Public Improvement and Transportation Committee
Regular MeetingMarshall, MN · January 13, 2026
Minutes
MINUTES
PUBLIC IMPROVEMENT/TRANSPORTATION COMMITTEE MEETING
JANUARY 13, 2026
4:30 PM
MEMBERS PRESENT: Craig Schafer and John Alcorn
MEMBERS ABSENT: James Lozinski
STAFF PRESENT: Jason Anderson, Director of Public Works/City Engineer; Eric Hanson, Assistant City
Engineer; Geoff Stelter, Senior Engineering Specialist; E.J. Moberg, Director of
Administrative Services
OTHERS PRESENT: None
Call to Order
Schafer called the meeting to order at 4:36 pm.
Director Anderson requested that Item Six: Review and Discuss US 59 Truck Bypass and Three: Project ST-001-2026
Chip Sealing on Various City Streets be swapped just in case time runs short.
1. Approval of Minutes
MOTION MADE BY SCHAFER to approve the minutes of the November 25, 2025, meeting as presented, SECOND BY
ALCORN ALL VOTED IN FAVOR. THE MOTION PASSED 2:0.
2. Project ST-014 (139-122-009/139-124-005): S 4th & Country Club Intersection Reconfiguration and
Reconstruction - Consultant Selection Process
The S 4th Street and Country Club Drive intersection currently operates under traffic signal control today. The traffic
signal was installed in 1983, and it is well out of compliance with current accessibility standards. The skew angle at
this intersection creates a safety hazard for both motorized travelers and pedestrians. Both S. 4th Street and
Country Club Drive are Municipal State Aid Street (MSAS) routes. The City of Marshall receives a significant amount
of funding for the maintenance and improvement of MSAS routes. With this funding, there is also a mandate from
MnDOT that engineering standards are complied with and MSAS rules are followed to both utilize the funds for
improvements and continue to draw “needs” that result in MSAS fund disbursement. With these considerations in
mind and understanding that an improvement needs to be made at this intersection to ensure compliance with
current standards, engineering staff received Council support to solicit proposals for an Intersection Control
Evaluation (ICE) at the January 26, 2021, meeting. At the February 23, 2021, meeting, the City selected Short Elliot
Hendrickson (SEH) to perform the ICE and generate the report. Following a July 6, 2021, PI/T meeting, the City
Council accepted the ICE report at their July 13, 2021, meeting and recommended drawing 3 or 5 for the
intersection. Following this Council meeting, City staff hosted adjacent property owners for an informational session
on August 9, 2021, to present the proposed changes and seek input. This project is currently identified in our 2027
CIP. City engineering staff has garnered two federal LRBP grants that total $824,000 for this project. Additional
project funding will come from the water, sewer, and stormwater utility for utility work on South 4th Street, and
MSAS funding for all remaining costs. Prior conversations with Council and property owners have promoted Layout
5, and staff believes that there was support for Layout 5 back in 2021. With the project nearing, we’d like to re-
confirm Layout 5 or hear input otherwise. Staff will likely request hiring a consultant to aid in project design and
permitting for this project, and with the federal standards and process. This item was again presented to the Public
Improvement/Transportation Committee on 06/10/2025. At this meeting, City staff re-confirmed the PI/T
Committee’s commitment to Layout 5, which included a split T intersection with one mini-roundabout. Staff also
informed the Committee of our intent to hire an engineering consultant to assist with project plan design and
federal standards. At the 06/10/2025 meeting, the PI/T Committee recommended Layout 5 to the City Council, with
a mini roundabout to the west and a ¾ or full intersection to the east. City staff would like to discuss the process
PI/T – 01/13/2026
-1-
for selecting an engineering consultant. Staff would like to send to a couple of firms to provide engineering services
and would like the PI/T Committee to assist with consultant selection in mid-January, with proposals returned by
February 5th. Staff would like the three members of the PI/T Committee and two Public Works staff members to be
the Proposal Review Committee. The Review Committee will be given proposals to read and a score sheet to
privately rank engineering proposals. Cost of engineering proposals to be determined. All costs are State Aid eligible.
Alcorn questioned the number of quotes needed to hire a consulting firm. Director Anderson stated that no specific
number of quotes were needed for professional services. However, having a small number of quotes was welcome
to ensure competitiveness and affordability. Alcorn asked if the February 5th deadline would be enough time to
receive proposals since it was already the middle of January. Hanson confirmed February 5th should be plenty of
time as he had already reached out to a couple firms and the firms were already preparing proposals. Schafer and
Alcorn both agreed with keeping the number of consultant proposals small but competitive.
MOTION MADE BY ALCORN that the Committee recommend that City staff move forward with requesting
engineering proposals for design of the Project ST-014 and convene the Proposal Review Committee once all
proposals are submitted, SECOND BY SCHAFER ALL VOTED IN FAVOR. THE MOTION PASSED. 2:0.
6. Review and Discuss US 59 Truck Bypass
City staff has been asked to consider requesting a US 59 truck bypass to route heavy truck traffic around Marshall
on MN 23 to County Road 33. The request began as a discussion between a Planning Commission member and City
Engineer over a year ago. After discussion, City staff brought forward the request to the traffic engineer’s office of
MnDOT District 8. City posed the question in spring 2025 of whether it was possible to sign a truck bypass and what
that process would look like. The response that City staff received indicated that the MnDOT traffic office did not
believe that signing a US 59 truck bypass would significantly reduce truck traffic along the corridor. The shortest
truck bypass would add 2.1 miles to the journey, as it would route US 59 traffic around Marshall on MN 23 and then
back to US 59 on County Road 33. Further, MnDOT traffic officials were concerned that creating a bypass route
could create some confusion with the traveling public as MN 23 carries quite a bit of through truck traffic, and
additional signage at the signalized intersection of MN23/US 59 isn’t desirable. In their view, the signage may cause
more disruption and confusion, and the benefit just isn’t there due to the route being so much longer and less direct
and intuitive. The purpose of discussing this item is to assist in determining the level of interest in this topic amongst
City Council members. City staff believe we may have discussed this topic at a past PI/T Committee meeting, but
we are not finding record of the discussion in our minutes to verify this. While City staff are sympathetic to the idea
that there is too much truck traffic through downtown Marshall, we do understand the response from the MnDOT
traffic engineers and their belief that the signing of a truck bypass will likely be ineffective at best and may cause
driver confusion at worst.
Schafer partially agreed that a reduction of truck traffic on Main Street would be welcome but noted that changing
truck routes can be difficult. Schafer suggested to help alleviate some of the dangerous trucks that MnDOT could
sign the downtown district as being “Center Lane” or “Left Lane” only for thru trucks. Schafer also suggested possibly
lowering the speed limit to 25 MPH from First Street to Seventh Street. The combination of lowering the speed and
traffic lights could cause GPS navigation algorithms to divert to a better bypass route. The group discussed concerns
that could come up diverting truck traffic to County Road 33 such as increased congestion and an increase in vehicles
before and after school lets out at the High School. Also, the need for Lyon Count to agree to the use of their road
as a bypass. Director Anderson added that the most successful bypass routes were by design and not created after
roads had already been built. Anderson addressed lowering the speed limit on Main Street that MnDOT would need
to conduct a speed study to determine what the appropriate speed should be and MnDOT could possibly find that
the speed should be increased instead of decreased. Alcorn was also in agreement with Schafer on reducing the
number of semi-truck traffic going through downtown. Anderson pointed out that using Google Maps showed that
using MN 23 and diverting to County Road 33 was one minute slower than going through the middle of town even
though the distance traveled was a bit further. The group continued the discussion of congestion on County Road
33 and the train overpass.
MOTION MADE BY SCHAFER that Committee recommends no action through the MnDOT regarding this item and
table for now, SECOND BY ALCORN. ALL VOTED IN FAVOR. THE MOTION PASSED 2:0.
PI/T – 01/13/2026
-2-
4. Project ST-002-2026: Bituminous Overlay Project
Current project estimate for mill and overlay is $626,860.00, including all streets shown below (excluding “Alternate
Streets”) and ADA sidewalk ramp work. The 2026 Capital budget includes $650,000 for this project. It is staff’s intent
to include the alternate street if bids are advantageous and we can keep the project cost below the CIP budget
of $650,000.
Street From-To
Carrow Street (Mill All) Horizon Dr. - East College Dr.
Michigan Road (Edge Mill) Lake Road - MMUA Training Center Road
McLaughlin Dr. (Edge Mill) Mustang Trail - O'Connell Street
Service Road (Edge Mill) McLaughlin Dr. - 1st connection to East College Dr.
Camden Dr. (Mill All) James Avenue - Southview Dr.
Margaret Avenue (Mill All) Susan Dr. - Boyer Dr. (Walmart Service Road)
Scott Street (Edge Mill) Genesis Avenue - Windstar Street
Washington Avenue (Mill All) Bruce Street - Van Buren Street
Van Buren Street (Mill All) Washington Street - Jefferson Avenue
Evergreen Avenue (Mill All) Van Buren Street - Parkside Dr.
Ellis Avenue (Edge Mill) Canoga Park Dr. - South End
Alternate Streets From-To
Canoga Park Dr. (Edge Mill) T.H. 59 - Canoga Park Dr./Circle
Director Anderson added that the newest roads on the list were from 2006, and the oldest was from 1998, which
had far exceeded its expected life span. Commission members discussed Margaret Ave (Walmart Service Road) and
how the overlay would be like the service road that loops around Hobby Lobby/Ashley Furniture.
MOTION MADE BY SCHAFER that the Committee recommend to City Council to authorize advertisement for bids
for Project ST-002-2026: Bituminous Overlay Project, SECOND BY ALCORN ALL VOTED IN FAVOR. THE MOTION
PASSED 2:0.
5. 2026 State Aid Overlay Project
Current project estimate for mill and overlay is $500,660, including all streets shown below and ADA sidewalk ramp
work. This project is identified on our CIP at $400,000, but it did not include the intersection of Susan Drive near
US59. Utilizing updated project quantities and our most current cost estimate arrives at $500,660. The project will
be funded with Municipal State Aid Street (MSAS) dollars. The current MSAS account balance is ($1,181,854). Our
low balance threshold is ($4,000,000).
Street From-To
South 6th Street (Mill Edge) Saratoga Street to Kendell Street
South 4th Street (Mill Edge) Elaine Avenue to T.H. 23
Windstar Street (Mill Edge) Saratoga Street to Scott Street
Susan Drive (Mill All) Intersection off T.H. 59
Director Anderson added that about 20 of the 80 streets within the city were state aid and this project was also
included in the request for Municipal State Aid Street Funds Advance that was on the agenda for the regular council
agenda tonight. Committee members agreed with the project and proposed streets.
MOTION MADE BY ALCORN that the Committee recommend to City Council to authorize advertisement for bids for
the 2026 State Aid Overlay Project, SECOND BY SCHAFER ALL VOTED IN FAVOR. THE MOTION PASSED. 2:0.
3. Project ST-001-2026: Chip Sealing on Various City Streets
The estimated total project cost is approximately $153,635 including all streets shown below (excluding “Alternate
Streets”). The 2026 Street Department budget includes a $165,000 line item for this project.
BASE BID STREETS
Street From-To Street From-To
Michigan Road N. T.H. 59 - MERIT Training Maple St. S. 2nd St. - S. 1st St.
Road
Michigan Road MERIT Center Gravel Road - Service Drive Jewett St. - O'Connell St.
Atlantic Ave
Charles/Hill/Minnesota 2025 Construction area Madrid Circle Channel Parkway - Channel
(Airport Park) Parkway
PI/T – 01/13/2026
-3-
Grimes St. S. 2nd St. - Williams St. Floyd Wild Drive Canoga Park Dr. - E. Southview
Drive
South 2nd St. Country Club Dr. - George St. Canoga Park Drive T.H. 23 - Canoga Park Circle
Lucille St. S. 4th St. - S. 2nd St. O'Connell St. Service Dr. - Birch St.
Williams St. Grimes St. - Maple St. N. 7th St. W. Fairview St. - Kossuth Ave
ALTERNATE STREETS
Street From-To Street From-To
South Bend Avenue Southview Dr. - Camden Dr. Marguerite Avenue Southview Dr. - Camden Dr.
In recent years staff and PI/T Committee have discussed the merits of a spray-on pavement rejuvenator product in
lieu of the chip seal program. In the past, City staff has not felt comfortable pursuing the use of spray-on
rejuvenators because they were not well-studied and there are many products on the market that all claim results.
Beginning in 2023, the MN Local Road Research Board (LRRB) has began studying 12 different spray-on rejuvenators
to study effectiveness. Through this research, four products have shown the most promise for improving pavement
longevity. One of these products is Reclamite, and this is the product that City staff has been reviewing and
considering. Though the LRRB report indicates that Reclamite does appear to have a beneficial impact on pavement
binder by reducing pavement stiffness, the duration of the study was not long enough to quantify the length of the
benefit. It is theorized in the report that most spray-on rejuvenators will require reapplication every 2-3 years,
though Reclamite was a product that did appear to still influence pavement creep stiffness at the 3-year mark. In
summary, while City staff does believe that Reclamite may be a good product for the City to consider in future years,
we believe that we should continue to monitor these studies and look for a little more conclusive evidence regarding
the duration of the benefit from treatment, so we can better make a cost-benefit comparison to chip sealing. We
do know that a good chip seal lasts upwards of 7 years; if a spray-on rejuvenator costs a similar price to apply and
must be re-applied every 3 years, it effectively costs twice as much, and you are also disrupting property owners
and traffic more frequently. It is staff’s recommendation that we continue with the chip seal program for 2026 and
keep monitoring alternatives in the industry. In staff’s opinion, there are much larger entities than Marshall that
should adopt use of a specific rejuvenator before Marshall decides to make the change. The Street Department
budget includes $165,000 for chip sealing work. Staff intend to award a contract that does not exceed this amount.
The Committee had further questions regarding the effectiveness of Reclamite. Hanson further explained the
testing that was being conducted by the National Road Research Alliance (NRRA), of which the Minnesota
Department of Transportation is a member of. Ramsey County, Rosemount, Richfield and Woodbury have used
Reclamite and are still in the early phases of results. Anderson was still hesitant to be an early adopter of the product
until more data and use cases became available. Alcorn asked how much, if any, saving could be had by switching
to Reclamite. Anderson said the saving would probably be small currently because the product costs more and
would have to be reapplied more often than chip sealing. Alcorn mentioned that another alternative would be to
do nothing on the streets and let them deteriorate until they need to be reconstructed at a greater cost.
MOTION MADE BY SCHAFER that the Committee recommend to City Council to authorize advertisement for bids
for Project ST-001-2026: Chip Sealing on Various City Streets Project, SECOND BY ALCORN ALL VOTED IN FAVOR.
THE MOTION PASSED 2:0.
Other Business
There was no further business.
Adjourn
Being no further business, MOTION MADE BY ALCORN to adjourn the meeting, SECOND BY SCHAFER ALL VOTED IN
FAVOR. THE MOTION PASSED 2:0. Meeting adjourned at 5:17 pm.
Respectfully submitted,
Steven Anderson, City Clerk
PI/T – 01/13/2026
-4-
Agenda
CITY OF MARSHALL
Public Improvement and Transportation
Committee
Agenda
Tuesday, January 13, 2026 at 4:45 PM
City Hall, 344 West Main Street
APPROVAL OF AGENDA
APPROVAL OF MINUTES
1. Consider Approval of the Minutes of the November 25, 2025 Meeting
NEW BUSINESS
2. Project ST-014 (139-122-009/139-124-005): S 4th & Country Club Intersection Reconfiguration and
Reconstruction - Consultant Selection Process
3. Project ST-001-2026: Chip Sealing on Various City Streets
4. Project ST-002-2026: Bituminous Overlay Project
5. 2026 State Aid Overlay Project
6. Review and Discuss US 59 Truck Bypass
OTHER BUSINESS ITEMS
ADJOURN
Disclaimer: These agendas have been prepared to provide information regarding an upcoming meeting of the
Common Council of the City of Marshall. This document does not claim to be complete and is subject to change.