Village Board
Regular MeetingLittle Chute, WI · May 2, 2018
Agenda
AMENDED AGENDA
R
PLACE:
EGULAR BOARD MEETING
Little Chute Village Hall
DATE: Wednesday, May 2, 2018
TIME: 6:00 p.m.
REGULAR ORDER OF BUSINESS
A. Invocation
B. Pledge of Allegiance to the Flag
C. Roll call of Trustees
D. Roll call of Officers and Department Heads
E. Public Appearance for Items Not on the Agenda
F. Approval of Minutes
Minutes of the Regular Board Meeting of April 18, 2018
G. Department and Officers Progress Reports
H. Action—2018 Paving Contract - Daytona
I. Discussion/Possible Action—Mill Street Bridge
J. Discussion/Possible Action—Wayfinding Signage
K. Approval of Special Event Permits:
a) Taste for the Game on September 8, 2018 for Little Chute Diamond Club
b) Mustang Scamper on May 12, 2018
c) American Legion Memorial Day Event and Parade on May 28th, 2018
d) Rock Cancer on August 17th through the 19th, 2018
L. Action—Approve Temporary “Class B” Retailers License for Rock Cancer
M. Disbursement List
N. Call for Unfinished Business
O. Items for Future Agendas
P. Closed Sessions:
a)19.85(1)(e) Wis. Stats. Deliberations or negotiations on the purchase of public properties,
investing of public funds or conduction other specific public business when competitive
bargaining reasons require a closed session. TID #6 Economic Development Proposals
b)19.85(1)(c) Consideration of Employment, Promotion, or Performance Evaluation Data of
any Public Employee of the Village of Little Chute. Personnel Related Matters Regarding
Recruitment and Discipline
Q. Return to Open Session
R. Adjournment
Requests from persons with disabilities who need assistance to participate in this meeting or hearing should be made with as much advance notice as
possible to the Clerk’s Office at 108 West Main Street, (920) 423-3852, email: Laurie@littlechutewi.org Prepared: April 30, 2018
Village of Little Chute
Engineering Department
REQUEST FOR BOARD'S CONSIDERATION
ITEM DESCRIPTION: Award of 2018 Concrete Paving For Daytona Lane - 2018003
REPORT PREPARED BY: Christopher L. Murawski, P.E.
REPORT DATE: May 3, 2018
ADMINISTRATOR'S REVIEW / COMMENTS:
No additional comments to this report ___________________
See additional comments attached ________________________
EXPLANATION:
On April 26, 2018 bids were opened for the 2018 Concrete Paving For Daytona Lane, Project
Contract Number 2018003.
Four bids were received ranging in price from $127,586.28 to $154,270.25 as compared to the
capital improvement budget of $141,740 for this work. The low bid was submitted by Vinton
Construction of Manitowoc, WI. This contractor appears to be a responsible bidder and qualified to
perform the work. The bid tabulation for this project is attached for your review.
RECOMMENDATION:
It is the recommendation of the Engineering Department to award the 2018 Concrete Paving
Contract for Daytona Lane, Project Contract Number 2018003, to Vinton Construction of
Manitowoc, WI in the amount of $127,586.28.
Bid Tabulation
2018 Daytona Lane Street Reconstruction - No.2018003
Village of Little Chute, Wisconsin
April 26, 2018 2:00 p.m.
2018 Concrete Paving Project - Daytona Lane MCC, Inc. Vinton Construction Company Highway Landscapers, Inc. Sommers Construction Co, Inc
Item No Est Qty Units Item Description Unit Cost Bid Amount Unit Cost Bid Amount Unit Cost Bid Amount Unit Cost Bid Amount
1 24 ID Grubbing (WisDOT Item #201.0220) $ 42.16 $ 1,011.84 $ 20.00 $ 480.00 $ 20.00 $ 480.00 $ 20.00 $ 480.00
2 6 EA Inlet Protection - Type D $ 120.00 $ 720.00 $ 110.00 $ 660.00 $ 110.00 $ 660.00 $ 110.00 $ 660.00
3 1 EA Tracking Pad $ 1,932.03 $ 1,932.03 $ 0.01 $ 0.01 $ 1,500.00 $ 1,500.00 $ 1,500.00 $ 1,500.00
4 28 LF 12" Class IV Reinforced Concrete Storm Sewer $ 76.79 $ 2,150.12 $ 69.00 $ 1,932.00 $ 69.00 $ 1,932.00 $ 69.00 $ 1,932.00
5 20 LF 15" Class IV Reinforced Concrete Storm Sewer $ 79.00 $ 1,580.00 $ 72.00 $ 1,440.00 $ 72.00 $ 1,440.00 $ 72.00 $ 1,440.00
6 39 LF 4 Inch Sanitary Lateral - Open Cut (Schedule 35 or 40 PVC) $ 58.97 $ 2,299.83 $ 60.00 $ 2,340.00 $ 60.00 $ 2,340.00 $ 60.00 $ 2,340.00
7 2 EA Storm inlet (2' x 3') $ 2,100.00 $ 4,200.00 $ 1,750.00 $ 3,500.00 $ 1,750.00 $ 3,500.00 $ 1,750.00 $ 3,500.00
8 1 EA Abandon Storm Structure (No Slurry) $ 850.00 $ 850.00 $ 750.00 $ 750.00 $ 750.00 $ 750.00 $ 750.00 $ 750.00
9 257 LF Sawcut Asphalt Pavement $ 2.85 $ 732.45 $ 3.00 $ 771.00 $ 4.00 $ 1,028.00 $ 2.50 $ 642.50
10 647 LF Removing Curb and Gutter (WisDOT Item #204.0150) $ 4.96 $ 3,209.12 $ 5.00 $ 3,235.00 $ 5.00 $ 3,235.00 $ 5.00 $ 3,235.00
11 402 SY Removing Concrete $ 8.35 $ 3,356.70 $ 6.00 $ 2,412.00 $ 6.00 $ 2,412.00 $ 6.00 $ 2,412.00
12 662 CY Excavation Common $ 10.96 $ 7,255.52 $ 15.00 $ 9,930.00 $ 15.00 $ 9,930.00 $ 15.00 $ 9,930.00
13 381 TON Base Aggregate Dense 1-1/4 Inch $ 13.12 $ 4,998.72 $ 16.00 $ 6,096.00 $ 16.00 $ 6,096.00 $ 16.00 $ 6,096.00
14 38 TON Base Aggregate Dense 3" Inch $ 22.20 $ 843.60 $ 16.00 $ 608.00 $ 16.00 $ 608.00 $ 16.00 $ 608.00
15 759 SY Concrete Pavement 7 Inch (Non-Doweled) $ 48.75 $ 37,001.25 $ 34.98 $ 26,549.82 $ 49.75 $ 37,760.25 $ 48.75 $ 37,001.25
16 8 EA Drilled Tie Bars (WisDOT Item #416.0610) $ 20.00 $ 160.00 $ 8.00 $ 64.00 $ 20.00 $ 160.00 $ 20.00 $ 160.00
17 192 LF 30" Concrete Curb & Gutter - Standard, Including Aggregate Base $ 33.31 $ 6,395.52 $ 30.00 $ 5,760.00 $ 30.75 $ 5,904.00 $ 27.75 $ 5,328.00
18 53 TON 2¼" Asphalt Binder Course, E-1 Mix, 19mm Aggregate $ 129.61 $ 6,869.33 $ 193.00 $ 10,229.00 $ 286.00 $ 15,158.00 $ 275.00 $ 14,575.00
19 53 TON 1¾" Asphalt Surface Course, E-1 Mix, 12.5mm Aggregate $ 63.54 $ 3,367.62 $ 193.00 $ 10,229.00 $ 286.00 $ 15,158.00 $ 275.00 $ 14,575.00
20 2 TON Asphaltic Surface Driveways, including Aggregate Base $ 833.77 $ 1,667.54 $ 193.00 $ 386.00 $ 305.00 $ 610.00 $ 305.00 $ 610.00
21 2255 SF 4" Concrete Sidewalk, Including Aggregate Base $ 5.79 $ 13,056.45 $ 4.10 $ 9,245.50 $ 6.95 $ 15,672.25 $ 5.60 $ 12,628.00
22 2052 SF 6" Concrete Driveway & Sidewalk, Including Aggregate Base $ 6.34 $ 13,009.68 $ 4.85 $ 9,952.20 $ 7.50 $ 15,390.00 $ 6.40 $ 13,132.80
Curb Ramp Detectable Warning Field Natural Patina(WisDOT Item
23 32 SF #602.0515) $ 35.00 $ 1,120.00 $ 28.00 $ 896.00 $ 35.00 $ 1,120.00 $ 35.00 $ 1,120.00
24 5 MGAL Water (WisDOT Item #624.0100) (For Compaction and Dust Control) $ 343.51 $ 1,717.55 $ 75.00 $ 375.00 $ 75.00 $ 375.00 $ 75.00 $ 375.00
25 635 SY Restoration (Topsoil, Seed, Fertilizer and Mulch) $ 7.64 $ 4,851.40 $ 10.05 $ 6,381.75 $ 10.05 $ 6,381.75 $ 10.05 $ 6,381.75
26 1 EA Relocate Sign $ 70.00 $ 70.00 $ 150.00 $ 150.00 $ 150.00 $ 150.00 $ 150.00 $ 150.00
27 2 EA Street Signs and Posts $ 220.00 $ 440.00 $ 400.00 $ 800.00 $ 400.00 $ 800.00 $ 400.00 $ 800.00
28 66 LF Pavement Marking Crosswalk Epoxy 6 Inch (WisDOT Item #646.7420) $ 35.00 $ 2,310.00 $ 29.00 $ 1,914.00 $ 20.00 $ 1,320.00 $ 35.00 $ 2,310.00
29 1 LS Traffic Control $ 900.00 $ 900.00 $ 8,500.00 $ 8,500.00 $ 900.00 $ 900.00 $ 3,500.00 $ 3,500.00
30 1 LS Construction Staking $ 2,200.00 $ 2,200.00 $ 2,000.00 $ 2,000.00 $ 1,500.00 $ 1,500.00 $ 3,000.00 $ 3,000.00
Base Bid Sub-Total $ 130,276.27 $ 127,586.28 $ 154,270.25 $ 151,172.30
Total of Base Bid $ 130,276.27 $ 127,586.28 $ 154,270.25 $ 151,172.30
Village of Little Chute
Engineering Department
REQUEST FOR BOARD'S CONSIDERATION
ITEM DESCRIPTION: Mill Street Bridge – Alternate for Bridge Operation
REPORT PREPARED BY: Christopher L. Murawski, P.E.
REPORT DATE: May 2, 2018
ADMINISTRATOR'S REVIEW / COMMENTS:
No additional comments to this report ___________________
See additional comments attached ________________________
EXPLANATION:
Hydraulic valve testing was completed on April 11, 2018 for two alternate valves for the bridge lift
system as currently designed. This testing resulted in less than acceptable results. The test results
are attached as provided by the Wisconsin Department of Transportation for your review.
The Village of Little Chute has been requested by the Wisconsin Department of Transportation to
consider an alternate design that would change the controls, hydraulic design and include a new
manifold with the installation of a torque tube to connect the two lift arms. The torque tube would be
installed in the equipment pit so as not to alter the bridge ascetics.
This change in design would provide additional control and adjustment to raise and lower the bridge
deck while allowing the design to meet AASHTO Standards for highway lift spans. These
additional costs are listed as follows:
Alternate Design by AECOM: $18,000
Materials for Hydraulic redesign by SIT and Installation by Lunda: $19,000
Supply and Install Torque Tube by Lunda: $18,000
Total = $55,000
RECOMMENDATION:
The Village’s options are limited at this time. If the presented alternative is not selected our only
other alternatives would be to accept the bridge as is and fix it on our own or pursue the costly
expense of legal action to try and prove errors in the design as constructed. Therefore, it is in my
opinion that the two later alternates are more costly than the provided solution and the $55,000
alternate should be accepted. It should be noted that although AECOM is confident in their
solution, no guarantee can be provided for its success.
Chris Murawski
From: Edwards, Brian - DOT <Brian.Edwards@dot.wi.gov>
Sent: Tuesday, April 17, 2018 2:00 PM
To: Byron Danley
Cc: Schilling, Bill; Thompson, James - DOT; Zlatohlavek, Jeff; NE Local Program; Shankar
Nair; Jeff Roemer; 'gnpavlakis@kc.surewest.net'; Chris Murawski; Edwards, Brian - DOT
Subject: 4990-03-71 Little Chute Bridge UPDATE 4/11/18
Attachments: CBAB_en_us_letter.pdf; CBCA_en_us_letter.pdf; MBDB_en_us_letter.pdf
Importance: High
Byron,
Here’s the latest update on the Little Chute Bridge testing. On Wednesday, April 11th Lunda and their sub provided two
additional CBV’s for testing purposes. The spec sheets are attached along with the CBCA valve, which are the ones that
were last placed into the system during prior testing. The new valves are CBAB, 1.5:1 pilot ratio, ultra-restrictive, with a
2.5 gpm capacity. The other valves were MBDB, 1.5:1 ratio, load reactive, rated at 15 gpm capacity. Both were factory
set at 3,000 psi.
Prior to testing and due to the seasonally cold temperatures, the machinery room was heated prior to operations to get
the hydraulic fluid and machinery equipment consistent with expected operating temperatures. Temperature reading on
the oil reservoir was 80 degrees. The heating began on 4/9/18 and remained consistent through testing operations.
The testing results are below, but basically failed to provide satisfactory results. Video was taken of all tests and can be
uploaded to an ftp site if you desire. Our next steps in troubleshooting are looking at revising the hydraulic circuit and
possible installation of a torque tube between the trunnions as Shankar previously proposed. I will forward you any
proposed revisions for exp’s review/comment before installation.
Testing – CBAB Valves (the oscillations observed were more prominent than previous CBV in the start and stopping
motion)
Test #1
Time: 8:16AM
Oscillations Up: 41
Oscillations Down: 24
Oil Temperature: 82° Fahrenheit
Cylinders Temperatures: 64° Fahrenheit
Test #2
Time: 8:25AM
Oscillations Up: 45
Oscillations Down: 24
Oil Temperature: 80° Fahrenheit
Cylinders Temperatures: 66° Fahrenheit
Test #3
Time: 8:34AM
Oscillations Up: 45
Oscillations Down: 27
Oil Temperature: 80° Fahrenheit
1
Cylinders Temperatures: 68° Fahrenheit
Testing – MBDB Valves (Partially tested and stopped due to considerable bouncing on deck)
Test #1
Oil Temperature: 82° Fahrenheit
Cylinder Temperature: 72° Fahrenheit
Test stopped due actual bouncing of the bridge deck. Lifted to approx. 10 ft before stopping and lowering the deck. No
visual bouncing observed in the lowering.
Test #2
Oil Temperature: 82° Fahrenheit
Cylinder Temperature: 72° Fahrenheit
Tried one time and had the same result. Did not do a complete lift and lowering due to the bouncing of the deck.
Testing – CBCA Valves (Original Valves)
Test #1
Time: 9:32AM
Oscillations Up: 27
Oscillations Down: 24
Oil Temperature: 83° Fahrenheit
Cylinders Temperatures: 72° Fahrenheit
Test #2
Time: 9:40AM
Oscillations Up: 45
Oscillations Down: 27
Oil Temperature: 83° Fahrenheit
Cylinders Temperatures: 72° Fahrenheit
Brian A. Edwards, PE
Local Program Project Manager
Wisconsin Department of Transportation
Northeast Region
920.360.2801
wisconsindot.gov
If this is related to a records request, please email: dotdtsdnerecords@dot.wi.gov
2
MODEL 1.5:1 pilot ratio, ultra-restrictive counterbalance valve
CBAB SERIES 1 / CAPACITY: 2.5 gpm / CAVITY: T-11A
snhy.com/CBAB
3-Port Non-vented
Counterbalance valves with pilot assist are meant to control an overrunning load. The check valve allows free flow
from the directional valve (port 2) to the load (port 1) while a direct-acting, pilot-assisted relief valve controls flow
from port 1 to port 2. Pilot assist at port 3 lowers the effective setting of the relief valve at a rate determined by the
pilot ratio.
Other names for this valve include motion control valve and over-center valve.
TECHNICAL DATA NOTE: DATA MAY VARY BY CONFIGURATION. SEE CONFIGURATION SECTION.
Pilot Ratio 1.5:1
Maximum Recommended Load Pressure at Maximum Setting 3075 psi
Maximum Setting 4000 psi
Factory Pressure Settings Established at 2 in³/min.
Maximum Valve Leakage at Reseat 5 drops/min.
Adjustment - No. of CCW Turns from Min. to Max. Setting 3.75
Reseat >85% of setting
Locknut Hex Size 9/16 in.
Locknut Torque 80 - 90 lbf in.
Seal kit - Cartridge Buna: 990011007
Seal kit - Cartridge Polyurethane: 990011002
Seal kit - Cartridge Viton: 990011006
CONFIGURATION OPTIONS Model Code Example: CBABLHN
CONTROL (L) FUNCTIONAL SETTING RANGE (H) SEAL MATERIAL (N) MATERIAL/COATING
L Standard Screw Adjustment H 1000 - 4000 psi w/25 psi Check (70 - N Buna-N Standard Material/Coating
C Tamper Resistant - Factory Set 280 bar w/ 1,7 bar Check), 3000 psi V Viton /AP Stainless Steel, Passivated
R Lockwired Screw Adjustment (210 bar) Standard Setting /LH Mild Steel, Zinc-Nickel
A 1000 - 4000 psi w/4 psi Check (70 -
280 bar w/ 0,3 bar Check), 3000 psi
(210 bar) Standard Setting
B 400 - 1500 psi w/4 psi Check (28 - 105
bar w/ 0,3 bar Check), 1000 psi (70
bar) Standard Setting
I 400 - 1500 psi w/25 psi Check (28 -
105 bar w/ 1,7 bar Check), 1000 psi (70
bar) Standard Setting
c 2017 Sun Hydraulics Corporation See www.sunhydraulics.com for detailed product information 1 of 1
MODEL 3:1 pilot ratio, standard capacity counterbalance valve
CBCA SERIES 1 / CAPACITY: 15 gpm / CAVITY: T-11A
snhy.com/CBCA
3-Port Non-vented Counterbalance valves with pilot assist are meant to control an overrunning load. The check valve allows free flow
from the directional valve (port 2) to the load (port 1) while a direct-acting, pilot-assisted relief valve controls flow
from port 1 to port 2. Pilot assist at port 3 lowers the effective setting of the relief valve at a rate determined by the
pilot ratio.
Other names for this valve include motion control valve and over-center valve.
TECHNICAL DATA NOTE: DATA MAY VARY BY CONFIGURATION. SEE CONFIGURATION SECTION.
Pilot Ratio 3:1
Maximum Recommended Load Pressure at Maximum Setting 3075 psi
Maximum Setting 4000 psi
Factory Pressure Settings Established at 2 in³/min.
3-Port Non-vented, Fixed Setting
Maximum Valve Leakage at Reseat 5 drops/min.
Adjustment - No. of CCW Turns from Min. to Max. Setting 3.75
Reseat >85% of setting
Locknut Hex Size 9/16 in.
Locknut Torque 80 - 90 lbf in.
Seal kit - Cartridge Buna: 990011007
Seal kit - Cartridge EPDM: 990011014
Seal kit - Cartridge Polyurethane: 990011002
Seal kit - Cartridge Viton: 990011006
CONFIGURATION OPTIONS Model Code Example: CBCALHN
CONTROL (L) FUNCTIONAL SETTING RANGE (H) SEAL MATERIAL (N) MATERIAL/COATING
L Standard Screw Adjustment H 1000 - 4000 psi w/25 psi Check (70 - N Buna-N Standard Material/Coating
C Tamper Resistant - Factory Set 280 bar w/ 1,7 bar Check), 3000 psi E EPDM /AP Stainless Steel, Passivated
(210 bar) Standard Setting V Viton /LH Mild Steel, Zinc-Nickel
A 1000 - 4000 psi w/4 psi Check (70 -
280 bar w/ 0,3 bar Check), 3000 psi
(210 bar) Standard Setting
B 400 - 1500 psi w/4 psi Check (28 - 105
bar w/ 0,3 bar Check), 1000 psi (70
bar) Standard Setting
I 400 - 1500 psi w/25 psi Check (28 -
105 bar w/ 1,7 bar Check), 1000 psi (70
bar) Standard Setting
c 2017 Sun Hydraulics Corporation See www.sunhydraulics.com for detailed product information 1 of 1
MODEL 1.5:1 pilot ratio, load reactive load control valve
MBDB SERIES 1 / CAPACITY: 15 gpm / CAVITY: T-11A
snhy.com/MBDB
3-Port Non-vented
Load reactive, load control valves with pilot assist combine two valves; a check valve and a relief valve. The check
valve allows free flow from the directional valve (port 2) to the load (port 1) while a direct-acting, pilot-assisted relief
valve controls flow from port 1 to port 2. Pilot assist at port 3 lowers the effective setting of the relief valve at a rate
determined by the pilot ratio.
TECHNICAL DATA NOTE: DATA MAY VARY BY CONFIGURATION. SEE CONFIGURATION SECTION.
Pilot Ratio 1.5:1
Maximum Recommended Load Pressure at Maximum Setting 3850 psi
Maximum Setting 5000 psi
Factory Pressure Settings Established at 2 in³/min.
Maximum Valve Leakage at Reseat 5 drops/min.
Check Cracking Pressure 25 psi
Adjustment - No. of CCW Turns from Min. to Max. Setting 6.5
Reseat >85% of setting
Locknut Hex Size 9/16 in.
Locknut Torque 80 - 90 lbf in.
Seal kit - Cartridge Buna: 990011007
Seal kit - Cartridge Polyurethane: 990011002
Seal kit - Cartridge Viton: 990011006
CONFIGURATION OPTIONS Model Code Example: MBDBLHN
CONTROL (L) FUNCTIONAL SETTING RANGE (H) SEAL MATERIAL (N)
L Standard Screw Adjustment H 1000 - 4000 psi (70 - 280 bar), 3000 psi N Buna-N
C Tamper Resistant - Factory Set (210 bar) Standard Setting V Viton
J 2000 - 5000 psi (140 - 350 bar), 3000
psi (210 bar) Standard Setting
c 2017 Sun Hydraulics Corporation See www.sunhydraulics.com for detailed product information 1 of 1
Get email alerts for Little Chute
A daily email when new agendas and minutes are posted.