
RECREATION MASTER PLAN
Take the Parks Survey: Your input
shapes the future of Liberty Lake!
Visit bit.ly/LLParksSurvey or scan the QR Code
to the right to take the survey and get involved!
It’s important that the Liberty Lake Parks & Recreation Master Plan is
community-driven, ensuring that community members are setting
the priorities for how we enhance, grow, and connect our parks and
recreation system for the future. Your feedback will meaningfully
shape the plan’s priorities!
Paper copies of the survey are available at City Hall.
Questions, comments, or concerns about the project
or process? Visit bit.ly/LLParksPlan to learn more!
Commented [LK2R1]: yes
CHAPTER 7
CLIMATE &
NATURAL
ENVIRONMENT
RESOURCES
City of Liberty Lake Comprehensive Plan
A. Introduction Commented [LK3]: Goals & Policies should follow the
introduction.
The Climate Change and Natural Environment Element combines
several environmentally relatedaddresses a range of environmental
topics that are essential to our community's sustainability and resilience
topics, including. This includes the management of Critical Areas
(wetlands, aquifer recharge areas, fish and wildlife conservation areas,
frequently flooded areas and geologically hazardous areas), as well as
tree conservation, shorelines, surface water quality and quantity, and
air quality. The City Planning and Community Development
Department maintains maps identifying natural environment and critical
areas located within the City and retains maps surrounding the City.
This element aligns with the directives of HB 1181, ensuring a
comprehensive approach to climate adaptation and environmental
stewardship aimed at reducing our community’s greenhouse gas
emissions and improving our resilience to natural and man-made
disasters.
B. History and Background Commented [AM4]: This section should be revisited
when we have a better idea of how we are organizing the
chapter and integrating climate specific language
The City of Liberty Lake has attracted desirable businesses in recent years because of the natural
environment that contributes to a high quality of life. Protecting and enhancing this unique natural
environment is the purpose of this Chapter. By ensuring the availability of clean air and water,
and preserving critical areas and natural features, we will continue to make the City of Liberty
Lake an inviting community. The following are the guiding principles for this element.
a.Critical areas, including wetlands, fish and wildlife habitat, aquifer recharge areas, Formatted: Numbered + Level: 2 + Numbering Style: a,
geologically hazardous areas, and flood hazard areas, shall be preserved, protected, b, c, … + Start at: 1 + Alignment: Left + Aligned at:
managed, and restored so that the functions and values of these areas are maintained. 1.03" + Indent at: 1.28"
b.Shoreline areas shall be protected from land uses that degrade water quality and wildlife
habitat.
c. Surface and groundwater should be maintained at adequate quantity and quality, with land
uses designed to ensure continued protection.
d.Air quality shall be maintained at levels that protect human health, prevent injury to plants
and animals, and preserves clear visibility.
Critical areas include the following areas and natural places:
1. Wetlands;
2. Areas with a critical recharging effect on aquifers used for domestic purposes;
3. Fish and wildlife habitat conservation areas;
4. Frequently flooded areas; and
5. Geologically hazardous areas.
The City of Liberty Lake acknowledges the essential role of protecting the functions of critical
areas, which
contributes significantly to the high quality of life our residents enjoy. These
areas are integral to natural systems that manage stormwater, prevent
flooding, and preserve water quality, while also offering recreational
opportunities. Safeguarding these critical areas is not only environmentally
prudent but also economically wise. Relying on natural landscapes for these
functions avoids the substantial costs associated with constructing and the alternative is
maintaining engineered systems designed to protect against floods and
geological hazards and to purify drinking water.The City of Liberty Lake
recognizes the importance of protecting the functions of critical areas.
Preservation of these areas helps to maintain the high quality of life that is
enjoyed by the residents of Liberty Lake. These natural systems play valuable
roles in stormwater disposal, flood prevention, and water quality preservation,
as well as providing recreational opportunities. Protection of critical areas
makes economic sense, since
expensive engineered systems for protection from floods and
geological hazards and for purification of drinking water. The Critical
Areas Goals and Policies establish allowable uses in
critical areas and provide development standards to mitigate impacts of
development. Better information is needed to refine critical area
designations and management recommendations. Effective protection
requires an interdisciplinary approach to the evolution of best available
science. Involvement by scientists from the Washington State
Department of Fish and Wildlife, Department of Ecology, area
universities, and others including local agencies/jurisdictions such as
Spokane Aquifer Joint Board, Spokane County, Spokane Regional
Health District, and Liberty Lake Sewer and Water District, will continue
to be essential to the advancement of critical area protection.
Wetlands
Wetlands are areas inundated or saturated by surface water or
groundwater at a frequency and duration sufficient to support, and that
under normal circumstances do support, a prevalence of vegetation
typically adapted for life in saturated soil conditions. Wetlands generally
include swamps, marshes, bogs, and similar areas. Wetlands do not
include those artificial wetlands intentionally created from non-wetland
sites, including, but not limited to, irrigation and drainage ditches, grass-
lined swales, canals, detention and retention facilities, wastewater
treatment facilities, farm ponds, and landscape amenities. However,
wetlands may include those artificial wetlands intentionally created from
non-wetland areas to mitigate conversion of wetlands, if permitted by
the City. In the past, wetlands were considered nuisances to be filled in
and covered up. Experience has revealed the many beneficial functions
provided by wetlands, including providing wildlife habitat, storage and
disposal of stormwater, groundwater recharge and removal of
contaminants. The primary purpose of the wetland goals and policies is
to preserve these important natural functions. Commented [AM5]: Should we have a discussion
about the limited amount of wetlands in the City?
While the City of Liberty Lake currently has no designated wetlands
within its municipal boundaries, it is situated near significant wetland
areas, including those within Liberty Lake Regional Park and the
seasonal wetlands at the south end of Liberty Lake. These nearby
wetlands provide essential ecological functions such as wildlife habitat,
stormwater management, and groundwater recharge. The City
acknowledges the importance of these natural resources and is
committed to regional collaboration to preserve and protect these vital
ecosystems
Aquifer Recharge Areas and Groundwater
Underground aquifers are the sources of nearly all the drinking water for the City of Commented [AM6]: I have not heard the aquifer
Liberty Lake. The purpose of the following goals and policies is to ensure the long-term referred to in the plural and other resources discuss it in
quality of groundwater as a source of drinking water in Liberty Lake. The Spokane singular form.
Valley-Rathdrum Prairie Aquifer (SVRP Aquifer), which serves as the sole source of
domestic water for Liberty Lake, is recognized as a sole source aquifer under the federal
Safe Drinking Water Act. The goals and policies outlined in this section aim to safeguard
the long-term integrity of groundwater, ensuring it remains a viable source of drinking
water for the community. The introduction of contaminants into aquifer recharge areas
presents significant risks to the quality of this water. To mitigate these risks, the City of
Liberty Lake is required to identify and preserve critical aquifer recharge areas—zones
that are crucial for replenishing the aquifer used for potable water. The guidelines in this
section are designed to maintain the purity and availability of our aquifer and its critical
recharge zones.
The Spokane Valley-Rathdrum Prairie Aquifer supplies all of the
domestic water used for the City of Liberty Lake and is designated as a
sole source aquifer by the federal Safe Drinking Water Act.
Contaminants deposited in aquifer recharge areas pose risks to the
water quality of the aquifers. To ensure quality groundwater, the City of
Liberty Lake is required to designate and protect critical aquifer recharge
areas. A critical aquifer recharge area is an area with a critical
recharging effect on aquifers used for potable water. The goals and
policies of this section provide guidance to protect our aquifers and
critical aquifer recharge areas.
Contamination Susceptibility of Aquifers Commented [AM7]: Some of the subsections involve
aquifer contamination but that does not seem to be a
uniting theme.
Surface Water Quantity and Quality
Water quality and quantity influences the domestic, economic,
recreational, and natural environments of the City of Liberty Lake.
Historically, clean water has been taken for granted. As growth and
development have increased, so have problems associated with
maintaining water quality and quantity. Industry, commercial business,
agriculture, and residences all contribute to reduced water quality and
quantity. From this perspective, a comprehensive approach must be
taken to ensure future water quality and quantity.
Stormwater Commented [AM8]: This seems inadequate in
describing the importance of stormwater management
Virtually all of the stormwater that runs off of developed and impervious and the City’s recent level of investment. It also refers to
surfaces in the City discharges to the SVRP Aquifer. The potential for protecting wetlands. We should rewrite this to also
pollutants in stormwater to enter the aquifer is well-established. describe the nexus between Liberty Lake’s 208 swales,
Consideration of these conditions will inform approaches to stormwater aquifer recharge, and climate resilience
management that the City develops as part of their SWMPStormwater
Master Plan.
The protection of the SVRP Aquifer from pollution, depletion, or
degradation is an important aspect of stormwater planning for the City.
Specifically, preparing and implementing measures to protect the
aquifer from potential stormwater quality impacts are a consideration for
the selection and application of stormwater control measures and their
maintenance. The City will continue to use stormwater discharge to the
ground as its primary disposition due to the advantages in doing so for
groundwater supply, flood management and control, system costs, and
low-impact design. Stormwater control measures identified in the
Eastern Washington Stormwater Manual will continue to be applied to
minimize the potential for adverse effects. The City will also continue to
engage in regional planning, protection, and education efforts to protect
this resource.
The increased impervious area resulting from development changes the
amount and the quality of runoff water. If left unmanaged, discharges of
stormwater can cause flooding and water quality degradation, especially
in already impaired water bodies. Increased impervious areas may also
adversely impact groundwater recharge. Long-term solutions to
stormwater problems will require creative problem-solving on a case-by-
case basis. In drainage basins where development has already
occurred, much of the natural stormwater system may be altered so that
it no longer functions effectively. In areas where wetlands have been
filled and natural drainageways altered, substantial investment in
stormwater collection and disposal systems will be required. In newly
developing areas where stormwater disposal has not yet become a
problem, it is important to preserve the natural system of wetlands and
drainageways to prevent problems from occurring as a result of future
development.
Fish and Wildlife Habitat Conservation Areas
Fish and Wildlife Habitat Conservation Areas include:
a.Areas with which specifically identified species have a primary Formatted: Numbered + Level: 2 + Numbering Style: a,
association. These specifically identified species include: b, c, … + Start at: 1 + Alignment: Left + Aligned at:
endangered, threatened, sensitive and candidate; and 1.03" + Indent at: 1.28"
secondarily: monitor and priority species (game and non-game),
as identified by the Department of Fish & Wildlife in the Priority
Habitats and species Species lists, hereinafter referred to as
priority species, compiled in compliance with WAC-365-190-080. Commented [AM9]: This is not the correct WAC. This
b.Habitats and species of local importance. WAC speaks generally about planning for critical areas
c. Naturally occurring ponds under 20 acres and their submerged Commented [AM10R9]: WAC 365-190-130 - Fish and
aquatic beds that provide fish or wildlife habitat. wildlife habitat conservation areas.
d.Waters of the state.
e.Lakes, ponds, streams, and rivers planted with game fish by a
governmental or tribal entity; or
f. State natural area preserves and natural resource conservation areas.
Fish and Wildlife Habitat Conservation involves managing land in a way
that helps wildlife species live and thrive in their natural environments.
The goal is to prevent these populations from being split into smaller,
isolated groups that might struggle to survive.
Fish and Wildlife Habitat Conservation means land management for
maintaining species in suitable habitats within their natural geographic
distribution so that isolated subpopulations are not created. This does
not mean maintaining all individuals of all species at all times, but it does
mean cooperative and coordinated land use planning is critically
important among counties and cities in a regionSpokane County and its
various municipalities. Fish and wildlife are part of our heritage. Fishing,
hunting, and simply watching wildlife A wide variety of outdoor recreation
activities are valued by residents and visitors are valued recreational
activities that and contribute to the local economy and quality of life.
Preservation of the fish and wildlife habitat is the key to the continued
existence of these species in the future. The following many of goals
and policies in this chapter articulate the high value that community
residents place on conservation of the local fish and wildlife.
Frequently Flooded Areas
Frequently flooded areas are lands in the floodplain subject to a 1-
percent or greater chance of flooding in any given year. These areas
include, but are not limited to, streams, rivers, lakes, sink areas, major
natural drainageways, and wetlands. Frequently flooded areas are
natural physical features of a watershed that play an important role in
stormwater storage and disposal. The purpose of these goals is to
maintain the natural function of these frequently flooded areas in order
to protect private and public property and reduce the need to construct
flood control facilities as well as protect the environment.
Geologically Hazardous Areas
Geologically hazardous areas are locations vulnerable to erosion,
landslides, earthquakes, or other geological events. These areas are
not suitable for commercial, residential, or industrial development due
to potential risks to public health and safety. The aim of establishing
specific goals and policies for these areas is to ensure that such
hazards are identified and allow for hazard mitigation measures to be
integrated into building designs. To protect public safety, development
in these hazardous areas should be prohibited unless effective hazard
mitigation strategies can be guaranteed.
Geologically hazardous areas are areas that, because of their
susceptibility to erosion, sliding, earthquake, or other geological
events, are not suited to siting commercial, residential, or industrial
development consistent with public health or safety concerns. The
purpose of these goals and policies is to ensure that areas subject to
geological hazard are identified so that hazard mitigation is
incorporated into designs. The public safety must be protected by
prohibition of development in geologically hazardous areas unless
hazard mitigation is assured.
Shorelines Commented [AM11]: We should rewrite this section to
be tailored to Liberty Lake’s unique shoreline context.
Shorelines are among the most sensitive and ecologically important
environments in Washington. While the City of Liberty Lake does not
contain any lakes, rivers, or streams within its municipal boundaries that
qualify as Shorelines of the State, a narrow portion of the northern city
limits does include regulated shorelands—defined as lands within 200
feet of the ordinary high-water mark of shoreline waters. These
shorelands are associated with the adjacent Spokane River, which is
designated as a Shoreline of Statewide Significance.
Although the river itself lies outside City limits, the presence of
shorelands within the City triggers planning responsibilities under the
Washington State Shoreline Management Act (SMA, RCW 90.58).
However, the City has not yet been required to adopt a Shoreline Master
Program (SMP). The Washington State Department of Ecology has
confirmed that while the City is subject to SMA requirements, it will not
be required to develop a local SMP until grant funding is made
available—expected around 2029, with formal notice anticipated in
2028. Ecology will support this process with a forthcoming desktop
assessment to determine the precise extent of affected areas.
Until such time as the City develops an SMP, the Spokane County
Shoreline Master Program—adopted by reference prior to
incorporation—remains applicable. In accordance with RCW
36.70A.480, goals and policies from the applicable SMP are considered
part of this Comprehensive Plan and inform land use planning within
shoreline areas.
The City recognizes the importance of managing shoreline areas to
ensure their ecological function, protect public health and safety, and
support responsible recreation and land use. Future planning will reflect
these values and ensure consistency with state law and regional
coordination efforts.
Shorelines are among the most valuable and fragile of environments.
The purpose of these goals and policies is to manage the use of the
shorelines, so that their protection, preservation, and restoration are
assured. The intent is to foster reasonable and appropriate use of the
shorelines but also to protect the natural character of the shorelines,
preserve the ecology and resources, increase public access to publicly
owned shorelines, and to increase recreational opportunities for the
public. Bodies of water with a mean annual flow of greater than 20 cubic
feet per second (in the case of flowing water) and an area greater than
20 acres (in the case of standing water) are considered Shorelines of
the State and are subject to the Shoreline Management Act (SMA). The
SMA area of jurisdiction is the body of water together with an adjacent
strip of land generally 200 feet wide, measured landward from the
ordinary high watermark. In compliance with the SMA, the City of Liberty
Lake adopted the Spokane County Shoreline Management Program by
reference prior to incorporation. The Shoreline Management Program
established goals, policies, and regulations to protect shoreline areas.
RCW 36.70A.480 requires that the Shoreline Master Program goals and
policies be considered as part of the Comprehensive Plan.
Watersheds
The City of Liberty Lake should conduct ongoing watershed stewardship
activities. The goals of watershed stewardship are to increase public
awareness about watershed management efforts and to get
participation in the process to ensure stewardship on residents' property
and homes. Promoting watershed advocacy is important because it can
lay the foundations for public support and greater watershed
stewardship. Most watershed protection tools require maintenance if
they are to properly function over the long run. Some of the most critical
watershed maintenance functions include management of conservation
areas and buffer networks, and maintenance of stormwater practices
and sewer networks. The Liberty Lake Sewer and Water District
(LLSWD) can provide resource management expertise. LLSWD is
involved at multiple scales of engagement, including long-term
management of the Liberty Lake and greater Spokane River
watersheds. There are six basic programs that can promote greater
watershed stewardship:
a.Watershed advocacy Formatted: Numbered + Level: 2 + Numbering Style: a,
b.Watershed education b, c, … + Start at: 1 + Alignment: Left + Aligned at:
c. Pollution prevention 1.03" + Indent at: 1.28"
d.Watershed maintenance
e.Indicator monitoring
f. Watershed restoration
Air Quality
Several conditions contribute to air pollution in Liberty Lake. Human activities, including
automobile use, wood stove use, and industrial and agricultural operations, generate airborne
substances that can affect air quality. In addition, the Spokane area has been affected
substantially by windblown dust from the entire central portion of the State. The Spokane Valley
is also a natural basin in which air pollution is concentrated by an occasional temperature
inversion (a situation in which lighter warm air overlies heavier cool air). A variety of air pollution
control strategies have been employed in the City of Liberty Lake. The strategies include auto
emission inspections, restrictions on open burning, wood stove certification, restriction on wood
stove use when pollution levels are high, oxygenated fuels for cars, road paving, use of
chemical deicers as an alternative to road sanding, and others. These measures, combined with
cleaner-burning cars, have significantly improved air quality. However, traffic volumes continue
to increase which could lead to degradation of air quality in the future. Air quality is intricately
related to land use and transportation. The challenge presented to the region is to balance land
use, transportation, and air quality in such a way that the community can continue to grow and
prosper without compromising quality of life. Commented [AM12]: Delete and replace with GHG
discussion but make sure GHG conversation talks about
other air pollutants that are not GHG’s.
Goals
Natural Environment Goal 1: Preserve and enhance the City’s environmental
resources and critical areas.environmentally sensitive areas. Commented [AM13]: “Environmentally sensitive areas”
is not a defined term.
Natural Environment Goal 2: Protect and conserve the quality and supply of
groundwater groundwater quality from the Spokane Valley-Rathdrum Prairie
Aquiferin Liberty Lake area aquifers.
Natural Environment Goal 3: Maintain air quality in the City of Liberty Lake that protects
human health, prevents injury to plant and animal life, and preserves clear visibility.
Natural Environment Goal 4: Preserve the unique beauty of the community
Commented [LK14]: This new goal is a paraphrase from
through the conservation of the native trees. the stormwater master plan.
Natural Environment Goal 5: Implement and maintain a fully functional, Formatted: Font: Bold
sustainable stormwater system that is integrated into the landscape, supports Commented [LK15]: These policies should be
envisioned growth, protects residents, and nurtures the environment. associated with the goal that they support
Policies Formatted: Highlight
Natural Environment Policy 1: Maintain an inventory of highly sensitive areas Commented [AM16]: Preservation through zoning or
appropriate for preservation. preservation through acquisition? Both present unique
challenges particularly without BAS supporting the
designation of “highly” sensitive areas.
Natural Environment Policy 2: Require “no net loss” of wetland functions, value,
Formatted: Highlight
and quantity as a result of land use activities and establish a long-term goal of
measurable gain of wetlands function and value.. Formatted: Highlight
Formatted: Highlight
Natural Environment Policy 3: Establish partnerships with non-profits entities,
such as Cooperative Extension and the Spokane Aquifer Joint Board, to provide Commented [AM17]: It is curious that a policy is
directing us to establish a goal.
public information and resources to educate the community in how to protect critical
areas and environmental resources from degradationProvide public information Commented [LK18R17]: We can (and do) require no net
programs to demonstrate how to protect environmentally sensitive areas from loss through our critical area ordinance but I don’t see
how we can meaningfully promote measurable gains of
degradation. wetlands function and values, particularly given the well-
draining soils that virtually preclude wetlands in the vast
majority of lands within the City.
Natural Environment Policy 4: Protect shorelines designated under the state
Shoreline Management Act with the Spokane County Shoreline Master Program until Formatted: Highlight
it is replaced by a City Master Program.through enforcement of the City’s Critical Formatted: Highlight
Areas Ordinance.
Commented [AM19]: This is an odd policy. Protection
of wetlands is not optional so “consider protection” is the
Natural Environment Policy 5: Encourage public and private groups to consider
wrong term. Wetlands, are already owned by either
protection and/or acquisition of wetlands and their buffer areas. public or private groups/individuals so the acquisition
piece seems weird.
Natural Environment Policy 6: New development and/or land use activities shall Perhaps it should be “Encourage public and private
provide adequate buffer areas of permanent native and/or appropriate vegetation conservation groups…” I’m not convinced that is an
adjacent to wetlands. These buffer areas shall be established based on the natural appropriate role for the City.
function and beneficial values of the wetland as determined by established criteria. Commented [LK20R19]: Agreed.
Natural Environment Policy 7: Require new development to avoid, minimize, and Formatted: Highlight
mitigate potential adverse environmental impacts. Formatted: Highlight
Natural Environment Policy 8: Require appropriate stormwater runoff and spill Formatted: Highlight
control provisions for those who use and/or store potentially critical materials within Commented [AM21]: Is this still something we want to
critical aquifer recharge areas. encourage?
Commented [LK22R21]: We were exploring this 20
Natural Environment Policy 9: Encourage the application of permeable and semi- years ago, and found that it didn’t really work in the long
permeable surfaces to parking areas and other innovative storm water control run.
alternatives to facilitate storm water treatment and disposal.
Formatted: Justified, Right: 0.86", Space Before: 0.05
pt, Line spacing: Multiple 1.01 li
Natural Environment Policy 10: Promote water conservation through education, Formatted: Highlight
incentives, and regulations in cooperation with water purveyors and the public.
Commented [AM23]: Perhaps we could consider
additional incentives in our landscape code.
Natural Environment Policy 11: It is recognized that the aquifer used for drinking
water in Liberty Lake has part of its recharge area located outside of the City. Formatted: Highlight
Accordingly, the City of Liberty Lake should coordinate and collaborate with Formatted: Highlight
surrounding jurisdictions to protect groundwater.
Formatted: Highlight
Natural Environment Policy 12: Water-conserving landscaping and other Formatted: Highlight
conservation practices should be encouraged. Incentives should be used to reduce
water consumption. Commented [AM24]: Special consideration resulting in
what alternative outcome?
Natural Environment Policy 13: Special consideration should be given to proposed Commented [LK25R24]: Incentives?
developments or activities that recycle or find use for wastewater.
Formatted: Highlight
Natural Environment Policy 14: Explore the feasibility of encouraging double Formatted: Highlight
metering for irrigation use in all new developments.
Formatted: Highlight
Commented [AM26]: This seems like something that
Natural Environment Policy 15: Make the public aware ofPartner with Spokane would be implemented by LLSWD and would not
County to educate the public on the long-term expense and public health encourage water conservation.
consequences of failure to protect critical aquifer recharge areas from degradation Formatted: Highlight
and provide information on practices that threaten water quantity and quality.
Formatted: Highlight
Natural Environment Policy 16: Provide convenient public access to groundwater Commented [AM27]: Do we have this information?
modeling documents and regulations to protect critical aquifer recharge areas.
Formatted: Highlight
Natural Environment Policy 17: Trucks and trains carrying critical materials should Formatted: Highlight
be required to use preferred critical material routes where emergency spill response Commented [AM28]: Do we have train tracks? How do
plans exist. we require trucks to do this?
Commented [LK29R28]: We do not.
Natural Environment Policy 18: Promote public education to increase the level of
responsibility for air quality. Formatted: Highlight
Formatted: Highlight
Natural Environment Policy 19: Encourage public awareness of the increased Formatted: Highlight
property values associated with tree conservation. Formatted: Highlight
Formatted: Highlight
Natural Environment Policy 20 Encourage programs that provide assistance to the Formatted: Font: Not Bold, Highlight
public in caring for and nurturing trees.
Formatted: Highlight
Formatted: Highlight
Natural Environment Policy 21: Encourage tree planting programs that emphasize
Commented [AM30]: We need to look at our
native species and encourage species diversity. conservation section. We do not require “replanting” nor
do we provide incentives.
Natural Environment Policy 22: Maintain tree conservation regulations that Commented [LK31R30]: The City’s new Urban Forester
discourage removal of mature trees, require appropriate tree replanting when is reviewing our street tree requirements and will be
recommending revisions.
removal is necessary to accommodate development, and provide incentive to
conserve trees in accordance with the City’s designation as a “Tree City USA”. Formatted: Highlight
Formatted: Highlight
Natural Environment Policy 23: Clearing and grading activities shall be limited Formatted: Highlight
based upon topography and seasonal weather conditions.
Natural Environment Policy 24: Within geologically hazardous areas, site Formatted: Highlight
alteration, grading, and filling shall be the minimum necessary to accomplish
approved designs/plans.
Natural Environment Policy 25: All development proposals should submit an Formatted: Highlight
erosion control plan prior to receiving approval.
Natural Environment Policy 26: Geologically hazardous areas demonstrated to be Formatted: Highlight
highly sensitive to modification by development activities shall be preserved in a
natural condition for uses other than development.
Natural Environment Policy 27: Continue to require all new development to
implement integrated stormwater treatment in accordance with the Eastern
Washington Stormwater Manual or equivalent best management practices.
Natural Environment Policy 28: Fund the long-term maintenance of stormwater
infrastructure through a dedicated stormwater utility fee assessed on all developed
properties as based upon its area of impervious surface. Formatted: Font: Bold
PLANNING COMMISSION
TENTATIVE COMP PLAN MEETING SCHEDULE
January 8, 2025 June 25, 2025
• Population & Housing Workshop -LCA • GHG Sub-element /Goals & Policy
• Update & Schedule on Climate Element • Urban Design – Redlines & Policies
January 22, 2025 July 9, 2025
• LCA Summary • Draft Sign Code Revisions & Redlines
• Critical Area Review • Resiliency Sub-Element/Goals & Policies
• Update & Schedule on Housing Element July 23, 2025
February 12, 2025 • Utilities & Essential Public Facilities -
• Housing Policy Workshop Workshop re Public Safety
• Update & Schedule on Other Elements: • Utilities & Essential Public Facilities -
February 26, 2025 Workshop re Utilities
• Sign Code Workshop with PC & CEC August 13, 2025
• Housing Policy Workshop • Sign Code Public Hearing
• Network analysis -Scope & Timeline • Co-living Housing Public Hearing
March 12, 2025 • Utilities & Essential Public Facilities –
• Econ Development – Redlines & Policies Redlines & Policies
• Cultural & Historical - Redlines &
Policies GHG SUB-ELEMENT SUBMITTAL TO
March 26, 2025 COMMERCE – AUGUST 15 – JANUARY 15
• Recap of Housing Policy Workshop
• Housing & Community Service – Goals August 27, 2025
& Policies • Review Revisions – Utilities & Essential
• Co-living Housing Workshop Public Facilities
April 9, 2025 • Review Urban Design Revisions
• Housing & Community Service – • Employment Projections
Revised Policies & Redlines September 10, 2025
• Economic Development Revised • Parks Plan Update
Redlines • Network Analysis Workshop
• Review Cultural & Historic Revisions September 24, 2025
April 23, 2025 • Outline of Required Development Code
• Sign Code Workshop Amendments
• Housing & Community Service – • Review Draft Climate Element
Updated Chapter October 8, 2025
• Co-living Housing Amendment • Capital Facilities Plan Overview
May 14, 2025 • Preliminary Draft of Combined Natural
• GHG Priority Actions and Emissions Environment/ Climate Element
Targets October 22, 2025
• Climate Vulnerability & Risk Assessment • Parks, Arts & Recreation Plan
Report Presentation
May 28, 2025 • Transportation - Redlines & Policies
• Land Use – Redlines & Policies, Map • Review Introduction & Governance
• Review Econ Development Revisions Chapters
• Development Code Checklist November 12, 2025
June 11, 2025 • Introduction & Governance Chapters
• Parks, Recreation & Open Space Update • Capital Facilities Plan Workshop
• Review Natural Environment Redlines • Implementation Plan Workshop
December 10, 2025
• Review Revisions to Transportation Element
• Capital Facilities Plan Element
January 14, 2026
• Parks & Recreation Chapter Review
• Other Chapter Reviews as needed
January 28, 2026
• Final Climate & Natural Environment Chapter & Policy Review
• Finalize Capital Facilities Plan
February 11, 2026
• Review Full Draft Document
DRAFT TO COMMERCE FOR REVIEW, FEBRUARY 15 – APRIL 15
SEPA, FEBRUARY 15 -APRIL 15
February 25, 2026
• Workshop on Housing & Required Development Code Amendments
March 11, 2026
• Workshop on Housing & Required Development Code Amendment
March 25, 2026
• Workshop on Housing & Required Development Code Amendments
HOUSING & REQUIRED CODE AMENDMENTS TO COMMERCE FOR REVIEW APRIL 15 – JUNE 15
April 8, 2026
• Public Hearing on the Periodic Comp Plan Update
April 22, 2026
• Workshop on Other Development Code Amendments
COMP PLAN PUBLIC HEARING BEFORE CITY COUNCIL MAY 5
May 13, 2026
• Workshop on Other Development Code Amendments
CITY COUNCIL 1ST & 2ND ORDINANCE READING, MAY 19 & JUNE 2
RESOLUTION FINDING FINAL COMP PLAN PERIODIC UPDATE IN COMPLIANCE WITH RCW 36.70A.130(1),
JUNE 2
June 10, 2026
• Workshop on Other Development Code Amendments
July 8, 2026
• Final Review of All Development Code Amendments
August 12, 2026
• Public Hearing on Required Development Code Amendments
DEVELOPMENT CODE PUBLKIC HEARING BEFORE CITY COUNCIL SEPTEMBER 15
CITY COUNCIL 1ST & 2ND ORDINANCE READING, OCTOBER 7 & 21
Get email alerts for Liberty Lake
A daily email when new agendas and minutes are posted.