Massena Electric Department
Regular MeetingMassena, NY · March 20, 2025
Minutes
Approved by the MEUB on 4/21/2025 Page 1
MASSENA ELECTRIC UTILITY BOARD
MINUTES of Thursday, March 20, 2025
Town of Massena Electric Department – 71 East Hatfield Street
Present:
James Shaw Andrew McMahon, Superintendent
Richard Maginn Jeffrey Dobbins, Treasurer
Rene Hart Matt Gray, Deputy Superintendent
Charles Raiti Margo Rochefort, Deputy Treasurer
Mark Ryan Patrick Facteau, Town Liaison @ 1:00pm
Eric Gustafson, Attorney Kristy Baker, Town Liaison @ 1:00pm
BST Auditors – Bill Freitag
Trevor Carroll
Jeremy DeBarr
Timothy Biernacki
Chairman Shaw opened the meeting at 12:03 pm
Annual Audit Review (12:00 pm – 1:00 pm)
1) APPROVAL OF MINUTES:
RESOLUTION:
The Massena Electric Utility Board hereby approves the minutes of the regular meeting
of February 20, 2025 as presented.
Moved by Richard Maginn- Seconded by Mark Ryan - All in Favor
2) OPERATIONS UPDATE: by Matt Gray, Deputy Superintendent
A. Safety: MED has not had a lost time injury since June 8th, 2022. The number of consecutive
days without a lost time accident now stands at 996 days.
As of February 28th, 2024, MED has been 253 days without a reportable injury. MED
experienced a reportable injury on June 20th when an Employee cut their forearm while
stripping wire. The Employee is currently working with no lingering effects from the injury.
Although no one was injured, MED experienced a near miss on February 25th when one of our
bucket trucks was involved in a motor vehicle accident. The crew was responding to an outage
and was travelling west on State Highway 37 when a truck entered the highway from Willard
Road and into the bucket trucks lane. The two vehicles collided and our truck came to rest on its
passenger side. The other vehicle also came to rest in the ditch. The two MED crew members
involved were not injured however were sent to the hospital for precautionary evaluation. No
issues were found with either employee. The driver of the second vehicle was taken from the
scene via ambulance. Although we are awaiting the final accident report from the New York
State Police, all indications suggest that MED is considered to be not at fault.
B. MED Customers experienced only 4,233 Customer Impact Minutes (CIM) throughout the
month of February. Given the amount of Customer Impact Minutes in February, the 12-month
average has increased slightly and is now at 20,914.
Approved by the MEUB on 4/21/2025 Page 2
C. Reliability: MED Crews responded to only eight calls in the month of February, with only
three calls affecting our Customer Impact Minute total. Of the eight calls received one call
affected no customers, six calls affected only one customer and one call affected more than one
customer. The largest customer impact was due to a failed insulator and pole fire on County
Route 39 in Louisville that affected ninety-six customers for forty-three minutes. The remainder
of the calls received in February were relatively insignificant and easily remedied.
D. Work Schedule: Crews have completed repairs to hotspots found during our annual IR
scanning. In all, MED crews addressed twenty-eight primary hotspots and forty-six secondary
hotspots.
Crews are also continuing to replace conventional tie insulators with vise top insulators with a
focus on mainline, wooded and wind prone areas
3) FINANCIAL REPORTS: by Jeff Dobbins, Treasurer
A. Write-Offs:
RESOLUTION:
The Massena Electric Utility Board hereby authorizes the write-off of bad debt
totaling $1,340.51 as audited by Mr. Charles Raiti.
Moved by Rene Hart - Seconded by Charles Raiti - All in Favor
B. Power Comparison Graph: Power Costs were over a $1.58 MM for the month. Highest total for
the month of February, even higher than 2014, 2015 and 2022 (5-year max). February Peak
Demand was over 44,300. Slightly higher than Jan. peak and 650 kW lower than 5-year high set
in 2022, 5-year max was 49,330 from 2022 and minimum on graph was from 2023. MWh
purchased, over 23,480. High end for February and over 1,200 MWh more than 2024. 5-year
max was from 2022 (over 24,000 MWh). Jan & Feb 2025 MWh purchased totaled 49,660 and
are the 4th highest total for the Department.
1st – 2022 (53,115 MWh), 2nd – 2015 (52,400), and 3rd – 2014 (49,900). Supplemental Power
costs were over $988,700 for February. 11,000 MWh of incremental energy purchased, 2,000
more than amount purchased in 2024. Zone D Average Energy rate was $88/MWh (additional
graph from Feb. showed this). Transmission related expenditures totaled $354,700. Up from Jan.
and compared to Feb. 2024. Reflects constraints on the system and these costs were paid by all
electric customers in the state. Cost standpoint Jan. & Feb. 2025 represents the highest total for a
2-month period, $3.3 MM. 2014 - $3.24 MM, 2022 - $3.2 MM,
2015 - $2.4 MM. Impact to customers - Base PPAC for March of 3.9¢/ kWh, Supplemental PPAC
of 8.2¢/ kWh, both are higher than previous years.
Treasurer Dobbins reviewed additional graphs reflecting Incremental Energy purchased during
the previous 14-months (January 2024 – February 2025) and monthly sales to customers. The
graphs showed the impact electric heating has on incremental energy purchased and the
significant increase in the number of residential customers using more energy in 2025 due to the
cold weather.
Nearly half of all residential customers used more than 1,500 kWh during December 2024 and
January 2025, based on cold temperatures in February, similar totals are expected for February.
The number of residential customers using more than 5,000 kWh during a month was also up
compared to previous years. Over 700 residential customers used more than 5,000 kWh in
January. This was up from less than 300 during the previous year.
Approved by the MEUB on 4/21/2025 Page 3
Due to increased incremental energy prices in 2025, the cost to serve these customers rose
dramatically. In previous years the cost was only a few thousand dollars. In January 2025 the
incremental energy purchased for the energy used above 5,000 totaled over $90,000 (921,000
kWh X $0.97 per kWh).
C. Cash Flow: The Operating Fund decreased by $563,200. Decrease was more than projected.
Receipts were lower than projected and expenditures were $366,500 more than anticipated. The
Operating Fund balance at month end was $5.88 MM. February receipts were over $1.6 MM.
Receipts are based on bills issued during January. These bills were higher than previous years. Several
customers were unable to pay the total amount due, requiring staff to set up payment plans. More customers
are applying for assistance from LI-HEAP to help pay these higher bills. Interest revenue remained higher
than budgeted. Expenditures totaled over $2.19 MM for the month, previously noted higher than budgeted.
RESOLUTION:
The Massena Electric Utility Board hereby approves the bills as audited by
Mr. Charles Raiti totaling $1,947,952.80.
Moved by Charles Raiti – Seconded by Rene Hart- All in Favor
4) COMMITTEE REPORTS: by Andrew McMahon, Superintendent
A. Personnel
1. Staff Update: Mr. McMahon reported to the board that we are advertising for two summer
interns. They will be brought on when they are done with classes for the summer.
B. Finance & Economic Development
1. Energy Efficiency Programs: Treasurer Dobbins reported that two residential audits were
completed, and the reports showed some improvements that could be made by these customers.
No new commercial audits were performed since the last meeting.
Audits and work related to the attic insulation approved by the board in the fall continued. One
new audit was scheduled and Energy Answers has commenced work on projects previously
approved by the Finance Committee. Treasurer Dobbins expects these to be completed by the
April meeting.
2. S&S Software Upgrade (Cloud servicing etc.): Treasurer Dobbins reported that Systems &
Software continues to work on the financial management system, and address issues converting
this portion of the software to v6. The issues have caused a delay in testing and the overall
project timeline. Treasurer Dobbins indicated there was an upcoming call with S&S. After that
call staff will have a better idea of when testing of the FMS package will start and when the
potential transition date will be.
C. Engineering & Energy
1. Cybersecurity: Treasurer Dobbins reported there were no incidents or changes since last month.
2. EAB extra work CR 40: Mr. McMahon and Mr. Gray gave an update on the progress on the
funds set aside for CR40. Putney Tree Service has completed the takedown of the problem Ash
trees on County Route 40. All that remains is to remove the wood from the occupied parcels for
those customers that do not wish to keep the wood. The total cost of this project was
Approved by the MEUB on 4/21/2025 Page 4
approximately $30,000. Being that the Board passed a resolution not to exceed $50,000 for ash
removal on Cr40, staff would like to use the remaining funds to target problem ash trees on State
Highway 56. This is a mainline section that affects approximately five hundred customers. It is
also worth noting that State Highway 56 is outside the bounds of the project area associated with
the NYS DEC Ash tree removal grant.
3. NYSERDA Projects: Mr. McMahon updated the board on two NYSERDA projects.
NYSERDA 5737 – This is technical assistance grant that we have been tentatively approved for.
The work associated with this grant is to study where our system weaknesses are and what
system upgrades to invest in as we become more electrified.
NYSERDA 5986 – This is an infrastructure grant that we will be applying for. We are proposing
a project that we are calling the 2305 line which would provide an additional distribution line to
the southwest portion of our service territory. In doing so, we could reduce load on our two most
heavily loaded circuits, 2301 (Louisville) and 2303 (off of SH420). The project would also take
load off of circuit 61 (Homecroft) and 62 (north west side of village). There are multiple
reliability benefits to the project as well as efficiency and power quality.
3. Federal Funding – Staff is still hoping for the PACES grant to support the AMI project although
based on information coming from Washington that seems increasingly unlikely.
4. AMI Procurement Update: Mr. McMahon reported that we are still working on acceptable
contract language for the AMI project.
5) LEGAL ISSUES: by Eric Gustafson, Attorney: Mr. Gustafson had no remarks for open session.
6) UNFINISHED BUSINESS:
St. Lawrence Tour - tentative date May 9, 2025
7) NEW BUSINESS:
Mr. McMahon reminded the board that the budget had two passenger vehicles in the budget for
2025 as both of them are approximately 6 years old and have around 90,000 miles each. Given
the impending tariffs and the uncertainty of getting delivery in recent years we had our staff
utilize the mini-bid process approved by the state to try and identify vehicles that met our needs.
We were able to find vehicles on the lot that aligned with our needs and are consistent with the
original budget.
RESOLUTION:
The Massena Electric Utility Board hereby approves the motion to purchase
two passenger vehicles, not to exceed $110,000.00.
Moved by Charles Raiti – Seconded by Mark Ryan- All in Favor
8) ARTICLES OF INTEREST:
Finally, Mr. McMahon discussed the articles included in the Board packet. There was a
discussion of the widely reported tariffs and the potential impact on the NYS energy market. Mr.
McMahon advised the board that while there have been many conversations, nobody seems to be
certain of what the impact will be.
Approved by the MEUB on 4/21/2025 Page 5
9) SCHEDULE OF EVENTS: Next regular meeting scheduled April 17, 2025
10) PUBLIC COMMENT:
11) EXECUTIVE SESSION:
Motion to move into executive session at 2:10 pm.
Moved by Richard Maginn – Seconded by Rene Hart - All in Favor
Motion to move out of executive session at 3:05 pm.
Moved by Mark Ryan – Seconded by Charles Raiti -All in Favor
Motion to adjourn at 3:15 pm
Moved by Charles Raiti – Seconded by Rene Hart - All in Favor
Approved by the MEUB on 4/21/2025 Page 6
Customer Impact
Customer Minutes Top Quartile 12-Month Average
90000
80000
70000
60000
50000
40000
30000
20000
10000
0
Feb-24 Mar-24 Apr-24 May-24 Jun-24 Jul-24 Aug-24 Sep-24 Oct-24 Nov-24 Dec-24 Jan-25 Feb-25
Approved by the MEUB on 4/21/2025 Page 7
Power Comparison Jan-2024 to Feb-2025
kW Supplemental NYPA
Actual kW Purchased vs. Monthly Min & Max
55,000
50,000
2020- 2024 Max kW
45,000
40,000
35,000
2020 - 2024 Min kW
30,000
25,000
20,000
15,000
10,000
5,000
-
Jan-24 Feb-24 Mar-24 Apr-24 May-24 Jun-24 Jul-24 Aug-24 Sep-24 Oct-24 Nov-24 Dec-24 Jan-25 Feb-25
MWh Actual MWh Purchased vs. Monthly Min & Max Supplemental NYPA
30,000
27,500
2020 - 2024 Max MWh
25,000
22,500
20,000
2020 - 2024 Min MWh
17,500
15,000
12,500
10,000
7,500
5,000
2,500
-
Jan-24 Feb-24 Mar-24 Apr-24 May-24 Jun-24 Jul-24 Aug-24 Sep-24 Oct-24 Nov-24 Dec-24 Jan-25 Feb-25
Total Power Costs vs. Monthly Min & Max
$2,000,000
NYPA CES Transmission & ISO Supplemental
$1,800,000
$1,600,000
2020 - 2024 Max $
$1,400,000
$1,200,000
$1,000,000
$800,000
$600,000
$400,000
2020- 2024 Min $
$200,000
$-
Jan-24 Feb-24 Mar-24 Apr-24 May-24 Jun-24 Jul-24 Aug-24 Sep-24 Oct-24 Nov-24 Dec-24 Jan-25 Feb-25
% NYPA MWh 56% 59% 62% 70% 83% 75% 75% 76% 90% 88% 78% 56% 54% 53%
% NYPA $ 17% 25% 29% 37% 39% 34% 33% 32% 41% 39% 36% 16% 10% 10%
PPAC $0.015 $0.012 $0.009 $0.006 $0.010 $0.013 $0.011 $0.012 $0.009 $0.007 $0.010 $0.019 $0.033 $0.039
Supp PPAC $0.045 $0.020 $0.014 $0.000 $0.000 $0.000 $0.000 $0.000 $0.000 $0.000 $0.016 $0.052 $0.092 $0.082
CES $0.004 $0.004 $0.003 $0.004 $0.004 $0.004 $0.004 $0.004 $0.004 $0.004 $0.005 $0.004 $0.004 $0.004
Approved by the MEUB on 4/21/2025 Page 8
Comparison_2025-3-20
MWh Purchased NYPA MWh Supplemental MWh
18,000
16,000
14,000
12,000
10,000
8,000
6,000
4,000
2,000
-
Jan-24 Feb-24 Mar-24 Apr-24 May-24 Jun-24 Jul-24 Aug-24 Sep-24 Oct-24 Nov-24 Dec-24 Jan-25 Feb-25
MWh Sold
Residential < 1500 Residential 1500 - 5000 Residential > 5000 Other Industrial
18,000
16,000
14,000
12,000
10,000
8,000
6,000
4,000
2,000
-
Jan-24 Feb-24 Mar-24 Apr-24 May-24 Jun-24 Jul-24 Aug-24 Sep-24 Oct-24 Nov-24 Dec-24 Jan-25 Feb-25
Approved by the MEUB on 4/21/2025 Page 9
Comparison_2025-3-20
MWh Sold
Residential < 1500 Residential 1500 - 5000 Residential > 5000 Other Industrial
18,000
16,000
14,000
12,000
10,000
8,000
6,000
4,000
2,000
-
Jan-24 Feb-24 Mar-24 Apr-24 May-24 Jun-24 Jul-24 Aug-24 Sep-24 Oct-24 Nov-24 Dec-24 Jan-25 Feb-25
# of Customers
Residential < 1500 Residential 1500 - 5000 Residential > 5000
8,000
7,000
6,000
5,000
4,000
3,000
2,000
1,000
-
Jan-24 Feb-24 Mar-24 Apr-24 May-24 Jun-24 Jul-24 Aug-24 Sep-24 Oct-24 Nov-24 Dec-24 Jan-25 Feb-25
Approved by the MEUB on 4/21/2025 Page 10
Comparison_2025-3-20
MWh Purchased Supplemental MWh Supplemental $/MWh
15,000 $100
13,500 $90
12,000 $80
10,500 $70
9,000 $60
7,500 $50
6,000 $40
4,500 $30
3,000 $20
1,500 $10
- $-
Jan-24 Feb-24 Mar-24 Apr-24 May-24 Jun-24 Jul-24 Aug-24 Sep-24 Oct-24 Nov-24 Dec-24 Jan-25 Feb-25
Power Cost to Serve Residential Usage > 1,500 kWh
Residential 1500 - 5000 Residential > 5000
$1,000,000
$900,000
$800,000
$700,000
$600,000
$500,000
$400,000
$300,000
$200,000
$100,000
$-
Jan-24 Feb-24 Mar-24 Apr-24 May-24 Jun-24 Jul-24 Aug-24 Sep-24 Oct-24 Nov-24 Dec-24 Jan-25 Feb-25
MASSENA ELECTRIC DEPARTMENT
STATEMENT OF CASH FLOW
PERIOD ENDING FEBRUARY 28, 2025
BUDGET vs. ACTUAL
MONTH YEAR TO DATE
over/(under) over/(under) ANNUAL
ACTUAL BUDGET ACTUAL BUDGET BUDGET
1 OPERATING FUND
2 BEGINNING FUND BALANCE 6,447,717 (235,161) 7,329,378 7,329,378
3
4 CASH RECEIPTS:
5 RECEIPTS FROM CUSTOMERS 1,592,047 (180,553) 2,781,831 (556,069) 15,114,600
6 REIMBURSED WORK 11,600 7,800 11,600 4,000 45,000
7 RVRDA CONSULTING FEE 2,500 0 5,000 0 30,000
8 INTEREST REVENUES 22,556 4,456 44,970 8,770 217,200
9 TOTAL CASH RECEIPTS: 1,628,702 (168,298) 2,843,401 (543,299) 15,406,800
10
11 CASH EXPENDITURES:
12 SALARIES & WAGES 159,242 (2,758) 318,654 (5,346) 2,106,000
13 HEALTH INSURANCE 37,905 (10,995) 116,233 (30,467) 586,800
14 FICA & NYS RETIREMENT 11,754 554 316,008 (3,492) 442,700
15 Salaries & Employee Benefits 208,900 (13,200) 750,895 (39,305) 3,135,500
16
17 NYPA POWER 166,113 5,213 327,753 9,153 2,003,800
18 SUPPLEMENTAL POWER 1,162,425 566,425 1,804,678 701,578 3,576,200
19 ISO/TRANSMISSION 286,751 74,951 457,271 48,471 2,247,000
20 CES 90,082 3,782 171,605 7,305 793,200
21 Power & ISO 1,705,371 650,371 2,761,307 766,507 8,620,200
22
23 CONTRACT SERVICES 2,025 (16,275) 17,963 (18,637) 219,000
24 CONSULTING SERVICES 545 (10,855) 2,366 (20,434) 137,200
25 LEGAL SERVICES 5,500 (13,100) 20,124 (17,076) 223,600
26 FINANCIAL SERVICES 3,000 3,000 3,000 3,000 34,400
27 NYS SALES TAX 90,981 20,981 156,160 24,160 595,000
28 REAL ESTATE TAXES 119,710 6,410 264,641 19,241 628,700
29 POSTAGE 3,850 (1,350) 7,700 (2,700) 62,400
30 TELEPHONE 7,846 246 14,197 (1,003) 91,200
31 CONSUMER REFUNDS 1,036 (3,164) 6,066 (2,334) 50,000
32 INSURANCE 0 0 135,931 (13,269) 225,800
33 OTHER OPERATING EXP. 32,075 (10,425) 98,934 (6,066) 612,600
34 Paid to Suppliers & Vendors 266,567 (24,533) 727,083 (35,117) 2,879,900
35
36 MATERIALS & SUPPLIES 9,325 (40,875) 45,503 (54,897) 602,400
37 DEBT SERVICE 0 0 0 0 0
38 Contrib. to Depr Fund/Capital Exp. 1,730 (205,270) 3,465 (410,535) 2,484,500
39 CONTRIB. TO INS FUND 0 0 0 0 0
40 CONTRIB. to Post Retire. Hlth Ins Fund 0 0 0 0 0
41 ENERGY EFFICIENCY 0 0 0 0 50,000
42 Utility Investment & Other Activities 11,055 (246,145) 48,968 (465,432) 3,136,900
43
44 TOTAL CASH EXPENDITURES: 2,191,893 366,493 4,288,252 226,652 17,772,500
45
46 ENDING FUND BALANCE 5,884,527 5,884,527 (769,951) 4,963,678
47
48 CHANGE IN FUND BALANCE: (563,191) (1,444,851) (2,365,700)
49 Monthly Change YTD Change
50 DEPRECIATION FUND BALANCE: 1,262,312 2,908 6,140
51 LIABILITY & CASUALITY FUND BALANCE: 941,332 0 0
52 POST RETIRE. HLTH INS. FUND BALANCE: 1,704,043 5,509 11,632
53 ENERGY EFFICIENCY FUND BALANCE: 86,523 (2,936) (3,240)
Agenda
MASSENA ELECTRIC DEPARTMENT
71 E. Hatfield Street • PO Box 209 • Massena New York 13662
Office: (315) 764-0253 • Fax: (315) 764-1498
www.massenaelectric.com
NOTICE OF REGULAR MEETING
MASSENA ELECTRIC UTILITY BOARD
DATE: Thursday March 20, 2025
TIME: 12:00 p.m. – Massena Electric Audit Review
1:00 p.m. – Monthly Meeting
Location: Massena Electric Department
71 E. Hatfield St.
Massena, NY 13662