City Council
Regular MeetingMarco Island, FL · March 16, 2015
Minutes
City of Marco Island Florida
51 Bald Eagle Drive
Marco Island, Florida
cityofmarcoisland.com
Meeting Minutes - Final
Monday, March 16, 2015
1:00 PM
Workshop
Community Meeting Room
City Council
Chairman: Larry Sacher
City Council: Joe Batte, Bob Brown, Ken Honecker, Larry Honig, Amadeo R. Petricca,
and Victor Rios
City Manager: Roger Hernstadt
City Clerk: Laura Litzan - City Attorney: Alan Gabriel
City Council Meeting Minutes - Final March 16, 2015
1. Call to Order
2. Roll Call
Present: 7- Councilor Batte, Vice-Chair Brown, Councilor Honecker, Councilor Honig, Councilor
Petricca, Chairman Sacher and Councilor Rios
Absent: 0
Also Present
Roger T. Hernstadt, City Manager
Laura Litzan, City Clerk
Alan L. Gabriel, City Attorney
Guillermo Polanco, Director of Finance
Robert Lange, Budget Manager
Jeff Poteet, General Manager, Water & Sewer
Justin Martin, Senior Project Manager, Water & Sewer
John Pratt, Manager, Wastewater Treatment
Brittany Lazo, Utility Engineering Technician
Sandra Schildhorn, Administrative Assistant
3. Business
Water & Sewer Department (W&S) General Manager Jeff Poteet and Senior Project
Manager Justin Martin provided the following update and slide presentation of W&S
Department activities and projects for Council’s consideration and direction:
a. Temporary Trailers Expiration
Temporary Trailers
(Background: Temporary trailers, funded by the Utility Fund, housing Water & Sewer
Department and Public Works staff, are in violation of the City’s Land Development Code
for temporary use, as no additional permits for administrative extensions are allowed. If
the City's Land Development Code is not amended, permanent housing will be needed.
Absence of another alternative, staff would need to move forward to hire an architect to
design two buildings, one for Water & Sewer Administration located at the North Water
Treatment Plant site, and the other for Collection & Distribution, located at the South
Water Treatment Plant site.)
Council directed staff to draft an Ordinance for review by the Planning Advisory Board,
amending the City's Land Development Code to extend temporary use permits for
temporary structures for all City of Marco Island government operated facilities, and
subject to inspection requirements of such facilities.
City of Marco Island Florida Page 1
City Council Meeting Minutes - Final March 16, 2015
b. Headworks Design
Headworks Design Update
(Background: The Headworks structure receives all of the City’s raw sewage from the
collection system. Fine screening of the wastewater influent is essential for the City’s
wastewater treatment process. The current Headworks structure design meets current
peak flow conditions. The original Headworks design incorporated a totally enclosed
structure for odor control, equipment protection from the elements, and ease of
maintenance. The cost of construction of a totally enclosed structure exceeds the
current budget and will require an additional $1,000,000 of funding.)
Staff is requesting direction from Council as to whether to continue with the current
design so that the project may stay on schedule, or to design a totally enclosed structure
with appropriate electrical and odor control.)
Council directed staff to continue with the current Headworks design project.
c. Pilot Study of Water Filtration
Water Filtration Pilot and Membrane Conversion
(Background: The changing of treatment methods at the North Water Treatment Plant
(NWTP) may have substantial beneficial economic impacts. There are several large
projects to replace existing lime softening infrastructure at the NWTP as part of the 2015
Water & Sewer Capital Improvement Program (CIP). Prior to expending 2015 CIP funds
for lime plant improvements, staff considered alternatives that could eliminate the lime
softening process and the associated costs. Membrane softening is a solution that has
substantial operational cost savings for the City. While determining the needed repairs
to the lime softening process, staff investigated other water softening treatment methods.
Nanofiltration (NF), a low-pressure membrane filtration process, has gained considerable
acceptance in the drinking water industry. Before the process can be converted to treat
filtered raw water by NF, pilot testing is needed for a period of 6 to 12 months at a cost of
approximately $185,000. The change of treatment processes will have a substantial
reduction, approximately 40%, in operational costs of our drinking water system.
Approximately $1,000,000 per year will be saved by treating the City’s surface water by
NF versus lime softening.)
Staff is requesting direction from Council whether to move forward with a conversion
project to change the current water treatment process from lime softening to the NF
membrane filtration process.
Council directed staff to provide an Internal Rate of Return for the conversion project.
The meeting went into recess at 2:18 p.m. It is noted for the record that the
same Councilors were present when the meeting reconvened at 2:28 p.m.
City of Marco Island Florida Page 2
City Council Meeting Minutes - Final March 16, 2015
d. Feasibility Anaysis - Replace Marco Shores Plant with Pump Station
Marco Shores and Isles of Capri Service Area Planning
(Background: Marco Shores Wastewater Treatment Plant (MSWWTP) is in poor
condition and will require a substantial investment to meet regulatory compliance and
produce reclaimed quality effluent. A decision is needed regarding the disposition of the
MSWWTP.
Marco Shores Potable Water Supply - Continued potable water consumption flow
increases in Marco Shores and will result in higher rates and additional County impact
fees to be paid by the City of Marco Island.
Marco Shores Irrigation Quality (IQ) Water - IQ water is supplied by the City of Marco
Island to Marco Shores in the form of reclaimed water from the wastewater plant on
Marco Island to the Hammock Bay golf course irrigation lake and various multi-family
developments within Marco Shores. Reclaimed water is also stored in the storage tank
at the MSWWTP site and re-pumped back to Marco Island as needed. This results in
costs for pumping the water multiple times.
Isles of Capri Service Area - The City of Marco Island accepts raw sewage from a limited
number of customers in Isles of Capri via a forcemain. Expanding municipal sewer
service to all Isles of Capri residents, businesses, and developments would result in
additional annual revenues for the City.)
Staff made recommendations and requested a course of action to determine the future of
Water & Sewer services provided by the City of Marco Island to Marco Shores and the
Isles of Capri.
Council directed staff to:
1) Prepare an RFP (Request for Proposal) in regard to selling the land.
2) Explore the feasibility of the cost to expand sewer services to Marco
Shores and Isles of Capri.
3) Obtain the City Attorney’s opinion about the feasibility of imposing an
impact fee assessment to Marco Shores and Isles of Capri customers.
e. Water & Sewer Operation 5 Year Projection FY2016 -
FY2020
(Background: In an effort to have a “pay as you go” plan, staff has identified all existing
Water & Sewer assets, and provided an estimated value of those assets and their life
cycle.)
A five-year operating and capital budgetary projection was presented for the period
FY2016 through FY2020 by Finance Direct Guillermo Polanco.
City of Marco Island Florida Page 3
City Council Meeting Minutes - Final March 16, 2015
4. Citizens' Comments
None.
5. Adjournment
The meeting adjourned at 3:27 p.m.
___________________________________
Larry Sacher, Council Chairman
ATTEST:
___________________________________
Laura Litzan, City Clerk
PREPARED BY:
___________________________________
Sandra Schildhorn, Administrative Assistant
City of Marco Island Florida Page 4
Agenda
51 Bald Eagle Drive
City of Marco Island Florida Marco Island, Florida
cityofmarcoisland.com
Meeting Agenda - Final
City Council
Chairman: Larry Sacher
City Council: Joe Batte, Bob Brown, Ken Honecker, Larry
Honig, Amadeo R. Petricca, and Victor Rios
City Manager: Roger Hernstadt
City Clerk: Laura Litzan - City Attorney: Alan Gabriel
Monday, March 16, 2015 1:00 PM Community Meeting Room
Workshop
1. Call to Order
2. Roll Call
3. Business
a. Temporary Trailers Expiration
ID 15 -89 Temporary Trailers
Attachments: Workshop P1-6 Power Point 3-16-15.pdf
b. Headworks Design
ID 15 -90 Headworks Design Update
Attachments: Workshop P7-12 Power Point 3-16-15.pdf
c. Pilot Study of Water Filtration
ID 15 -91 Water Filtration Pilot and Membrane Conversion
Attachments: Copy of 20150225 Marco Cost Estimates.pdf
Marco Cost Estimates Graph.pdf
Workshop P8-18 Power Point 3-16-15.pdf
d. Feasibility Anaysis - Replace Marco Shores Plant with Pump Station
City of Marco Island Florida Page 1 Printed on 3/11/2015
City Council Meeting Agenda - Final March 16, 2015
ID 15 -92 Marco Shores and Isles of Capri Service Area Planning
Attachments: Final Feasibility Report 030615 (1).pdf
City County Water Bulk Services Agreement.pdf
WCI Reclaimed Water Agreement.pdf
Property Appraisal MSWWTP and MSWTP.pdf
Property Appraisal RIBS.pdf
Marco Shores plant pictures.pdf
Workshop P19-23 Power Point 3-16-15.pdf
e. ID 15 -94 Water & Sewer Operation 5 Year Projection FY2016 -
FY2020
Attachments: WATER & SEWER 5 YEAR PROJECTION FOR FY15 2-25-15 RML - CM 3-10-15.pdf
4. Citizens' Comments
5. Adjournment