MADISON HISTORIC PRESERVATION COMMISSION
Regular Meeting – March 12, 2019
Attending: Madison Historic Preservation (“HPC”) members Co-
Chairs Janet Foster and Mary Ellen Lenahan; Members Karen Jeisi,
Chris Kellogg, David Luber, Jill Rhodes, John Solu and Carmine
Toto; Commission Attorney Vincent Loughlin and Recording
Secretary Laurie Hagerich. Absent: Member John Forte, Council
Liaison Maureen Byrne.
The meeting was called to order by Ms. Foster at 7 pm. Ms. Lenahan
announced the meeting was called in accordance with the Open
Public Meetings Act. A motion was made, seconded and carried to go
into Executive Session, at which time Commission Members and
Attorney Loughlin went into Executive Session. At this time Attorney
Loughlin explained the procedures and protocol to take place at the
public meeting and the Executive Session was adjourned.
The meeting was continued at the Madison Presbyterian Church
sanctuary to accommodate the large number of the public in
attendance. Ms. Lenahan called the meeting to order as an open
public meeting at 7:44 p.m.
The January 8, 2019 minutes were considered and, by unanimous
consent, approved as written.
New Business:
Application for redevelopment of Madison Theater property at 14
Lincoln Place:
Mr. Loughlin summarized the Historic Preservation Ordinance, which
requires a Certificate of Approval from HPC for demolition in an
historic district and outlined protocols and time limits for all witnesses
and public speakers. He noted that, per the Ordinance, after all
testimony and discussion, HPC will then vote on demolition, and set
conditions for the new building.
Mr. Peter Wolfson of Day Pitney, attorneys for property owner Saxum
Real Estate, began by presenting background information, including
that the property is a “contributing” structure in the Madison Civic and
Commercial Historic District historical development. Applicant’s Plans
call for a new building 4 stories high, containing 24 living units,
including 4 affordable housing units, as well as 2 ground floor retail
spaces and a ground-floor space intended as a 91-seat replacement
movie theater. He noted that as a result of two prior meetings with the
HPC, efforts were made to make the new building harmonious with
existing buildings in the commercial district.
The following were introduced into the record and marked as exhibits:
• Ex. A 2. Report of Applicant’s Structural Engineer, Wayne
Hostetler, of Thornton Tomasetti;
• Ex. B 2. Report of HPC’s Structural Engineer, John McManus
of McManus Design Group;
• Ex. A 1.Report of Applicant’s Preservation Consultant, Robert
Kornfeld of Thornton Tomasetti;
• Ex. A 3. Applicant’s earlier structural report- the Persimmon
Report
• Ex B 1. Report of HPC’s Preservation Consultant, John Hatch
of Clarke Caton Hintz.
• Ex. A 4.Powerpoint from Applicant’s structural engineer, Mr.
Hosteler;
• Ex. A 5. Applicant’s model of proposed building
• Ex. A 6. Powerpoint of Applicant’s architect, Jeff Gertler, of
Gertler & Wente Architects.
Mr. Loughlin swore in each witness before their testimony.
Mr. Anthony Rinaldi, principal of Saxum Real Estate, was sworn in as
a witness and gave background information on his firm’s ownership of
the property and reasons they feel demolition and re-development is
the best path forward. The HPC and the public were given an
opportunity for questions after his presentation.
Next, Mr. Wayne Hostetler of, Applicant’s Structural Engineer,
testified about his report, inspection of the property and conclusion
that the building is structurally compromised. Photos of various areas
showing structural damage and deterioration were shown. Mr.
Hostetler contended that the cost to rehabilitate the structure or adapt
it to another use is not financially viable. There was opportunity for
questions by HPC members, as well as by Mr. Hatch and the public.
Mr. John McManus, HPC’s Structural Engineer, had questions for Mr.
Hostetler and then proceeded to testify about his report and visual
inspection of the property. His conclusion was that the building has
been neglected and undergone deterioration over decades, resulting
in various structural issues that would be very costly to correct.
Next, Mr. Jeff Gertler, Project Architect, gave a power-point
presentation showing the newest design plans for the replacement
building, taking into account comments and recommendations made
by HPC in two previous informal meetings, in December 2017 and
February 2018. Materials will include a reddish-tone brick on the 3
lower floors and buff colored brick on the top floor, matching the Post
Office and Madison train station. Care was taken with the roof,
cornices, windows, doors and rhythm of façade openings to be
compatible with neighboring buildings.
Design modifications to the interior were also made, including space
for a small theater on the first floor. Mr. Gertler feels the tenants in
the upper floors will add energy, vitality and increased business for
the merchants in the commercial district without adding to the carbon
footprint.
HPC members and Mr. Hatch asked Mr. Gertler several questions
and raised numerous concerns, including among them concerns that:
• The overall façade of the building looks like a factory or
warehouse, which is not in keeping with Madison’s non-
industrial character;
• How does the scale and square footage of the building
compare to other buildings in the Historic District;
• “Faux cornice” similar to those on other Madison buildings is
not favored in historic building;
• Concern about visual impression of train passengers coming
from the railroad station "tunnel" and the alignment of the
center of the new building to correspond with the "tunnel".
• Suggestion that the 2 doors to the retail spaces be placed at
the center of the front façade;
• The visual impact of the 4th floor of the building is a concern;
• Can the visual scale of the building be reduced;
• Difficulty in maintaining privacy with the large windows on the
upper floors;
• Having entrance to movie theater on the Post Office side was
favored and may provide opportunity to create a civic space in
this area
At 11 pm it was agreed that the meeting would be continued on the
next regular HPC meeting date, which is April 9, 2019, at 7:30 pm.
There will be opportunity for further questions and public comments
following continued testimony from Mr. Gertler. An extension of the
45-day time period for action on the application was agreed to
between Mr. Loughlin and Mr. Wolfson.
The meeting was adjourned at 11:05 pm.
Laurie Hagerich, Recording Secretary
Agenda
Madison Historic Preservation Commission
MEMORANDUM
March 5, 2019
TO: HISTORIC PRESERVATION COMMISSION
FROM: JANET FOSTER & MARY ELLEN LENAHAN, Co-Chairs
RE: REGULAR MEETING, Tuesday, March 12, 2019, 7:00 p.m.
Our next meeting will be held Tuesday, March 12 at 7:00 p.m. in the Council Chamber of the Hartley
Dodge Memorial. Please note: Immediately after the meeting is opened there will be an executive
session lasting until 7:30 pm.
The agenda is as follows:
Call to Order: Open Meeting Statement
Approval of Minutes: January 8, 2019
New Business:
• Application for redevelopment of the Madison Theater property on Lincoln Place
Adjournment:
MHPC Web site content http://www.rosenet.org/gov/historic-preservation
cc: Members: J. Forte, J. Foster, D. Luber, J. Solu, C. Toto, C. Kellogg, K. Jeisi, M. Lenahan, J.Rhodes,
Recording Secretary: Laurie Hagerich
Borough Representatives: R. Conley, Mayor; Maureen Byrne, Council Liaison; R. Vogel, Engineer; Frances Boardman,
Administrative Official Planning and Zoning