City Council
Regular MeetingMaple Grove, MN · March 15, 2021
Minutes
Maple Grove City Council Meeting
Meeting Minutes
March 15, 2021
Call to Order Pursuant to call and notice thereof, a Regular Meeting of the
Maple Grove City Council was held at 7: 30 p.m. on March 15,
2021 at the Maple Grove Government Center/ Public Safety
Facility, Hennepin County, Minnesota and online via WebEx.
Members present were Mayor Mark Steffenson and
Councilmembers Judy Hanson, Karen Jaeger, Phil Leith, and
Kristy Barnett. Absent was none. Present also were Heidi
Nelson, City Administrator; Joe Hogeboom, Community and
Economic Development Director; Peter Vickerman, Planning
Manager; Brett Angell, Economic Development Manager; Ken
Ashfeld, Public Works Director/ City Engineer; Jupe Hale,
Assistant City Engineer; and Justin Templin, City Attorney.
Mayor Steffenson called the meeting to order at 7: 30 p. m. and
led the city in the Pledge of Allegiance.
Additions or Mayor Steffenson asked if there were any additions and/ or
Deletions to deletions to the Consent Agenda to which Heidi Nelson stated
the Agenda
the following:
Item Amended to the Agenda
None
Item Amended to the Consent Agenda
None
Item Added to the Agenda
None
Item Removed from the Consent Agenda for Discussion
None
Consent Items The following Consent Items were presented for Council' s
approval:
Maple Grove City Council Minutes
March 15, 2021
Page 2
MINUTES
A. Regular Meeting —March 1, 2021
PERSONNEL ITEMS
B. Appointment of Paid -on -Call Fire Officers
Motion to appoint the following to the position of Lieutenant in
the Fire Department effective April 1, 2021.
Station 2: Jesse Navin
Station 4: Riley Slimmer, Adam Ohme
Station 5: Louis Anderson, Steve James
Motion to appoint the following to the position of Captain in the
Fire Department effective April 1, 2021.
Station 2: Carlos Davila
Station 5: Chandler Van Curler
C. Light Equipment Operator Appointment
Motion to approve the hiring of Dustin Rose to the position of
Light Equipment Operator at an annual salary of $ 46, 063. 68
starting step, per Union Contract), effective on March 16, 2021,
subject to a 12- month probationary period. All required
screenings and background checks have been successfully
completed.
COMMUNITY & ECONOMIC DEVELOPMENT ITEMS
D. Avery Park PUD Residential Development Stage Plan,
Rezoning and Final Plat - Ordinance No. 21- 04 and
Resolution No. 21- 035
Motion to adopt Ordinance No. 21- 04 rezoning the property
from R- A, Single Family Agricultural to R2 PUD Single Family
Residential ( Planned Unit Development) and R4 PUD, Medium
Density Residential District ( Planned Unit Development),
subject to the approval of the final plat.
Motion to adopt Resolution No. 21- 035 approving the Avery
Park Residential PUD development stage plan and final plat,
subject to:
Maple Grove City Council Minutes
March 15, 2021
Page 3
1. Planned Unit Development agreement final review and
approval of the City Attorney and the Director of
Community & Economic Development.
E. Edgewater on Cook Lake PUD Residential Development
Staue Plan and Final Plat - Resolution No. 21- 019
Motion to adopt Resolution No. 21- 019 approving the
Edgewater on Cook Lake PUD development stage plan and
final plat, subject to:
1. Planned Unit Development agreement final review and
approval of the City Attorney and the Director of
Community & Economic Development.
F. Tricare 4th Addition Final Plat - Resolution No. 21- 033
Motion to adopt Resolution No. 21 033 approving the final plat
of Tricare 4th Addition.
G. 6248 Eagle Lake Dr Variance - Resolution No. 21- 034
Motion to adopt Resolution No. 21- 034 approving the 6248
Eagle Lake Drive variance.
ENGINEERING ITEMS
H. Chapel Wood, Weaver Estates Wicklow Meadows, Weaver
Lake Boat Launch Street Rehabilitation Project No. 20- 02
Final Acceptance
Motion to approve the final acceptance of Chapel Wood,
Weaver Estates, Wicklow Meadows and Weaver Lake Boat
Launch Area Street Rehabilitation Project No. 20- 02 completed
by GMH Asphalt subject to the warranty provisions of the
contract and statutory law.
I. Sureties
Motion to approve the surety actions as identified on the
Council Action Form.
Maple Grove City Council Minutes
March 15, 2021
Page 4
ADMINISTRATIVE ITEMS
J. Findings of Fact on Hannu Enterprises, Inc. dba Maple
Tavern - Resolution No. 21- 037
Motion to adopt 21- 037 making findings,
Resolution No.
conclusion, and decision imposing a civil penalty of $2, 000 and
a two ( 2) day suspension on Hannu Enterprises Inc. dba Maple
Tavern, 9375 Deerwood Lane, Maple Grove, Minnesota.
K. Maple Grove Transit Station Electric Vehicle Charging
Agreement
Motion to authorize Mayor and City Administrator to enter into
an agreement with Blink Network for electric vehicle charging
stations at the Maple Grove Transit Station.
L. Annual Replace and Upgrade PCs
Motion to approve the replacement of desktops, laptops,
monitors and docks for 2021. The total cost of replacement will
be $ 48, 438.00 to be purchased from the Data Processing
Replacement Fund. The breakdown of costs are as follows:
Replacement of 30 desktops: $ 22, 440. 00
Replacement of 18 laptops: $ 19, 468. 00
Replacement of 10 monitors: $ 1, 730. 00
Replacement of 20 laptop docks: $ 4, 800. 00
M. Administration Amendment to Maple Grove City Code
Chapter 2 by Establishing Section 2. 74 - Council Decorum -
Ordinance 21- 06
Motion to approve Ordinance No. 21- 06 amending Maple
Grove City Code Chapter 2 by establishing Section 2.74 —
Council Decorum.
Motion to approve Summary Ordinance No. 21- 06 to reduce
publication costs.
N. Refund Consideration of On -Sale Liauor License Fees
Consider a refund of on -sale liquor license fees for additional
dates on -sale liquor license holders were closed due to extended
Maple Grove City Council Minutes
March 15, 2021
Page 5
executive orders. A refund of on sale liquor license fee from
forced government closure which created an unearned revenue
for the City of Maple Grove. This covers May 2 through May
31, 2020 and November 20, 2020 to January 10, 2021 dates of
closures, for a total of 82 additional days.
O. Transfer from General Fund to the Long Term Development
Fund, Community Resources Fund, Road Reconstruction
Fund, Community Center Fund and Sports Dome Fund
Motion to transfer $ 4, 500, 000 from the General Fund to the
Long Term Development Fund to finance public facilities and
Emerald Ash Borer treatment & removal, $ 1, 000, 000 to be
transferred to the Community Resources fund for any potential
impacts of the pandemic caused in 2021, $ 800, 000 to the Road
Reconstruction Fund for road maintenance, $ 200, 000 to the
Community Center Fund to cover the 2020 Deficit, and
100, 000 to the Sports Dome Fund to cover the 2020 Deficit.
CLAIMS
P. Motion to approve the claims as listed:
City Checks: $ 957, 167. 32
Purchasing Card: $ 22, 619. 01
Electronic Payments: $ 962. 16
Motion by Councilmember Leith, seconded by
Councilmember Jaeger, to approve the Consent Items as
presented. Upon call of the motion by Mayor Steffenson,
there were five ayes and no nays. Motion carried.
Consideration None.
of Items
Pulled from
the Agenda
Special
Business
Maple Grove City Council Minutes
March 1 S, 2021
Page 6
Open Forum Owen Schleissman, 6379 Cheshire Lane, explained he sent a
letter to the city dated March 9, 2021 regarding zoning law
violations due to the junk in his neighbor' s yard. He reported
his neighbor was contacted by the zoning office requesting his
two construction machines, a couch and other items be removed
from his yard. He noted an old stock car was also removed. He
stated there was some ambiguity in the zoning law and how it
was enforced. He asked if City Code allowed homeowners to
store junk vehicles or industrial trailers that they do not own in
their yards. He questioned if junk tires, pick up trucks,
bulldozers and scrap parts can be stored in six- foot high fenced
in enclosure that is attached to a shed. He inquired if a
driveway can be installed over a catch basin. He asked why
Maple Grove allowed his neighbor to continue the illegal
driveway after they admitted it was installed on Park Board
property. He questioned if fines were assessed for the illegal
driveway and wondered who covered the cost of new trees and
shrubs.
He expressed frustration with the fact the city had
poorly trained zoning employees. He believed the zoning code
had far too much ambiguity which led to enforcement and
interpretation differences. He recommended the City Code be
addressed in order to reduce corruption. He explained his
neighbor has a travel trailer parked in the front driveway that
was one- third the size of the house. He reported this trailer has
been parked on the driveway since 2018. He indicated he has
reviewed the zoning laws in other suburbs and some restrict the
size of or limit this kind of parking in the front yard to 30 days.
He encouraged the city to consider hiring additional zoning
enforcement staff in order to prevent the decay of Maple Grove
neighborhoods.
He noted he had photos of his neighbor' s
property and thanked the Council for hearing his concerns.
City Attorney Templin reported complaints against properties
were addressed within the Data Practices Act. He noted the
identity of a real property complaint was confidential
information, which means any information the city has was
confidential.
Mayor Steffenson reported there have been a number of staff
members out to address these issues. He explained staff would
continue to work with the various homeowners to ensure they
were following City Ordinance. He suggested the Council also
look at these Ordinances to ensure they were not ambiguous.
Maple Grove City Council Minutes
March 15, 2021
Page 7
Councilmember Barnett asked if the city was hiring additional
staff to addressing zoning enforcement concerns. Community
and Economic Development Director Hogeboom stated a
temporary seasonal zoning inspector would be hired in May.
7: 30 p. m. Assistant City Engineer Hale requested the Council approve
Public City Project 21- 06, the Avery Park Street and Utility Project. He
described the work that would be completed in this
Hearing development which included roadways, watermain, sanitary
sewer and trunk sewer, along with a trail along Nathan Lane.
Avery Park
The estimated project costs were discussed with the Council
Street &
along with the proposed assessments. He reviewed which
Utility Project streets would be public and those that would be private and
No. 21- 06 recommended approval of the improvements.
Resolution No. Motion by Councilmember Hanson, by seconded
Councilmember Barnett, to open the public
hearing. Upon
21- 036
call of the motion by Mayor Steffenson, there were five ayes
and no nays. Motion carried.
Mayor Steffenson opened the public hearing at 7: 45 p. m. and
asked if anyone would like to address this issue.
No public testimony was offered.
Motion by Councilmember Hanson, seconded by
Councilmember Barnett, to close the public hearing at 7: 46
p. m. Upon call of the motion by Mayor Steffenson, there
were five ayes and no nays. Motion carried.
Motion by Councilmember Barnett,by seconded
Councilmember Hanson,
to approve adopting Resolution
No. 21- 036 ordering Avery Park Street and Utility Project
No. 21- 06, receiving surety, ordering plans and
specifications, approving plans and specifications,
authorizing advertisement for bids, and approving
Developer' s Agreement for Avery Park subject to final
review by the City Attorney and Director of Public Works.
Councilmember Jaeger reviewed the watershed district
recommendations for this project.
Upon call of the motion by Mayor Steffenson, there were
five ayes and no nays. Motion carried.
Maple Grove City Council Minutes
March 1 S, 2021
Page 8
Community
Development
Items
Reserve Arbor
Planning Manager Vickerman stated the applicant is requesting
Lakes a Planned Unit Development ( PUD) development stage plan,
Building 4 and final plat for the purpose of constructing the fourth and final
Planned Unit building in the Reserve Arbor Lakes apartment development.
Development The building is proposed to have 164 units and 216 bedrooms.
The proposed amenities within the development were reviewed
Development with the Council. Staff discussed the plans in further detail and
reported the Planning Commission recommended approval with
Stage Plan
conditions.
and Final Plat
Councilmember Leith asked if the building had underground
parking.Planning Manager Vickerman stated this complex
would have underground and first level parking within the
building, along with 114 surface parking spaces.
Evan Doran, Doran Companies, thanked the Council and staff
for their time and consideration. He stated he was looking
forward to starting and completing the final phase of this
project.
Councilmember Leith questioned when construction would
begin. Mr. Doran reported the third building was under
construction and would be completed at the end of August. He
explained the fourth building would begin construction around
August I".
Motion by Councilmember Leith,
by seconded
Councilmember Jaeger,
to approve directing the City
Attorney to draft a Planned Unit Development agreement
and a Resolution approving the Reserve Arbor Lakes
Building 4 PUD development stage plan and final plat,
subject to:
1. The applicant addressing to the satisfaction of the
city any remaining applicable comments contained
in the memorandums from:
a. The Community & Economic Development
Department dated March 3, 2021
Maple Grove City Council Minutes
March 15, 2021
Page 9
b. The Water Resources Engineer dated February
17, 2021
c. The Fire Department dated February 12, 2021
d. The Parks & Recreation Department dated
February 16, 2021
The applicant shall acknowledge that Park Dedication
requirements are based on staff review and
recommendation to the Park and Recreation Board and
their subsequent board action. Board meetings are held on
the third Thursday of each month.
Upon call of the motion by Mayor Steffenson, there were
five ayes and no nays. Motion carried.
Boston Economic Development Manager Angell stated Boston
Scientific is seeking Planned Unit Development ( PUD)
Scientific
development stage plan approval to construct a new building of
Building 3 76, 000 square feet of production space. The
approximately
West Planned
proposed addition would be constructed directly to the west of
Unit
existing building # 3 and would be connected via skyway to the
Development other buildings within the overall campus. The building would
be constructed in what is currently surface parking area. The
Development request for this development stage plan for the new building
Stage Plan coincides with the parking lot expansion that Boston Scientific
was approved of in 2020. The applicant has expressed the need
for the expansion is due to a current limited availability of
available production space within the campus. The product that
would be manufactured in this space is currently being produced
in building number 2 and will be relocated to this space
allowing for more spacing of equipment, materials, and to free
up the existing production space that is used for future new
product creation. The landscaping plan was reviewed with the
Council along with the proposed renderings. Staff discussed the
plans in further detail and reported the Planning Commission
recommends approval with conditions.
Councilmember Jaeger questioned if this project would be
impacting Niagara Lane. Economic Development Manager
Angell explained this project would not be impacting Niagara
Lane.
Councilmember Jaeger asked why all of the additional parking
was needed. Economic Development Manager Angell deferred
Maple Grove City Council Minutes
March 15, 2021
Page 10
this question to the applicant.
Brendan Collins, Boston Scientific representative, explained
pre- COVID the site was constrained by parking. He indicated
the additional parking was needed for shift change times.
Councilmember Jaeger inquired if this would create additional
traffic along Weaver Lake Road. Mr. Collins stated he did not
anticipate the project would increase the traffic volumes along
Weaver Lake Road any more than they are now.
Councilmember Jaeger asked if the construction traffic would
be using Niagara Lane. Mr. Collins reported the construction
traffic would not be using Niagara Lane.
Motion by Councilmember Jaeger, seconded by
Councilmember Leith, to
directingapprove the City
Attorney to draft a Resolution and a Planned Unit
Development agreement approving the Boston Scientific
Building 3 West PUD development stage plan, subject to:
1. The applicant addressing to the satisfaction of the
city any remaining applicable comments contained
in the memorandums from:
a. The Community & Economic Development
Department dated February 23, 2021
b. The Engineering Department dated February
2292021
c. The Fire Department dated February 23, 2021
d. The Arbor Committee dated March 2, 2021
The applicant shall acknowledge that Park Dedication
requirements are based on staff review and
recommendation to the Park and Recreation Board and
their subsequent board action. Board meetings are held on
the third Thursday of each month.
Upon call of the motion by Mayor Steffenson, there were
five ayes and no nays. Motion carried.
Evanswood Motion by Councilmember Leith, seconded by
Councilmember Barnett, to remove this item from the table.
PUD Concept
Upon call of the motion by Mayor Steffenson, there were
Maple Grove City Council Minutes
March 15, 2021
Page I
Stage Plan five ayes and no nays. Motion carried.
Planning Manager Vickerman explained the applicant has
resubmitted plans for the Evanswood proposal. He indicated the
main change was for the area in the northwest that had 28- foot
wide lots have been changed to 45- foot wide lots. He noted
everything else remains the same as was previously discussed.
He reported the development now has 301 single family
detached lots when 358 lots were previously requested. He
commented on the changes that were made to the townhome
area noting four additional units were added. He indicated
screening of the townhomes from Lawndale Avenue would have
to be further considered. He requested the Council discuss the
development and provide the applicant with feedback on how to
proceed.
Councilmember Jaeger asked if the streets would be public or
private. Planning Manager Vickerman explained the streets in
the single- family area would be public and the streets within the
townhome area would be private.
Councilmember Leith indicated this item was tabled at the last
meeting in order to allow the Council to discuss this
development at a work session meeting along with the recently
completed housing study. He noted this worksession meeting
was cut short. He questioned why this matter was being
considered when further discussion had to be held with respect
to the housing study. Planning Manager Vickerman stated staff
was running short on time under 15. 99.
Councilmember Jaeger asked if time could be made to further
consider this request.
Councilmember Hanson stated there was a 120- day review time
period which put this project out to April 28, 2021.
Councilmember Jaeger questioned if a work session was held by
the Council could this item be approved on a future consent
agenda.
Mayor Steffenson anticipated this item had to be fully
considered and could not be placed on the Consent Agenda. He
asked when the Council would be able to further review the
housing study. He commented he had concerns with the 45- foot
lot widths. Planning Manager Vickerman explained the housing
Maple Grove City Council Minutes
March 15, 2021
Page 12
study would be discussed at the April 19, 2021 work session
meeting, which would be the last meeting the Council could
address this project prior to the 15. 99 deadline running out.
Councilmember Hanson asked if the applicant would agree to
an extension to the May 3, 2021 City Council meeting to allow
the Council to review this project in light of the housing study
in April.
Councilmember Leith explained he appreciated going from 28
to 45- foot wide lots, but he stated this was still quite small for
single family homes.
Mayor Steffenson requested the applicant address the Council at
this time.
Ben Schmidt, Excelsior Group representative, stated his goal
was not to jam this thing through for approval, but rather to seek
feedback from the Council. He appreciated the dialogue from
the Council and noted he would be refining the plan as the
Council housing study. He offered several
considers the
comments on why he submitted the project the way he did
noting he spent a fair amount of time speaking to the neighbors
to the north. He described the diverse housing product and
prices that would be offered. He commented further on how the
housing development was designed noting he was willing to
come back with an alternate design, but noted the cost of
housing would continually be on the rise. He explained he
would support an extension.
Councilmember Hanson thanked the applicant for being willing
to support an extension. She stated when she looks at this
development, it appears all of the homes would be squeezed in
on top of each other without any space in between.
Councilmember Jaeger agreed.
Councilmember Leith commented on the recent Comprehensive
Plan and noted the plans for this area was low density with
medium density as the site approached Dayton. He indicated he
was envisioning a development that matched this vision. He
stated he looked forward to considering this further when the
housing study was discussed.
Mayor Steffenson stated this was his recollection as well and he
Maple Grove City Council Minutes
March 15, 2021
Page 13
looked forward to reviewing the housing study analysis.
Motion by Mayor Steffenson, seconded by Councilmember
Jaeger, to approve tabling the Evanswood PUD concept
stage plan to the April 5, 2021 City Council meeting so the
applicant can make additional adjustments to their plan
based on City Council feedback. Upon call of the motion by
Mayor Steffenson, there were five ayes and no nays. Motion
carried.
Report On Community and Economic Development Director Hogeboom
Upcoming updated the Council regarding the following:
Community • The Planning Commission would meet next on Monday,
and Economic
March 29, 2021 at 7: 00 p.m. where the group will discuss a
Development 6, 000 square foot medical building, an amendment to allow
Items a drive through at the Shake Shack, and a seven lot
development in the Nottingham Parkway area.
The plans for Main Street were being revised and the
Council would be reviewing these shortly.
The Community Forum on Race would be held on April 22,
2021. It was noted this event would be held jointly with the
City of Brooklyn Park and the Osseo School District.
Report on Director of Public Works/ City Engineer Ashfeld updated the
Council regarding the following:
Upcoming
Engineering • The I- 94 project continues and beams would be placed at the
Items Dayton Parkway interchange later this week.
The city would be painting the Upland Lane water tower this
summer.
Heidi Nelson, Ms. Nelson explained that the Council has her Monday report if
there are any questions. She reported the Council would be
City
holding a work session meeting on March 25, 2021. She
Administrator
commented the street maintenance hearings would be held on
April 5, 2021. She stated the Board of Appeal meetings would
be held on April 8, 2021 and April 22, 2021 noting valuation
notices were currently being mailed.
Items Added Councilmember Jaeger stated maple trees are being tapped in
Maple Grove.
to the Agenda
Maple Grove City Council Minutes
March 15, 2021
Page 14
Councilmember Jaeger reported the farmer' s market was being
held on Sunday, March 21, 2021.
Councilmember Jaeger encouraged residents to clean up after
their pets in the city' s parks and trails.
Adjournment Motion by Councilmember Jaeger, seconded by
Councilmember Leith, to adjourn to the regular City
Council meeting on April 5, 2021 at 7: 30 p. m. Upon call of
the motion by Mayor Steffenson, there were five ayes and no
nays. Motion carried.
The meeting was adjourned at 8: 46 p. m. by Mayor Steffenson.
Respectfully submitted,
Heidi Nelson
City Administrator