Conservation Commission
Regular MeetingLowell, MA · March 12, 2025
Minutes
CONSERVATION COMMISSION
LOWELL, MASSACHUSETTS
March 12, 2025
Note: These minutes are not completed verbatim. For further detail, video recordings are available at
the Pollard Library, second floor reference desk or online at www.LTC.org.
This meeting was held both in person and virtually using Zoom.
Members Present: Chairman Brad Buitenhuys, Vice Chair Kevin Dillon, Commissioner Perry Downs,
Commissioner Stephen Laput, Commissioner Roberto Ciccarelli, Commissioner Paul Belley
Members Absent: Commissioner Marie Burns
Others Present: Peter Cutrumbes, Assistant Planner
AGENDA
CALL TO ORDER
Chairman Buitenhuys called the meeting to order at 7:01 PM.
ORDER OF BUSINESS
CONTINUED BUSINESS
Enforcement Order
Sy Dang
258 Varnum Avenue
Lowell MA 01854
Violation Location: 258 Varnum Avenue, 01854
An Enforcement Order has been issued due to debris dumping within the 100-year floodplain.
On Behalf:
None
Speaking in Favor:
None
Speaking in Opposition:
None
Discussion:
B. Buitenhuys said the photos did not look like much has been cleaned up. P. Downs noted the snow is
gone and can make cleanup easier.
Motion:
K. Dillon motioned to continue the matter to the March 26 meeting. P. Downs seconded. The vote was
unanimous (6-0).
Notice of Intent
21 Century Mill LLC
291 Main Street, Suite 8
Northborough, MA 01532
DEP #: 206-0838
Project Location: 10 Toupi Lane, 01854
A Notice of Intent has been filed by 21 Century Mill LLC to construct 3 single-family homes at 10 Toupi
Lane. The proposed work is located within the 100-foot buffer zone of a protect wetland.
On Behalf:
Scott Goddard, representing 21 Century Mill LLC, spoke. He presented plans that have been revised
since the last meeting. He submitted a letter that covered any comments from DEP and DPD. They are
currently in jurisdictional litigation with DEP regarding whether this is a resource area. DEP has asked
them to be here and submit an NOI that could receive an OOC. This would cease the litigation activity. It
would acknowledge the presence of a resource area on site from his end, but would also protect the
wetlands.
The letter was summarized. DEP said there was a lack of alternative analyses as to how wetlands
alteration can be avoided. S. Goddard has now done those. Three possibilities: development rotated to
the south, assume the wetland is not jurisdictional on lot 3 and shrink wetland impact on lot 2, or
meeting DEP’s replication standards. They also retain the right to continue to proceed with the
referenced litigation. If they won this litigation, the development could be done with no Conservation
Commission oversight at all. Feels this would be bad for the Commission.
S. Goddard said area 2 can be filled as it meets the definition of a finger-like projection. Noted
DEP disagrees. S. Goddard said DEP had questions about whether some of the flagged area in
the photos could qualify as Bank as apposed to BVW. He agreed with DEP’s determination that
flags A1, A2, A28, A29, and A30 are bank.
S. Goddard also discussed the comments from DPD. The Building Department expressed a
desire to use flood protocols, but the site is not part of the FEMA flood plain. The Project
Management team is seeking a way to inform future buyers about the border with the
wetlands. Suggested the Conservation Commission could condition some kind of boundary
marker (like a fence) be included.
He noted that the revised plans mostly meet the requests the Commission made at the
previous meeting.
Speaking in Favor:
None
Speaking in Opposition:
None
Discussion:
B. Buitenhuys noted that they had asked the applicant to submit the revised plans a week early but they
only recently received them. He feels the Commission is being asked to go against DEP to wrap up
litigation. Thinks they may need to hire a third party evaluator. Ask Law Department about how the
litigation process with DEP works, and how the outcome of the case would affect the Commission. S.
Goddard said they are not asking the Commission to go against DEP. DEP wants to take the position that
this is a BVW. An OOC from the Commission would confirm that. B. Buitenhuys said there is a 25-foot no
build zone. S. Goddard said this is not codified. B. Buitenhuys conceded it is not codified but it is a
longstanding precedent. He understands it may add to litigation issues. The wetland boundary should be
reviewed. S. Goddard said the requirement of peer review is only necessary if they are working towards
an OOC.
K. Dillon asked to confirm if they are still in litigation. S. Goddard said they are on a stay. K. Dillon said he
would prefer DEP’s litigation plays out. B. Buitenhuys says that the deal being offered is the applicant
will accept a ruling that there is a BVW, which protects these areas. The risk is that if the Commission
votes no that the settlement between DEP and the applicant may result in the project going forward and
no protections for the resource area at all.
S. Laput said he visited the site recently and that there is a pond there. Difficult to think it is not a
jurisdictional area. Asked about issues during construction. Basements would require excavations. Given
that there is visible water there right now, the water table must be high. How do they plan to deal with
dewatering? S. Goddard said the basements would be above the groundwater table. S. Laput asked if
the driveway of Lot 3 on the southern side will be paved. How will it be graded? S. Goddard confirmed it
will be paved and said it will be at grade. S. Laput said he does not believe that the construction process
wouldn’t inadvertently do damage to the resource area. S. Goddard said they could do the driveway
during low water conditions like in late summer. S. Laput asked about snow removal from the southern
driveway. Will homeowners dump the snow into the resource area? S. Goddard said an O&M could be
put in place. S. Laput said the entire project is within the 100-foot buffer zone, which both sides agree
on. The project will clear cut much of the area, regrade the area, and modify the flow of water. It is
completely changing the entire buffer area. Not just the 25 foot buffer zone. Eliminating trees and plants
that contribute to wetland.
B. Buitenhuys said that they requested plans a week in advance so they could fully review. He would like
to wait on a vote. S. Goddard asked for a straw poll to assess if they should go forward with peer review.
S. Goddard said that if the general feeling is the Commission is unsupportive, it may be a waste. P. Belley
said he is unsupportive. R. Ciccarelli said he would like to wait for a determination from legal but right
now at this moment he would say no. P. Downs agreed. S. Goddard said he is not sure that a peer review
would convince the Commission.
K. Dillon motioned to continue the 3/26 meeting. Seconded by R. Ciccarelli. The vote was unanimous (6-
0).
Norice ce of Intent
Franco American Holdings, LLC
357 Pawtucket Street
Lowell MA 01854
DEP #: 206-0842
Project Location: 357 Pawtucket Street, 01854
A Notice of Intent has been filed by Franco American Holdings, LLC to construct an 80-unit mixed-use
building at 357 Pawtucket Street. The project will include a new stormwater management system that
will eventually discharge into the Northern Canal. A portion of the parking area improvements may be
located in the 100-foot buffer zone of the Northern Canal.
On Behalf:
David Jordan, engineer for the applicant. He summarized the project. It is an 80 unit residential building.
All proposed work on the paving and building is outside the 100-foot buffer zone. The only work within
the buffer zone is to tie their stormwater systems into the drainage structures at the rear of the
property that connect to a manhole. He summarized the proposed stormwater management. Much of
the runoff will be infiltrated into the ground. There will be emergency overflow provisions. There will be
a silt fence as an erosion control measure.
Speaking in Favor:
None
Speaking in Opposition:
None
Discussion:
B. Buitenhuys supports the project and does not believe it will significantly impact the resource area. P.
Belley asked if the existing stormwater overflow system is currently functional. D. Jordan confirmed.
Motion:
P. Downs motioned to close the public hearing and K. Dillon seconded. The vote was unanimous (6-0).
K. Dillon motioned to issue a City of Lowell Standard Order of conditions. S. Laput seconded. The vote
was unanimous (6-0).
OTHER BUSINESS
B. Buitenhuys wants to talk to legal about codifying the 25 foot buffer zone no disturbance policy. P.
Downs noted it could reduce flexibility. B. Buitenhuys asked if it can be drafted in a way as to grant an
exception.
2/26/2025 meeting minutes
P. Downs motioned to approve. S. Laput seconded. The vote was unanimous (6-0).
ADJOURNMENT
K. Dillon motioned to adjourn. The meeting was adjourned at 7:57 PM.
Agenda
The City of Lowell • Dept. of Planning and Development • Division of Development Services
Lowell City Hall • 375 Merrimack Street • Lowell, MA 01852
P: 978.674.4144 • F: 978.446.7103
www.LowellMA.gov
Yovani Baez-Rose
Assistant City Manager/DPD Director
March 5, 2025
In accordance with the Massachusetts General Laws Chapter 131, Section 40, and the City of Lowell
Wetland Ordinance Section 280.1-13, the Lowell Conservation Commission will hold a meeting on
Wednesday, March 12, 2025 at 7:00 PM in-person in the Lowell City Council Chambers, 375 Merrimack
Street, 2nd Floor, Lowell MA 01852.
Meetings will be held in the Lowell City Council Chambers at 375 Merrimack Street, 2nd Floor
Lowell MA 01852 with public welcome and by using remote participation as follows:
Members of the public may view the meeting via ltc.org or local cable channel
6. Those wishing to speak regarding a specific agenda item shall register to
speak in advance of the meeting by sending an email to
fcigliano@lowellma.gov , dricker@lowellma.gov , AND
pcutrumbes@lowellma.gov indicating the agenda item and a phone number to
call so that you may be issued zoom link to the meeting. If no access to email,
you may contact Development Services at 978-674-4144. All requests must
occur prior to 4:00PM on the day of meeting.
For help with zoom please visit: Joining a Zoom meeting – Zoom Support
Review the project materials online at: https://lowellma.gov/1100/Conservation-Commission
AGENDA
CALL TO ORDER
ORDER OF BUSINESS
CONTINUED BUSINESS
Enforcement Order
Sy Dang
258 Varnum Avenue
Lowell MA 01854
Violation Location: 258 Varnum Avenue, 01854
An Enforcement Order has been issued due to debris dumping within the 100-year floodplain.
Notice of Intent
21 Century Mill LLC
291 Main Street, Suite 8
Northborough, MA 01532
DEP #: 206-0838
Project Location: 10 Toupi Lane, 01854
A Notice of Intent has been filed by 21 Century Mill LLC to construct 3 single-family homes at 10 Toupi
Lane. The proposed work is located within the 100-foot buffer zone of a protect wetland.
NEW BUSINESS
Notice of Intent
Franco American Holdings, LLC
357 Pawtucket Street
Lowell MA 01854
DEP #: 206-0842
Project Location: 357 Pawtucket Street, 01854
A Notice of Intent has been filed by Franco American Holdings, LLC to construct an 80-unit mixed-use
building at 357 Pawtucket Street. The project will include a new stormwater management system that
will eventually discharge into the Northern Canal. A portion of the parking area improvements may be
located in the 100-foot buffer zone of the Northern Canal.
OTHER BUSINESS
2/26/2025 meeting minutes
ADJOURNMENT