Planning Commission
Regular MeetingMaple Grove, MN · November 30, 2020
Minutes
MAPLE GROVE
PLANNING COMMISSION
November 30, 2020
CALL TO ORDER A meeting of the Maple Grove Planning Commission was held at
7:00 p.m. on November 30, 2020 at the Maple Grove City Hall,
Hennepin County, Minnesota. Chair Colson called the meeting to
order at 7:00 p.m.
PLEDGE OF
ALLEGIANCE
ROLL CALL Planning Commission members present were Chair Larry Colson,
Vice- Chair Chris Ayika, Lorie Klein, Craig Lamothe, Chuck
Lenthe, and Joe Piket. Absent was Commissioner Susan
Lindeman. Present also were Karen Jaeger, City Council Liaison;
Joe Hogeboom, Community and Economic Development Director;
Peter Vickerman, Planning Manager; Jesse Corrow, Associate
Planner; Brett Angell, Economic Development Manager; and Scott
Landsman, City Attorney.
ITEMS TO BE None.
REMOVED FROM
THE AGENDA
CONSENT ITEMS The following Consent Items were presented for the Commission’ s
approval:
MINUTES
A. Regular Meeting – September 28, 2020
Motion by Chair Colson, seconded by Commissioner Ayika, to
approve the Consent Items as presented. Upon call of the
motion by Chair Colson, there were six ayes and no nays.
Motion carried.
CONSIDERATION None.
OF ITEMS PULLED
FROM CONSENT
AGENDA
REVIEW OF THE Mr. Hogeboom reviewed with the Commission what items the City
CITY COUNCIL Council approved that was given direction at the Planning
Maple Grove Planning Commission
November 30, 2020
Page 2
MINUTES FROM Commission level. He reported The Great Greek and Riviera
THEIR REGULAR Maya recently opened on Main Street in Maple Grove.
MEETING OF
NOVEMBER 16,
2020
OLD BUSINESS No items to present.
NEW BUSINESS
Mr. Vickerman stated the applicant is requesting a planned unit
PUBLIC HEARING
development ( PUD), development stage plan and final plat for a
250- unit market rate apartment building. The proposed building is
MHV MULTI-
located at the southwest corner of Grove Circle Drive and 99th
FAMILY Place North in the Project 100/ Minnesota Health Village campus
MINNESOTA that was approved conceptually in February 2020.
HEALTH
VILLAGE) Mr. Vickerman explained the proposed apartment building is in the
same general location as what was shown in the concept plan. The
ROERS building has been rotated 90 degrees so that the courtyard opens to
the west versus the south, but in most other respects it is similar to
INVESTMENTS
the concept plan approval. Vehicular access comes off of 99th
Place North and there is a combination of underground and above
1-94/ HWY 610 –
ground parking. A large central courtyard with a pool is proposed
OUTLOTS A & B
in the middle of the site with the building wrapping around the
courtyard. A public park component, wetland and other open
PUD
space sit to the south of the building. Overall the proposal is in
DEVELOPMENT conformance with the approved concept plan. Staff reviewed the
STAGE PLAN AND landscaping plan and offers a recommendation of approval with
FINAL PLAT FOR conditions.
A PROPOSED
MARKET RATE STAFF RECOMMENDATION:
250- UNIT RENTAL
Motion to recommend that the City Council direct the City
HOUSING Attorney to draft a Resolution approving the MVH Multi- Family
PUD development stage plan and final plat, subject to:
1. The applicant addressing to the satisfaction of the City any
remaining applicable comments contained in the
memorandums from:
a. The Community & Economic Development Department
dated November 4, 2020
Maple Grove Planning Commission
November 30, 2020
Page 3
b. The Fire Department dated November 11, 2020
c. The Water Resources Engineer dated October 9, 2020
d. The Parks & Recreation Department, dated November
15, 2020
The applicant shall acknowledge that Park Dedication
requirements are based on staff review and recommendation to the
Park and Recreation Board and their subsequent board action.
Board meetings are held on the third Thursday of each month.
Discussion
Chair Colson asked if a formal variance for the fire access road
would be handled. Mr. Vickerman reported this would be handled
with the Fire Department directly.
Chair Colson questioned what the difference was between a
residential multi-dwelling and a single-family residential with
respect to park dedication fees. Mr. Vickerman discussed how the
City sets park dedication fees for single-family residential units
and residential multi-dwelling units. It was noted affordable
projects received a reduction.
Commissioner Lenthe expressed concern with the fact the garage
parking area only had one access point. Mr. Vickerman indicated
this may be due to how the site was shaped. He deferred this
question to the applicant.
The applicant was at the meeting to answer questions.
Jeff Koch, Roers Investments, thanked the Commission for their
time. He explained the garage would have one main entrance but
noted a second garage door was available in case of an emergency.
He reported this was consistent with other projects he has
completed without any operational issues. He stated he was very
excited to complete this project in the City of Maple Grove.
Commissioner Ayika asked when the applicant would begin
construction on this project. Mr. Koch stated he was planning to
begin construction at the end of January or the beginning of
February in 2021. He commented further on the growing need for
housing in the metro area.
Motion by Commissioner Piket, seconded by Commissioner
Ayika, to recommend that the City Council direct the City
Maple Grove Planning Commission
November 30, 2020
Page 4
Attorney to draft a Resolution approving the MVH Multi-
Family PUD development stage plan and final plat, subject to:
1. The applicant addressing to the satisfaction of the City
any remaining applicable comments contained in the
memorandums from:
a. The Community & Economic Development
Department dated November 4, 2020
b. The Fire Department dated November 11, 2020
c. The Water Resources Engineer dated October 9,
2020
d. The Parks & Recreation Department, dated
November 15, 2020
The applicant shall acknowledge that Park Dedication
requirements are based on staff review and recommendation
to the Park and Recreation Board and their subsequent board
action. Board meetings are held on the third Thursday of each
month.
Upon call of the motion by Chair Colson, there were six ayes
and no nays. Motion carried.
PUBLIC HEARING Mr. Hogeboom stated Duffy Development Company is proposing
to develop the third and final phase of the Bottineau Ridge
BOTTINEAU apartments, located west of Hemlock Lane and north of Arbor
RIDGE PHASE III Lakes Parkway. Bottineau Ridge was first conceptualized in 2015
as a location for attainable family housing that is near to jobs,
DUFFY
services, and future transit opportunities. At that time, the City
DEVELOPMENT approved the concept of the project, as well as approved a
CO. INC. comprehensive plan amendment that enabled its development.
HEMLOCK LANE
Mr. Hogeboom explained the proposed third phase of the
N/ARBOR LAKES
Bottineau Ridge development will consist of a four-story, 50-unit
PARKWAY N, building that will be a mirror image of the second phase. The
OUTLOT A second and third phase buildings will connect via a courtyard area.
On site amenities will include a community room, a fitness room, a
PUD
business office, and an on-site property management office. There
DEVELOPMENT will be an average of two parking stalls available per unit, half of
STAGE PLAN AND which will be located in an underground parking garage. This, as
FINAL PLAT TO well as building façade treatments, are identical to that of Phase II.
CONSTRUCT THE Bottineau Ridge provides affordable housing to families in Maple
Grove. In addition to housing, Bottineau Ridge offers various
Maple Grove Planning Commission
November 30, 2020
Page 5
THIRD AND FINAL onsite services and amenities to assist residents in obtaining
PHASE OF A 50- various needs. A fly through video of the project was screened for
the Commission. Staff commented further on the proposed project
UNIT MULTI-
and recommended approval with conditions.
FAMILY HOUSING
STAFF RECOMMENDATION:
Motion to recommend that the City Council direct the City
Attorney to draft a Resolution and a planned unit development
agreement approving the Bottineau Ridge Phase III PUD
development stage plan and final plat subject to:
1. The applicant addressing to the satisfaction of the City any
remaining applicable comments contained in the
memorandums from:
a. The Engineering Department, dated October 27, 2020
b. Water Resources Engineer, dated October 22, 2020
c. The Fire Department, dated November 5, 2020
d. The Building Department, dated October 19, 2020
e. The Arbor Committee, dated November 16, 2020
f. The Parks & Recreation Department, dated November
9, 2020
The applicant shall acknowledge that Park Dedication
requirements are based on staff review and recommendation to the
Park and Recreation Board and their subsequent board action. For
this project, the City Council previously enacted various fee
waivers that impact park dedication fee amounts. Board meetings
are held on the third Thursday of each month.
Discussion
Chair Colson requested further information regarding the
accessible parking. Mr. Hogeboom reported the applicant would
be addressing this concern during the building permit phase.
Commissioner Ayika commented it was his understanding the City
had a moratorium on apartment buildings. Mr. Hogeboom
reported the moratorium was still in place and would remain in
place until mid-May 2021. He explained the moratorium would
prevent any new applications from coming forward and would
allow the City to complete a housing study. He commented the
moratorium did not apply to any multi-family developments that
Maple Grove Planning Commission
November 30, 2020
Page 6
had received prior concept plan approval.
Commissioner Klein recommended the development include
benches and that the doors be easily opened. She questioned if the
garage would have charging stations. Mr. Hogeboom explained
the project had been reviewed by the Age Friendly Maple Grove
Committee. He deferred the questions regarding charging stations
and benches to the applicant.
The applicant was at the meeting to answer questions.
Jeff Von Feldt, Duffy Development, thanked staff for the thorough
report. He stated he supported all of staff’ s recommendations. He
addressed the park dedication fees and noted the City gives a 25%
discount for affordable housing units. He explained this project
would be extremely walkable and noted benches could be installed
as part of Phase III. He indicated he could install electric car and
bike charging stations.
Commissioner Klein suggested all future development design
standards require electric charging stations. Further discussion
ensued regarding electric charging stations.
Motion by Commissioner Lamothe, seconded by
Commissioner Ayika, to recommend that the City Council
direct the City Attorney to draft a Resolution and a planned
unit development agreement approving the Bottineau Ridge
Phase III PUD development stage plan and final plat subject
to:
1. The applicant addressing to the satisfaction of the City
any remaining applicable comments contained in the
memorandums from:
a. The Engineering Department, dated October 27, 2020
b. Water Resources Engineer, dated October 22, 2020
c. The Fire Department, dated November 5, 2020
d. The Building Department, dated October 19, 2020
e. The Arbor Committee, dated November 16, 2020
f. The Parks & Recreation Department, dated
November 9, 2020
The applicant shall acknowledge that Park Dedication
requirements are based on staff review and recommendation
Maple Grove Planning Commission
November 30, 2020
Page 7
to the Park and Recreation Board and their subsequent board
action. For this project, the City Council previously enacted
various fee waivers that impact park dedication fee amounts.
Board meetings are held on the third Thursday of each month.
Upon call of the motion by Chair Colson, there were six ayes
and no nays. Motion carried.
Mr. Vickerman stated the applicant is requesting a comprehensive
PUBLIC HEARING
plan amendment and planned unit development concept stage plan
approval for a 23.9-acre development that would consist of 42
AVERY PARK
single family detached homes and 77 townhomes. The site is
D.R. HORTON, currently the Ahrens Greenhouse property at 9533 Jefferson
INC. MINNESOTA Highway N and consists of greenhouse buildings and open grass
areas.
9533 JEFFERSON
HIGHWAY NORTH Mr. Vickerman reported the current comprehensive plan guides
this land for low-medium density residential uses which allows
COMPREHENSIVE generally single-family residential units at a density of one to four
PLAN units per acre. The applicant is requesting that the site be reguided
AMENDMENT to medium density residential which has a range of 4-10 units per
AND A PUD acre. The applicant’ s proposal is at five units per acre, thus
CONCEPT STAGE necessitating the request for an amendment. Staff commented
further on the concept plan of the development.
PLAN FOR A
PROPOSED Mr. Vickerman explained staff recommends approval of the
NEIGHBORHOOD proposal. The proposed comprehensive plan amendment is a
TO INCLUDE reasonable request for the site considering the location adjacent to
APPROXIMATELY major roadways such as Highway 610 and Jefferson Highway and
77 ATTACHED more intense uses planned for across Jefferson Highway in
Brooklyn Park. The applicant is also proposing an overall density
TOWNHOMES
at the low end (five units per acre) of the medium density range of
AND 42
4-10 units per acre. In addition to the relatively low density, they
DETACHED have proposed single-family homes adjacent to the existing single-
SINGLE- FAMILY family home neighborhood to the west and townhomes closer to
HOMES Jefferson Highway. This helps the proposal fit well into the
overall context of the adjacent neighborhoods. Staff has no major
issues with the concept plan proposal either. The site is arranged in
a reasonable way with a good variety of architecture is proposed
for the site. The pedestrian and bicycle connections will enhance
the ability for non-motorized movement for both existing residents
in the adjacent neighborhood and the new residents of this
neighborhood. We note there are some minor adjustments that
would need to be made with any development stage plan and these
are listed in the memorandums.
Maple Grove Planning Commission
November 30, 2020
Page 8
STAFF RECOMMENDATION:
Motion to recommend that the City Council direct the City
Attorney to draft a Resolution approving the Avery Park
comprehensive plan amendment and PUD concept stage plan
subject to:
1. The applicant addressing to the satisfaction of the City any
remaining applicable comments contained in the
memorandums from:
a. The Community & Economic Development Department
dated November 10, 2020
b. The Engineering Department dated November 10, 2020
c. The Water Resources Engineer dated October 12, 2020
d. The Parks & Recreation Department dated November
10, 2020
e. MnDOT dated November 3, 2020
The applicant shall acknowledge that Park Dedication
requirements are based on staff review and recommendation to the
Park and Recreation Board and their subsequent board action.
Board meetings are held on the third Thursday of each month.
Discussion
Commissioner Piket asked if the land use change would only
impact the townhomes. Mr. Vickerman explained the applicant put
together a plan based on the concerns raised by neighbors. He
reported the single-family area could remain low density and the
comprehensive plan amendment change could only be for the
townhome portion of the development.
Commissioner Piket indicated this development would not have a
Nathan Lane access point. Mr. Vickerman stated this was the
case.
Commissioner Lamothe questioned what the land use was for the
parcel to the east of the proposed development. He inquired if
there would be a traffic signal at Jefferson Highway and Decatur
in Brooklyn Park. Mr. Vickerman indicated the land use for the
vacant land to the east of Jefferson Highway was guided for mixed
Maple Grove Planning Commission
November 30, 2020
Page 9
use.
Commissioner Lenthe stated he had many concerns regarding this
project, particularly regarding the layout of the townhomes. He
feared the roadway within the townhome project was too narrow.
He asked if the applicant could reduce the accesses to the garages
and have this replaced with public roadway. He commented he
supported a noise wall and recommended the ponds be further
improved. He explained he was concerned with the fact there
would not be room for a sidewalk or parallel parking within the
townhome association. He recommended the applicant reconsider
the plan. He suggested the item be tabled to allow for the
applicant to reconsider the townhome portion of this project.
Commissioner Ayika indicated the City and the developer have
closed the door on opening up the cul-de-sac to Nathan Lane. He
believed this was not proper planning. He expressed concern with
how traffic would flow through the neighborhood with only one
access point. He understood there were neighbors that were
complaining about higher traffic levels, but he did not recommend
the City moving forward with planning in this manner.
Commissioner Piket reported a connection to the adjacent
neighborhood was not recommended because this would create a
bigger traffic concern.
Commissioner Ayika understood traffic would increase through
this neighborhood, but this should have been the assumption when
future development occurred. He believed there needed to be
connectivity in the City’ s development projects.
Chair Colson asked what the City’s standard lot width was. Mr.
Vickerman stated 80 feet was the standard lot width.
Chair Colson questioned why it took so long for the property to be
turned back from MnDOT. Mr. Vickerman explained there were a
significant number of turn back requests at MnDOT and the
requests took time to be reviewed and approved.
Chair Colson requested further information regarding the
townhome row parking. Mr. Vickerman commented one of the
conditions for approval would that if the 50 foot right of way stays
public, the head in parking would have to go away.
Chair Colson indicated he has been relatively consistent with
Maple Grove Planning Commission
November 30, 2020
Page 10
respect to neighborhood connections. However, he noted this one
did not bother him because Nathan Lane was so short.
Further discussion ensued regarding how traffic would flow
through this neighborhood and onto the adjacent streets.
Mr. Vickerman spoke to the possibility of tabling this item. He
explained the City was approaching the end of the 120 time frame.
The applicant was at the meeting to answer questions.
Deb Ridgeway, D.R. Horton, commented on the concerns that
were raised by the Commission regarding the townhome roadways
and neighborhood access. She reported she likes to provide ample
parking for her residents and their guests. She noted she would
look into the parking situation further for the townhome portion of
the development. She noted the finger streets were typically kept
private. She indicated a noise study would be completed as part of
the preliminary plat process. She stated the ponding would also be
reviewed with MnDOT.
Fran Hagen, D.R. Horton, explained the development could be tied
into the adjacent pond, but noted MnDOT would not allow for any
excavation or enhancement to their ponds.
Ms. Ridgeway indicated she would take the City’s lead regarding
the Nathan Lane connection but it was her understanding the
adjacent neighborhood did not support the connection. She stated
she was looking forward to bringing this project forward.
Chair Colson commented he would not be opposed to changing the
guiding for the increase in units, but he recommended the project
be separated into two separate parcels.
Chair Colson opened the public hearing at 8:20 p.m.
The public was asked by Chair Colson if they had any comments to
make regarding this application.
James Penaz, 9526 Orleans Lane, explained he was a 42 year
resident of Maple Grove at his address. He thanked the
Commission for allowing him to speak and for all of their hard
work on behalf of the community. He indicated the affected area
Maple Grove Planning Commission
November 30, 2020
Page 11
by the proposed development was one of the oldest developments
in Maple Grove. He requested the City not approve the connection
between the two neighborhoods. He discussed how this
connection would negatively impact his neighborhood. He stated
he understood the area adjacent to his neighborhood would
develop some day, and he did not oppose this development. He
feared how the residents at 9515 Nathan Lane and 9904 95th would
be impacted by turning cars. He explained he and his neighbors
value the peace and quiet within their neighborhood. He
appreciated the fact that D.R. Horton was willing to address his
concerns.
Mr. Penaz questioned what the overall density was for the
proposed project. Chair Colson reported the overall density was
5.0 units per acre.
Mr. Penaz asked if the watermains would be taken in from TH610.
He explained he would like the water lines and water pressure
within the neighborhood to remain as is. He stated the adjacent
neighborhood supported the project moving forward this evening.
Mr. Vickerman discussed how the waterlines would be looped but
noted it has not been determined where the sewer lines would be
connected.
Fran Hagen, Westwood Professional Services, reported the sewer
lines would be connected at Nathan Lane. He commented the
watermain would be connected at TH610 and along the cul-de-sac
to the south. He noted these connections would help with the
water pressures within the adjacent neighborhoods.
Mr. Penaz encouraged the City to consider dropping the speed
limit for Jefferson Highway down to 40 miles per hour after the
bridge.
Chair Colson thanked Mr. Penaz for his comments.
Motion by Chair Colson, seconded by Commissioner Lenthe,
to close the public hearing at 8:40 p.m. Upon call of the
motion by Chair Colson, there were six ayes and no nays.
Motion carried.
Commissioner Ayika thanked Mr. Penaz for his comments. He
encouraged staff to further investigate the alignment of this
development with adjacent homes and consider how traffic and
light wash would impact these homes. He stated he still supported
Maple Grove Planning Commission
November 30, 2020
Page 12
the connection to the adjacent neighborhood but he understood this
would not be approved.
Chair Colson thanked the residents and developer for coming
together to discuss the concerns regarding this development.
Motion by Chair Colson, seconded by Commissioner Klein, to
recommend that the City Council direct the City Attorney to
draft a Resolution approving the Avery Park comprehensive
plan amendment and PUD concept stage plan subject to:
1. The applicant addressing to the satisfaction of the City
any remaining applicable comments contained in the
memorandums from:
a. The Community & Economic Development
Department dated November 10, 2020
b. The Engineering Department dated November 10,
2020
c. The Water Resources Engineer dated October 12,
2020
d. The Parks & Recreation Department dated
November 10, 2020
e. MnDOT dated November 3, 2020
The applicant shall acknowledge that Park Dedication
requirements are based on staff review and recommendation
to the Park and Recreation Board and their subsequent board
action. Board meetings are held on the third Thursday of each
month.
Commissioner Lamothe reported he supported the connection not
being made to the adjacent neighborhood. He discussed the
connectivity precedent that had been set in previous developments.
He noted the adjacent neighborhood was one of the oldest
developments in Maple Grove and it didn’ t have sidewalks. He
feared how this neighborhood would be impacted by increased
traffic without having proper pedestrian facilities. He stated in this
case, he would be recommending the neighborhood connection not
be made.
Commissioner Piket recommended the City Council have the
Comprehensive Plan Amendment apply only to the townhome
portion of the proposal.
Maple Grove Planning Commission
November 30, 2020
Page 13
Motion amendment by Chair Colson, seconded by
Commissioner Klein, to recommend that the City Council have
the Comprehensive Plan Amendment apply only to the
townhome portion of the project.
Upon call of the amendment by Chair Colson, there were six
ayes and no nays. Motion carried.
Upon call of the amended motion by Chair Colson, there were
six ayes and no nays. Motion carried.
DISCUSSION There were no discussion items.
ITEMS
ADJOURNMENT Motion by Chair Colson, seconded by Commissioner Piket, to
adjourn the Planning Commission meeting. Upon call of the
motion by Chair Colson, there were six ayes and no nays.
Motion carried.
Chair Colson adjourned the meeting at 8:50 p.m. to the next
regularly scheduled meeting of the Planning Commission
scheduled for December 14, 2020.