Village Board
Regular MeetingLittle Chute, WI · January 3, 2024
Agenda
AGENDA
R EGULAR BOARD MEETING
PLACE: Little Chute Village Hall
DATE: Wednesday, January 3, 2024
TIME: 6:00 p.m.
Virtually attend the January 3rd, Regular Board meeting at 6 PM by following the zoom link here:
Dial by your location: +1 312 626 6799 US (Chicago)
Meeting ID: 837 8951 2995
Join Zoom Meeting
https://us06web.zoom.us/j/83789512995
REGULAR ORDER OF BUSINESS
A. Invocation
B. Pledge of Allegiance to the Flag
C. Roll call of Trustees
D. Roll call of Officers and Department Heads
E. Public Appearance for Items Not on the Agenda
F. Other Informational Items:
G. Consent Agenda
Items on the Consent Agenda are routine in nature and require one motion to approve all items listed. Prior
to voting on the Consent Agenda, items may be removed at the request of any Board Member or member of
the public. Any removed items will be considered immediately following the motion to approve the other
items.
1. Minutes of the Regular Board Meeting of December 20, 2023
2. Disbursement List
3. Reappointment of Jerry Schumacher as Chairperson to the Parks Planning Committee
H. Public Informational Meeting for W. Evergreen Drive (Vandenbroek Road to Holland Road)
I. Public Hearing – Amending Section 18-19 and 18-58 of the Municipal Code
J. Action—Adopt Ordinance No. 1, Series 2024 Amending Section 18-19 and 18-58 of the Municipal Code
K. Introduction of E. Evergreen Drive Rezoning
L. Department and Officers Progress Report
M. Call for Unfinished Business
N. Items for Future Agenda
O. Closed Sessions:
(a)19.85(1)(e) Wis. Stats. Deliberations or negotiations on the purchase of public properties, investing of
public funds or conducting other specific public business when competitive or bargaining reasons require
a closed session. Economic Development Item
(b)19.85(1)(c) Consideration of Employment, Promotion, or Performance Evaluation Data of any Public
Employee of the Village of Little Chute. Personnel Review
P. Return to Open Session
Q. Adjournment
MINUTES OF THE REGULAR BOARD MEETING OF DECEMBER 20, 2023
Call to Order: President Vanden Berg called the Regular Board Meeting to Order at 6:00 p.m.
Pledge Allegiance to the Flag
President Vanden Berg led members in the reciting of the Pledge of Allegiance.
Roll call of Trustees
PRESENT: Michael Vanden Berg, President
Bill Peerenboom, Trustee
Larry Van Lankvelt, Trustee
David Peterson, Trustee
John Elrick, Trustee
Don Van Deurzen, Trustee
EXCUSED: Brian Van Lankveldt, Trustee
Roll call of Officers and Department Heads
PRESENT: Beau Bernhoft, Administrator
Laurie Decker, Village Clerk
Lisa Remiker-DeWall, Finance Director
John McDonald, Director of Parks, Rec and Forestry
Dave Kittel, Community Development Director
Dan Meister, Fox Valley Metro Police Chief
Matt Woicek, Deputy Director of Public Works
Kent Taylor, Director of Public Works
Megan Kloeckner, Library Director
EXCUSED: Tyler Claringbole, Village Attorney
Public Appearance for Items Not on the Agenda
None
Consent Agenda
Items on the Consent Agenda are routine in nature and require one motion to approve all items listed. Prior to
voting on the Consent Agenda, items may be removed at the request of any Board Member or member of the
public. Any removed items will be considered immediately following the motion to approve the other items.
1. Minutes of the Regular Board Meeting of December 6, 2023
2. Disbursement List
3. Reappointment – Todd Verboomen to Plan Commission
4. 2024 Village Board and Commissions Meeting Calendar
Moved by Trustee L. Van Lankvelt, seconded by Trustee Peterson to Approve the Consent Agenda as
presented.
Ayes 6, Nays 0 – Motion Carried
Public Hearing – Village North Covenant Updates
Moved by Trustee, seconded by Trustee Elrick to enter Public Hearing at 6:03 p.m.
Ayes 6, Nays 0 – Motion Carried
Director Kittel stated notice was placed in the paper, a letter was sent to all residents with a lot in the
subdivision, no feedback, complaints, or concerns were received in regard to detached garages and the proposed
changes. Trustee Van Deurzen asked if everyone was aware of the option to build a detached garage in the
subdivision. Director Kittel stated everyone received the letter and is aware.
Moved by Trustee Elrick, seconded by Trustee Van Deurzen to Exit Public Hearing at 6:34 p.m.
Ayes 6, Nays 0 – Motion Carried
Discussion/Action – Village North Covenant
Trustee Elrick asked for clarification on the size, 500 or 600 sq ft. Director Kittel stated it is up to the board to
decide, or no size restriction should they choose. A motion was made by Trustee Elrick, seconded by Trustee
Van Deurzen to change the Village North Covenants to allow for detached garages not to exceed 600 square
feet. Trustee Peerenboom stated he would like the line removed about notifying adjacent property owners, this
is not required any other place in the village and doesn’t see why the additional stipulation is included. Trustee
Van Deurzen agreed with Trustee Peerenboom and wanted clarification on if permission is required from
adjacent property owners. Trustee Peerenboom would like to follow Village procedure on this issue and not
require Community Development Director approval or notification of adjacent property owners. Director Kittel
did not see any concerns about the changes and simplifying the language.
Moved by Trustee Elrick, seconded by Trustee Van Deurzen to change the Village North Covenants to
allow for detached garages not to exceed 600 square feet, and remove the sentence, “Detached garages
are only allowed by permission of the Community Development Director and notification of adjacent
property owners in in the subdivision.”
Ayes 6, Nays 0 – Motion Carried
Discussion/Action – Fire Department Rescue Squad Purchase
Administrator Bernhoft presented a request to proceed with the purchase of a new rescue squad truck from
Pierce Manufacturing. The Fire department had reached out to three qualified manufacturing companies for
quotations. Pierce was the only responder with a price of $1,234,000 and provided a purchasing agreement.
Staff and legal have reviewed the agreement included in the packet. Time to complete is 43 – 46 months. Fire
Chief Nechodom is currently employed with Pierce Manufacturing but holds no direct benefit from this
purchase. Trustee Van Deurzen asked when the agreement needs to be signed to get the price. Administrator
Bernhoft stated January 1, 2024. Van Deurzen asked for a representative from Pierce or Chief to discuss what is
included in this purchase and why it costs this much money. He does not feel comfortable voting on this without
knowing what is included on the truck. Administrator Bernhoft stated Fire Chief is sick and unavailable to
attend this meeting. He stated the board is the voting body on this, if they need more information that is fine,
however we are running on a very tight deadline. If the direction of the board is to gather more information he
can reach out to the Fire Chief and Pierce to get a representative and hold a special meeting. President Vanden
Berg stated he would like more information, perhaps a virtual tour of the vehicle. Trustee Peerenboom stated he
would like to hear from someone on the fire department about the purchase. President Vanden Berg stated he
would like to see if Pierce can extend the deadline to January 31st to allow time for discussion. Administrator
Bernhoft stated he would reach out to Pierce to see if they can accommodate a later date and schedule a Special
Board meeting. Trustee Elrick asked why the Pierce proposal was received on November 7th yet no other
manufacturers were contacted until December. Administrator Bernhoft stated that is correct, the fire department
was working directly with Pierce on this, they worked with staff who reminded them to reach out to get
additional quotes. Elrick asked how long Pierce had to get the proposal together, the other companies had less
than three weeks. Bernhoft stated the process started in 2023, allowing Pierce to work on the spec for a year.
Elrick stated he is in agreement; the board needs to wait and is troubled with the scenario. Trustee Van Lankvelt
stated in talks with the Chief the other manufacturers were not interested in bidding. Elrick would like to see
documentation on their intent to bid. Trustee Elric stated the timeline of spec requests was unrealistic, emailed
on Dec 4 with a deadline of December 13. President Vanden Berg agreed with the statements and asked
Administrator Bernhoft to reach out to Pierce and provide feedback to the board. Trustee Peerenboom would
also like clarification on whether the correct procedure on going out for bids was followed, how one company
was giving such an advantage on this project. Was competitive bidding process followed, who was invited to
bid and when. Trustee Elrick wanted to know where in writing this was only good until the First of the year.
Administrator Bernhoft said he would find that information in an email and would share it with Trustees.
No action taken.
Discussion/Action – State Municipal Financial Agreement for State Let Highway 41 Project
Administrator Bernhoft presented a financial agreement between the state and municipalities for the Rosehill Rd
overpass reconstruction that will be occurring during the I41 project. The Village would be responsible for $23.
This agreement is a formality. More agreements may come as the project progresses. He then asked Finance
Director Remiker-DeWall for her input and additional comments. Remiker-DeWall stated she did a quick
review, a few points and concerns that stood out include: The top 3 items include a 100% from municipal funds
(highlighted in packet) which can be subject to federal and state grants, any amount over would be subject to
local funding and could be deducted from transportation needs, she wanted board to be aware of this inclusion.
Under item 8: The agreement be revised as necessary as the project progresses, all costs are approximate and
subject to audit, under comments some issues may need to be amended as some issues have not been fully
evaluated or resolved. She reminded the board we ran into issues with Mill St bridge where grants were capped
and took years to resolve. Director Taylor stated she is correct and he is in agreement. At this point we owe $23
and cannot predict what the future will bring. At this point there is no utility relocation at any of the overpasses.
We haven’t seen the plans for the straight-line road, there are 3 situations where we have roads that go under 41.
He is confident the board can approve it at this point in time. Trustee Van Deurzen asked what would happen if
we were to disagree with the agreement and not sign it. Director Taylor stated if no agreement is reached, we
send it back to state and additional discussion will take place, he believes it is negotiable but cannot speak for
the state. He recommends the board signs and approves it. Trustee Van Deurzen raised concerns about surprises
and additional costs the way it is currently written. Director Taylor stated other communities were in agreement
with this and would be signing off as well. Trustee Elrick stated he is not comfortable with the agreement as
written and would like the 100% from the first three lines changed to 0% and then he is favorable. Trustee Van
Deurzen stated he agreed but wonders if the state would agree with this and wants to know where we stand on
this. Director Taylor stated discussions with the state would have to take place if changes are made to the
document, there is a deadline for submission. President Vanden Berg stated he would like to find out what the
numbers actually mean before signing the document. Board members were in agreement and directed Taylor to
inquire more about the agreement.
Department and Officer Reports
Department Heads and Officers provided progress reports to the Board.
Call of Unfinished Business
None
Items for Future Agenda
None
Closed Sessions:
19.85(1)(e) Wis. Stats. Deliberations or negotiations on the purchase of public properties, investing of public
funds or conducting other specific public business when competitive or bargaining reasons require a closed
session. Economic Development Item
19.85(1)(c) Consideration of Employment, Promotion, or Performance Evaluation Data of any Public Employee
of the Village of Little Chute. Performance Review
Moved by Trustee Elrick, seconded by Trustee Van Deurzen to Enter into Closed Session at 6:37 p.m.
Ayes 6, Nays 0 – Motion Carried
Return to Open Session
Moved by Trustee Peterson, seconded by Trustee Elrick to Exit Closed Session at 8:29 p.m.
Ayes, Nays 0 – Motion Carried
Adjournment
Moved by Trustee Peterson, seconded by Trustee Elrick to Adjourn the Regular Board meeting at 8:29
p.m.
Ayes 6, Nays 0 – Motion Carried
VILLAGE OF LITTLE CHUTE
By: ___________________________________
Michael R. Vanden Berg, Village President
Attest:
Laurie Decker, Village Clerk
December 4, 2023
RE: NOTICE OF PUBLIC INFORMATIONAL MEETING
2024 Village of Little Chute - Utility & Street Reconstruction Project
Dear Property Owner/Resident:
In 2024 the Village of Little Chute will begin reconstruction of utilities and street pavement along Evergreen
Drive from Vandenbroek Road to Holland Road. The Village of Little Chute would like to provide you the
opportunity, as a property owner or affected resident, to attend the scheduled Public Informational Meeting to
discuss this project and how it will impact you. The Village of Little Chute Engineer staff will be available to
provide information and answer questions that you may have regarding this project.
The Public Informational Meeting is scheduled as follows:
Date: Wednesday, January 3, 2024
Time: 6:00 pm
Location: Village Hall, Village Board Room
108 W. Main Street, Little Chute
Residents and Property Owners are encouraged to attend the Public Informational Meeting to address
questions or concerns. If you are unable to attend, or if you have any questions prior to the hearing, please do
not hesitate to contact the Public Works Department at 920-423-3865 to discuss your concerns or schedule an
appointment to discuss in person.
Sincerely,
Matthew Woicek, P.E.
Matthew Woicek
Public Works Department
Assistant Director of Public Works
Office: 920.423.3865
Item For Consideration
For Board Review On: 1/3/2024 Prepared On: 12/28/2023
Agenda Item Topic: Evergreen Drive Reconstruction Project Prepared By: Assistant
Director of Public Works
Report: Attached is the preliminary typical section for Evergreen Drive between Vandenbroek
Road and Holland Road. The proposed concrete pavement will include integral curb and gutter
with two 12-foot travel lanes and one center turn lane, which will allow left turning vehicles to
pull out of the travel lane in both directions. The total street width will be 38-feet from face of
curb to face of curb. The reconstruction project will also include the construction of a paved
10-foot wide shared use trail which will connect to the existing trail system east of
Vandenbroek Road. The trail will be located on the north side of Evergreen Drive, offset
approximately 3-feet from the back of curb. The terrace behind the back of the curb on the
south side of Evergreen Drive will be graded to allow the construction of sidewalk at a future
date, if needed. This roadway typical section will mirror the typical sections of the recently
reconstruction sections of Evergreen Drive to the east of Vandenbroek Road and to the west of
Holland Road.
Fiscal Impact: N/A
Recommendation/Board Action: N/A
Respectfully Submitted,
Matthew Woicek, P.E.
Assistant Director of Public Works
ENGINEERING DEPARTMENT
108 WEST MAIN STREET
ESTABLISHED 1848
PRELIMINARY
LITTLE CHUTE, WISCONSIN 54140
Nov. 17, 2023
R/W R/W
66'
VILLAGE OF LITTLE CHUTE, WISCONSIN
2024 RECONSTRUCTION ROJECT
C/L
VARIES VARIES
11' 11'
1' - 3' 1' - 3'
% VARIES % VARIES
VARIE
S
IE S
VAR EXISTING ASPHALT PAVEMENT
(ESTIMATED 4" DEPTH)
EX. GROUND
(TYP.) EXISTING AGGREGATE BASE
WEST EVERGREEN DRIVE TYPICAL SECTIONS
(ESTIMATED 10" DEPTH)
EVERGREEN DRIVE EXISTING TYPICAL SECTION
Q:\Dept of Public Works\Engineering Department\2000 - Municipal Projects\Evergreen - Holland Rd to Vandenbroek Rd\10 - DWG\SHEETS\4.0_Paving_Cross-Section_Sheets.dwg
; 10/23/2023 7:46:15 ;
AM KRIS LYONS
; acad.ctb
(NOT TO SCALE)
R/W R/W
66'
41' BASE COURSE
39' BACK TO BACK
C/L 13.5' TERRACE
VARIE 10' TRAIL 3' TERRACE )
S 4H 12' 14' 12' 8' TERRACE 5'± TERRACE (TYP
:1V ( H:1V
TYP) SLOP
E LANE CENTER LANE IES 4
VARIE VAR
TURN LANE
DESCRIPTION
S 1.5% SLOPE
1.5% SLOPE VARIES 4H:1
V (TY
P ) 0.5' 2%* 2%* 2%* P)
V (TY 2%*
4H:1 1' TYP.
ISSUED FOR BID
INTEGRAL CURB
(SEE NOTE 1)
8" CONCRETE PAVEMENT
0.5" X 30" DEFORMED TIE BARS (DOWELED) 4" COMPACTED
4" ASPHALT TRAIL OVER SPACED 3' ON CENTER REQUIRED AT TOPSOIL, SEED,
4" COMPACTED 5" OF 1-1/4" BASE AGGREGATE DENSE ALL LONGITUDINAL SAW OR 10"- 1-1/4" BASE AGGREGATE DENSE FERTILIZER & MULCH EX. GROUND
TOPSOIL, SEED, BY
XX/XX/2024 KAL
EX. GROUND CONSTRUCTION JOINTS (TYP.)
FERTILIZER & EMAT
(TYP.)
DATE
EVERGREEN DRIVE PROPOSED TYPICAL SECTION (NOT TO SCALE)
REV
DESIGNED: KAL
DRAWN: KAL
CHECKED: DEM
APPROVED: MJW
PROJECT NUMBER
2024001
SHEET REFERENCE NO.
5.0
W. Evergreen Drive
Reconstruc on
Department of Public Works
Engineering Division
108 W. Main Street – (920) 423-3865
The Village of Li le Chute Department of Public Works-Engineering Division is proposing to reconstruct
W. Evergreen Drive between Holland Road and Vandenbroek Road, comple ng a mul -year road
reconstruc on and urbaniza on program along W. Evergreen Drive.
Project Need
W. Evergreen Drive between Holland Road and Vandenbroek Road is the final remaining segment of W.
Evergreen Drive, that remains a rural sec on u lizing ditches. The roadway has experienced an
increased amount of truck traffic over the past few years, which has resulted in significant cracking
throughout the asphalt pavement. The proposed reconstruc on project will widen W. Evergreen Drive
to an urban concrete roadway with curb and gu er, matching the previous two phases of road
urbaniza on between Freedom Road (CTH “N”) and French Road.
Pavement
The proposed concrete roadway will include integral concrete curb and gu er with two 12-foot travel
lanes and one center turn lane, which will allow le turning vehicles to pull out of the travel lane in both
direc ons. The total street width will be 38-feet from face of curb to face of curb. The project will also
include the construc on of a paved 8-foot wide shared use trail which will connect to the exis ng trail
system east of Vandenbroek Road and will eventually connect to the trail system on Cherryvale Avenue.
The trail is proposed on the north side of W. Evergreen Drive, offset approximately 5-feet from the back
of curb at most loca ons. Sidewalks will not be constructed as part of the project, however, the terrace
behind the back of the curb on the south side of W. Evergreen Drive will be graded to allow for
construc on of sidewalk at a future date, if needed.
Sewer and Water Construc on
Sanitary Sewer
The exis ng sanitary sewer main is in good condi on and will remain in place. The project will involve
minor rehabilita on/repair work to the sanitary main, as needed, and will include adjustments to the
manhole structures to match the new roadway eleva ons. The majority of the sanitary sewer laterals are
also in good condi on and will remain. A few exis ng sanitary laterals with leaks will be repaired/replaced
as part of this project for your use if/when you choose to connect to the sanitary sewer system.
Storm Sewer
The exis ng storm sewer main is undersized and will be either removed or abandoned as part of the
project. New, larger storm sewer will be installed along the project length to help improve drainage in the
area; storm sewer inlets and manholes will also be installed. Exis ng ditches will be removed where
possible, however, there are a few loca ons where shallow ditches will remain. Field inlets will be installed
to carry stormwater from the remaining shallow ditches into the new storm sewer main, where needed.
At residen al proper es with basements, storm sewer laterals will be installed to the right of way line for
use if/when you ever choose to connect to the Village storm sewer system.
Watermain
The exis ng watermain is in good condi on and will remain in place. Exis ng copper water services will
be replaced with poly water service piping as part of the project. For the contractor to replace the water
service, the service will temporarily be shut down during the replacement. You will be no fied of the date
and mes of this shutdown in advance so you can plan your day accordingly. This temporary interrup on
of service will only occur if you are connected to the municipal water system.
Traffic Impacts
W. Evergreen Drive will be closed to thru traffic during the length of the project but shall remain open to
local traffic and emergency vehicles. Depending on construc on opera ons, traffic may be reduced to a
single lane in one direc on at mes.
Lawn Restora on
As part of the project, you will likely have some areas of lawn that will be impacted. Lawn areas will be
restored with topsoil, seed, fer lizer, and either hydro-mulch or erosion mat at the comple on of the
project.
Project Schedule
It is an cipated that u lity construc on will begin in April or May with pavement construc on beginning
in July. Final project comple on is an cipated in late September/early October.
Construc on Updates
Construc on updates and informa on will be posted on the Village of Li le Chute’s website under Road
Projects. The website link is www.li lechutewi.org.
Project Contact
Ma hew Woicek, P.E.
Assistant Director of Public Works
920.423.3865
Ma hew@li lechutewi.org
W. Evergreen Drive Reconstruc on
This sheet is provided to your wri en comments and concerns about this project. Please use the space
below to write down your comments and mail to the address listed below by January 5 th, 2024. Thank
you for your interest in this project.
Address:
Comments:
Project Contact: Ma hew Woicek, P.E.
Phone: 920.423.3865
Email: ma hew@li lechutewi.org
Village Address: Village of Li le Chute
Department of Public Works
108 W. Main Street
Li le Chute, WI 54140
Frequently Asked Questions About Construction
Common Questions for Village Street Improvement Projects –2024 W. Evergreen Drive Reconstruction
How much is this street improvement going to cost me?
The proposed project will not involve any special assessments or costs to property owners. The
Tax Incremental District, otherwise known as TID, will cover all costs associated with the project.
How long will the project take?
Depending on the project complexity and weather, it will take approximately 23 weeks to
complete construction. There may be times during this period when you will be inconvenienced
by construction equipment and delays. We realize this will be an interruption to your normal
routine; the Village appreciates your patience and thanks you in advance for your cooperation.
What are the typical hours of construction?
Construction hours are from 7:00 am to 8:00 pm. Some exceptions may occur due to weather
conditions or approaching deadlines. There may exist the need for saw cutting of the newly paved
concrete street after the typical construction hours. The timing of this sawing is critical to
control/reduce random cracking from occurring. We apologize in advance for this inconvenience,
but it is necessary to protect the integrity of the newly constructed concrete street.
Do I need to do anything before construction starts?
Please remove any irrigation, landscaping, walls, rocks, electric pet fences, and other items within
the right of way you want preserved during construction. If items are not removed, the Contractor
will remove and dispose of them. Also, contact the Village if those items reside on your property
to minimize impacts. Finally, please try to attend the on-site, walk through public informational
meeting to be held in the Spring of 2024. This meeting provides an opportunity to meet with the
Village engineering staff to discuss the project and any questions that you may have specific to
your property. The Village will provide notification of this meeting, which will occur prior to the
start of construction.
How will garbage and recycling pickup be affected?
The Village will endeavor to maintain your regular garbage pick-up schedule. However,
depending upon the stage of construction, pick-up may be delayed by a day or two. Unless
notified otherwise, please leave your polycart out until it is emptied. If you experience problems or
have questions during construction, please contact Public Works at 920-423-3865 (for garbage
issues) and LRS at 920-759-0501 (for recycling concerns).
What will happen to mail delivery and my mailbox?
The contractor will be required to maintain mail service during construction. The contractor will
also be responsible for the re-installation of any mailboxes that are removed during construction
of the project.
How will this affect emergency services?
There should be no impact to emergency services. They are informed daily and instantly if
changes in traffic occur. Construction equipment will provide access and move out of the way if
emergency services are seeking access.
What kind of access can I expect during construction?
Driveway access will be temporarily restricted throughout the project. This will occur when work
is being completed in front of or adjacent to the property. Driveway access will be restored at the
end of each construction day, whenever possible.
Driveway access will be restricted for an extended period during the construction of the street
pavement, driveway approach and any sidewalk through the driveway. Advance notice will be
provided to the residents prior to closure.
Where should I park?
Your new concrete street will be constructed in phases, typically one direction of travel at a time.
Once the first lane is paved, the concrete requires seven (7) days of cure time before driving on.
There are several properties on the project that have multiple access points. One access point
will be maintained during paving of the street at these locations.
Additionally, adjacent side streets are available for parking during construction. Please be
advised that during normal construction hours vehicles are required to be located outside of the
public right of way.
What if I need special access to my property?
Simply call the Village Public Works Office to discuss your accommodation needs during
construction. The earlier the advance notice is made to the Village, the more likely the Village can
help to accommodate these needs. If something comes up without notice, the Contractors will
be informed to assist as much as possible to avoid harm to either person or property.
If you have any special needs for accessibility or for any other considerations, please notify the
Village as soon as possible.
Will my utilities (water, sewer, phone, cable, etc.) be affected?
The Village anticipates minor interruptions to your water on Evergreen Drive during replacement
of the water services. You will be notified of the date and times of this shut-down in advance.
No interruptions to your municipal sewer utilities are anticipated. However, it is typical for private
utilities, such as gas, electric, or communications to schedule work either prior to or during the
same time period.
Will my driveway be replaced?
For reconstruction projects, the driveway approach, including the sidewalk section through the
driveway will be replaced, or constructed if you do not already have a concrete apron. This is the
portion of your driveway that resides in the public right of way.
Can the Contractor perform work on my private property?
The Village does not get involved with coordinating construction on private property. You may
contact the Contractor individually to contract work with them privately.
Minimal transition work in lawn areas should be expected but if the property owner requests an
easement one can be provided to document the extent of disturbance and the duration of the
temporary construction easement. Because this work is considered to be a benefit to the
property owner it is the Village’s policy that no cost for the easement will be provided to the
property owner. If permission to access the property is denied the construction work will end at
the property line and the property owner will be required to complete the transition work using the
established design elevations at the Right of way.
There are a few locations on this project where storm sewer field inlets are proposed to be
installed outside of the right of way on private property, to help aid in drainage. The Village will
be in contact with the property owners at these locations, to seek sewer easements for future
maintenance needs of these field inlets.
What happens if I witness something dangerous in the construction zone?
Please inform the project inspector or the Village offices as soon as possible. Appropriate staff
will attempt to remedy the situation. If it is an emergency, contact 911.
Dust and Noise
Street construction is a process during which you can expect to endure a fair amount of noise and
dust. Methods are in place to help limit dust, but elimination of all construction related dust is not
possible. We ask for your patience and understanding as we make the necessary improvements
to your street. Thank you in advance for your cooperation.
What should I expect after construction is completed?
The Contractor will have top soiled, seeded, and mulched all areas disturbed by the construction.
It is the property owner’s responsibility to water the seeded areas and cut the newly established
grass. By providing the same lawn care in the right of way as the property owner’s lawn will
ensure the grass seed will germinate and grow while preventing weeds from taking over the area.
Please do not use weed killer during the first year of lawn development.
Communication Updates
The Village will use a variety of methods to communicate with you. Public meetings, the postal
service, and/or doorstep memos and notices are standard. Once construction has started,
bi-weekly updates will be posted on the Village website at www.littlechutewi.org. Of course, we
are always available by telephone if you should have questions that arise during the project. In
the event of an emergency, please dial 911.
VILLAGE OF LITTLE CHUTE
VILLAGE BOARD
NOTICE OF PUBLIC HEARING
AMENDING SECTION 18-19 AND 18-58 OF THE MUNICIPAL CODE
NOTICE IS HEREBY GIVEN that a Public Hearing will be held on January 3, 2024 at 6:00 p.m.
by the Village Board, for consideration of amending Sections 18-19 and 18-58 “Fire Prevention and
Protection” of the Municipal Code, for various code reference updates and current staffing numbers.
Notice is further given that the said meeting is open to the public and that the applicants and any other persons
interested may appear and be heard for or against the amendments to the Village Board of Trustees.
If you have any questions, please contact the Village Administrator at (920) 423-3850
DATE OF HEARING: January 3, 2024
TIME OF HEARING: 6:00pm
PLACE OF HEARING: Village Hall
Board Room
108 West Main Street
Little Chute, WI 54140
Publish: December 27, 2023 and January 3, 2024
Reasonable accommodations for persons with disabilities will be made upon request and if feasible.
VILLAGE OF LITTLE CHUTE
ORDINANCE NO. 1, SERIES OF 2024
AN ORDINANCE AMENDING SECTION 18-19 and 18-58 OF THE VILLAGE OF LITTLE CHUTE MUNICIPAL CODE.
WHEREAS, the Village of Little Chute Board of Trustees has recommended the following ordinance
amendments; and,
WHEREAS, the required public hearing has been held before the Village Board of Trustees, Village of
Little Chute; and,
WHEREAS, the Village Board of Trustees, Village of Little Chute, finds the following ordinance
amendments to be in the public interest;
NOW, THEREFORE, the Village Board of Trustees, Village of Little Chute, do ordain as follows:
Section 1. That Section 18-19 and 18-58 (Fire Prevention and Protection) of the Municipal Code of the
Village of Little Chute is hereby amended to read as follows:
Sec. 18-19. - Established.
(a)
Composition: service to village recognized; delegation of duties. There is established a fire department for
the village consisting of a fire chief, a three volunteer assistance fire chiefs, two volunteer captains, and four
volunteer lieutenants, and not more than 40 50 volunteer firefighters. The village fire department is officially
recognized as the fire department serving the village, and the duties of firefighting and fire prevention in the
village are delegated to such department. The fire department shall be respo nsible for the program of fire
defense for the citizens and property within the village.
Sec. 18-58. - Adoption of Fire Prevention and Protection Codes.
a) Adoption of Wisconsin Department of Safety and Professional Services Codes . The
provisions of Wisconsin Administrative Codes, published on or before the effective date of this
chapter, or as they may be amended or renumbered from time to time, are hereby adopted by
reference and the rules and regulations contained therein are hereby made a part of this chapter as
though they were fully ser forth herein. The following Wisconsin Administrative Codes in effect on
the date of adoption this chapter, or as they may be amended or renumbered from time to time, are
adopted by reference, enforced and incorporated into this chapter as if fully set forth herein.
SPS 305 Licenses, Certification and Registration
SPS 307 Explosive Materials and Fireworks Manufacturing
SPS 314 Fire Prevention
SPS 316 Electrical
SPS 318 Elevator Code
SPS 320-325 Uniform Dwelling Code
SPS 326 Manufactured Home Communities
SPS 328 Smoke Detectors and Carbon Monoxide Detectors
SPS 330 Fire Department Safety and Health Standards
SPS 334 Amusement Rides and Attractions
SPS 340 Gas Systems
SPS 343 Anhydrous Ammonia
SPS 361-366 Wisconsin Commercial Building Code
SPS 371 Solar Energy Systems
SPS 375-379 Buildings Constructed Prior to 1914
b) Adoption of Wisconsin Agriculture, Trade and Consumer Protection Codes . The provisions of
Wisconsin Administrative Codes, published on or before the effective date of this chapter, or as they
may be amended or renumbered from time to time, are hereby adopted by reference and the rules
and regulations contained therein are hereby made a part of this chapter as though they were fully
ser forth herein. The following Wisconsin Administrative Codes in effect on the date of adoption this
chapter, or as they may be amended or renumbered from time to time, are adopted by reference,
enforced and incorporated into this chapter as if fully set forth herein.
ATCP 93 Flammable and Combustible Liquids
ATCP 94 Petroleum Products
Nore: Copies of the Wisconsin Department of Safety and Professional Services and the Wisconsin
Agriculture, Trade and Consumer Protection Codes respectively are available from:
https://docs.legis.wisconsin.gov/code/toc/sps and https://docs.legis.wisconsin.gov/code/toc/atcp
c) Conflicting Provisions. In case of a conflict between the provisions of this section or between this
section and existing Village Ordinances, the strictest provisions shall apply.
d) Penalty. The failure or refusal any person to obey the requirements of the Wisconsin Administrative
Code provisions incorporated in this section by reference shall subject that person to penalties in the
form of monetary forfeitures expressed therein, or if none to the general penalty provisions under
Appendix C Village Fees, Deposits and Charges
e) State statutes.
(1) Fire Inspections, Prevention, Detention and Prevention, Wis. Stats. § 101.14.
(2) Recordkeeping of Fires, Wis. Stats. § 101.141.
(3) Inventory of Petroleum Products Storage Tanks, Wis. Stats. § 101.142.
(4) Smoke Detectors, Wis. Stats. § 101.145.
f) Fire code. NFPA 1, Uniform Fire Code—2006 2012 edition is hereby adopted, subject to the
modifications specified in Wis. Admin. Code ch. COMM 14 ATCP 94.
g) Amendments, revisions, etc. Any further amendment, revision or modifications of the statutes,
codes, and standards incorporated herein are intended to be made part of this article.
i) Unaddressed fire prevention problems. Any fire prevention problem not herein addressed by this
article or adopted standards will be addressed on the basis of current accepted National Fire Protection
Association Standards.
(j) Fire code construction.
(1) All construction, repairs, maintenance, and enlargement of existing public buildings within the
village shall be subject to all applicable rules and regulations of the state administrative code dealing with
fire-resistive construction of all such public buildings as defined by state statutes.
(2) The director of inspections for the village may approve all construction, repair, and enlargement
building permits for commercial/public buildings within the village, so long as all such proposed construction
or alteration meets all applicable provisions of the state administrative code, of every kind and nature,
reference state statute/state administrative code requirements on fire-resistive construction and all
applicable village ordinances.
Sec. 18-21 (b)
Fire inspection duties
(1) The Fire Chief shall be the Fire Inspector of the Village of Little Chute and shall have the power to appoint
one or more Deputy Fire Inspectors and shall perform all duties required of fire inspectors by the laws of the
state and rules of the Department of Safety and Professional Services, particularly § 101.14, Wis. Stats and In
accordance with Wis. Adm. Code Section SPS 314.01(13)(b) 7.
(2) While acting as Fire Inspector pursuant to § 101.14(2), Wis. Stats. and In accordance with Wis. Adm. Code
Section SPS 314.01(13)(b)7, the Fire Chief or any officer of the Fire Department designated by the Fire Chief
shall have the right and authority to enter any building or upon any premises in the Village of Little Chute at all
reasonable hours for the purpose of making inspections or investigations which under the provisions of this
Code he may deem necessary. Should the Fire Inspector find that any provisions of this Code relating to fire
hazards and prevention of fires are being violated or that a fire hazard exists which should be eliminated, it
shall be his duty to give such directions for the abatement of such conditions as he shall deem necessary and,
if such directions be not complied with, to report such noncompliance to the Village Board for further action.
(3) The Chief of the Fire Department is required, by himself or by officers or members of the Fire Department
designated by him as fire inspectors, to inspect all buildings, premises and public thoroughfares, except the
interiors of private dwellings, for the purpose of ascertaining and causing to be corrected any conditions liable
to cause fire, or any violations of any law or ordinance relating to fire hazards or to the prevention of fires.
Such inspections shall be made at least once in six months in all of the territory served by the fire
department. Each six-month period shall begin on January 1 and July 1 of each year. Such inspections shall
be made at least once per calendar year in all of the territory served by the Fire Department, provided the
interval between those inspections does not exceed 15 months. The Chief of the Fire Department may order
more frequent inspections than required under this subsection.
Section 2. Effective Date. This Ordinance shall take effect upon the adoption and publication and
enactment of the Ordinance by the Village Board of Trustees, Village of Little Chute.
Approved and adopted: January 3, 2024
VILLAGE OF LITTLE CHUTE
By: _____________________________________
Michael R. Vanden Berg, Village President
Attest: __________________________________
Laurie Decker, Village Clerk
Item For Consideration
For Village Board Review On: 1/3/2024 Prepared On: 12/22/2023
Agenda Item Topic: Evergreen Dr Rezoning Prepared By: Dave Kittel CDD
Report:
A Request to rezone a property from RT-Residential Two Family to RM- Residential
Multifamily has been received. The property is located on Evergreen Dr near French pond,
parcel number 260447100 and is shown below:
This is currently being presented to the Village Board as an introduction. This request is scheduled
to go the Plan Commission for review/recommendation on 1/8/2024 and back to the Village Board
for a hearing on 1/17/2024. The request is in line with development in the area and is in line with
the Villages Comprehensive Plan and future land use map.
Item For Consideration
Fiscal Impact: None
Recommendation/Board Action: Introduction
Respectfully Submitted,
Dave Kittel, Community Development Director
Get email alerts for Little Chute
A daily email when new agendas and minutes are posted.