Muyni
← Back to Maple Grove

Lake Quality Commission

Regular Meeting

Maple Grove, MN · March 16, 2022

AgendaMinutes

Minutes

MAPLE GROVE LAKE QUALITY COMMISSION MINUTES March 16, 2022 CALL TO ORDER A meeting of the Lake Quality Commission (LQC) was held on March 16, 2022 in the Mayor’s Conference at the Maple Grove Government Center, 12800 Arbor Lakes Parkway, Maple Grove. Joe Ruegsegger called the meeting to order at 6:33 p.m. Commissioners Present: George Schneider – Rice Lake Brennon O’Callaghan – Fish Lake Nancy Bergstrand – Weaver Lake Steve Lane – Cedar Island Sharon Martin-Kotula – Edward Lake Joe Ruegsegger – At Large Commissioners Absent: Ben Zaker – At Large Becky Fahrenbruch – Chair - Eagle Lake Others Present: City Council Member LQC Liaison Karen Jaeger Derek Asche, City of Maple Grove Mark Lahtinen, City of Maple Grove Martha West – Eagle Lake AREA REPORTS Rice Lake, George Schneider – Still about 15” of ice remaining. There is a small amount of flow through the Rice Lake dam. The Rice Lake association will hold their annual meeting in May. Eagle Lake, Martha West – Still about 20” of ice remaining on Eagle and fishermen are still present taking advantage of the conditions. Fish Lake, Brennon O’Callaghan – Still about 18” of ice remaining. FLARA will hold their annual meeting on April 13, 2022. Cedar Island, Steve Lane – The geese are beginning to return. Edward Lake, Sharon Martin-Kotula – Waterfowl are beginning to return in the area of the aerator and some folks are still walking on the lake. Weaver Lake, Nancy Bergstrand – The ice is continuing to melt as there is ponding of water on the lake. At Large, Joe Ruegsegger – Predicting ice out in three weeks based on current conditions and forecast. APPROVAL OF Minutes of the February 16, 2022 LQC meeting were presented. MINUTES MOTION TO APPROVE made by Schneider, second by Bergstrand. With all in favor the motion was APPROVED. LAKE Asche presented a synopsis of the Lake Improvement Program (LIP) and noted that IMPROVEMENT staff was recommending the LQC approve total funding from the city (individual PROGRAM lake applications + basic annual programming) of $56,835.78. The LIP applications were presented individually by the submitters and were discussed by the committee. After presentations and discussion, no changes were made to the funding sources from the staff proposal. MOTION TO APPROVE made by Martin-Kotula, second by Lane. With all in favor the motion was APPROVED. INFORMATIONAL It was noted that LQC will have a booth at the upcoming Maple Grove Days in July. ITEMS Joe Ruegsegger is coordinating on behalf of LQC and will be meeting with LQC Chair Becky Fahrenbruch and city staff Derek Asche to discuss details. FUTURE April 20, 2022 MEETING: ADJOURNMENT Meeting adjourned at 7:37 pm.

Agenda

Lake Quality Commission Agenda March 16, 2022 The Lake Quality Commission (LQC) meeting will commence at 6:30 pm at the Maple Grove Government Center, 12800 Arbor Lakes Parkway, Maple Grove, MN, 55369. ITEM ACTION REQUIRED CALL TO ORDER Call to order by Chairperson Fahrenbruch at 6:30 p.m. BUSINESS ITEMS 1. Introductions Introduce commissioners and students; five minutes for public comment 3. Area Reports 4. Approval of Minutes Approve minutes from the February 16, 2022 LQC meeting Approval of Lake Improvement Program projects and funding 8. Lake Improvement Program requests. INFORMATIONAL ITEMS FUTURE MEETINGS: April 20, 2022 ADJOURNMENT MAPLE GROVE LAKE QUALITY COMMISSION DRAFT MINUTES February 16, 2022 CALL TO ORDER A meeting of the Lake Quality Commission (LQC) was held on February 16, 2022 in the Mayor’s Conference at the Maple Grove Government Center, 12800 Arbor Lakes Parkway, Maple Grove Becky Fahrenbruch called the meeting to order at 6:32 p.m. Commissioners Present: Becky Fahrenbruch – Chair - Eagle Lake George Schneider – Rice Lake Brennon O’Callaghan – Fish Lake Nancy Bergstrand – Weaver Lake Steve Lane – Cedar Island Sharon Martin-Kotula – Edward Lake Joe Ruegsegger – At Large Commissioners Absent: Ben Zaker – At Large Others Present: City Council Member LQC Liaison Karen Jaeger Derek Asche, City of Maple Grove Mark Lahtinen, City of Maple Grove Ben Olson – Teal Lake Diane Spector - Stantec OATHS OF OFFICE Councilmember Jaeger gave oaths of office to Steve Lane and Sharon Martin-Kotula. AREA REPORTS Rice Lake, George Schneider – Aerator may not be working as planned. Recent DO readings have indicated low dissolved oxygen levels. Eagle Lake, Becky Fahrenbruch – Winter activity is less than last year although there are some ice rinks and fish houses. The Winter Festival will be on February 26, 2022 in the Balsam Lane Channel. Fish Lake, Brennon O’Callaghan – FLARA is considering restocking bluegills this year. TRPD will have kids activities going on the 19th-20th of February. A DNR permit has been secured to remove cattails in the channel between Fish and Rice lakes. One boat was detected with zebra mussels in 2021 and it seems the launch inspections are having a positive effect. There is no indication of northern pike spearing this winter. Cedar Island, Steve Lane – The aerator has been on since January 1st, 2022. Edward Lake, Sharon Martin-Kotula – The aerator is running and there are some hockey rinks on the lake. Weaver Lake, Nancy Bergstrand – Winter activities are down compared to last year. The white stem pondweed appears thick. At Large, Joe Ruegsegger – There was recently a polar plunge on Fish Lake but the hole was left open and not well marked. APPROVAL OF Minutes of the November 17, 2021 and January 19, 2022 LQC meetings were MINUTES approved with one correction to the November 17, 2021 minutes. Nancy Bergstrand was present at the November meeting. MOTION TO APPROVE made by Schneider, second by Bergstrand. With all in favor the motion was APPROVED. ELECTION OF Becky Fahrenbruch was nominated to serve as Chair. Joe Ruegsegger was OFFICERS nominated to serve as Vice-Chair. MOTION TO APPROVE made by O’Callaghan, second by Schneider. With all in favor the motion was APPROVED. SHINGLE CREEK Diane Spector presented information on the Shingle Creek/West Mississippi 4TH GENERATION process for updating their watershed management plan. Spector noted a number PLAN of watershed successes over the years including securing over $3,000,000 in grant funding to support community projects, restoration of 3.2 miles of Shingle Creek, and the delisting of three lakes from the State impaired waters list. Spector also explained that this current update is required every 10 years and will include updating policies/goals, addressing emerging issues, promoting inclusivity, and enhancing education. Spector will be back to the LQC later in the Spring with more information. 2022 WORK PLAN Asche presented the 2022 Work Plan as discussed at the January LQC meeting. February – Work Plan, Shingle Creek 4th Generation Pan and LIP Process March – LIP review and approval April –Steve McComas Lake Monitoring Report May – Shingle Creek 4th Generation Plan & Shingle Creek TMDL Updates June – Edward Lake Tour if weeds are not too thick July – Maple Grove Days August – Fish Lake Tour September – Eagle Lake Tour October - NPDES MS4 Annual Meeting & Fish Lake Alum presentation November – Fish/Rice Lake Carp Report and Presentation December – Winter/Holiday Gathering MOTION TO APPROVE made by Lane, second by Schneider. With all in favor the motion was APPROVED. INFORMATIONAL The Chair will not be at the March LQC meeting. The Vice-Chair will serve in her ITEMS place. The Rice Lake drawdown will end in late March by closing the dam. FUTURE March 16, 2022 MEETING: ADJOURNMENT Meeting adjourned at 7:46pm. LAKE QUALITY COMMISSION STAFF REPORT TO: Lake Quality Commission (LQC) FROM: Derek Asche, Water Resources Engineer DATE: March 8, 2022 SUBJECT: Lake Improvement Program (LIP) The LQC annually reviews, and makes recommendations to the City Council, funding for projects that improve the water quality in our local lakes. These projects are generally divided into two categories. The first is Individual Lake LIP applications which are primarily a partnership between lake associations and the city, but can also include other partners such as watershed management organizations, Hennepin County, the Three Rivers Park District, and possibly others. The second category is Basic Annual Programming which includes water quality monitoring, non-lake association projects and/or city wide projects. Staff received 21 Individual Lake LIP applications with project costs totaling $83,436.11. To provide equity in funding from the City across all lake associations, staff drafted recommended funding guidance based on four general project categories (see Table 1) and their relative benefit to lake water quality. Staff recommends funding from the City of $42,785.78 and funding of $41,151.33 from lake associations for Individual Lake LIP applications based on the applications submitted and guidance described in Table 1. LIP projects and recommended funding levels from the LQC are typically placed on an April City Council agenda for approval. Table 1. Staff guidance on LIP funding Association City Category Example Funding Funding Internal Phosphorus Sequestering Alum/Phoslock treatment or similar 20% 80% Education Handouts/pamplets, etc… 25% 75% Aquatic Vegetation Management Invasive species – Curlyleaf/EWM etc. 30% 70% Native Planting (ex. Shoreline restoration) 30% 70% Algae Reduction/Control 30% 70% Launch Inspections/Cleaning Station (CD3) 30% 70% Dye Treatments 30% 70% Fish Management Carp Removal 40% 60% Fish Stocking 40% 60% Miscellaneous Activities Boat Launch Upgrades 50% 50% Consulting/Monitoring Services 50% 50% Aeration 50% 50% Adopt-A-Drain 0% 100% Individual Projects Case by Case Case by Case LAKE QUALITY COMMISSION STAFF REPORT Funding for Basic Annual Programming such as water quality monitoring, non-lake association projects and/or city wide projects are also included with the LIP and does not require partnerships or a funding match from lake associations. Staff is recommending four Basic Annual Programming projects be funded totaling $14,050.00. BUDGET: The 2022 Lake Improvement Program has a budget of $60,000. RECOMMENDATION: Staff recommends total funding from the City (Individual Lake Applications + Basic Annual Programming) of $56,835.78 for the 2022 Lake Improvement Program. Attachment: 2022 Lake Improvement Program Summary Lake Improvement Program (LIP) Applications 2022 Lake Improvement Program Application Summary Lake Requested Association City LQC Recommended Funding Funding Funding Total Cost Funding Level Level INDIVIDUAL LAKE APPLICATIONS Eagle and Pike Lakes Eagle Lake Education and Eradication - AIS treatment $1,140.00 $2,660.00 $3,800.00 70% 100% Eagle Lake Education and Eradication - Surveys $750.00 $1,750.00 $2,500.00 70% 100% Eagle Lake Education and Eradication - Education $250.00 $750.00 $1,000.00 75% 100% Rice Lake AIS Plant Survey $315.00 $735.00 $1,050.00 70% 70% Fish Survey $1,125.00 $2,625.00 $3,750.00 70% 70% Fish Restocking $3,000.00 $4,500.00 $7,500.00 60% 60% Weaver Lake CLP Treatment $2,097.33 $4,893.78 $6,991.11 70% 70% Education $112.50 $337.50 $450.00 75% 50% Walleye Stocking $640.00 $960.00 $1,600.00 60% 40% General AIS Programming $2,190.00 $5,110.00 $7,300.00 70% 70% Cedar Island Lake Curlyleaf Pondweed treatment $975.00 $2,275.00 $3,250.00 70% 70% Navigation channel treatment $750.00 $1,750.00 $2,500.00 70% 70% Pump Bay treatment $309.00 $721.00 $1,030.00 70% 70% Aeration $450.00 $450.00 $900.00 50% 50% Fish Lake Goose Management $1,800.00 $1,200.00 $3,000.00 40% 38% Watercraft Inspections $2,100.00 $4,900.00 $7,000.00 70% 70% Street Sweeping $20,790.00 $2,310.00 $23,100.00 10% 90% Edward Lake Aeration $397.50 $397.50 $795.00 50% 75% Boat Ramp Installation $460.00 $460.00 $920.00 50% 75% AIS Management $1,500.00 $3,500.00 $5,000.00 70% 75% Teal Lake Fish Stocking $501.00 $835.00 60% Sub Total $41,151.33 $42,785.78 $83,436.11 51% BASIC ANNUAL PROGRAMMING Adopt a Drain NA 300.00 300.00 100% Water Quality Monitoring by Blue Water Science NA 12,000.00 12,000.00 100% 100% Individual Water Quality Improvement Projects Mauritzen - Native Shoreline Restoration NA 750.00 1,500.00 50% 50% Phragmites Control NA 1,000.00 1,000.00 100% 100% Sub Total 0.00 14,050.00 14,800.00 95% Recommended Grand Total 41,151.33 56,835.78 98,236.11 58% Note: For reimbursement purposes, the applicant must demonstrate they were accountable for the percentage of project that they have projected in the application. Staff Guidance on Funding Lake Association City LOC Category of Project Investment Investment Internal Phosphorus Sequestering Alum/Phoslock treatments or similar 20.00 80.00 Education 25.00 75.00 Aquatic Vegetation Management Invasive species Management - Curlyleaf/EMW 30.00 70.00 Native Plantings (shoreline restorations, etc…) 30.00 70.00 Algae Reduction Control 30.00 70.00 Boat Launch Inspections/Cleaning Stations (CD3) 30.00 70.00 Dye Treatments 30.00 70.00 Fish Management Carp Removal 40.00 60.00 Fish Stocking 40.00 60.00 Miscellanious Activities Boat Launch Upgrades 50.00 50.00 Consulting/Monitoring Services 50.00 50.00 Aeration 50.00 50.00 Adopt-a-Drain 0.00 100.00 Individual Water Quality Improvement Projects Case by case Case by Case MAPLE GROVE LAKE IMPROVEMENT PROGRAM APPLICATION FORM DUE FEBRUARY 28th, 2022 PROJECT NAME Eagle Lake Education and Eradication DATE February 28, 2022 Eagle Lake and Pike Lake Lake Organization Eagle Lake Preservation Association (ELPA) Contact Person Martha A. West Telephone (H) 763-381-4845 Address: 6325 Eagle Lake Drive, Maple Grove, MN (W) Contractor/Applicator James Johnson, Freshwater Scientific Services and Patrick Selter, PLM Lake Management Address fixmylake.com PLMCorp.net 651-336-8696 218-270-3338 Telephone Project Description Scope of Work (including description of lake area, size of area and expected longevity of project enhancements) We are proposing a two-part approach this year because education is critical to the care of the lake and the fishery. We are proposing to expand our educational initiatives, including our Eagle Lake welcome booklet to property owners who are not directly on the lake shore but clearly enjoy the amenities the lake provides whether it be the public access or walking trails. We would respectfully request assistance with printing costs for the booklet in addition to materials to post at the public access about caring for the waterway and thoughtful, considerate usage. We need to be more rigorous in our treatment approach this year as the large weed clumps, particularly at the entrance to the south bay of Eagle Lake are creating a navigational hazard. Treatment of Curly Leaf Pondweed (CLP) and Eurasian Water Milfoil (EWM) with Diquat for Eagle Lake in excess of 19 acres in the northwest corner and south east corridor. The extensive CLP matting created a safety hazard as boats would either be stopped by the propeller clogging, or would operate more closely in proximity to one another to avoid the weed mats. In addition, we are requesting an updated survey from Freshwater Scientific Services/James Johnson and the scope and cost is included in this estimate. Meets Objective of Management Plan? Yes No 1. Shoreline Buffer   2. Watershed Clean-Up  X  3. Aquatic Plant Control  x  4. Water Quality  x  5. Public Education  x  6. Fisheries  X  7. Recreational  x  8. Algae Control   9. Other     Lake Improvement Program Application – Page 2 For Copper Sulfate treatments, secchi disc readings for water quality, must be taken for one week prior to and after treatment. Readings Before Readings After Date Date Date Date Project Cost $3800 PLM AIS treatment $2500 Freshwater Scientific Services for new surveys Project Cost $ $1000 Printing for educational booklets, posters and signs (Attach copy of invoices and permits) Association Funding $ Other Funding $ $7,300.00 Amount of City Funding Requested $ Description of Association in-kind labor and materials: I declare the stated costs are an accurate reflection of estimated costs to be incurred. Martha A. West February 28, 2022 Organization Representative Date MAPLE GROVE LAKE IMPROVEMENT PROGRAM APPLICATION FORM DUE FEBRUARY 28th, 2022 PROJECT NAME 2022 Rice Lake AIS Plant Survey DATE February 15, 2022 Lake Rice Organization Rice Lake Area Association Contact Person George Schneider Telephone (H) 763-420-8027 Address: 14000 92nd Place North, Maple Grove, MN 55369 (W)(C) 763-453-0065 Contractor/Applicator Freshwater Scientific Services, LLC Address 15771 Creekside Lane, Osseo, MN 55369 Telephone 651-336-8696 Project Description Scope of Work (including description of lake area, size of area and expected longevity of project enhancements) Survey purpose is to locate and map areas where curlyleaf pondweed (CLP) and Eurasian Watermilfoil (EWM) exist to help guide management. Survey will follow MN DNR delineation requirements. Note: MN DNR requires Rice Lake to conduct annual AIS surveys for three (3) years post drawdown. A DNR IAPM (Invasive Aquatics Plant Management) permit has been submitted. Meets Objective of Management Plan? Yes No 1. Shoreline Buffer   2. Watershed Clean-Up X  3. Aquatic Plant Control  X  4. Water Quality  X  5. Public Education   6. Fisheries   7. Recreational  X  8. Algae Control  X  9. Other     Lake Improvement Program Application – Page 2 For Copper Sulfate treatments, secchi disc readings for water quality, must be taken for one week prior to and after treatment. Readings Before Readings After Date Date Date Date Project Cost Project Cost $ 1,050 (Attach copy of invoices and permits) Association Funding $ 315 (30%) Other Funding $ Amount of City Funding Requested $ 735 (70%) Description of Association in-kind labor and materials: I declare the stated costs are an accurate reflection of estimated costs to be incurred. George Schneider February 15, 2022 Organization Representative Date 15771 Creekside Lane Osseo, MN 55369 james@freshwatersci.com (651) 336-8696 PROPOSAL (February 3, 2022) 1 PROJECT Aquatic Plant Surveys for Rice Lake in 2022 Client: Rice Lake Area Association 2 PROPOSED SERVICES 1 – Late-Spring CLP and EWM Delineation Survey (May/Jun) ________________________________________ 2 – Point-Intercept Aquatic Vegetation Survey (Jul/Aug) GLS 1 – Curlyleaf Pondweed & Eurasian Watermilfoil Delineation Survey The purpose of this survey will be to locate and map areas of curlyleaf pondweed (CLP) and Eurasian watermilfoil (EWM) in the lake to help guide management. During this survey, I will search for CLP and EWM in the nearshore portion of the lake using a combination of surface observations, rake tosses, and sonar readings. The location and density of any CLP or EWM will be documented in the field using a hand-held GPS unit, with final mapping and area calculation being completed using desktop GIS. ____________________________________________________ 2 – Point-Intercept Aquatic Vegetation Survey GLS _____________________________________________________________________________________________________ This point-intercept survey will be conducted in the late summer (Jul-Aug) to assess the distribution _______________________________________________________________________________________________________ and density of all aquatic plants in Rice Lake. Sampling and data analysis will be conducted according _______________________________________________________________________________________________ to the methods described in the MNDNR protocol for aquatic vegetation surveys. Surveys will _______________________________________________________________________________________________________ incorporate assessments at ~200 sample points, with documentation of the following at each sample _______________________________________________________________________________________________________ point: water depth, plant taxa retrieved on the sampling rake, overall plant height, and rake density _______________________________________________________________________________ rating (1 to 4) of retrieved plants (collectively and for individual taxa). 3 DELIVERABLES Freshwater will provide the following items to you after completing the proposed services: Item Delivery 1 – CLP/EWM Delineation Report 1 week after survey completion _________________________________________________________________________ GLS 2 – PI Aquatic Vegetation Survey Dec 31, 2022 4 PRICE QUOTE Service 1 – CLP/EWM Delineation Survey Price $ 1,050 ________________________________________________________________________ 2 – PI Aquatic Vegetation Survey $ 2,350 GLS © 2022 – Freshwater Scientific Services, LLC (Proposal: 2/3/2022) page 1 of 3 15771 Creekside Lane Osseo, MN 55369 james@freshwatersci.com (651) 336-8696 SERVICES AGREEMENT 1 AGREEMENT This agreement is for services to be provided to Rice Lake Area Association (“Client”) by 3 DELIVERABLES Freshwater will provide the following items to Client by the end of the agreement period Freshwater Scientific Services, LLC unless otherwise noted: (“Freshwater”). 1 – CLP/EWM Delineation Report _____________________________ 2 – Lake Vegetation Report GLS This agreement starts when signed by both Freshwater and Client, and ends on December 31, 2022. However, it may be ended at an earlier date by either Freshwater or Client with 30-days written notice. If ended early, Client agrees to pay Freshwater for all costs associated with completed 4 PAYMENT Freshwater will invoice Client as follows upon delivery of each item listed: services, and Freshwater agrees to provide 1 – CLP/EWM Report $ 1,050 Client with all of the materials or data already __________________________________________ GLS 2 – Lake Vegetation Report $ 2,350 collected. Client agrees to pay Freshwater within 30 This document covers the entire agreement days of being invoiced (due date will be between Freshwater and Client, and explicitly stated on invoices). If Freshwater overrides any other previous written or oral has not received full payment after the agreements between them. However, this indicated due date, Client may be charged a agreement may be changed later on if both late fee of 1.5% of the invoiced amount for parties agree to such changes in writing (as each month that it is left unpaid. described in item 6). This agreement is governed by the laws of Minnesota. If any part of this agreement is found to be legally invalid or unenforceable, it will not affect the validity or enforceability 5 INSURANCE Freshwater carries the following insurance (certificate available upon request): of the rest of the agreement. General Liability Aggregate $2,000,000 Products/Operations $2,000,000 Personal/Advertising Injury $1,000,000 2 SERVICES Freshwater will provide the following services to Client (see the attached proposal dated Watercraft Liability $ 500,000 2/3/2022 for a full description of the services): 1 – CLP/EWM Delineation Survey (May/Jun) _______________________________ 2 – PI Aquatic Vegetation Survey GLS Freshwater will provide all equipment and personnel needed to conduct these services and will obtain any required permits needed to complete the services listed. © 2022 – Freshwater Scientific Services, LLC (Proposal: 2/3/2022) page 2 of 3 15771 Creekside Lane Osseo, MN 55369 james@freshwatersci.com (651) 336-8696 6 COMMUNICATION All required communication between Client and Freshwater will use the following contacts: Rice Lake Area Association Primary Contact: George Schneider Phone: (763) 420-4677 Email: dukewolves@comcast.net Freshwater Scientific Services, LLC Contact: James A. Johnson 15771 Creekside Lane Osseo, MN 55369 Phone: (651) 336-8696 Email: james@freshwatersci.com Any communication regarding changes to this agreement must be explicitly stated in writing and signed by both parties to be effective (or emailed with explict written statements of acceptance by both parties). 7 ACCEPTANCE I have read this entire agreement and understand its meaning and requirements. I am a representative of the Rice Lake Area Association with the legal authority to enter into this agreement on its behalf, and I willfully accept the terms of this agreement. 2/14/2022 ______________________________________ _____________ Secretary/Rice Lake Area Assoc. _____________________________ Signature Date Title/Position George L. Schneider ______________________________________ Name (printed) I have read this entire agreement and understand its meaning and requirements. I am a representative of Freshwater Scientific Services, LLC with the legal authority to enter into this agreement on its behalf, and I willfully accept the terms of this agreement. ______________________________________ 2/3/2022 _____________ Aquatic Ecologist _____________________________ Signature Date Title/Position James A. Johnson ______________________________________ Name (printed) © 2022 – Freshwater Scientific Services, LLC (Proposal: 2/3/2022) page 3 of 3 MAPLE GROVE LAKE IMPROVEMENT PROGRAM APPLICATION FORM DUE FEBRUARY 28th, 2022 PROJECT NAME 2022 Rice Lake Fish Survey DATE February 15, 2022 Lake Rice Organization Rice Lake Area Association Contact Person George Schneider Telephone (H) 763-420-8027 Address: 14000 92nd Place North, Maple Grove, MN 55369 (W)(C) 763-453-0065 Contractor/Applicator Blue Water Science Address 550 South Snelling Ave, St. Paul, MN 55116 Telephone 651-690-9602 Project Description Scope of Work (including description of lake area, size of area and expected longevity of project enhancements) Conduct a fish survey using MnDNR-style fyke nets to characterize existing fish conditions and compare to previous fish survey results. Six MnDNR style fyke nets will be deployed over a two-day period for a total of 12 net lifts. A report will be prepared that summarizes and makes comparisons to previous surveys. Quote includes: permit, net rental, boat use, field work and report prep. Meets Objective of Management Plan? Yes No 1. Shoreline Buffer   2. Watershed Clean-Up   3. Aquatic Plant Control   4. Water Quality   5. Public Education  X  6. Fisheries  X  7. Recreational   8. Algae Control   9. Other     Lake Improvement Program Application – Page 2 For Copper Sulfate treatments, secchi disc readings for water quality, must be taken for one week prior to and after treatment. Readings Before Readings After Date Date Date Date Project Cost Project Cost $ 3,750 (Attach copy of invoices and permits) Association Funding $ 1,125 Other Funding $ Amount of City Funding Requested $ 2,625 Description of Association in-kind labor and materials: Note: We again asked MN DNR to conduct a fish survey but they refused. The last MN DNR fish survey was conducted in 1994 (https://www.dnr.state.mn.us/lakefind/showreport.html?downum=27011600). BWS last conducted a fish survey in 2014 for Rice Lake. I declare the stated costs are an accurate reflection of estimated costs to be incurred. George Schneider February 15, 2022 Organization Representative Date QUOTE Fish Survey for Rice Lake, Maple Grove, MN in 2022 Date: December 17, 2021 To: Rice Lake Association From: Steve McComas, Blue Water Science We propose to conduct a fish survey of Rice Lake in 2022 using MnDNR-style fyke nets to characterize existing fish conditions and compare to previous fish survey results. We will employ six MnDNR style fyke nets. There will be one day of net installation followed by two days of net sampling for a total of 12 net lifts. Net removal will occur after the second fishing day. A report will be prepared that summarizes results and makes comparisons to previous surveys along with fish management recommendations. Quote includes: permit acquisition, net rental, boat use, field work, and report preparation. Quote Lake Approx. Lake Fish Survey Fish Survey Total Survey Area (acres) Labor Data Analysis Cost and Report Rice 3 days using 2 staff to set and 333 2 days $3,750 3 staff to run nets TOTAL QUOTE: $3,750 MAPLE GROVE LAKE IMPROVEMENT PROGRAM APPLICATION FORM DUE FEBRUARY 28th, 2022 PROJECT NAME 2022 Rice Lake Fish Stocking DATE February 28, 2022 Lake Rice Organization Rice Lake Area Association Contact Person George Schneider Telephone (H) 763-420-8027 Address: 14000 92nd Place North, Maple Grove, MN 55369 (W)(C) 763-453-0065 Contractor/Applicator TBD Address TBD Telephone TBD Project Description Scope of Work (including description of lake area, size of area and expected longevity of project enhancements) In the event that Rice Lake experiences a significant winter kill this season, we would like to restock the lake with gamefish as we last did in 2015 and 2017. Our objective is to populate the lake with gamefish which would feed on carp eggs and help keep their population down. Our Fish Management team is in the process of getting bids from suppliers. Meets Objective of Management Plan? Yes No 1. Shoreline Buffer   2. Watershed Clean-Up   3. Aquatic Plant Control   4. Water Quality  X  5. Public Education  X  6. Fisheries  X  7. Recreational   8. Algae Control   9. Other     Lake Improvement Program Application – Page 2 For Copper Sulfate treatments, secchi disc readings for water quality, must be taken for one week prior to and after treatment. Readings Before Readings After Date Date Date Date Project Cost Project Cost $ 7,500 (Attach copy of invoices and permits) Association Funding $ 3,000 (40%) Other Funding $ Amount of City Funding Requested $ 4,500 (60%) Description of Association in-kind labor and materials: Note: We will withdraw this submission if we do NOT experience a significant fish kill this season. A planned Fish Survey by BWS this season will help us determine if the need to restock exists. I declare the stated costs are an accurate reflection of estimated costs to be incurred. George Schneider February 28, 2022 Organization Representative Date AQUATIC NUISANCE CONTROL QUOTE - 2022 Jeremy Miller February 9, 2022 Cedar Island Lake Homeowners Assoc. 6916 E Fish Lake Road Maple Grove MN 55369 I the undersigned have inspected and/or reviewed specifications for the treatment of the following aquatic nuisances using aquatic herbicides and algaecides. If you are in agreement please sign and return this form via mail, email or fax. Please advise if you have any questions. x Submerged Weeds Shoreline (Filmentous) Algae Plankton Algae x Eursian Watermilfoil Duckweed Emergent Weeds Swimmers Itch x Curly-Leaf Pondweed Lily-pads I HEREBY PROPOSE AND AGREE TO: Lake/Bay/Pond CEDAR ISLAND LAKE A) Service & Costs: Curly-Leaf Pondweed, 6.10 Acres Reward Herbicide (diquat) Cost: $3,250 B) Date(s): When water temps range between 50-60 degrees. C) Permit: CILHA will apply for DNR permit All applications will be consistent with the 2022 MN Department of Natural Resources Aquatic Permit. Midwest Aqua Care will furnish all labor and materials as necessary to perform the above services. Midwest Aqua Care carries insurance for liability, property damage, workers compensation and will upon request confirm by certificate of insurance. This proposal may be withdrawn by Midwest Aqua Care if not accepted within THIRTY (30 ) days. Respectfully submitted, Name /Association Name MIDWEST AQUA CARE email: sales@midwestaquacare.com Signature Date Email:_____________________________ Thank you for using Midwest Aqua Care WE'VE MOVED! MIDWEST AQUA CARE • 1924 W 200TH ST, JORDAN, MN • 952-403-6879 AQUATIC NUISANCE CONTROL QUOTE - 2022 Jeremy Miller February 9, 2022 Cedar Island Lake Homeowners Assoc. 6916 E Fish Lake Road Maple Grove MN 55369 I the undersigned have inspected and/or reviewed specifications for the treatment of the following aquatic nuisances using aquatic herbicides and algaecides. If you are in agreement please sign and return this form via mail, email or fax. Please advise if you have any questions. x Submerged Weeds Shoreline (Filmentous) Algae Plankton Algae x Eursian Watermilfoil Duckweed Emergent Weeds Swimmers Itch Curly-Leaf Pondweed Lily-pads I HEREBY PROPOSE AND AGREE TO: Lake/Bay/Pond CEDAR ISLAND LAKE A) Service & Costs: Coontail Pondweed, 2.30 Acres Channel treatment ~ 2000-ft x 50-ft wide Reward Herbicide (diquat) Cost: $1,250 per application, two allowed by DNR per season B) Date(s): May/June & July/August C) Permit: CILHA will apply for DNR permit All applications will be consistent with the 2022 MN Department of Natural Resources Aquatic Permit. Midwest Aqua Care will furnish all labor and materials as necessary to perform the above services. Midwest Aqua Care carries insurance for liability, property damage, workers compensation and will upon request confirm by certificate of insurance. This proposal may be withdrawn by Midwest Aqua Care if not accepted within THIRTY (30 ) days. Respectfully submitted, Name /Association Name MIDWEST AQUA CARE email: sales@midwestaquacare.com Signature Date Email:_____________________________ Thank you for using Midwest Aqua Care WE'VE MOVED! MIDWEST AQUA CARE • 1924 W 200TH ST, JORDAN, MN • 952-403-6879 AQUATIC NUISANCE CONTROL QUOTE - 2022 Jeremy Miller February 9, 2022 Cedar Island Lake Homeowners Assoc. 6916 E Fish Lake Road Maple Grove MN 55369 I the undersigned have inspected and/or reviewed specifications for the treatment of the following aquatic nuisances using aquatic herbicides and algaecides. If you are in agreement please sign and return this form via mail, email or fax. Please advise if you have any questions. x Submerged Weeds Shoreline (Filmentous) Algae Plankton Algae x Eursian Watermilfoil Duckweed Emergent Weeds Swimmers Itch Curly-Leaf Pondweed Lily-pads I HEREBY PROPOSE AND AGREE TO: Lake/Bay/Pond CEDAR ISLAND LAKE A) Service & Costs: Coontail Pondweed, .34 Acres Teardrop Channel ~ 500-ft x 30-ft wide Reward Herbicide (diquat) Cost: $515 per application, two allowed by DNR per season B) Date(s): May/June & July/August C) Permit: CILHA will apply for DNR permit All applications will be consistent with the 2022 MN Department of Natural Resources Aquatic Permit. Midwest Aqua Care will furnish all labor and materials as necessary to perform the above services. Midwest Aqua Care carries insurance for liability, property damage, workers compensation and will upon request confirm by certificate of insurance. This proposal may be withdrawn by Midwest Aqua Care if not accepted within THIRTY (30 ) days. Respectfully submitted, Name /Association Name MIDWEST AQUA CARE email: sales@midwestaquacare.com Signature Date Email:_____________________________ Thank you for using Midwest Aqua Care WE'VE MOVED! MIDWEST AQUA CARE • 1924 W 200TH ST, JORDAN, MN • 952-403-6879 MAPLE GROVE LAKE IMPROVEMENT PROGRAM APPLICATION FORM DUE FEBRUARY 28th, 2022 PROJECT NAME Goose Management DATE 2/28/2022 Lake Fish Lake Organization Fish Lake Area Residents Association Contact Person Brennon O’Callaghan Telephone (H) 612-202-5440 Address: 7546 Mariner Dr. 55311 (W) Contractor/Applicator Contracted through Three Rivers Park District Address Telephone Project Description Scope of Work (including description of lake area, size of area and expected longevity of project enhancements) Goose population management is necessary when the gaggle becomes too large for the lake. Excess geese produce water hazards for the boaters, nuisance for land owners and increase E. coli levels in the lake. Last summer the beach at Fish Lake park was shut down for more than a month from dangerously high E. coli levels. TRPD is partner in this project and will share costs. Meets Objective of Management Plan? Yes No 1. Shoreline Buffer 2. Watershed Clean-Up 3. Aquatic Plant Control 4. Water Quality X 5. Public Education 6. Fisheries 7. Recreational 8. Algae Control 9. Other Health and Safety X Lake Improvement Program Application – Page 2 For Copper Sulfate treatments, secchi disc readings for water quality, must be taken for one week prior to and after treatment. Readings Before Readings After Date Date Date Date Project Cost Project Cost $ $3000 (Attach copy of invoices and permits) Association Funding $ $450 Other Funding $ $1500 Amount of City Funding Requested $ $1150 Description of Association in-kind labor and materials: I declare the stated costs are an accurate reflection of estimated costs to be incurred. 2/28/2022 Organization Representative Date X MAPLE GROVE LAKE IMPROVEMENT PROGRAM APPLICATION FORM DUE FEBRUARY 28th, 2022 PROJECT NAME Fish Lake Additional Watercraft Inspections DATE 2/25/2022 Lake Fish Lake Organization Fish Lake Area Residents Association (FLARA) Brennon O'Callaghan 612-202-5440 Contact Person Telephone (H) Address: 7546 Mariner Dr. 55311 (W) Contractor/Applicator Sam Kiesow, Three Rivers Park District (TRPD) Address 3000 Xenium Ln N, Plymouth, MN 55441 Telephone 763-694-7752 Project Description Scope of Work (including description of lake area, size of area and expected longevity of project enhancements) TRPD, with support from Hennepin County, funds approximately 1350 hours of watercraft inspection coverage at the Fish Lake public access. The purpose of this program is to educate lake users on AIS and best behaviors for preventing AIS spread as well as to prevent the spread of AIS into and out of Fish Lake. Trained inspectors are generally present June-August 8-5pm, with minimal coverage in May, September, and prior to 8am (peak angling). We propose to expand this program by providing $7000 to increase staffing coverage by roughly 500 hours (37%), specifically during May, September, and early mornings when coverage would otherwise be lacking. FLARA and the City of Maple Grove have been supporting this program since 2017 with much success. In 2021 alone, 3159 inspections were conducted; 116 violations were documented and resolved including 2 boats attempting to enter Fish Lake with zebra mussels attached. Meets Objective of Management Plan? Yes No 1. Shoreline Buffer 2. Watershed Clean-Up 3. Aquatic Plant Control 4. Water Quality 5. Public Education X 6. Fisheries 7. Recreational 8. Algae Control 9. Other AIS Prevention X Lake Improvement Program Application – Page 2 For Copper Sulfate treatments, secchi disc readings for water quality, must be taken for one week prior to and after treatment. Readings Before Readings After Date Date Date Date Project Cost Project Cost $ 7,000 (Attach copy of invoices and permits) Association Funding $ 2,100 (30%) Other Funding $ in-kind support from TRPD Amount of City Funding Requested $ 5,900 (70%) Description of Association in-kind labor and materials: TRPD administers a robust watercraft inspection program at the Fish Lake Public Access including hiring, training, and supervision of seasonal inspectors. This program allows for additional staffing coverage to be added at an affordable rate (see attached email correspondence). I declare the stated costs are an accurate reflection of estimated costs to be incurred. 2/28/2022 Organization Representative Date %UHQQRQ2¶&DOODJKDn 7546 Mariner Dr, Maple Grove, MN 55311 612-2025440 PROJECT NAME: Enhanced Sweep Streeting to Reduce Storm Water Nutrient Loading in Fish Lake DATE: February 13, 2022 Lake: Fish Lake Organization: Fish Lake Area Residents Association (FLARA) Contact Person __Brennon O¶Callaghan_______________ Telephone (M)_612-202-5440 Address:_ 7546 Mariner Dr, Maple Grove, MN 55311 (W)_____________________ Contractor/Applicator _KZ Contracting _____________________ Address 16 S Sutton Lake Blvd, Jordon, MN 55352___________________________ Telephone 507-273-1159__________________________________________________ Project Description Scope of Work (including description of lake area, size of area and expected longevity of project enhancements): The goal of the project is to minimize phosphorus loading into Fish Lake by using intensive street sweeping using a regenerative air sweeper. One pound of phosphorus can create 500 pounds of wet algae1. The Elm Creek TDML study 2 indicated the phosphorus loading in Fish Lake should be reduced by 130 ± 180 pounds per year. The City of Maple Grove¶s Local Surface Water Management Plan3 states the Fish Lake critical watershed road¶s as shown in Figure 1 will be swept by the city five (5) times per year. Street sweeping with a regenerative air sweeper (or similar technology) would increase load recovery by 37% for total phosphorus (Edina, 2015)4. There are approximately 11 curb miles (5.5 street miles) in the targeted area with about 18% tree cover in the target area surrounding Fish Lake as shown in Figure 1 as a combination of the red and blue labelled roads. In addition, we would have the fresh weight of the sweepings measured by the contractor to estimate the nitrogen and phosphorus load removed during each cleaning. To achieve a recovery of approximately 23 pounds of phosphorus and 200 pounds of nitrogen street sweeping would occur once a month from April to October5. Based on 11 curb miles x 7 occurrences the cost of regenerative air sweeping would be $6,020. The information gathered will allow us to modify the street sweeping cleaning schedule to increase efficiency and help to ensure an acceptable TDML for Fish Lake in the future. 1 CleanLakesAlliance.org, a nonprofit organization devoted to improving the water quality of the lakes, streams, and wetlands of the Yahara River Watershed 2 Elm Creek TMDL study, August 2015 3 City of Maple Grove Local Surface Water Management Plan, June 2018 4 Street Sweeping Plan for the City of Edina, October 2015. 5 Fish Lake Street cleaning simulations compiled 5/2014 by Rich Brasch, Sr. Manager of Water Resources at Three Rivers Park District Figure 1. Fish Lake Critical Watershed Roads for Regenerative Street Sweeping Key: Red roads swept 5 times a year by City of Maple Grove Blue roads for regenerative air sweeper following city sweeping Meets Objective of Management Plan? Yes No 1. Shoreline Buffer † † 2. Watershed Clean-Up _ † 3. Aquatic Plant Control _ † 4. Water Quality _ 5. Public Education † † 6. Fisheries † 7. Recreational † † 8. Algae Control _ † 9. Other __________________ † † Lake Improvement Program Application Form Page 2 For Copper Sulfate treatments, secchi disc readings for water quality must be taken for one week prior to and after treatment. Readings Before Readings After Date Date Date Date Project Cost Project Cost $23,100* (Attach copy of invoices and permits) Association Funding _______$2,310*________ Other Funding Amount of City Funding Requested ________$20,790*_________ Description of Association in-kind labor and materials: I declare the stated costs are an accurate reflection of actual costs incurred. ____________ 2/28/2022 _______ Organization Representative Date * Revised on 3/11/15 based on attached quote from Curb to Curb MAPLE GROVE LAKE IMPROVEMENT PROGRAM APPLICATION FORM DATE February 13th, 2022 Lake Edward / Maple Grove MN Organization Edward Lake Homeowners Association Contact Person Sharon Martin Kotula Telephone 612-875-1703 Address: 6426 Ithaca Lane N Maple Grove Mn 55311 Contractor/Applicator Edward Lake Home owners Association Address 6426 Ithaca Ln N Maple Grove MN 55311 Telephone Contact president of Asso. Tim Martin 612-875-0394 Project Description Scope of Work (including description of lake area, size of area and expected longevity of project enhancements) Continue to maintain and run existing aeration system during the Winter months, and high algae blooming months (July & August) Keeping oxygen levels up sufficient to sustain fish population and deter algae growth - This includes posting public notifications ads, erecting danger signs, renewing permit, paying meter & electric costs. And repair maintenance. Lake Aeration expenses: Permit = $250.00 Public Postings = $80.00 Meter Costs = $10.42 X 12 =$125.04 Electrical costs =$40 X 6 months = $240.00 Estimated sign replacement and repairs = $100.00 Total = $795.00 (rounded) Meets Objective of Management Plan? Yes No 1. Shoreline Buffer   2. Watershed Clean-Up   3. Aquatic Plant Control x  4. Water Quality X  5. Public Education x  6. Fisheries x  7. Recreational x  8. Algae Control x  9. Other Testing, monitoring, maintenance   Weed control & recreation X  Lake Improvement Program Application Form Page 2 For Copper Sulfate treatments, secchi disc readings for water quality, must be taken for one week prior to and after treatment. Readings Before Readings After Date Date Date Date Project Cost Project Cost $795.00 (Attach copy of invoices and permits) Association Funding $ 25% or 198.75 Other Funding $ 0 Amount of City Funding Requested $ 596.25 or 75% Description of Association in-kind labor and materials: Lake Association provides all volunteer maintenance labor I declare the stated costs are an accurate reflection of actual costs incurred. Sharon Martin Kotula Feb 13, 2022 Organization Representative Date MAPLE GROVE LAKE IMPROVEMENT PROGRAM APPLICATION FORM DATE 2/13/2022 Lake EDWARD Organization Edward Lake Homeowners Association Contact Person Sharon Kotula/Lake Commissioner Doug Elser & Ted Kopacek handling project Telephone (H) Sharon 612-875-1703 Doug Elser 612- 432- 3834 Address: 6426 Ithaca Lane N Maple Grove Mn 55311 - Contractor/Applicator Lake Asso. members will volunteer their time & Labor – Material quotes from Hedberg Address Doug 6407 Glacier Ln N MG MN 55311 Telephone Doug 612-432-6628 Ted 763-559-2027 Project Description Scope of Work (including description of lake area, size of area and expected longevity of project enhancements) Install a boat ramp on the North shore near aeration site. This is needed in able to launch boats for Aeration maintenance, DNR water testing such as secchi disk readings, phosphorus levels, vegetation and fish accessments, homeowners living on the lake (on & off seasonally) and potentially weed harvesting Rip Rap Rock base 3 tons @ $100/ton = $300 + $110 for delivery $410.00 class 2 or 5 Top layer 2.5 tons @ $40/ton = $100 + $110 for delivery $210.00 Tax for above items $50.00 Additional signage “Custom Authorized Vehicles only” $250.00 Total costs = $920.00 Meets Objective of Management Plan? Yes No 1. Shoreline Buffer   2. Watershed Clean-Up X  3. Aquatic Plant Control X  4. Water Quality X  5. Public Education X  6. Fisheries X  7. Recreational X  8. Algae Control X  9. Other: Lake access for water quality testing: secchi disk, phosphorus, plant identification, Aeration maintenance, fish stocking, weed control & recreational access XLake Improvement Program Application Form Page 2 For Copper Sulfate treatments, secchi disc readings for water quality, must be taken for one week prior to and after treatment. Readings Before Readings After Date Date Date Date Project Cost Project Cost $ 920.00 (Attach copy of invoices and permits) Association Funding $ 25% or 230.00 Other Funding $ Amount of City Funding Requested $ 75% or 690.00 Description of Association in-kind labor and materials: Edward Lake Association is asking For assistance from the city to help with material costs towards installing this much needed Ramp to be able to access the lake for all environmental ongoing testing and monitoring. The homeowners will help with 25% of the material costs plus supply all labor with the exception of material delivery. See attached approved location on the map and site picture I declare the stated costs are an accurate reflection of actual costs incurred. Sharon Martin Kotula Feb 13, 2022 Organization Representative Date MAPLE GROVE LAKE IMPROVEMENT PROGRAM APPLICATION FORM DATE February 13th , 2022 Lake Edward Organization Edward Lake Association of Homeowners Contact Person Sharon Martin Kotula Telephone (H) 612-875-1703 Address: 6426 Ithaca Lane N Maple Grove Contractor/Applicator Midwest Weed Harvesting Inc. Or Premier Lake Harvesting Address 3420 148th Street W Rosemount MN 8421 Wayzata Blvd. Suite 200 Golden Valley MN 55426 Telephone 952-288-6910 763-257-4853 Adam Mclain Project Description Scope of Work (including description of lake area, size of area and expected longevity of project enhancements) Curley leaf Plant Management & Recreational Lake Access via harvesting. An aquatic plant survey was completed for Edward Lake in 2015. The survey identified that Curley leaf pondweed coverage was about 13 acres of the 33 acre Edward Lake. Coverage was heavy to moderate in the Southeast section of the Lake. We would like to harvest allowed DNA invasive Curley leaf. We are proposing spring harvesting of allowed Curley leaf pondweed. Plus a channel close to the shore along the East side of the lake with an aprox 200” foot shared channel leading to the center of the lake to allow seasonal access onto the lake. In addition to this, some homeowners have expressed a desire to clear some excessive weeds per DNR regulations around their docks. We would like funding to help offset the cost of the Harvesting and disposing the weeds. This would go a long ways towards supporting a healthy fish population and other wild life, while allowing lakeshore homeowners to feel invested in the lake they live on as they enjoy use of it along side nature. And for others in the community to be able to launch kayaks and view the abundant wild life. Meets Objective of Management Plan? Yes No 1. Shoreline Buffer   2. Watershed Clean-Up X  3. Aquatic Plant Control x  4. Water Quality X  5. Public Education X  6. Fisheries X  7. Recreational X  8. Algae Control X  9. Other access X    Lake Improvement Program Application Form Page 2 For Copper Sulfate treatments, secchi disc readings for water quality, must be taken for one week prior to and after treatment. Readings Before Readings After Date Date Date Date Project Cost Project Cost $ Aprox. $5,000.00 (Attach copy of invoices and permits) Association Funding $ $1,250 Other Funding $ Amount of City Funding Requested $ $3,750 Description of Association in-kind labor and materials: Association will be installing a ramp for lake access for Harvesting equipment – volunteer labor Sharing percentage based on the guidelines that this provides a direct benefit to the water quality of impaired water. 75% is guideline for minimum city support. I declare the stated costs are an accurate reflection of actual costs incurred. Sharon Martin Kotula 2/13/2022 Organization Representative Date Maple Grove Lake Improvement Project Grant DUE FEBRUARY 28th, 2022 Maple Grove Lake Improvement Project Application (Funding is limited and based on approval from the Lake Quality Commission. Is based on a first come basis, so please get in your application ASAP) Jessica Mauritzen Name:_____________________________________________ 6788 Fountain Lane North, Maple Grove MN 55311 Address:___________________________________________________________________________ Phone:____________________________Email:___________________________________________ 612 271-8820 jmauritzen19@gmail.com Project (check project(s) below): ___ X Native shoreline restoration ___ Rain garden (design approved) ___ Bioengineered shoreline ___Native buffer (at least 15 feet wide) X ___ Bioengineered slopes greater than 4:1 (H:V) near shore ___ ___Consulting services for training for those projects listed above (Note: only covered if a project was implemented) ___Other X (please explain in detail) _______________________________________________________ **Note that lake weed removal will not be covered by this grant Explain in detail how your project will improve lake quality (include before and/or after pictures if available) Use back of form if needed. _____________________________________________________________________________________ The city of Maple Grove repaired a city drain on our property in January, 2022. That _____________________________________________________________________________________ shoreline is now bare ground and we would like to plant and restore a native shore _____________________________________________________________________________________ buffer. We would also like to add more throughout our natural shoreline which is over _____________________________________________________________________________________ 100 linear feet to encourage pollinators and habitat growth. We would consult with Prarie Restoration and/or Native Landscapes to see their recommendations. Estimated Cost of Project (Home owner pays 100% of cost up front, and is then reimbursed up to 50% of the total cost and $750 maximum). Please save ALL Receipts. You will need to turn them in for reimbursement. $1,500.00 _______________________ Please send completed form to your Lake Quality Commission Representative. LQC Use Only: _____Approved ____ Not Approved

Get email alerts for Maple Grove

A daily email when new agendas and minutes are posted.

Report an issue with this meeting