Conservation Commission
Regular MeetingLowell, MA · December 9, 2020
Minutes
The City of Lowell • Dept. of Planning and Development • Division of Development Services
Lowell City Hall • 375 Merrimack Street • Lowell, MA 01852
P: 978.674.4144 • F: 978.446.7103
www.LowellMA.gov
Diane N. Tradd
Assistant City Manager/Director
R. Eric Slagle
Director of Development Services
CONSERVATION COMMISSION
LOWELL, MASSACHUSETTS
December 9, 2020
Note: These minutes are not completed verbatim. For further detail, video recordings are available at the
Pollard Library, second floor reference desk or online at www.LTC.org.
Due to the COVID-19 pandemic, this meeting was held virtually using Zoom.
Members Present: Chairwoman Varnum, Commissioner Lovely, Commissioner Dillon, Commissioner Buitenhuys,
Commissioner Downs, and Commissioner Standish
Members Absent: None
Others Present: Joe Giniewicz, City of Lowell
CALL TO ORDER
7:00 PM
CONTINUED BUSINESS
Enforcement Order
Duel State Investments LLC
15 Mannion Pl
Littleton, MA 01460
Violation Location: 25 Clifton Street 01852
Enforcement Order for fill dumping and storage of construction materials within the 100-year flood plain.
On Behalf:
Ken Lania, Cornerstone Land Consultants
John Faneros, Owner
Speaking in Favor:
None
Speaking in Opposition:
Denise, 7 Clifton Street
Discussion:
Commissioner Varnum noted that the Commission still hasn’t received an NOI or more information and it
appears that work activity, including grading with fill, is still occurring on the property. Mr. Lania stated that he
tracked down some old materials that were part of a LOMA in 2018 and had sent them to Administrator Cigliano
earlier today - shows floodplain elevation at 104. The LOMA was approved by FEMA in 2019, so looks like all that
work is done outside of FEMA elevation 104. Mr. Lania believes that the Commission will see that when it reviews
the additional information and will agree that the work is not jurisdictional. Commissioner Varnum asked who
determined the 104 elevation. Mr. Lania said the map determines it as area AE - Ron Close and Leo White did this
determination for the previous owner. Lot was then subdivided and sold to the current owner. Mr. Lania
suggested to continue for 2 weeks to give time to review information and is willing to stake out the 104
elevation.
Additional discussion occurred about whether additional work had commenced since the last meeting.
Consensus was made around continuing the matter with the intention that Mr. Lania will go out to the property
and mark out the 104-ft line and will discuss again at next meeting. Until then, the Commission is open to any
submission from proponent or abutter to get the full picture.
Motion:
Continued to the next meeting of the Commission – January 13, 2021.
NEW BUSINESS
Request for Certificate of Compliance
Flood Law Office, P.C.
549 Rogers Street
Lowell, MA 01852
DEP #206-0607
Project Location: 50 Phoenix Ave 01852
Request for Certificate of Compliance. The above-referenced Order of Conditions has lapsed and is no longer
valid, and the work regulated by it was never started.
On Behalf:
Catherine Flood, Applicant’s Attorney
Speaking in Favor:
None
Speaking in Opposition:
None
Discussion:
Commissioner Varnum noted the existing OOC is quite old, has since expired and work was never started, so
have seen that this is a way to close out the Order so it is not lingering out there. Attorney Flood said that at the
time (est. 2007), the property owners were looking to construct a building on the lot, but the owner has no intent
to do so at this time.
Motion:
Commissioner Buitenhuys motioned to grant COC in which work was never started and/or completed.
Commissioner Lovely seconded the motion. Passes unanimously 6-0.
Emergency Certification
City of Lowell
375 Merrimack Street
Lowell, MA 01852
Project Location: 50-55 Phoenix Ave 01852
The City has Lowell has requested an Emergency Certification to allow a small breach of the existing beaver dams
to allow water to flow and abate the flooding emergency resulting from recent rain events and continued beaver
activity.
On Behalf:
None
Speaking in Favor:
None
Speaking in Opposition:
None
Discussion:
Commissioner Varnum noted the functionality of this wetland, and doesn’t want to see the system not function.
Commissioner Dillon said that this seems to be a recurring issue in this area, that maybe a beaver deceiver or
something to prevent beavers from building in this area may make sense. Commissioner Varnum and Buitenhuys
stated that they think given its size just keeping an eye on it would be the best approach.
Motion:
Commissioner Lovely motioned to grant an emergency certificate. Commissioner Downs seconded the motion
which passed unanimously, 6-0.
Order of Conditions Extension
City of Lowell
375 Merrimack Street
Lowell, MA 01852
DEP #206-0776
Project Location: 350.4 Dutton Street 01852
The City of Lowell has submitted a Request for an Extension to the OOC (DEP #206-0776) issued by the Lowell
Conservation Commission on January 25, 2018 for the Hamilton Canal Innovation District (HCID) parking garage.
The applicant is requesting a one-year extension until January 25, 2022.
On Behalf:
Justin Mosca, VHB
Speaking in Favor:
None
Speaking in Opposition:
None
Discussion:
L. Varnum said that they were back in here fairly recently in order to improve pedestrian access. J. Mosca said
that they had been here in August and the applicant is only looking to extend the Order of Conditions for work
that was previously approved by the Commission.
Motion:
K. Dillion motioned to extend the order for 1 year, W. Standish seconded, the motion passed unanimously 6-0.
Request for Determination of Applicability
Matt Lalone c/o HEG 1148 Bridge Street LLC
2 International Way
Lawrence, MA 01843
Project Location: 1148 Bridge Street 01854
A Request for Determination of Applicability has been filed by Matt Lalone c/o HEG 1148 Bridge Street LLC to
convert the existing restaurant building at 1148 Bridge Street into a recreational marijuana dispensary. Portions
of the site are within the 100-ft buffer zone to bordering vegetated wetlands.
On Behalf:
Chris Tymula, Representative
Speaking in Favor:
None
Speaking in Opposition:
None
Discussion:
Commissioner Varnum said that this is one of the more unusual wetlands in the City, almost intermittent but still
functional. Mr. Tymula went over the redevelopment/ site plan. There is no on-site stormwater management on
and the client is simply looking to convert the existing building to adult marijuana recreational facility. The
applicant received site plan approval from the Planning Board on Monday and is hoping that the Commission will
issue a negative 3 determination this evening. Most work is within the building, with limited site work being
conducted outside. The current parking meets zoning requirements. Aproximately 3,870 sq. ft. is in buffer zone,
most of which is the existing building; a little over 800 sq. ft. in area beside the building is used for parking. The
applicant is planning to resurface the parking lot, add two 2 rolling dumpsters in the parking lot footprint, and
replace the existing fence with a new security fence. There will be no impact to the wetlands at the rear end of
the property. Planned grading of the parking lot will not drain stormwater runoff towards the wetland. Rather
stormwater will directed to the City’s stormwater system via an agreement with the City that will cost the
applicant approximately $30,000 year. Funds will contribute to the City’s existing stormwater mitigation fund.
The building itself will not include any changes to the roof line and stormwater runoff from the roof is considered
clean runoff.
Commissioner Lovely had the applicant clarify/confirm that their runoff going into City system and fee paying is
the help City bring the City system into compliance with current regulations.
Motion:
Commissioner Lovely motioned to issue a negative 3 determination. Commissioner Buitenhuys seconded.
Unanimous approval, 6-0.
Request for Determination of Applicability
Daniel Dean
125 Totman Street
Lowell, MA 01854
Project Location: 125 Totman Street 01854
A Request for Determination of Applicability has been filed by Daniel Dean to expand an existing driveway within
the 100-ft buffer zone to bordering vegetated wetlands (BVW).
On Behalf:
Daniel Dean
Speaking in Favor:
None
Speaking in Opposition:
None
Discussion:
Mr. Dean stated that he has a stone driveway and grass has been growing through the stones. The City keeps
fining him for parking on grass and not being able to maintain the driveway as the City sees fit. He’s looking to
put recycled asphalt in the grass area so can park without further fines from the City, but was told that he needs
to get a permit. Commissioner Varnum feels the big issue with this application is the topography and the steep
drop beyond the property line to the wetland. She mentioned that the Commission has received the City
comments, and the concern is if soil is disturbed now, there will be loose dirt/ runoff eroding and draining
toward the wetland. Consequently, the Commission needs to determine if work can continue with or without
further review of potential impacts to wetland. The City’s Stormwater team feels this is an area that could
critically impact the wetland. Mr. Dean said he spoke to someone (Mike Sidensky?) from the City Water
department today about how to proceed with proposal, but he didn’t mention what information or level of detail
about the project would need to be part of the application. However, now that he understands the potential
impacts more, he would like to withdraw the current plan and just finish the area where cars park, then come
back in spring with new plan for proposed work at the rear of the property. Commissioner Varnum asked if the
construction timeline might extend to the spring anyway? Mr. Dean said if he limits work to around the
foundation of home, should be more than 100 feet from wetland and can then come back in the spring with a
new plan on how to determine/ treat the back area. Commissioner Varnum said that she would be comfortable
with Mr. Dean coming in with a new plan in a month as don’t have a plan describing what you’re looking to do.
Commissioner Lovely confirmed that looking to do work outside of the jurisdictional area now and come back
with more detail for work within the jurisdictional area in the Spring. DD correct.
Commissioner Buitenhuys expressed concern given it looks like 100 feet to front of foundation versus back
corner of the foundation based on the current plan. It is critical to make sure the proposed work is outside of
jurisdictional area. Mr. Dean asked how look to determine that. Commissioner Buitenhuys suggested to hire a
wetlands scientist who would flag it by identifying plants as it is currently difficult to determine whether or not
the proposed work is in jurisdictional area. He recommends that the applicant consider withdrawing the RDA and
file an NOI.
Commissioner Lovely said that he thinks the board can get the additional information without the cost of an NOI.
Feel like the scope of the project doesn’t justify and the need for public comment.
Commissioner Buitenhuys said that he’s looking at options possible, feel there’s a lot of work to do here.
Commissioner Varnum told Mr. Dean that he should understand concerns of both the Stormwater Team and
Commission. He needs to somehow demonstrate that water runoff will not cause erosion and damage wetland.
There are different strategies to accomplish this and the Commission usually sees them described in a NOI
application. Limiting the driveway length so that it doesn’t go all the way to the rear of the property would be
beneficial. She suggested that Mr. Dean consider getting some help from a consultant as they they may be able
to help get through this process versus an NOI.
Mr. Dean said will get in contact with Administrator Cigliano. Commissioner Varnum asked that he make sure get
any new materials in shortly after new year so time to review.
Motion:
Commissioner Lovely motioned to continue the matter to 1/13/2021. Commissioner Dillon seconded the motion,
which passed unanimously, 6-0.
Notice of Intent
Corey Schutzman
Boston Gas Company
40 Sylvan Road
Waltham, MA 02451
DEP #206-0804
Project Location: Lowell Area Gas Modernization Project 01851
A Notice of Intent (DEP#206-0804) has been filed by Boston Gas Company for a proposed gas pipeline
replacement including a section underneath the Lowell Connector and Interstate 495 using Horizontal Directional
Drilling (HDD) techniques and along an existing corridor adjacent to US Route 3. The wetland resource areas
include Inland Bank, Riverfront Area, Bordering Land Subject to Flooding, Land under Wetlands and Waterways,
and bordering vegetated wetlands (BVW). Black Brook and River Meadow Brook are within or adjacent to the
project area.
On Behalf:
Corey Schutzman
Matt Hayward
Siona Patisteas
Speaking in Favor:
None
Speaking in Opposition:
None
Discussion:
Those speaking on behalf of the project gave a presentation gave presentation, noting the following:
Project to replace existing line that is to enhance safety and reliability of gas network.
Will replace about 2 miles of pipeline. Pipeline changes size throughout currently, looking to make
uniform.
Will utilize horizontal directional drilling.
New pipe will be 12 inch as opposed to the scattered 6 and 8 inch lines. The changes will allow them to
utilize an inline inspection tool.
Overall pipeline is 5.8 miles, but of that 3.8 miles is already appropriately sized for inline inspection.
Majority of project is through existing ROW so as to minimize impacts.
Showed the variety of permits already achieved, including permits from Conservation Commissions in
Chelmsford and Tewksbury.
Detail provided for construction methods. Applicant will be working outside of the existing ROW. Some
tree clearing at grade is necessary, but stumps will be left behind. Work will be done on construction
mats to limit wetland impacts and cofferdams will be used to divert the stream around work area. Work
in the stream will be about 2 weeks. Work areas include River Meadow Brook, Olde Middlesex Canal, via
acmes through Chatham St. Work will also be performed near the cinema at Reiss Ave.
Mitigation is primarily going to be in-situ restoration. Construction matting is a best practice to make
sure wetland isn’t dug up from equipment. Restoration activities following construction include planting
grasses in disturbed areas and mulch to both stabilize soils and retain moisture. The project is bound by a
number of environmental conditions and regulations, that require monitoring to ensure that restoration
activities are successful. The applicant believes that natural regrowth is the best restoration method.
The applicant also discussed some strategies to mitigate invasive species with MassDEP and the applicant
will make a payment to the Army Corps, fee in lieu of work program as compensation for wetland
impacts.
Commissioner Lovely received clarification regarding necessary permitting, and asked to have rationale of project
described. Mr. Hayward explained how they need to have inspections in a certain frequency and how this project
will be helpful in terms of long term impacts utilizing the current technology available. Also, because project is
does not cross an interstate line, doesn’t reach federal-level permitting. Commissioner Lovely asked if this project
was prompted by the 2018 Columbia Gas incident, or were plans already in the works for using this in-line
inspection technology. Mr. Hayward stated this the incident 2 years ago was a distribution line but this is a
transmission line, so no feeding into residences of Lowell. As for the in-line inspection technology, there is a
substantial difference between distribution and transmission line. The explosion out in California years ago is
more of a driver for this type of inspection. Commissioner Lovely said that he thinks it’s great that it will help in
prevention of methane leaks, which are an even worse form of greenhouse gas emissions than CO2.
Commissioner Varnum asked if they could use horizontal drilling in whole project. Mr. Hayward said that they did
look at it, but comes down to soil stability, ledge and room available on each side of the drill, so different space
restrictions exist going under the highway versus going through the wetland. Open cut best way to help preserve
the wetland.
Commissioner Dillon asked for an estimated lifespan of pipeline getting installed. Commissioner Buitenhuys said
he would like to hear about lifetime expectation of existing line as well. Mr. Hayward stated that these lines are
designed around integrity/demand. If line is regularly maintained and coated, should last a long time. Some parts
of this pipe are over 50 years old. The project also includes a reforestation mitigation plan that includes
monitoring for 5 years and corrective actions, as needed if regrowth isn’t occurring. Ms. Schutzman said they
would also monitor invasive species and keep up with that maintenance to let the natural species have better
likelihood for regrowth. Commissioner Dillon asked if this would include Knotweed? Ms. Patisteas said yes this
would be an invasive species we would treat if in the area, as well as bittersweet. Commissioner Dillon asked
what does management look like if growth is satisfactory in 5 years. Ms. Patisteas said that per federal standards,
only herbaceous species will be allowed to grow over the pipeline as deep-rooted trees would be a problem.
Therefore the corridor would likely include shrubs within 10 feet of either side of the pipeline, with trees likely
beyond that.
Commissioner Standish asked for further explanation on the difference between 50ft crossing versus 75ft
crossing in some areas. Ms. Patisteas explained the different needs for stockpile area depending on soil
conditions (wetness), while also confirming that erosion controls will be in place. Commissioner Standish asked
about turbidity in the water. Ms. Patisteas stated that this would likely not be an issue because water will be
hitting a pad as opposed to directly discharging to the streambed. Commissioner Standish then asked when the
applicant planning on doing the work. An exact date wasn’t given as there are a number of factors that will
nfluence the schedule. Commissioner Standish asked how much fill will the mulch generate. Ms. Patisteas stated
that they will be using a straw mulch, which will be just enough to prevent erosion.
Commissioner Buitenhuys pointed out that the applicant noted no leaks in the past, any repairs in past that were
preemptive and kept leaks from occurring. In other words, why isn’t the applicant spending money in other areas
that may already have leaks. Mr. Hayward said that they are being proactive, and without inline tool inspection
they can only get so much information currently. Commissioner Buitenhuys asked what federal regulation is
requiring this and if it is based on size. Mr. Hayward responded that it is from federal regulations on transmission
lines in general. Commissioner Buitenhuys stated that he does not see the rationale for being proactive, when
there hasn’t been any issues for decades. Mr. Hayward responded that he feels the applicant is being proactive
on safety. Commissioner Buitenhuys said he is trying to weigh the impacts to safety vs the environmental impact
of doing this project and asked if the inline systems can be used in smaller pipelines. Mr. Hayward responded yes,
but current technology doesn’t allow for tools to go through different size pipes.
Commissioner Standish asked when they are due for the next inspection, just had one recently, so about 7 years.
Commissioner Lovely noted that going from an ex-situ to in-situ inspection system would provide real-time data
and at a greater frequency.
Commissioner Downs had applicant clarify why having a 75-ft corridor was necessary.
Commissioner Standish asked if applicant has drafted any geotechnical reports? Ms. Schutzman said that they do
have survey of area and have talked about reducing impacts at nauseam. The driving force for this project is
safety and that really trumps everything else. Commissioner Downs said he would agree with Commissioner
Lovely that having constant monitoring provides better safety for the public, especially when considering the
temporary impacts to the wetlands. Ms. Schutzman emphasized that repairs have been done to the line., but
nothing major, and all have been done in conjunction with inspections.
Spoke on Project: Neil Dale. Stated that the project has been proposed 3 different times over the years. First time
was for capacity, second and now this time for safety. He doesn’t feel this project is necessary, and would like to
know if there are other options for the inspections. He hasn’t seen any research that says the current inspection
protocol is inferior to inline devices. He also noted that: (1) this project would give National Grid 4 times the
current natural gas supply; and (2) the proposed route is going around movie theater parking lot when compared
to position of current line in parking lot. Consequently, wouldn’t be adjacent to wetlands in this stretch, and
therefore he feels that that the applicant shows any value for the wetlands.
Cormac Hondros-McCarthy, member of Lowell Sustainability Project, also noted that the original reason for the
pipeline was to increase supply and he feels that this runs counter to what City is trying to do via City Master
Plan. He asked what National Grid can do to help City get to 100% renewables?
Jay Mason, 415 Pawtucket St, Chair of LSC, stated that he has reviewed a number of documents over the years
and sent a number of questions for National Grid. Mr. Hayward responded by saying that the applicant has
updated their website with answers to some of those questions. Mr. Mason said he thinks we should have some
answers on the most recent questions, including whether the project would be able to help on 176 known leaks
throughout the City? Mr. Hayward said unfortunately no, because those leaks are on distribution lines and this
project is on the transmission side of the supply.
Jon Grossman, Varnum Ave, asked why the applicant is replacing a line that doesn’t have leaks vs ones that do
and and whether abutters to project been notified? If abutters were notified, were the notifications in any
language other than English? Ms. Patisteas stated that yes, anyone within 300 feet was notified and that
notification was sent in English, but we also had translators available at public meetings about the project when
it was discussed with abutters in Highlands area. He also asked why the line in the movie theater parking lot is
being moved. Mr. Hayward said this was a request made by the property owner to move to the edge vs in center
of parking lot. Mr. Grossman then asked how project is contributing to City’s goal of 100% renewables? Ms.
Patisteas questioned is germane to the WPA.
Commissioner Lovely suggested at this point to take time to address questions and come back with responses.
Commissioner Standish stated that he still doesn’t know why need 75-foot clearing and feels the sun going to
“torch" wetlands.
Marissa Dupont – agree with others that feel like wetlands needs to be prioritized. Understand movie theatre
needs parking, but being used right now. She still feels like it is like the initial proposal to increase capacity.
Commissioner Varnum expressed that they haven’t received a close up view of areas to be impacted, more of a
sky-high view. Usually with a project of this scale, we survey areas planned for tree removal, then consider
whether some of the more mature and healthy trees can be preserved.
Commissioner Standish said he would like to see real plans, eespecially with something that has 10 acres of
clearing. He see’s replication and paying for it identified as a goal, but not minimizing impact.
Commissioner Varnum asked if more detailed plans available. Ms. Schutzman said that they do have them and
will try to provide the Commission with specific plans for portions of project that will take place in Lowell.
Commissioner Buitenhuys asked National Grid to respond to questions from community groups and from the
Commission in writing.
Commissioner Lovely said that he feels like applicant gave good overview of the project and suggests continuing
the NOI to 1/13/21 meeting, while also looking to the applicant to provide answers questions related to the
process used to reach its preferred alternative for the work (i.e., avoid/minimize/mitigate hierarchy), and provide
additional clarity and detail as to why need 75 feet clearing is needed along the entire project corridor. He also
suggested that the applicant further explain why the the in-line inspection method is better and why it can only
be done with a uniform pipe diameter. Lastly, considering the questions raised at this hearing, is there a way to
modify the preferred alternative to further minimize the wetland impacts presented in the plan?
Commissioner Varnum said that if the NOI hearing is going to be continued, the applicant should use the time
wisely to answer questions and modify the plans as best as possible. Maybe take another look of what is needed
in light of comments that have come forward?
Motion:
Commissioner Buitenhuys motioned and Commissioner Lovely seconded to continue to 1/13/2021. The motion
passed unanimously 6-0.
OTHER BUSINESS
Minutes
October 14, 2020
October 28, 2020
November 12, 2020
Commissioner Lovely motioned to approve the minutes as revised and submitted to Fran today. Commissioner
Standish seconded. Unanimously approved, 6-0.
ADJOURNMENT
Commissioner Lovely motioned and Commissioner Standish seconded to adjourn. Unanimously approved, 6-0.
Meeting end: 9:43PM
Agenda
The City of Lowell • Dept. of Planning and Development • Division of Development Services
Lowell City Hall • 375 Merrimack Street • Lowell, MA 01852
P: 978.674.4144 • F: 978.446.7103
www.LowellMA.gov
Diane N. Tradd
Assistant City Manager/Director
R. Eric Slagle
Director of Development Services
December 3, 2020
In accordance with the Massachusetts General Laws Chapter 131, Section 40, and the City of Lowell Wetland
Ordinance Section 280.1-13, the Lowell Conservation Commission will hold a meeting on Wednesday, December
9, 2020 at 7:00 PM.
Due to the COVID-19 pandemic, the meeting will not occur in-person. Please use one of these four options to access
the meeting:
1. Join using your computer, tablet, or smartphone:
https://lowellma.zoom.us/j/81505305636?pwd=akUwV3FjZHZ4S3M5RElUZzVESzFnQT09
and enter the PASSWORD: 584 889
2. Call (646) 558 8656 and enter the MEETING ID: 815 0530 5636 and PASSWORD: 584 889
3. Watch LTC channel 99
4. Watch LTC online at: https://www.ltc.org/watch/channel-99/
Review the project materials online at: https://lowellma.gov/1100/Conservation-Commission
AGENDA
CALL TO ORDER
ORDER OF BUSINESS
CONTINUED BUSINESS
Enforcement Order
Duel State Investments LLC
15 Mannion Pl
Littleton, MA 01460
Violation Location: 25 Clifton Street 01852
Enforcement Order for fill dumping and storage of construction materials within the 100-year flood plain.
NEW BUSINESS
Request for Certificate of Compliance
Flood Law Office, P.C.
549 Rogers Street
Lowell, MA 01852
DEP #206-0607
Project Location: 50 Phoenix Ave 01852
Request for Certificate of Compliance. The above-referenced Order of Conditions has lapsed and is no longer
valid, and the work regulated by it was never started.
Emergency Certification
City of Lowell
375 Merrimack Street
Lowell, MA 01852
Project Location: 50-55 Phoenix Ave 01852
The City has Lowell has requested an Emergency Certification to allow a small breach of the existing beaver dams
to allow water to flow and abate the flooding emergency resulting from recent rain events and continued beaver
activity.
Order of Conditions Extension
City of Lowell
375 Merrimack Street
Lowell, MA 01852
DEP #206-0776
Project Location: 350.4 Dutton Street 01852
The City of Lowell has submitted a Request for an Extension to the OOC (DEP #206-0776) issued by the Lowell
Conservation Commission on January 25, 2018 for the Hamilton Canal Innovation District (HCID) parking garage.
The applicant is requesting a one-year extension until January 25, 2022.
Request for Determination of Applicability
Matt Lalone c/o HEG 1148 Bridge Street LLC
2 International Way
Lawrence, MA 01843
Project Location: 1148 Bridge Street 01854
A Request for Determination of Applicability has been filed by Matt Lalone c/o HEG 1148 Bridge Street LLC to
convert the existing restaurant building at 1148 Bridge Street into a recreational marijuana dispensary. Portions of
the site are within the 100-ft buffer zone to bordering vegetated wetlands.
Request for Determination of Applicability
Daniel Dean
125 Totman Street
Lowell, MA 01854
Project Location: 125 Totman Street 01854
A Request for Determination of Applicability has been filed by Daniel Dean to expand an existing driveway within
the 100-ft buffer zone to bordering vegetated wetlands (BVW).
Notice of Intent
Corey Schutzman
Boston Gas Company
40 Sylvan Road
Waltham, MA 02451
DEP #206-0804
Project Location: Lowell Area Gas Modernization Project 01851
A Notice of Intent (DEP#206-0804) has been filed by Boston Gas Company for a proposed gas pipeline
replacement including a section underneath the Lowell Connector and Interstate 495 using Horizontal Directional
Drilling (HDD) techniques and along an existing corridor adjacent to US Route 3. The wetland resource areas
include Inland Bank, Riverfront Area, Bordering Land Subject to Flooding, Land under Wetlands and Waterways,
and bordering vegetated wetlands (BVW). Black Brook and River Meadow Brook are within or adjacent to the
project area.