City Council
Regular MeetingMartinsville, VA · November 20, 2014
Minutes
November 20, 2014
A special meeting of the Council of the City of Martinsville, Virginia was held on
November 20, 2014, in Council Chambers, at the Municipal Building, at 12:00 noon, to
conduct a called worksession. Council Members present included: Mayor Adkins, Vice
Mayor Gene Teague, Sharon Brooks Hodge, Danny Turner, Mark Stroud, and Council
Member Elect Jennifer Bowles. Staff present included: Leon Towarnicki, City Manager,
Brenda Prillaman, Linda Conover, Eric Monday, Andy Lash, Dennis Bowles, Wayne
Knox, Sean Dunn and Jeff Joyce.
Report on engineering study of 6.2 mile section of sanitary sewer interceptor line
that extends generally along the Smith River to the City’s Wastewater Treatment Plan:
Leon Towarnicki and Scott Ehrhardt of Dewberry presented the following information:
November 20, 2014
After lengthy discussion, Council agreed to have this issue on the December 9 Council
meeting agenda for authorization to proceed with initial phase of the project.
Report regarding possible upgrades to the City’s utility metering system: Leon
Towarnicki and Dennis Bowles presented the following information:
November 20, 2014
November 20, 2014
After lengthy discussion, Council agreed to have the metering issue on the December 9
Council meeting agenda for authorization to proceed along with the sewer issue.
No other action was taken at this worksession and there being no further
business, Mayor Adkins adjourned the meeting at 2:10 pm.
__________________________________ ______________________________
Brenda Prillaman, Clerk of Council Kim Adkins, Mayor
Agenda
MARTINSVILLE CITY COUNCIL AGENDA
Council Chambers, 55 West Church St.
CALLED WORKSESSION
THURSDAY, NOVEMBER 20, 2014
12:00 NOON TO 2PM
1. Hear a report regarding the recently-completed
engineering study of the 6.2 mile section of sanitary sewer
interceptor line that extends generally along the Smith
River to the City’s Wastewater Treatment Plant.
2. Hear a report regarding possible upgrades to the City’s
utility metering system.
Smith River Intercept
Investigation
Investigation Results and Path Forward.
Thursday, November 20, 2014
Background
The Smith River Intercept Starts at Koehler and ends
at the Wastewater Treatment Plant, spans 6.2 miles.
All sewage from the City except the Mulberry
Intercept travels through it. County waste comes
from closed Koehler plant and north side.
4.2 miles Corrugated Metal(CMP) with asphalt liner.
The remainder is Reinforced Concrete(RCP)
Constructed in early ’60s.
Has a lifespan of 35 to 50 years.
City contracted with Dewberry to oversee the
investigation
RedZone Robotics was contracted to do the field
investigation.
Camera equipment with Ultrasonic and Infrared
detection.
Investigation started in June and ended in July.
The results of the investigation indicate repair work
is needed.
Suggested repairs are in two phases; immediate,
and others scheduled over multiple years.
Immediate Need -Section of CMP Between
Walker Road and Smith River
Approximately 200 feet of 42 inch CM pipe
that has significant collapse. (80% +/-)
Location presents significant challenges.
The slope supports the only road in and out of
the old Bassett Walker Plant.
Has large gas main under the road.
The railroad in supported by the same slope.
Challenges
Very limited access to the section.
Need to investigate geotechnical structure of
surrounding property.
Bypass/pump-around during project.
Need to stabilize the slope during repairs.
Install pipe liner from manhole 43 to manhole
43.5 while line access is available.
Leave bank in stabilized condition.
Additional Sections of Partial Collapse
The Path Forward
Categorize/prioritize needed repairs
Investigate funding options for short term and
long term repairs.
Request authorization at upcoming Council
meeting to proceed with the initial phase of
the project.
City of Martinsville
Meter Replacement and Self-
funding Projects
Thursday, November 20, 2014
What is AMI/AMR
• AMI - Automated Metering Infrastructure
– is an architecture for automated, two way
communication between a smart utility meter and a
central database for utility billing, trouble shooting and
data analysis. Communication can be continuous.
• AMR – Automated Meter Reading
– is a an automated one way communication from a utility
meter to a central database for utility billing and status
reporting. Communicate is interval-based.
Water Meter Replacement was the
driving factor for AMR/AMI
• Meter replacement is recommended every 15 to
20 years.
• Majority of City’s meters are well over 20 years.
• Meter accuracy degrades over time – typically will
get slower as they age.
Options Investigated
• With changing technology, staff investigated the
latest metering techniques and equipment.
• Automated metering is now in a mature state
and is the industry standard.
• Collection is either fixed based or drive-by
systems and usually accomplished by radio
communication, telephone or network system
• Staff visited Iredell Water Corp. in Late July
2011 and observed their data collection process.
• Visited Danville Utilities
Benefits of AMI over AMR
• Data is continuous and easily accessible.
• City can monitor electrical quality at
meter.
• Water leaks can be detected for the
customer almost immediately.
• Current readings can be accessed quickly
without truck rolls
Overview of Possible System
• When the meters are replaced they will be
equipped with a radio transmitter.
• Different systems have different means of
gathering the data.
• Fixed-based (AMI) systems are becoming
less expensive.
Process Followed . . .
• City has budgeted for meter replacement
for a number of years, but delaying
project pending review of options
• Conducted a test of approx. 100 sample
meters and found accuracy at
approximately 95%.
• Concluded improved accuracy would
generate revenue that could be used to
fund meter replacement project
Energy Savings Companies
• Considered structuring an AMI/AMR
project with a participating ESCO as a self
funding process.
• This is a widely-used option and ESCO’s
have numerous AMI/AMR deployments
• City issued “Back of the Envelope”
invitations to 5 companies. Received
proposals, conducted interviews.
• Currently working with Johnson Controls
Johnson Controls
Proposal includes:
Evaluate AMI cost for installation and
maintenance
Evaluate Street Lights (LED lighting)
Evaluate Sludge Dewatering &
Disposal Options
Johnson Control Cont.
Projects will be structured as self-
funding – savings pays for project.
Cost of investment-grade audit for
evaluation is $175,000. If self-
funding project cannot be developed,
City has no cost obligation for audit.
If City accepts the project, the audit
cost is rolled into overall project cost.
Next Steps . . .
• Opportunity to review information, clarify,
ask questions
• At upcoming Council meeting, request will
be made to authorize execution of
agreement to proceed, identifying funding
for audit (expected to take 6 months +/-)
• Upon completion of audit, staff will review
findings and determine an appropriate
project scope.
Next Steps cont. . .
• Presentation made to Council, along with
recommendation for project scope and
implementation.
• Arrange project financing (bond issuance)
• Project savings finances debt service.
• Project implementation
• Measure & Verify, report results.