Planning Board
Regular MeetingMarlborough, MA · September 27, 2021
Minutes
MINUTES 1A
MARLBOROUGH PLANNING BOARD
MARLBOROUGH, MA 01752
Call to Order September 27, 2021
The Meeting of the Marlborough Planning Board was called to order at 7:00 pm in Memorial Hall, 3rd Floor City Hall, 140
Main Street, Marlborough, MA. Members present: Barbara Fenby, Sean Fay, Phil Hodge, Chris Russ, Matthew Elder and
William Fowler. Meeting support provided by City Engineer, Thomas DiPersio.
1. Draft Meeting Minutes
A. September 13, 2021
On a motion by Mr. Fay, seconded by Mr. Hodge, the Board voted to accept and file the September 13, 2021
meeting minutes. Yea: Fay, Fowler, Hodge, and Fenby. Nay: 0. Abstain: Elder and Russ. Motion carried.
2. Chair’s Business
A. Marlborough Planning Board Subdivision Rules and Regulations discussion
On a Motion by Mr. Fay, seconded by Mr. Russ, the Board voted to refer the Marlborough Planning Board’s
Subdivision Rules and Regulation to the Legal Department, requesting the Rules and Regulations be put into final
legal form. The Board also requested that Legal advise them on the proper procedure and language for their final
vote to adopt the new regulations and to put them into effect. Yea: Elder, Fay, Fowler, Hodge, Russ, and Fenby.
Nay: 0. Motion carried.
3. Approval Not Required (None)
4. Public Hearings (None)
5. Subdivision Progress Reports (None)
6. Preliminary/Open Space/Limited Development Subdivision
A. Preliminary Subdivision Application - 209 Cullinane Drive Extension – Continued from August 23, 2021
Applicant: J. Mor Realty Trust (209 Cullinane Drive, Marlborough, MA 01752)
Engineer: William Tirrell, Chappell Engineering Associates, LLC (201 Boston Post Road West, Suite 101,
Marlborough, MA 01752)
Mr. Elder read the correspondence from John Garside into the record.
The Board had a discussion regarding the Title 5 and sewer connection concerns addressed in John Garside’s letter.
Mr. Fay and City Engineer Thomas DiPersio had a discussion on the gravity sewer easement and the concerns on
whether the subdivision would prevent potential sewer connections from Red Spring Road through to Cullinane
Drive. Mr. Russ and City Engineer Thomas DiPersio addressed concerns on potential future roadway connection
to Red Spring Road.
On a Motion by Mr. Fay, seconded by Mr. Hodge, the board voted to approve alternative 3 of the preliminary
subdivision plan with the following conditions:
1. Satisfactory Septic inspections and or approval of sewer connections consistent with
communications from John Garside dated September 24th, 2021.
2. The applicant shall work with the Planning Board on connection of the existing recreational
path that runs from Longfellow Terrace to Cullinane Drive.
3. The subdivision shall not connect through to Red Spring Road because it would change the
character of its surrounding neighborhood, which was not contemplated.
Yea: Elder, Fay, Fowler, Hodge, Russ, and Fenby. Nay: 0. Motion carried.
1
MINUTES
MARLBOROUGH PLANNING BOARD
MARLBOROUGH, MA 01752
B. Informal Discussion of potential subdivision - 342 Sudbury Street, Marlborough, MA 01752 – Continued from July
19, 2021
Representative: Neal Vigeant
Engineer: Robert Parente, P.E.
Mr. Elder read the correspondence from Engineering into the record.
The Board had a discussion regarding concerns on the proposed road being a private way and setting a precedent.
City Engineer Thomas DiPersio and Dr. Fenby addressed the previous discussions the City has had in trying to push
to have all current private ways be accepted as public ways. Mr. DiPersio explained these roads ways are private
due to faults in the process such as never getting the plans, deeds not being record, and or easement issues. These
roads being accepted as public ways would credit the City more Chapter 90 allotment.
The Board determined the applicant by right could do a full road construction with no waivers, but it would require
a higher priced house be built to become profitable and would also eliminate the 40-foot no cut buffer zone which
is being proposed to appease the abutters.
Mr. Russ discussed setting a precedent on “pork-chop” lots and how some surrounding cities/towns have zoning
by-law’s that require the back lot to be x percentage larger than the front lot. The Board requested he provide an
example of this at the next meeting.
Mr. Fowler spoke in opposition to the proposed subdivision because the proposed roadway is private.
The Board requested the applicant determine how many lots there are within the City that have the same or more
acres with the ability to fit the rectangle lot shape requirements within the zoning, where a similar project could
be proposed.
The Board determined they are generally in favor of the proposed subdivision if the Board has the ability to control
the precedent.
City Councilor Laura Wagner spoke in favor of this proposed subdivision and expressed the want to conserve the
land and the character of the neighborhood.
7. Definitive Subdivision Submissions (None)
8. Signs (None)
9. Correspondence (None)
10. Unfinished Business (None)
11. Calendar Updates (None)
2
Get email alerts for Marlborough
A daily email when new agendas and minutes are posted.