Economic Development Authority
Regular MeetingMaple Grove, MN · September 20, 2021
Minutes
Maple Grove Economic Development Authority
Meeting Minutes
September 20, 2021
Call to Order Pursuant to call and notice thereof, an Economic Development
Authority Meeting of the Maple Grove City Council was held at
7:30 p.m. on September 20, 2021 at the Maple Grove
Government Center/Public Safety Facility, Hennepin County,
Minnesota.
Members present were President Mark Steffenson, Vice
President Karen Jaeger, Secretary Heidi Nelson, Treasurer Judy
Hanson, and Commissioners Phil Leith and Kristy Barnett.
Absent was none. Present also were Joe Hogeboom,
Community and Economic Development Director; Brett Angell,
Economic Development Manager; Ken Ashfeld, Director of
Public Works/City Engineer; and Justin Templin, City Attorney.
President Steffenson called the meeting to order at 8:53 p.m.
Approval of Motion by Treasurer Hanson, seconded by Commissioner
September 7, Barnett, to approve the September 7, 2021 Economic
Development Authority meeting minutes. Upon call of the
2021 Minutes
motion by President Steffenson, there were five ayes and no
nays. Motion carried.
Façade Economic Development Manager Angell requested the
Improvement Commission consider the creation of a new façade improvement
grant program. He noted this program would allow commercial
Grant
businesses and property owners to apply for grants of up to
Program $15,000 for building enhancements. He explained the grants
Creation would operate on a one to one match basis. He commented
further on the regulations and eligible costs that would be
covered by the program and recommended approval of the grant
program.
Commissioner Leith stated this was a great program for the city
to be pursuing as it would help business owners with older
buildings make improvements to their property.
Motion by Treasurer Hanson, seconded by Commissioner
Barnett, to approve EDA Resolution No. 31 authorizing the
Maple Grove EDA Minutes
September 20, 2021
Page 2
creation of and funding for the façade improvement grant
program. Upon call of the motion by President Steffenson,
there were five ayes and no nays. Motion carried.
Adjournment Motion by Commissioner Leith, seconded by President
Steffenson, to adjourn to the City Council meeting. Upon
call of the motion by President Steffenson, there were five
ayes and no nays. Motion carried.
The meeting was adjourned at 8:56 p.m. by President
Steffenson.
Respectfully submitted,
Heidi Nelson
EDA Secretary
Agenda
AGENDA
ECONOMIC DEVELOPMENT AUTHORITY
SEPTEMBER 20, 2021
1. CALL TO ORDER
2. CONSENT ITEMS
A. Minutes September 7, 2021
Motion byseconded by to
approve, table or deny the Consent Items as presented.
3. REGULAR ITEMS
A. Facade Improvement Grant Program Creation - EDA Resolution No. 31
Motion byseconded by to
approve, postpone, table or deny
4. ADJOURNMENT
Motion by Seconded by to
adjourn.
Meeting adjourned at _
Maple Grove Economic Development Authority
DRAFT Meeting Minutes
September 7, 2021
DRAFT
(Delete this when final edits are complete)
Call to Order Pursuant to call and notice thereof, an Economic Development
Authority Meeting of the Maple Grove City Council was held at
7:30 p.m. on September 7, 2021 at the Maple Grove
Government Center/Public Safety Facility, Hennepin County,
Minnesota.
Members present were President Mark Steffenson, Vice
President Karen Jaeger, Secretary Heidi Nelson, Treasurer Judy
Hanson, and Commissioners Phil Leith and Kristy Barnett.
Absent was none. Present also were Ken Ashfeld, Director of
Public Works/City Engineer; Greg Sticha, Finance Director;
Brett Angell, Economic Development Manager; and Justin
Templin, City Attorney.
President Steffenson called the meeting to order at 8:46 p.m.
Approval of Motion by Vice President Jaeger, seconded by
June 7, 2021 Commissioner Leith, to approve the June 7, 2021 Economic
Development Authority meeting minutes. Upon call of the
Minutes
motion by President Steffen son, there were five ayes and no
nays. Motion carried.
Adopt Finance Director Sticha requested the Commission adopt the
Proposed proposed EDA/HRA tax levy. He noted the levy was for
$150,000, which was the same amount that has been approved
EDA/HRA
each year since 1999. He reported staff was not proposing to
Tax Levy make any changes to the EDA housing program at this time.
EDA Motion by President Steffenson, seconded by Commissioner
Resolution No. Barnett, to approve deny adopting EDA Resolution No. 30
30 setting a proposed tax levy for 2022. Upon call of the
motion by President Steffenson, there were five ayes and no
nays. Motion carried.
Adjournment Motion by Vice President Jaeger, seconded by
Commissioner Barnett, to adjourn to the City Council
DRAFT Maple Grove EDA Minutes
September 7, 2021
Page2
meeting. Upon call of the motion by President Steffenson,
there were five ayes and no nays. Motion carried.
The meeting was adjourned at 8:48 p.m. by President
Steffenson.
Respectfully submitted,
Heidi Nelson
EDA Secretary
City of REQUEST FOR EDA ACTION
Maple Grove
Minnesota
MEETING DATE: September 20, 2021
PREPARED BY: Brett Angell, Economic Development Manager
AGENDA ITEM: Facade improvement grant program creation
PREVIOUS ACTIONS:
None.
RECOMMENDED COUNCIL ACTION:
Motion to approve EDA Resolution No. 31 authorizing the creation of and funding for the
facade improvement grant program.
COMMENTS:
The proposed facade improvement grant program is a matching grant which would
provide commercial business and/or property owners with needed capital to make
exterior improvements to the physical exteriors of their buildings. The proposed program
would offer grants of up to $15.000 and would require a one-to-one match by the
grantee for the improvements being funded. The intention of the program would be to
further stabilize and improve some of the older commercial centers within the City
through offering a slight incentive to make the enhancements.
In order to be eligible for a grant through the facade improvement program, the business
or property owner must have a commercial building constructed prior to 1990 and have
no delinquent utilities. charges, or taxes due to the city. The building or business must
also be a conforming or legally nonconforming use and all improvements that would be
eligible would be limited to the exterior of the building.
The eligible uses of the funds would include items such as:
• Exterior painting or re-siding:
• Restoration of exterior finishes and materials
• Replacement or installation of new windows or doors
• Canopy or awning installation
• Replacement of free-standing signage
The proposed program would allow for the city to have direct input on some of the
improvements being made to ensure the quality and finishes meet a high standard. The
proposed program policies also include encouraged and prohibited facade improvement
for the program. Applicants for the program would be encouraged to discuss overall
plans with staff prior to applying for funding.
Once the program is established, applications will begin to be accepted on a continuous
basis until funds are exhausted. As applications are received, they will be reviewed by city
staff for completeness and scored based upon established review criteria.
Recommendations for awards will then be presented to the EDA for final approval.
Once a grant is awarded, the grantee will be required to enter into a grant agreement with
the City. Any funds to be distributed would be on a reimbursement basis following the
grantee providing proof of expenditure and proof of payment.
The proposed level of funding for the 2021 pi lot year of the facade improvement program
is $50,000. This amount of funding would allow for 4-5 grants to properties. Based upon
initial conversations with businesses and property owners, it is anticipated that this
program will be able to utilize all the funds within a timely manner.
ATTACHMENTS:
Attachment A- EDA resolution no. 31
Exhibit A- Facade improvement grant program policies
I Attachment A I
RESOLUTION NO. 31
ECONOMIC DEVELOPMENT AUTHORITY IN AND FOR
THE CITY OF MAPLE GROVE
A RESOLUTION AUTHORIZING THE CREATION OF AND FUNDING FOR THE
FACADE IMPROVEMENT GRANT PROGRAM
WHEREAS, the City Council has authorized the transfer of funds from the City's
Revolving Loan Fund (RLF) to the Economic Development Authority; and
WHEREAS, the Economic Development Authority seeks to use the funding for the
establishment of a Facade Improvement Grant Program; and
WHEREAS, the objective of the Facade Improvement Grant Program is to deploy a
local pool of funds to support and incentivize commercial businesses and property owners
located in older structures to make improvements and enhancements to the exterior facades
of their properties; and
WHEREAS, the goals of the Facade Improvement Grant Program may be
accomplished by some or all of the following means:
(a) providing a financial incentive on a one-to-one match to construct the
improvements; and
(b) ensuring the long-term stability of the businesses and buildings through enhanced
building facades; and
(d) allowing for the EDA to have a direct role in the types of enhancements and
finishes used at proposed grant locations.
WHEREAS, the Facade Improvement Grant intends to offer matching grants in amounts
up to $15,000 to eligible Maple Grove businesses and property owners on a limited basis;
NOW THEREFORE, IT IS RESOLVED by the Board of Commissioners of the EDA,
based on the above recitals, information provided by City staff, and information received at the
meeting, as follows:
1. The EDA hereby creates the Facade Improvement Grant program and adopts the
FACADE IMPROVEMENT PROGRAM GUIDELINES attached hereto as Exhibit A;
2. The EDA hereby receives $50,000 of funding to be used for the Facade Improvement
Grant program from the City's Revolving Loan Fund to be distributed according
to that program's policies and procedures.
3. The EDA authorizes the City's Economic Development Manager to enter into and
execute Grant Agreements on behalf of the EDA for the Facade Improvement Grant
program.
1
Motion to approve the foregoing findings, conclusions, and decisions was made by
______ and seconded by , upon a vote being duly taken thereon,
the following voted in favor thereof:
and the following were against:
and the following were absent:
whereupon, the resolution was declared duly passed and adopted this 20th day of September,
2021.
STATE OF MINNESOTA )
COUNTY OF HENNE PIN ) ss.
CITY OF MAP LE GROVE )
I, the undersigned, being the duly qualified Secretary of the Economic Development
Authority in and for the City of Maple Grove, a public body corporate and politic and a political
subdivision of the State of Minnesota, hereby certify that the above Resolution No. 31 is a true and
correct copy of the Resolution as adopted by the EDA Board on the 20th day of September, 2021.
Secretary
2
Exhibit A
MAPLE GROVE
BUSINESS
Succeeding today. Growing tomorrow.
FACADE IMPROVEMENT PROGRAM
2021 PILOT
Adopted:
Economic Development Authority of Maple Grove
Economic Development Department
12800 Arbor Lakes Parkway
Maple Grove, MN 55369
763-494-6003
Table of Contents
I. Introduction
11. Purpose And Authority
111. Objectives
IV. General Criteria
V. Grant Process
VI. Design Guidelines
EDA of Maple Grove - Far;ade Improvement Program 2
I. INTRODUCTION
The Economic Development Authority of Maple Grove's Facade Improvement Grant
program is designed to provide technical and financial assistance to property and/or
business owners within Maple Grove in order to facilitate upgrades and improvements
to the appearance of commercial and retail buildings. The goal of the program is to
strengthen the viability of commercial buildings within the City, attract and retain
business tenants, and beautify commercial areas.
II. PURPOSE AND AUTHORITY
A. The purpose of this policy is to establish the EDA's position relating to the use of the
Facade Improvement Program. This policy shall be used as a guide in the processing
and review of applications requesting grant funds.
B. The criteria are to be used in conjunction with other relevant policies of the City
and/or EDA.
C. The EDA reserves the right to approve or reject applications on a case-by-case basis,
taking into consideration factors considered appropriate by the City, in addition to
established policies, criteria, and potential benefits. Approval or denial of an
application is at the sole discretion of the EDA or authorized City of Maple Grove
personnel.
Ill. OBJECTIVES
The objective of the Facade Improvement Program is to deploy a local pool of grant
funds on a match basis to support and incentivize improvements to the exterior of
established commercial and retail buildings. This may be accomplished by some or
all of the following means:
A. Provide needed finances to property owners within the community which are
making significant improvements to their buildings and have a financial need for
assistance for these improvements;
B. Providing funding to business owners to enhance their public facing
storefronts as a means to attract additional customers;
c. Providing technical assistance to business and/or property owners on
improvement mechanisms and materials for their property.
IV. GENERAL CRITERIA
Business and property owners located within buildings that were constructed prior to
1990 are eligible, assuming the business or property have no delinquent bills, charges, or
taxes due to the City. All improvements made using grant funds or the required matching
EDA of Maple Grove - Facade Improvement Program 3
funds must result in permanent, external building improvements. Due to the limited
amount of funding available, all applications may be subject to a competitive selection
process which will be based upon the review criteria defined in Section IV.D. All
applications and plans are subject to the review and approval of the EDA and/or City.
Applying and providing plans does not guarantee approval.
A. ELIGIBLE APPLICANTS
• The applicant must be the property owner or a tenant (business) with written
permission from the property owner to make facade improvements to a commercial
or retail building
• There must be no delinquent bills, charges, or taxes due to the City at the time of
applying
• In order to be eligible, the building in which the enhancements are proposed must
have been constructed prior to 1990
• All projects must result in permanent, external building improvements
• The property and/or business must be a conforming or legally non-conforming use
• All improvements must follow the principles, guidelines, and rules of the Maple
Grove Zoning Code, Building Code, Fire Code, and Fac;:ade Improvement Program
Guidelines
B. ELIGIBLE IMPROVEMENTS
The following improvements are eligible uses of grant funds or required match funds.
Innovative improvements not listed below may be eligible upon approval by the EDA. All
improvements must be completed by a licensed contractor.
• Exterior painting or re-siding
• Green facade improvements (e.g. living wall, reclaimed wood accents, etc.)
• Restoration of exterior finishes and materials
• Masonry repairs
• Removal of architectural accents which are incompatible, obsolete, or damaged
• Repair, replacement, or installment of windows and doors
• Canopy or awning installation or repair
• Replacement of free-standing signage for a multi-tenant building
• Labor costs are only eligible to be covered by the grant if the labor is done by a third-
party contractor who has no financial interest in the building
C. INELIGIBLE IMPROVEMENTS
Ineligible improvements include, but are not limited to, the following:
EDA of Maple Grove - Fac;:ade Improvement Program 4
• Improvements in progress or completed prior to grant approval or preliminary
approval
• Routine maintenance that is not part of an eligible project
• Billboards
• Roofing
• Mechanical and HVAC systems
• Interior work
• Security Systems
• Trash and mechanical enclosures
• Fencing
• Landscaping
• Purchasing of a property
• Marketing of the property or business
D. REVIEW CRITERIA
The following review criteria and goals shall be used when evaluating applications
for funding and determination or grant amounts:
• Project goals and description
• Impact of the project on the building and/or business
• Readiness of the project
• Ownership ability to provide the required match
E. APPLICATION PROCESS
All applications for funding from the Facade Improvement Program will be accepted on a
continuous basis until all funds are exhausted. City of Maple Grove staff will review
applications to ensure complete information is provided and determine if a proposed
project is eligible. All questions in the application must be answered and all required
attachments must be attached for the application to be considered. Potential applicants
are encouraged to contact City staff to discuss a potential project prior to applying.
The following items much accompany any grant application:
• Proof of property ownership or lease and written letter of consent by the property
owner
• Color photographs of the existing building facade condition
• Two or more competitive proposals from contractors for the work to be completed,
including detailed information on the work to be completed, detailed costs, and a
project completion schedule
• Other supporting documentation deemed necessary by the Economic Development
Authority of Maple Grove
EDA of Maple Grove - Facade Improvement Program 5
F. GRANT AGREEMENT
If a project has been selected for a grant award, the grantee shall be required to enter
into a Grant Agreement with the City. The Grant Agreement must be fully executed prior
to requesting disbursement of funds.
G. EDA RIGHTS
The EDA reserves and retains the right to deny any grant application for funding. All
grantees shall be required to indemnify the City of Maple Grove, the Economic
Development Authority of Maple Grove, and any officers acting on their behalf.
H. CONFLICT OF INTEREST
An officer of the City will not have a personal financial interest or personally benefit
financially from the business or property owner to be assisted. Minn. Stat. 471.87
and 471.88 provide guidance on conflict of interest.
I. GOVERNMENT DATA PRACTICES
Information contained in the application for assistance will become a matter of public
record with the exception of those items protected under Minn. Stat. 5 13.591.
V. GRANT PROCESS
A. GRANT SIZE
Property or business owners may apply for grant assistance of up to 50% of the
costs of eligible improvements. Grants shall be no less than $1,000 and no greater
than $15,000.
E. MATCH REQUIREMENT
All grant recipients are required to provide a 1:1 match of grant dollars with private
funds. No grant shall exceed 50% of the total eligible project cost.
F. GRANT FUND DISBURSEMENT
All grantees shall receive their grant funds via reimbursement for costs incurred. To
receive the grant funds, the work must be completed and the grantee must submit
to City staff any invoice(s) and corresponding proof of payment(s). Grant funds will
not be disbursed prior to the work being completed.
EDA of Maple Grove - Facade Improvement Program 6
G. FEES
There shall not be an application fee to apply for a grant from the Facade
Improvement Program for any applicant business.
VI. DESIGN GUIDELINES
The following Design Guidelines outline the standards which must be followed when
renovating buildings using a Fac;:ade Improvement Program grant. These guidelines
provide a basis for activities. Applicants are encouraged to speak with City staff regarding
proposed facade improvements prior to applying for a grant.
A. ENCOURAGED FACADE IMPROVEMENTS
• Windows and Doors
i. No tinted windows, only clear glass. Spandrel glass may be used where
real glass is not practical;
ii. Windows and doors free of clutter and obstructions (including window
signage) allowing for clear views to the primary street.
• Structure and Materials
i. Use of durable materials such as brick, stone, etc.
ii. If a two-story building, the ground floor should appear visually distinct
from the upper stories of the building;
• Painting and Lighting
i. Unpainted brick shall stay unpainted, previously painted masonry may be
painted;
ii. Bright or primary colors should be used only as accents;
iii. Spot or flood lighting to highlight architectural detailing of a building
should be inconspicuous and blend with the wall on which it is mounted;
iv. Energy saving lighting and light bulbs are encouraged;
v. Building light fixtures should complement the entire facade.
• Awnings and Signage
i. Awning should attach to the building at or below the lower edge of the
sign band;
ii. Awnings should be made of canvas and waterproof cloth designed to
resist fading and tearing;
iii. Awning colors should coordinate with the primary or accent color of the
building;
iv. Awning should be proportional to the building and not obstruct the
building or storefront.
v. Signage should include fonts and colors that are legible from a distance.
EDA of Maple Grove - Fac;:ade Improvement Program 7
B. PROHIBITED FACADE IMPROVEMENTS
• Covering brick or stone with vinyl, concrete, aluminum, or wood siding;
• Sandblasting brick
• Reducing existing window size to accept standard residential window sizes
• Replacing windows with wall surface, wood, metal, or other materials
• Adding lighting which moves, flashes, or has audible noise
EDA of Maple Grove - Facade Improvement Program 8
Get email alerts for Maple Grove
A daily email when new agendas and minutes are posted.