Planning Board
Regular MeetingLowell, MA · March 2, 2020
Minutes
City of Lowell - Planning Board
Planning Board Meeting Minutes
Monday, March 2, 2020 6:30 p.m.
City Council Chambers, 2nd Floor, City Hall
City of Lowell, 375 Merrimack St, Lowell, MA
Note: These minutes are not completed verbatim. For further detail, contact the Division of Development
Services, 375 Merrimack Street, Lowell.
Members Present
Thomas Linnehan, Chairman
Gerard Frechette, Member
Richard Lockhart
Caleb Cheng, Member
Russell Pandres, Associate Member
Sinead Gallivan, Associate Member
Members Absent
Robert Malavich, Member
Others Present
Francesca Cigliano, Assistant Planner
A quorum of the Board was present. Chairman Linnehan called the meeting to order at 6:31pm.
I. Minutes for Approval
February 3, 2020
G. Frechette motioned and R. Lockhart seconded the motion to approve the minutes from the February 3, 2020
Planning Board meeting. The motion passed unanimously, (5-0).
II. Continued Business
On behalf:
Matt Hamor, Landplex
Offered Comments:
M. Hamor: We have revised the set of plans, reducing the density of the project. Submitted last week. Also submitted
in writing a continuance to vet out plans with municipal departments. Incorporated comments into revised plan. We
would like to continue to March 16. We have notified Dave Ouellette.
In Favor:
None
In Opposition:
None
Discussion:
T. Linnehan: Reads the submitted petition that opposes the development. Total of 97 signatures.
Motion:
R. Lockhart motioned and G. Frechette seconded the motion to continue to the March 16 Planning Board meeting.
The motion passed unanimously, (5-0).
III. Other Business
Pre-Application Request: 82 Riverside Street 01854
Arthur E. Fosse, Jr. and Donna Fosse are seeking a pre-application discussion of their plans to construct two
duplexes in the rear of 82 Riverside Street, which has an existing duplex at the front of the property. The
property is in the Traditional Neighborhood Multi-Family (TMF) zoning district.
On behalf:
John Geary, Attorney for Applicant
Offered Comments:
J. Geary: We are here for a pre-hearing. Not here for site plan or special permit yet. Looking for feedback. The site
presently consists of a two-family structure toward the street with two-car garage behind it. We are proposing to
demolish the garage on the property. We had a staff meeting with the department head and received good feedback
so we tried to put their feedback into our proposal. Maintain the existing two family structure, demolish garage and
construct two duplex structures to the rear of the property. The first structure would be 145 feet back, the second
would be angled to the right of that, facing the driveway. Somewhat of a village feel to it. We feel this is a transitional
development. Large condos nearby, we are proposing 6 unit, then we there is a three family structure. The
neighborhood has a mix throughout. We feel that the project fits and enhances the existing neighborhood. There’s
plenty of open space, land area per dwelling unit. Proposing market rate housing.
Brian Milisci, Project Engineer: Increase the size of driveway for maneuverability. Existing building parking. Connecting
to municipal sewer. Will handle stormwater on-site. Well-draining soils. We are planning on landscaping fairly heavily.
This is a fairly good sized lot. We are on a state road so we will have to apply for and get Mass DOT permits. There’s
an existing island and stop sign. No left hand turn going out of the property. We did meet preliminarily with the Fire
Department to discuss access. I’ll leave it at that.
Jack Lougee, Eagle Creek Development: The units that we are proposing are duplex townhouses. The original
architectural design, we had lower levels of a garage and utility room, then kitchen and half bath, then bedrooms on
third floor. Tried to make a bit bigger with same footprint. Suggested putting a dormer on the back of the units. Goes
from about 1100 sq. ft. to 1300 sq. ft. The garage in the winter in New England is great to have. This is pretty much a
perfect setup for garage-unders. You build them into the hill. Pretty extensive sized backyard. Typical townhouse units.
One thing when I do when building, increase energy efficiency. Additional air sealing and other things to make it a
tighter house. Reduces heating and cooling costs.
Discussion:
T. Linnehan: Might need other relief from other Boards. ZBA. How far back does the grass go before the parking area?
B. Milisci: Area for maneuverability. Can talk to staff about adding an island for extra space here. Area for underground
recharge and snow storage.
G. Frechette: I will be recusing myself.
R. Lockhart: Comments about a retaining wall?
B. Milisci: Runs along property line. To provide parking on the gentle slope. Plan on having landscaping in that area.
Ranges from 6 feet to 4 feet.
R. Lockhart: Elevations, topography?
B. Milisci: They are garage-unders. Decks in the back on the first level. 8 foot difference.
S. Gallivan: I appreciate the renderings. It would be helpful for more detail about how you are calculating the building
height. Some difference in topography. Would be helpful to get that.
R. Pandres: Comments from staff about lighting plan. Could you speak to that?
B. Milisci: Plan as submitted shows two residential lamp posts. Comment from staff was why not use motion sensor
lighting. We agree with this, when we apply you will see that change.
C. Cheng: I noticed you have the parking layout. As we know, parking is usually a contentious issue. How many
bedrooms? Work with staff to figure out how many parking spaces. Consideration of parking in front of garage is also
not preferred.
J. Geary: Are we also proposing parking in front of the units? 2 in front, 1 inside.
T. Linnehan: Where will snow storage be on the lot? Want to make sure traffic flows properly.
R. Pandres: Locating units closer to the street?
J. Lougee: Wouldn’t be able to do garage-under if we did that. That’s the only way we can get a garage-under. Can
build into the hill. That way we do not have to force the grades, they just work naturally.
J. Geary: Though that is better for the streetscape, what we are proposing is a better development.
B. Milisci: Did not include details about stormwater. Will be part of the submission.
J. Geary: Right now on the existing dwelling, will replace the vinyl with wood siding. Ultimately, would build and sell.
T. Linnehan: Good luck and thank you for your pre-app.
Motion:
None
Minor Modification Request: 165 Industrial Ave 01852
In September 2019, TRS S&A Nominee Trust received Site Plan Review Approval to demolish an existing building and
construct a new 16,890 sq. ft. building at 165 Industrial Ave E for King Printing Company, Inc. The site is in the General
Industrial (GI) zoning district and the project requires Site Plan Review approval under Section 11.4.2 for constructing
a non-residential structure greater than 10,000 sq. ft., a parking lot with more than 14 spaces, and for any other relief
required of the Lowell Zoning Ordinance. The applicant is now seeking minor modification approval for a revised site
plan.
On behalf:
Matt Hamor, Landplex
Offered Comments:
M. Hamor: Difference in the little notch. Made a specific submittal to the traffic engineer. Project was originally
designed around maneuvering trucks around loading bays, such large vehicles. We submitted a full swept-path
analysis showing truck coming in and out of site. Fully agree with all of the comments.
Discussion:
T. Linnehan: When we approved it, we talked about a gate?
M. Hamor: Yes, gate is going to be there.
T. Linnehan: Fire Department suggested an easement?
M. Hamor: There is going to be an easement. Additionally, there’s going to be utilities that’s going to need a utility
easement to access manholes. Process going quicker this year because of the weather being so good.
R. Pandres: There is no additional impervious surface?
M. Hamor: No additional. Extension of building on top of concrete pad anyways. No net increase. Utilities redesigned.
Did not have to redesign subsurface drain system.
C. Cheng: Two water mains going to building? Clarify that?
M. Hamor: Yup. This water line was for fire suppression, this is for domestic water for bathrooms. Those are subject
to change with the site constrictor working with the water department.
S. Gallivan: I think the changes will make for a neater design.
Motion:
T. Linnehan motioned and G. Frechette seconded the motion stating that the changes are not substantial or
material and that they represent a minor modification. The motion passed unanimously, (5-0).
G. Frechette motioned and R. Lockhart seconded the motion to APPROVE the revised site plan with the
following conditions:
1. The applicant shall incorporate the conditions from the original Site Plan approval granted by the
Planning Board at the hearing on 09/05/2019:
a. The applicant must obtain approval from DPD on the landscaping plan pursuant to Section
6.1.9.
b. The applicant must obtain final approval from the Lowell Fire Department.
2. The applicant shall incorporate the conditions of approval for the Variances granted by the ZBA at
the hearing on 10/17/2019:
a. The applicant shall provide an easement to permit vehicles using the loading bay at 165
Industrial Ave E to drive onto the property at 171 Swan Street, prior to the application for a
building permit.
b. The loading/unloading plan is subject to final approval by the City’s Transportation Engineer
prior to the application for a building permit.
c. Loading/unloading will not occur more than twice per day with vehicles that do not exceed
the size of WB-65 trucks and only during the off-peak hours for traffic on Industrial Ave E and
Swan Street.
d. The applicant shall provide the final swept path analysis demonstrating access to the
proposed loading bay prior to the application for a building permit.
e. The applicant shall submit a revised site plan that shows the correct calculations for the
parking requirement prior to the application for a building.
f. The applicant shall meet the conditions of the September 2019 Site Plan Review
approval by the Planning Board.
3. The applicant shall incorporate these proposed conditions of approval from the City of Lowell’s
Transportation Engineer included on the City’s comment memo dated 02/25/2020:
a. Loading and unloading will only occur only about twice per day and only during off-peak
hours, i.e., when traffic on Swan Street and Industrial Ave E is light.
b. Vehicles will not exceed the size of WB-65 trucks.
c. Install a “not an exit” sign at the location indicated by the red X.
d. Stripe and/or sign the entrances/exists off of Swan Street as “deliveries only” and enter/exit
based on the proposed use.
4. The applicant shall correct the calculation of the parking requirement on an updated site plan.
5. The applicant shall obtain final approval from the Lowell Fire Department.
6. The applicant shall obtain the recommended easements from the Lowell Fire Department and the
Lowell Engineering Department.
The motion passed unanimously, (5-0).
IV. Notices
V. Further Comments from Planning Board Members
R. Lockhart: The Historic Board has been fairly quiet.
VI. Adjournment
C. Cheng motioned and R. Lockhart seconded the motion to adjourn the meeting at 7:30 PM. The motion
passed unanimously, (5-0).
Get email alerts for Lowell
A daily email when new agendas and minutes are posted.