Public Improvement and Transportation
Regular MeetingMarshall, MN · January 25, 2022
Minutes
MINUTES
PUBLIC IMPROVEMENT/TRANSPORTATION COMMITTEE MEETING
January 25, 2022
1:30 PM
On Main, City Hall
MEMBERS PRESENT: Councilmembers Schafer, Labat and Lozinski
MEMBERS ABSENT: None
STAFF PRESENT: Director of Public Works/City Engineer Jason Anderson,
Assistant City Engineer Jessie Dehn,
Senior Engineering Specialist Geoffrey Stelter, City Clerk Kyle Box
Call to Order.
Chairman Schafer called the meeting to order at 1:30 pm.
Discussion by Labat on sidewalk placement along South 1st Street from the previous meeting.
Member Schafer provided additional discussion on sidewalks and the connectivity they bring to
the community. Member Lozinski added further discussion in favor of the sidewalks on both sides
of the street project.
1. Approval of the Minutes.
MOTION BY LABAT, SECONDED BY LOZINSKI to approve the minutes of the November 22,
2021 Public Improvement/Transportation Committee meeting. ALL VOTED IN FAVOR.
MOTION PASSED 3:0.
2. ST-006: RRFB School Pedestrian Crossing Improvements Project.
Background: This project is included in the 2022 capital improvement plan (CIP). The City was
awarded a Transportation Alternatives Grant (TA Grant) in the amount of $339,840 for this
project. The project would improve school pedestrian crossings adjacent to the Marshall Middle
School, Southview Elementary School, Park Side Elementary School, and True Light Christian
School. The required 20% local match is split 50-50 between participating schools and the City of
Marshall. In addition to the Rectangular Rapid Flashing Beacon (RRFB) sign assemblies and
pedestrian refuge islands, the project would install two School Speed Limit (when flashing) sign
assemblies including dynamic speed feedback signs. During school arrival and dismissal periods,
the sign would report driver speed as their vehicle passes the sign and flash their speed when the
speed exceeds the posted school zone speed limit. To establish school zone speed limits in
Marshall, staff performed an evaluation of the existing areas to determine an appropriate school
zone speed limit. This evaluation is required by State Statute. City staff is recommending
establishment of a 20 MPH school zone speed limit in the vicinity of the schools previously
referenced. There was compliance with this speed limit in prior years at the now-closed Westside
Elementary School on S. 4th Street and TH 19. The MnDOT District 8 Traffic Engineer, Cody
Brand, has reviewed the recommendation for the True Light Christian School on TH 19 (E. College
Drive) and is acceptable to the recommendation of 20 MPH.
-1-
Councilmember Labat commented on the posted speed limit recommendation. Labat also
commented on previous discussion from the January 11, 2022 council meeting regarding the
discussion on medians near the schools. Director of Public Works/ City Engineer Jason Anderson
provided additional information on the medians but commented that these items are separate from
the speed limit recommendation.
An additional recommendation will be made to MnDOT to lower the speed limit by True Light to
20mph as well. Member Lozinski discussed the level of enforcement that should be in place when
the signs are installed.
Lozinski asked a clarification on when the speed limit will be enforced. Director Anderson
commented that will be a future discuss with the Council and School District.
Member Schafer commented that this should be specifically a school crossing not an enhanced
pedestrian crossing.
MOTION BY LABAT, SECONDED BY LOZINSKI to recommend the City Council adopt a
resolution which establishes the 20 MPH school zone speed limit in the vicinity of the Marshall
Middle School, Southview Elementary School, Park Side Elementary School, and True Light
Christian School. ALL VOTED IN FAVOR. MOTION PASSED 3:0.
3. ST-023: W. Lyon Street (College to 1st) Reconstruction Project.
Background: The project limits include: W. Lyon Street (E. College Drive to N. 1st Street). The
proposed project was originally included in the scope of the Z82 (N. 1st/Redwood/Marshall)
Reconstruction Project constructed in 2021. In consideration of the unknown status regarding the
potential development of the Block 11 property, the block of W. Lyon Street between E. College
Drive and N. 1st Street was removed from the scope of the project. The intention was to bring this
project forward once development of the Block 11 property was anticipated to ensure that the
proposed street and utility reconstruction would adequately serve the Block 11 development. After
discussion with the developers, construction on the first phase of the redevelopment is anticipated
for the 2022 construction season. The proposed project includes complete reconstruction of the
street, curb, driveways, water system, and sanitary sewer collection system. This project will tie
into the proposed limits of the MnDOT College Drive Reconstruction project (2025) on the
northwest end and into where the Z82 Reconstruction project finished in 2021. This block does
not currently have water main. MMU has expressed their desire to extend new 6” PVC water main
from N. 1st Street (stubbed out with the Z82 project) to E. College Drive to complete a water main
loop. There is no existing sanitary sewer under this block also. The reconstruction project would
install new PVC main, with new PVC services to adjacent vacant lot(s) for potential future
development. Storm water would likely not be required on this project as this block is serviced by
the new storm water facilities at N. 1st Street and E. College Drive. Included in the packet are
proposed layouts that identify street widths and proposed sidewalk locations. The street width of
W. Lyon Street is proposed to be 58-FT as measured from back of curb; this is 2 feet wider than
the existing width of 56-FT. The additional width would provide for two 13-FT travel lanes and
two 15.5-FT rows of 45° angle parking stalls. City staff is proposing concrete surfacing.
Councilmember Labat discussed parking availability surrounding Block 11. Director Anderson
discussed the CUP that will go before the City Council that discusses parking requirements that
will be readdressed for each building that will be built.
-2-
There was additional discussion on concrete compared to asphalt. The life expectancy for concrete
with average use can be 30 to 35 years and asphalt can be stretched to 20 years.
Councilmember Lozinski asked if the project needs all the proposed driveway access. Director
Anderson commented that the accesses on the Block 11 side will be combined into 1 access and
that staff will review the two on the north side of the project.
Alternative options for grass were also discussed. There was support from the Committee to have
some type of green space.
MOTION BY LOZINSKI, SECONDED BY SCHAFER to recommend approval of project to City
Council. Note that this project will be bid with concrete. COUNCILMEMBER LABAT VOTED
NO. MOTION PASSED 2:1.
4. ST-010: Lyon Circle Reconstruction Project.
Background: The project limits include: Lyon Circle from Jewett Street to approximately 165-FT
south. The proposed project is included in the 2023 capital improvement plan (CIP) for complete
reconstruction of the street, curb, driveways, and sanitary sewer collection system. The street
pavement condition is extremely poor and City staff believes a reconstruction is necessary. A street
section consisting of 4” bituminous and 12” Class 5 aggregate gravel base is being proposed.
Sanitary sewer reconstruction will replace clay sewer pipe with PVC pipe. There is no sidewalk in
this area currently and none being proposed. Included in the packet is a proposed layout that
identifies street width. The street width of Lyon Circle is proposed to be 33-FT as measured from
back of curb with a cul-de-sac radius of 47-FT as measured from back of curb. The existing street
width is 41-FT with a cul-de-sac radius of 50-FT. The purpose of the narrowing is to reduce costs
for this assessment project. Parking is not required along the street, as the adjacent properties have
available off-street parking. The cul-de-sac would accommodate necessary traffic turning
movements.
There was further discussion by staff and the committee on how the special assessment policy will
apply to this project.
MOTION BY LABAT, SECONDED BY LOZINSKI to recommend approval of project to City
Council. ALL VOTED IN FAVOR. MOTION PASSED 3:0.
5. ST-024: Baldwin Parking Lot (City Hall Lot) Reconstruction Project.
Background: The proposed project is included in the 2023 Capital Improvement Plan (CIP) for
reconstruction of parking lot surfacing. Limits of reconstruction would include the entire lot owned
by the City of Marshall and the portion of the lot owned by CenturyLink/Lumen. Staff would
propose to assess the portion of the lot that is owned by CenturyLink/Lumen. Staff will need to
work with the City Attorney to draft an agreement that allows for our reconstruction on their
property and assessment of the costs. Staff is proposing concrete surfacing for the downtown
parking lots. The parking lot will consist of a minimum section of 6” concrete and 6” Class 5
aggregate base. Included in the packet is the proposed layout for Committee consideration
MOTION BY LABAT, SECONDED BY LOZINSKI to recommend approval of the project to the
City Council. ALL VOTED IN FAVOR. MOTION PASSED 3:0.
-3-
-4-
6. Review Draft Driveway Ordinance Revisions.
Background: City staff is proposing to establish a set of driveway regulations that more explicitly
describes the requirements and limitations for driveways in various land uses. The proposed
ordinance would apply to new properties or applications for modifying existing driveways.
Applications to replace driveways, as they are currently, would be exempt from the requirements
in the ordinance. The proposed ordinance describes the requirements for materials and geometrics
(size, slope, etc.) for residential, commercial, and industrial-zoned properties. The ordinance also
identifies an exemption process, should a property owner wish to install a driveway that does not
conform to the requirements in the proposed ordinance. Staff believes that the proposed ordinance
would provide clear direction to property owners regarding driveway installations. Limiting
driveway width and spacing between driveways can improve safety by helping to reduce
vehicle/pedestrian interaction area and by reducing and limiting street access/conflict points, help
ensure good gutter drainage, reduce unnecessary storm water runoff, help ensure compliance with
vegetative cover ordinance requirements, and help maintain character of a neighborhood.
Establishment of driveway regulations are typical for many other communities in Minnesota. Staff
can review requirements of other communities as needed.
There was support from the Committee to limit the width of the driveway to 36’ at the sidewalk
and to allow the driveway to flare out and expand behind the sidewalk to the house.
There was further discussion from Councilmember Lozinski on limiting the use of front yard space
as a driveway.
MOTION BY LABAT SECONDED BY SCHAFER to recommend approval of the driveway
ordinance revisions to the City Council. ALL VOTED IN FAVOR. MOTION PASSED 3:0.
7. SRF Consulting Group – Review/recommend Proposal for Design of City Utilities in
MnDOT 2025 College Drive Reconstruction Project. Background: Attached is a proposal from
SRF Consulting Group, Inc. (SRF) for professional services for the design of watermain and
sanitary sewer relocations along TH 19 (College Drive). The design includes the relocation and/or
replacement of approximately 2,800 feet of watermain and 3,600 feet of sanitary sewer in various
segments along the proposed MnDOT TH 19 corridor. Scope of Services is shown in
Attachment B of the attached proposal. City staff has requested this proposal to allow for the
consideration of hiring SRF to complete these tasks in lieu of City Engineering staff completing
this work. MnDOT’s design and approval process is very long, time consuming, and specific.
MnDOT requires everything to be to their design standard, including everything down to the
method of labeling and formatting of tabular data. The level of detail and back and forth review
required to get plans to their satisfaction is not always worth the cost of our staff time. There is a
reason why they begin work 7 years in advance of a project and complete a pre-design contract,
followed by a design contract. SRF is already hired by MnDOT for design of all of project items.
The most seamless method for designing this project would be to hire SRF to include City utilities
with their design to meet MnDOT standards for project layout. The proposal is for services as
described for a not-to-exceed amount of $62,598. This cost does not consider the possible addition
of the Bruce Street intersection into the project limits.
MOTION BY LABAT, SECONDED BY LOZINSKI to recommend Council authorize execution
of the attached SRF “Proposal for Professional Services for Watermain and Sanitary Relocation
Design” associated with MnDOT’s 2025 College Drive Reconstruction Project for a not-to-exceed
amount of $62,598. ALL VOTED IN FAVOR. MOTION PASSED 3:0.
-5-
8. Consider Proposal from Bueltel-Moseng Land Surveying for Survey of the Marshall Flood
Control Project property.
Background: Bueltel-Moseng is providing a proposal for surveying services for determination and
location of select property points of the Flood Control Project, both levee and diversion channel
property and easements. The survey would include setting property pins (where applicable) and
setting stakes at requested locations along the Flood Control Project. The flood control project is
very important to the City of Marshall, and it is imperative that all adjacent property owners
understand where their properties end. According to the US Army Corps of Engineers national
levee database, roughly $1.26B dollars of property value is protected by our flood control project,
including at least 2,101 buildings. There are numerous locations along the flood control project
properties where adjacent property owners have planted trees, placed sheds, planted gardens, and
parked trailers on city property. Any installation on City property should require City permission.
Staff is proposing that the survey be completed to better identify to adjacent property owners the
actual locations of Flood Control Property, as determined by a licensed land surveyor. This would
allow staff the option to install posts at selected points to indicate property boundaries. The posts
could be outfitted with placards that state “City Flood Control Property” or something similar. At
locations where the City has easement, as opposed to fee estate, staff would not recommend posts
but rather annual notifications to those property owners about the presence of the Flood Control
easement. The purpose of hiring a licensed land surveyor to complete this work in lieu of city staff
working to find property lines is to be certain that locations are accurate and defensible to the
adjacent property owners. If staff is directed to install the posts and placards, it will certainly
generate a reaction from many of the property owners who would be upset by the sign being placed
“on their property”. Further, a portion of the adjacent landowners may threaten to stop mowing or
otherwise maintaining the city-owned property in retaliation to the signs being installed. Staff is
open to input from the Committee and Council at-large. An alternative action, though less
effective, would be to send letters/notices annually to every property owner adjacent to the flood
control project. The proposal is for services as described for a not-to-exceed amount of $9,000.
The cost would be funded using the Surface Water Utility.
There was discussion by the committee and staff.
MOTION BY LABAT SECONDED BY LOZINSKI to recommend the proposal to the City
Council for authorizing execution of the attached Buetel proposal for survey services associated
with the Flood Control Project for a not-to-exceed amount of $9,000. ALL VOTED IN FAVOR.
MOTION PASSED 3:0.
9. Project ST-009: W. Lyon Street/N. 3rd Street Reconstruction Project – Changes to N. 3rd
Street and Aesthetics.
The project limits include: W. Lyon Street (E. College Drive to N. 5th Street)
N. 3rd Street (W. Main Street to W. Redwood Street). The proposed project is included in the 2023
Capital Improvement Plan (CIP) for complete reconstruction of the street, curb, driveways,
watermain, sanitary sewer, and storm sewer collection system. The street pavement condition is
poor and City staff believes a reconstruction is necessary.
Brad Meulebroeck has expressed interest in making changes to the function of N. 3rd Street
between W. Main Street and W. Lyon Street. After discussion with staff, his request would include
considering the following:
-6-
- Remove the signal light at the intersection of N. 3rd Street (City) and W. Main Street
(MnDOT). This signal is currently owned and operated by MnDOT, and any changes
would need to be approved by MnDOT Traffic.
- Addition of an enhanced pedestrian crossing at the intersection of N. 3rd Street and W.
Main Street, including a pedestrian refuge island and Rectangular Rapid Flashing Beacon
(RRFB) signage. As this installation would be in MnDOT Right-of-Way, this installation
would need to be approved by MnDOT Traffic.
- Reconfiguration of N. 3rd Street from the existing two-way travel into a one-way street
moving from Main Street to Lyon Street, including reconfiguration of parking to 45-degree
angle parking on both sides of N. 3rd Street.
- Narrowing of N. 3rd Street to accommodate several additional features including but not
limited to landscaping, string lighting, artwork, and park sitting.
Staff has also considered the possibility of including some aesthetic and/or
landscaping/hardscaping upgrades to the remaining blocks of the downtown project. Some of these
upgrades may or may not include planter boxes, vegetative strips along the curb and at corners,
and others.
With the scheduled timeline of construction in 2023, staff would like the committee to provide
guidance on which changes, and features should be pursued further. The changes to W. Main Street
will require an Intersection Control Evaluation (ICE) report and coordination with the MnDOT
District 8 office. Aesthetic features would likely require the services of a landscape architect to
assist with the scoping and design of included features. To accommodate these additional tasks as
well as determination of potential assessment agreements, staff would like the committee to
provide guidance moving forward.
Director Anderson commented on the additional services that would be needed for this type of
project including consulting fees, pedestrian use, land design, etc.
There was further discussion from the Committee to work with the property owners that requested
the redevelopment of the street. Staff will begin working on estimates on the project for further
discussion.
Councilmember Labat suggested that the property owner bring this to the Downtown Business
Association for consideration and support.
Further discussion on working with a landscape architect to identify long term.
There was a consensus from the Committee for STAFF TO HAVE FURTHER DISCUSSION
WITH THE DOWNTOWN BUSINESS ASSOCIATION AND REQUEST A LETTER OF
SUPPORT TO MOVE FORWARD WITH A PROJECT.
10. Municipal State Aid Route Designations and Revocations.
Background: The Municipal State Aid Street program (MSAS) provides funding to assist
municipalities with the construction and maintenance of community-interest streets on their state
aid systems. The program goals are to provide users with a city roadway network that is safe,
provides adequate mobility and structural capability, and to provide an integrated transportation
network. A city must have a population of at least 5,000 to be included in the MSAS system.
-7-
Within each eligible city, up to 20% of the local streets may be designated as MSAS. To be
designated, the route must:
- Carry a heavier traffic volume or be classified as a collector or arterial.
- Connect points of major traffic interest.
- Provide an integrated and coordinated highway and street system.
Designation
- West Marshall Street (N. 6th Street/Existing MSAS 103 to N. 7th Street) – 0.133 miles
- North 7th Street (N. 7th Street/W. Marshall Street intersection to Kossuth Avenue) – 0.460
miles
- West Fairview Street (US 59 to N. 7th Street) – 0.231 miles
- South 10th Street (Legion Field Road to W. Main Street/MN 68) – 0.159 miles
- Legion Field Road (Kendall Street to S. 10th Street) – 0.433 miles
- Kendall Street (Legion Field Road to S. 6th Street) – 0.144 miles
- South 6th Street (Kendall Street to W. Saratoga Street/Existing MSAS 109) – 0.192 miles
- C Street (E. Saratoga Street to US 59/E. Main Street) – 0.206 miles
- Susan Drive (US 59/E. Main Street to Clarice Avenue) – 0.357 miles
Revocation
- Southview Drive – MSAS 119 (Country Club Drive/Elaine Avenue to S. 4th Street) –
0.318 miles
- Birch Street – MSAS 114 (Mustang Trail to State Street) – 0.463 miles
- North O’Connell Street – MSAS 125 (MN 19/E. College Drive to Birch Street) – 0.124
miles
- State Street – MSAS 135 (Birch Street to MN 23) – 0.415 miles
MOTION BY LABAT SECONDED BY LOZINSKI to recommend the City Council adopt a
resolution which revises the City’s Municipal State Aid System (MSAS) routes designated herein.
ALL VOTED IN FAVOR. MOTION PASSED 3:0.
Adjourn.
MOTION BY LABAT SECONDED BY LOZINSKI to adjourn the meeting. ALL VOTED IN
FAVOR. MOTION PASSED 3:0.
Meeting adjourned at 3:29 pm.
Respectfully submitted,
Kyle Box, City Clerk
-8-
Agenda
AGENDA
Public Improvement/Transportation
Committee
Tuesday, January 25, 2022
1:30 PM
On Main, City Hall
344 West Main Street
Call to Order
Approval of the Minutes
1. Consider approval of the minutes of the November 22,
2021 Public Improvement/ Transportation Committee
meeting.
New Business
2. ST-006: RRFB School Pedestrian Crossing Improvements
Project – Establish School Speed Limits.
3. ST-023: W. Lyon Street (College to 1st) Reconstruction
Project – Review/approve layouts.
4. ST-010: Lyon Circle Reconstruction Project –
Review/approve layout.
5. ST-024: Baldwin Parking Lot (City Hall Lot)
Reconstruction Project – Review/approve layout.
6. Review Draft Driveway Ordinance Revisions.
7. SRF Consulting Group – Review/recommend Proposal for
Design of City Utilities in MnDOT 2025 College Drive
Reconstruction Project.
8. Consider Proposal from Bueltel-Moseng Land Surveying
for Survey of the Marshall Flood Control Project
property.
9. Project ST-009: W. Lyon Street/N. 3rd Street
Reconstruction Project – Changes to N. 3rd Street and
Aesthetics.
10. Municipal State Aid Route Designations and
Revocations.
Adjourn
NOTE: Individuals needing assistance, pursuant to the
Americans with Disabilities Act, should contact the
Administration Office (537-6760) in advance of the meeting
to make any necessary arrangements.
Get email alerts for Marshall
A daily email when new agendas and minutes are posted.