Conservation Commission
Regular MeetingLowell, MA · July 17, 2024
Minutes
CONSERVATION COMMISSION
LOWELL, MASSACHUSETTS
July 17, 2024
Note: These minutes are not completed verbatim. For further detail, video recordings are available at
the Pollard Library, second floor reference desk or online at www.LTC.org.
This meeting was held both in person and virtually using Zoom.
Members Present: Brad Buitenhuys, Louisa Varnum, Kevin Dillon, Marie Burns, Roberto Ciccarelli
Members Absent: Perry Downs, Stephen Laput
Others Present: Dylan Ricker, Associate Planner
CALL TO ORDER
B. Buitenhuys called the meeting to order at 7:01pm with a quorum of members present.
ORDER OF BUSINESS
CONTINUED BUSINESS
Request for Determination of Applicability
Wendy Luna
155 Totman Street
Lowell, MA 01854
Project Location: 155 Totman Street, 01854
A Request for Determination of Applicability has been filed by Wendy Luna seeking to construct two (2)
decks at 155 Totman Street. The proposed work is within the 100-foot buffer zone of a protected
wetland.
On Behalf:
Rafael Rivera, 155 Totman Street
Sam Scarmise, Applicant’s Representative
S. Scarmise said there was an existing deck, he is looking to rebuild where the deck was located before.
S. Scarmise said the deck will have a roof over it.
Speaking in Favor:
None
Speaking in Opposition:
None
Discussion:
B. Buitenhuys asked if there will be any ground impact. S. Scarmise said no. B. Buitenhuys said he has no
concerns.
Motion:
K. Dillon motioned, and M. Burns seconded the motion to issue a Negative 3 Determination. The motion
passed unanimously, (5-0).
NEW BUSINESS
Request for Determination of Applicability
MassDOT Highway Division
10 Park Plaza
Boston, MA 02116
Project Location: VFW Highway (Route 110)
A Request for Determination of Applicability has been filed by MassDOT Highway Division to make road
improvements on the VFW Highway between the intersection with First Street Boulevard and the Dracut
town line. The work is within the 100-foot buffer zone of the Merrimack River.
On Behalf:
Bridget Myers, Applicant’s Representative
B. Myers presented the project, including the work area and explained the roadway improvements.
Speaking in Favor:
None
Speaking in Opposition:
James Harrington, Christian Street
J. Harrington said the distance from the road to the river is about the same distance as the proposed
work in Dracut.
Discussion:
B. Buitenhuys said he has had issues with Japanese Knotweed in the area, and said it would be
important to contain the spread of invasive plant weeds. B. Buitenhuys said the applicant should avoid
mowing the knotweed in a way that causes it to spread by turning it into seeds.
K. Dillon asked the closes point of work to the resource area. B. Myers said the closest point is about 50
feet from the resource area.
M. Burns asked about erosion and sediment control. B. Myers said they were considering compost filter
tubes, MassDOT left the sediment control description vague to give the contractor more flexibility on
what to use.
B. Myers said they are presenting the project before Dracut as well.
Motion:
K. Dillon motioned to issue a Negative 3 Determination with the following condition:
1. Erosion control barriers shall be staked down to secure them.
M. Burns seconded the motion. The motion passed unanimously, (5-0).
Emergency Certificate
City of Lowell
Department of Public Works
1365 Middlesex Street
Lowell, MA 01851
Project Location: Circuit Avenue & Felton Street, 01852
The City of Lowell Department of Public Works has requested an Emergency Certificate to create a small
breach in a beaver dam to allow water to flow and abate a flooding emergency. The approval will not
allow for whole dam removal.
On Behalf:
Paul St. Cyr, DPW Commissioner
P. St. Cyr said there is suspected beaver activity in the area, and they need the Certificate to be able to
move forward. P. St. Cyr said it was causing issues at the mouth of the culvert and they will be working
with Wachusett Wildlife.
Speaking in Favor:
None
Speaking in Opposition:
None
Discussion:
B. Buitenhuys said this is to make sure it is standard practice and the issue is needed to resolve flooding.
B. Buitenhuys asked where the beavers are taken. P. St. Cyr said they are relocated and he can provide
the exact location, and added they are live relocated.
Motion:
R. Ciccarelli motioned, and B. Buitenhuys seconded the motion to ratify the Emergency Certificate. The
motion passed unanimously, (5-0).
Enforcement Order
Berkley Development, LLC
16 Pulpit Rock Road
Pelham, NH 03076
Violation Location: 129 Llewellyn Street & 115 Christian Street, 01850
An Enforcement Order has been issued to Berkeley Development, LLC for filling within the buffer zone to
a protected wetland.
On Behalf:
Jeff Miller, Owner
Discussion:
B. Buitenhuys said the Enforcement Order stemmed from a prior determination made by the
Conservation Commission that a wetland was present on the site. B. Buitenhuys summarized the
background on the property. B. Buitenhuys noted the applicant has appealed the Commission’s decision
to MassDEP.
B. Buitenhuys said fill was found in the wetlands areas in hydric soils.
K. Dillon said he believes the fill should be removed, but they should wait until the State weighs in.
Dillon said the Commission is typically stringent on fill in the buffer zone.
R. Ciccarelli asked what the fill would be replaced with. B. Buitenhuys said the goal would be returning it
to its original state.
B. Buitenhuys said since the decision has been appealed he believes the Commission should let MassDEP
make a determination before the Commission debates remediation. B. Buitenhuys said construction
can’t take place at this point and work can’t continue until there is a determination.
J. Miller said they aren’t planning on doing work until after the appeal is decided.
B. Buitenhuys said it is in the best interest of the Commission to continue. B. Buitenhuys asked the
applicant if they would like to discuss remediation tonight. J. Miller said he’d like to wait until after the
appeal is decided.
Motion:
K. Dillon motioned, and R. Ciccarelli seconded the motion to continue the Enforcement Order to the
August 7th Conservation Commission meeting. The motion passed unanimously, (5-0).
Order of Conditions Extension
Markley Group, LLC
1 Summer Street, 5th Floor
Boston, MA 02110
Project Location: 2 Prince Avenue, 01852
The Markley Group, LLC has applied for an extension to their Order of Conditions (DEP # 206-0787)
issued for work associated with the front parking lot, retaining wall, and other related work. The
applicant is requesting a 6-month extension.
On Behalf:
Anna Jahn, Applicant’s Representative
A. Jahn presented the proposal, and summarized the progress on the site.
Tony Moura, Applicant’s Representative
Speaking in Favor:
None
Speaking in Opposition:
None
Discussion:
B. Buitenhuys noted the Commision attended a site visit at the property last week. B. Buitenhuys said he
understands the delays for the project.
K. Dillon asked if there were any changes to the plans. A. Jahn said there are no changes, and they are
filing a new NOI for updates.
Motion:
M. Burns motioned, and R. Ciccarelli seconded the motion to extend the Order of Conditions for 6
months. The motion passed unanimously, (5-0).
OTHER BUSINESS
6/26 Meeting Minutes
M. Burns motioned, and K. Dillon seconded the motion to approve the meeting minutes. The motion
passed unanimously, (5-0).
ADJOURNMENT
K. Dillon motioned and M. Burns seconded the motion to adjourn the meeting. The motion passed
unanimously, (5-0). The time was 7:30PM.
Agenda
The City of Lowell • Dept. of Planning and Development • Division of Development Services
Lowell City Hall • 375 Merrimack Street • Lowell, MA 01852
P: 978.674.4144 • F: 978.446.7103
www.LowellMA.gov
Yovani Baez-Rose
Assistant City Manager/DPD Director
July 17, 2024
In accordance with the Massachusetts General Laws Chapter 131, Section 40, and the City of Lowell
Wetland Ordinance Section 280.1-13, the Lowell Conservation Commission will hold a meeting on
Wednesday, July 17, 2024 at 7:00 PM in-person in the Mayors Reception Room, 375 Merrimack Street,
Lowell MA 01852.
Meetings will be held in the Mayor Reception Room at 375 Merrimack Street, Lowell MA 01852
with public welcome and by using remote participation as follows:
Members of the public may view the meeting via ltc.org or local cable channel
6. Those wishing to speak regarding a specific agenda item shall register to
speak in advance of the meeting by sending an email to
fcigliano@lowellma.gov , dricker@lowellma.gov , AND
pcutrumbes@lowellma.gov indicating the agenda item and a phone number to
call so that you may be issued zoom link to the meeting. If no access to email,
you may contact Development Services at 978-674-4144. All requests must
occur prior to 4:00PM on the day of meeting.
For help with zoom please visit: Joining a Zoom meeting – Zoom Support
Review the project materials online at: https://lowellma.gov/1100/Conservation-Commission
AGENDA
CALL TO ORDER
ORDER OF BUSINESS
CONTINUED BUSINESS
Request for Determination of Applicability
Wendy Luna
155 Totman Street
Lowell, MA 01854
Project Location: 155 Totman Street, 01854
A Request for Determination of Applicability has been filed by Wendy Luna seeking to construct two (2)
decks at 155 Totman Street. The proposed work is within the 100-foot buffer zone of a protected
wetland.
NEW BUSINESS
Request for Determination of Applicability
MassDOT Highway Division
10 Park Plaza
Boston, MA 02116
Project Location: VFW Highway (Route 110)
A Request for Determination of Applicability has been filed by MassDOT Highway Division to make road
improvements on the VFW Highway between the intersection with First Street Boulevard and the Dracut
town line. The work is within the 100-foot buffer zone of the Merrimack River.
Emergency Certificate
City of Lowell
Department of Public Works
1365 Middlesex Street
Lowell, MA 01851
Project Location: Circuit Avenue & Felton Street, 01852
The City of Lowell Department of Public Works has requested an Emergency Certificate to create a small
breach in a beaver dam to allow water to flow and abate a flooding emergency. The approval will not
allow for whole dam removal.
Enforcement Order
Berkeley Development, LLC
16 Pulpit Rock Road
Pelham, NH 03076
Violation Location: 129 Lewellyn Street & 115 Christian Street, 01850
An Enforcement Order has been issued to Berkeley Development, LLC for filling within the buffer zone to
a protected wetland.
Order of Conditions Extension
The Markley Group, LLC
1 Summer Street, 5th Floor
Boston, MA 02110
Project Location: 2 Prince Avenue, 01852
The Markley Group, LLC has applied for an extension to their Order of Conditions (DEP #206-0787)
issued for work associated with the front parking lot, retaining wall, and other related work. The
applicant is requesting a 6-month extension.
OTHER BUSINESS
6/26 meeting minutes
ADJOURNMENT
Get email alerts for Lowell