Conservation Commission
Regular MeetingMethuen, MA · February 17, 2022
Minutes
CONSERVATION COMMISSION
Minutes of a Meeting – February 17, 2022
The City of Methuen Conservation Commission held a hybrid meeting via in person and Zoom video
conferencing (VC) on February 17, 2022, at 7:00 p.m. in the Searles Building 2nd floor conference
room, 41 Pleasant Street, Methuen MA 01844. Present for this meeting were Matt Davidson,
Chairman; Michael Rossi, Vice Chairman; Ken Sateriale, Secretary; Sandra Boulay, Financial
Secretary (arrived at 7:10 p.m.); and Cara Seaman, Commissioner. Also present were Conservation
Officer Joseph Giarrusso and Head Clerk Jodie Geary. Commissioners Christopher Parsons and
Neily Soto were on an excused absence.
The Chairman opened this meeting and announced that Pursuant to Chapter 20 of the Acts of 2021,
this meeting will be conducted in person and via remote means, in accordance with applicable law.
This means that members of the public body as well as members of the public may access this
meeting in person, or via virtual means. In person attendance will be at the meeting location listed
above, and it is permissible for any or all members of the public body and any or all members of the
public to attend either in person or via virtual means. The meeting may be accessed remotely via
Zoom video conferencing (VC) by contacting the Conservation Office. When required by law or
allowed by the Chair, persons wishing to provide public comment or otherwise participate in the
meeting, may do so by in-person attendance, or by accessing the meeting remotely, as noted above.
For this meeting, members of the public who wish to listen/watch the meeting may do so in the
following manner: To be contacted by phone or by VC, please contact the Commission Office. In
the event that access and participation is not achieved, then the Commission will post, on the City of
Methuen website, an audio or video recording, transcript, or other comprehensive record of
proceedings as soon as possible after the meeting. The following are actions, comments, and
concerns regarding the information submitted for the Commission’s meeting of February 17, 2022.
I. NOTICES OF INTENT:
A. Notice of Intent – DEP File #219-1263 – MCC File #21-012 – 61 Old Ferry Road – Desal
Ferry, LLC – Norse Environmental Services, Inc. (TABLED from 02/03/2022)
Mrs. Geary read an email dated February 17, 2022 from Norse Environmental Services, Inc.
stating the applicant has requested that this item be tabled to allow for the redesign of the projects
to include a forced sewer main that will allow the project to move forward.
A motion was made by Mr. Rossi; seconded by Mrs. Seaman; so voted UNANIMOUS to
TABLE the public hearing to the meeting of March 3, 2022.
Notice of Intent – DEP File#219-1266 – MCC File #22-001 – 151 Pelham Street- Clear
Channel Outdoor – Andover Consultants, Inc.
The file in order, a motion was made by Mr. Sateriale; seconded by Mr. Rossi; so voted
UNANIMOUS to ACCEPT the above Notice of Intent.
The submitted Notice of Intent by Clear Channel Outdoors is for the demolition of the existing
billboard and foundation, and replacement of it with a new digital billboard system, as described
in plans submitted to the Commission by Andover Consultants, dated February 2, 2022 with the
proposed work resulting in the alteration of 260 sq/ft of Riverfront area, with the proposed
erosion control being located at the edge of existing maintained area, 10’ from the edge of
bordering vegetated wetlands.
METHUEN CONSERVATION COMMISSION
Minutes of a Meeting – February 17, 2022
Dennis Griecci from Andover Consultants, Inc. presented the plans for the proposed work.
Mr. Davidson asked if there was any public participation. Hearing and seeing none, public
participation was closed.
A motion was made by Mr. Sateriale; seconded by Mr. Rossi; so voted UNANIMOUS to
CLOSE the public hearing. The Commission now has 21 days in which to make their decision.
II. CALL TO ORDER: The Chairman called the meeting to order at 7:15 p.m.
III. ACCEPTANCE OF AGENDA / AMENDMENTS (IF ANY): A motion was made by Mr.
Rossi; seconded by Mrs. Seaman; so voted UNANIMOUS to ACCEPT the agenda as posted.
IV. ACCEPTANCE OF MINUTES: A motion was made by Mr. Rossi; seconded by Mr.
Sateriale; so voted UNANIMOUS to ACCEPT the minutes of 1/20/2022.
A. Request for Determination of Applicability – MCC File 22-001 – 19 & 19 ½ Mystic
Street – Methuen Housing Authority – Allen & Major Associates, Inc.
The Request for Determination of Applicability filed by Methuen Housing Authority, is for the
proposed replacement of existing pavement and sidewalks within the Buffer Zone of Bordering
Vegetated Wetlands associated with an intermittent stream. The project as proposed appears to be
within the existing paved areas and the proposed limit of work and erosion control appear to be
within the maintained areas of the property.
A motion was made by Mrs. Seaman, seconded by Mr. Sateriale; so voted UNANIMOUS to
issue a Negative 2 under the State and Local with the following stipulations:
1. A 48-hour written notice shall be given to the Methuen Conservation Commission prior to
any activity on site.
2. Before work may begin, erosion control, consisting of staked wattle and silt fencing shall be
installed at the limit of work as shown on the approved plan dated February 3, 2022. The
Conservation Commission or its agent shall inspect it before work may begin.
3. All building materials shall be stockpiled in the front of the property.
4. Prior to any field changes, a written request to include drawings shall be submitted for review
and approval by the Commission and/or its agent. Should dewatering be required for the
construction, the Commission shall be notified and shall approve the methods used.
5. Members and agents of the Methuen Conservation Commission shall have the right to enter
and inspect the premises to evaluate site conditions for compliance and to require the submittal of
any data deemed necessary by the Commission for that evaluation.
6. Upon completion of this project, a letter stating that the work has been completed in
compliance with the Determination of Applicability shall be sent to the Commission.
B. Request for Determination of Applicability – MCC File 22-002 – 566 Merrimack Street
– Eliander Troncoso
Page 2
METHUEN CONSERVATION COMMISSION
Minutes of a Meeting – February 17, 2022
The Request for Determinations of Applicability filed by Eliander Troncoso, is for the proposed
construction of a 24’ by 24’ garage, and approving a limit of work within the Riverfront Area
associated with an Bare Meadow Brook, a perennial stream. The project as proposed appears to
be within the existing yard, and the proposed limit of work and erosion control appear as shown
on the submitted plan and within the existing maintained property, and are located approximately
143’ from the top of an Inland Bank. Therefore the request was only filed under the State
Wetlands Protection Act.
A motion was made by Mr. Rossi; seconded by Mr. Sateriale issue Negative 2 under the State
only with the following stipulations:
1. No work shall be undertaken until the Final Determination has been recorded in the Registry
of Deeds or Land Court for the district in which the land is located, within the chain of title of the
affected property. In the case of recorded land, the Final Determination shall also be noted in the
Registry's Grantor Index under the name of the owner of the land upon which the proposed work
is to be done. In the case of registered land, the Final Determination shall also be noted on the
Land Court Certificate of Title of the owner of the land upon which the proposed work is to be
done. The recording information shall be submitted to the Methuen Conservation Commission on
the form at the end of this Determination prior to commencement of the work.
2. A 48-hour written notice shall be given to the Methuen Conservation Commission prior to any
activity on site.
3. Before building permit may be issued, erosion control, consisting of staked 12” Straw
Wattle shall be installed at the limit of work as shown on the approved plan dated February 3,
2022. The Conservation Commission or its agent shall inspect it before work may begin.
4. All building materials shall be stockpiled in the front of the property.
5. A dumpster will be used for the construction debris to prevent materials from blowing into the
resource area(s) and it shall be covered at the end of each workday.
6. Prior to any field changes, a written request to include drawings shall be submitted for review
and approval by the Commission and/or its agent. Should dewatering be required for the
construction, the Commission shall be notified and shall approve the methods used.
7. Members and agents of the Methuen Conservation Commission shall have the right to enter
and inspect the premises to evaluate site conditions for compliance and to require the submittal of
any data deemed necessary by the Commission for that evaluation.
8. Upon completion of this project, a letter stating that the work has been completed in
compliance with the Determination of Applicability shall be sent to the Commission.
V. OLD BUSINESS:
B. Orders of Conditions/Bond – DEP File#219-1260 – MCC File #21-009 – 45 Maple Street
– Thomas Evangelista
Page 3
METHUEN CONSERVATION COMMISSION
Minutes of a Meeting – February 17, 2022
The Notices of Intent filed by Thomas Evangelista with plan sheets 1 of 1 , dated August 31,
2021, revised January 21, 2022 prepared by GPI, is for the after-the-fact approval of the
installation of a floating walkway and stairway within Wetland Resource Areas adjacent to a
single-family dwelling at 45 Maple Street resulting to alterations to the following resource areas:
Approximately 43 sq/ft of Bordering Vegetated Wetlands (BVW), Approximately 11’ of Inland
Bank and Unknown amount of Bordering Land Subject to Flooding associated with Hawkes
Brook and the 100-foot Buffer Zone, as jurisdictional under the Massachusetts Wetlands
Protection Act (M.G.L. c.131, s. 40, the Act) and its implementing Regulations (310 CMR 10.00,
the Act Regulations), and the City of Methuen Wetlands Ordinance (Chapter 12, the Ordinance)
and its implementing Rules and Regulation (Ordinance Regulations). The location of the activities
is within a mapped Estimated Habitat of Rare Wildlife and Priority Habitat of Rare Species for
the Blanding's Turtle (Emydoidea blandingii). Those activities are in violation of earlier
Wetlands and MESA approvals.
A motion was made by Mr. Rossi; seconded by Mr. Sateriale ISSUE an Order of Conditions with
the following Special Conditions:
1. Before ANY activity on the site may begin, the Contractor, job supervisor, and City shall
meet with the Conservation Officer to review the Order of Conditions, Work Sequence and
timetable regarding the removal of utilities and lighting for the project. At this time, the
contractor shall review any issues with the location of stockpile areas.
2. Before ANY activity on the site may begin, erosion control shall be installed at the limit of
work as shown on the approved plans. The Conservation Commission or its agent shall inspect it
before work may begin.
3. The applicant within 30 days of issuance of the Order of Conditions, shall submit the Draft
Conservation Restriction, dated December 9, 2021 to the Office of the Secretary of Executive
Office of Energy and Environmental Affairs for review and approval. Once this document has
been approved the property owner shall comply with all requirements to execute the Conservation
Restriction. Once the Conservation Restriction is in place any failure to comply with this
restriction and its condition will result in a fine of $300.00 per day that the property owner is in
non-compliance of this condition. This Condition shall remain in perpetuity.
4. NO WORK or OTHER ACTIVITIES SHALL BEGIN ON SITE until the boundaries of the
“Conservation Restriction” have been permanently monumented and marked with signage that
will delineate the boundary of the protected open space as shown on the Conservation Restriction
Plan, dated December 1, 2021, an as-built plan shall be provided to the Commission verifying the
placement of all bounds. Said permanent bounds and signage shall be maintained in good
condition by the property owner and repaired or replaced, as necessary. ALL boundary markers
shall comply with the requirements as required in the standards set by NHESP Guidance
Document for Open Space Signage and Monumentation or the NHESP Conservation Permit. The
Conservation Commission or its agent shall inspect and approve the location of the markers in the
field before work may begin. Failure to comply with this condition will result in a fine of not less
than $100.00 per day that the property owner is in non-compliance of this condition. This
Condition shall remain in perpetuity.
5. To ensure that each property owner has been properly informed of the existence of the
Conservation Restriction on their property and the critical importance that they perform NO
activity within the restricted area, a notice to this effect shall be included in both the purchase and
sales agreement for the property and any deed(s) prepared for the property. A form signed by the
Page 4
METHUEN CONSERVATION COMMISSION
Minutes of a Meeting – February 17, 2022
buyer(s) acknowledging they understand these restrictions shall be submitted to the Commission.
This condition shall remain in perpetuity and any violation of this condition shall result in
fines of not less than $100.00 per day.
6. The property owner shall comply with the requirements the approved “INVASIVE PLANT
Management Plan”, dated October 29, 2021. The Commission shall be given 48 hour notice each
time management work is done as required under the plan. The Commission shall be receive an
annual report as stated in the management plan for invasive plants management and in addition
SHALL receive inspection reports for all proposed restoration and mitigation plantings. These
reports shall be performed for a minimum of three (3) growth seasons after planting and at the
completion of this time period the Commission will determine if additional monitoring is
necessary, and if not the property owner shall file for a Certificate of Compliance, which shall
include an as-built plan. The Commission requires that once it has been determined that
treatment of invasive species is not required, there will be a be site assessment done every two
years thereafter, with a summary report submitted to the Commission for review, no later than
November 1st of each year. Should invasive species be found a proposed management plan shall
be provide for the Commission’s review and approval. Failure to comply with this condition will
result in a fine of $300.00 per day that the property owner is in non-compliance of this condition.
This Condition shall remain in perpetuity.
7. ALL equipment shall be stored a minimum of 35’away from the delineated Bordering
Vegetated Wetlands. This shall be verified in the field by the Conservation Officer.
8. Failure to comply with all the conditions stated herein, and with all related statutes and other
regulatory measures, shall be deemed cause to revoke or modify this Order.
9. This Order does not grant any property rights or any exclusive privileges; it does not authorize
any injury or absolve the petitioner of responsibilities to other property owners or any invasion of
private rights, including land to which he discharges water directly or indirectly.
10. This Order does not relieve the permittee or any other person of the necessity of complying
with all other applicable federal, state or local statues, ordinances, by-laws or regulations.
11. The work authorized hereunder shall be completed within (3) three years from the date of this
Order unless work is a maintenance dredging project as provided for in the Ordinance. Should
there be a need to remove the dock system the Commission shall at that time determine if a
filing is necessary.
12. This Order may be extended by the issuing authority for one-year periods, each upon
application to the issuing authority at least (30) thirty days prior to the expiration date of the
Order.
13. Any fill used in connection with this project shall be clean fill, containing no trash, refuse,
rubbish or debris, including but not limited to lumber, bricks, plaster, wire, lath, paper, cardboard,
pipe, tires, ashes, grass clippings, refrigerators, asphalt products, hazardous waste, motor vehicles
or parts of any of the foregoing. At no time shall any debris or other material be buried or
disposed of within that line marked on the plan as wetland, other than that fill which is allowed by
this Order and is shown in the plan(s) referenced above.
14. No work shall be undertaken until all administrative appeal periods from this Order have
elapsed or, if such an appeal has been filed, until all proceedings before the Department have been
completed.
Page 5
METHUEN CONSERVATION COMMISSION
Minutes of a Meeting – February 17, 2022
15. No work shall be undertaken until the Final Order has been recorded in the Registry of
Deeds or the Land Court for the district in which the land is located, within the chain of title of
the affected property. In the case of recorded land, the Final Order shall also be noted in the
Registry’s Grantor Index under the name of the owner of the land upon which the proposed work
is to be done. In the case of registered land, the Final Order shall also be noted on the Land
Court Certificate of Title of the owner of the land upon which the proposed work is to be done.
The recording information shall be submitted to the Methuen Conservation Commission on the
form at the end of this Order prior to commencement of the work.
16. A sign shall be displayed at the site not less than two (2) square feet in size, bearing the
words, D.E.P. File # 219-1260_ and M.C.C. File No. 21-009_ Said sign shall not be nailed to any
living tree.
17. The Methuen Conservation Commission shall be notified within ten (10) days of any instance
where an individual, association, partnership, trust, or corporation transfers, in whole or part, its
title and interest to the land which is the subject of this Order of Conditions, or in the instance
where a corporation shall transfer greater than fifty (50) percent of its stock. Such individuals or
other entities shall notify the Methuen Conservation Commission of the name, address, and
telephone number of the new owner. Such new owners or new controlling interests, in the case of
a corporation, shall forthwith also furnish the Methuen Conservation Commission with a
notarized statement as called for in condition #26.
18. Within thirty (30) days of completion of the work described herein, the applicant shall
forthwith request in writing that a Certificate of Compliance be issued stating that work has been
satisfactorily completed.
19. No work may proceed until the applicant has received other permits required by law,
including but not limited to, any permit required by the Methuen Board of Health, Planning
Board, Board of Appeals, D.E.P., MEPA and USCOE.
20. If substantial (i.e. a minimum of 1/3 of construction) work has not been completed within one
year from the date of issuance, any request for an extension may be denied.
21. Upon completion of this project, any request for a Certificate of Compliance shall be
accompanied by, but not limited to, those materials as specified in Section 7 of the Rules and
Regulations and Chapter 12. (Section 7 reads “A Certificate of Compliance shall be requested by
the applicant/owner in writing and may be issued by the Commission following a site inspection,
provided that the request for the Certificate of Compliance must contain with it, an affidavit
signed and stamped by a Massachusetts Registered Professional Engineer, Land Surveyor,
Architect or Landscape Architect, stating that all work has been completed in accordance with
this Order of Conditions and plans submitted. Such request for Certificate of Compliance shall
include with it an as-built plan signed and stamped by said individual. The Certificate of
Compliance shall be issued on the form marked “B” annexed hereto and shall be valid only when
approved by a majority of the Methuen Conservation Commission. If, after a site inspection, the
Methuen Conservation Commission determines that the Order of Conditions has not been
satisfactorily complied with, the request for certificate may be denied. This decision shall be
forwarded to the applicant, along with the reasons for denial within twenty-one (21) days of
receipt of the request for a certificate.”)
Page 6
METHUEN CONSERVATION COMMISSION
Minutes of a Meeting – February 17, 2022
22. Any deviations made or intended to be made from the plans submitted, the Notice of Intent,
and this Order of Conditions, shall require the filing of a new Notice of Intent, or to inquire of the
Methuen Conservation Commission in writing whether the change is substantial enough to
require a new filing.
23. The applicant shall have received written approval of any proposed change(s) from the
Methuen Conservation Commission prior to the execution of any change in the field.
24. The applicant shall file, in conjunction with the Methuen Conservation Commission, all
those materials, plans and certifications showing foundation locations that are required by the
City of Methuen Building Inspector.
25. A forty-eight (48) hour written notice shall be received by the Methuen Conservation Agent
prior to the commencement of any work on the site.
26. Prior to commencement of any work, the person receiving the Order of Conditions shall
provide the Methuen Conservation Commission with a signed, notarized statement indicating, at a
minimum, that such individual, under pains and penalties of perjury, swears that he understands
the terms/conditions as specified in the Order of Conditions and that such person agrees to
comply with the provisions of the Methuen Wetlands Ordinance, the regulations and the Order of
Conditions.
27. This Order of Conditions shall apply to any successor in interest or in control.
28. If any plan, calculation, or other data presented to the Methuen Conservation Commission is
in error or having omissions, and are deemed significant by the Methuen Conservation
Commission or their agents, all work will stop at the discretion of the Commission, until the
discrepancies have been rectified to the Methuen Conservation Commission’s satisfaction.
29. Members of the Methuen Conservation Commission and their agents shall have the right to
enter the premises to inspect and evaluate compliance with this Order of Conditions and the
Methuen Wetlands Ordinance, and to require the submittal of any data deemed necessary by the
Methuen Conservation Commission for that evaluation.
30. A Performance Bond (Form ”K”) shall be issued by the Methuen Conservation Commission and
signed by all parties prior to any alteration of the project site. Said bond shall be in the amount
determined by the Methuen Conservation Commission, and said bond shall guarantee and assure
performance of the conditions as outlined in this Order of Conditions and plans, diagrams and other
data as incorporated therein. A copy of this bond or collateral including the expiration date shall be
filed with the Methuen Conservation Office. (A Bond shall be calculated for the proposed wetlands
restoration and the proposed Native Restoration Plantings.)
31. This document shall be included in all construction contracts and subcontracts dealing with
the work proposed and shall supersede other contract requirements, to the extent that a conflict
exists between performance requirements of the sections.
32. The Notice of Intent dated September 3, 2021 shall become a part of this plan.
33. Prior to construction, the applicant shall inform the Methuen Conservation Commission, in
writing, of the names, addresses, business and home phone numbers of the project supervisor and
his/her alternate.
Page 7
METHUEN CONSERVATION COMMISSION
Minutes of a Meeting – February 17, 2022
34. A copy of the plan on record, Order of Conditions, and specific sequence of construction and
instructions shall be kept at the work site whenever work is in progress.
35. Fill used for this project will be clean granular fill containing no organic matter, and
containing no more than 20% by volume of objects that are no greater than one-half (1/2) cubic
foot and is subject to the approval of the Methuen Conservation Agent.
36. The siltation fence or hay bale line erected to prevent siltation of the wetland shall also serve
as the limit of activity for work crews. It shall remain in good repair during all phases of
construction and it shall not be removed until all soils are stabilized, revegetated, and until
permission to remove is given by the Methuen Conservation Commission. When approved for
removal, all stakes and silt fence shall be removed from the site and disposed of lawfully. Hay
bales shall either be removed or broken apart and spread out over the upland portion of the site.
37. Erosion and sedimentation controls shall be placed prior to construction activity and
inspected by agents of the Methuen Conservation Commission before land disturbing activity
may commence. The Methuen Conservation Commission reserves the right to require additional
erosion control or storm damage prevention controls as construction progresses. These controls
will be maintained, along with other controls deemed necessary by the Methuen Conservation
Commission and/or its agent. Hay bales and siltation control barriers shall mark the limit of
construction beyond which no equipment, earth or vegetation disturbance may take place.
38. The applicant shall have on hand at the start of any soil disturbance, removal or stockpiling, a
minimum amount of hay bales and sufficient stakes for staking the bales. Said bales shall be used
only for the control of emergency erosion problems and shall not be used for the normal control
of erosion.
39. All stockpiled soil shall be stockpiled and/or protected in such a way as to prevent wind and
water erosion. In no case shall any soil be stockpiled within 50’ of any wetlands or floodplain.
40. As soon as possible during construction, all disturbed upland areas shall be brought to final
finish grade and permanently stabilized (a) according to USDA Soil Conservation Service
published guidelines or (b) in another way approved by the Methuen Conservation Commission.
Bare ground that cannot be stabilized within thirty (30) days shall be stabilized by temporary
measure approved by the Methuen Conservation Commission. A mulch of hay or straw shall be
used on newly seeded slopes. The Methuen Conservation Commission may require the mulch to
be anchored.
41. All drainage structures and roadways will be built per Methuen Department of Public Works
specifications. All drainage facilities, silt ponds, and related structures and equipment shall be
continually operated and maintained so as to comply with this Order of Conditions. The operation
and maintenance of these facilities and structures shall be in perpetuity by the landowner(s) or
through easement by the City of Methuen and shall not expire at the end of one year or with issuance
of the Certificate of Compliance.
42. Any dewatering activities on the project in which water will be released to wetlands shall
make use of a settling pond or similar device to remove sediment before water is released. Prior to
any dewatering activities, the Methuen Conservation Commission and/or its agent shall approve
of the location or the settling pond.
Page 8
METHUEN CONSERVATION COMMISSION
Minutes of a Meeting – February 17, 2022
43. The storm drainage system, detention basins, compensatory storage areas and/or erosion
control devices shall be constructed/installed during the initial phases of the project so that they
may be functional during construction.
44. Grading shall be established and maintained so there shall not be direct runoff to the abutting
properties.
45. The project shall not be or constructed as to increase runoff in the post-development stages
measured against pre-construction to abutting properties and wetland resource areas.
46. Site grading and construction shall be scheduled to avoid periods of high groundwater.
47. During construction, all rubbish shall be confined to a commercial container system. All
debris, including but not limited to, stumps, brush waste and debris, from all aspects of this
project shall be removed from the site and lawfully disposed of outside of any area subject to
protection under Chapter 131, Section 40, Massachusetts General Law, or Chapter 12 of the
Municipal Code of Methuen. Records as to the destination of all materials removed from the site
shall be kept and made available to the Methuen Conservation Commission upon request.
48. During and after work on this project, there shall be no discharge or spillage of fuel, oil or
other pollutants onto any part of the site. The applicant shall take all reasonable precautions to
prevent the release of pollutants by ignorance, accident or vandalism.
49. No further filling, dredging or altering of wetland resource areas shall take place other than
provided for in this Order of Conditions.
50. Fertilizers utilized for landscaping and lawn care after final stabilization shall be of low
nitrogen content variety and shall be used in moderation.
51. Special Condition(s) 3, 4, 5 & 6 shall extend beyond the Certificate of Compliance, in
perpetuity and shall be referred to in all future deeds to this property.
VI. CONSERVATION OFFICER’S REPORT:
There was no additional information on the Conservation Officer’s report.
VII. OTHER BUSINESS:
There was no other business at this time.
VIII. ADJOURN: A motion was made by Mrs. Rossi; seconded by Mrs. Seaman, so voted,
UNANIMOUS to ADJOURN the meeting at 7:30 p.m.
Respectfully submitted by: Reviewed by: Approved on:
___________________ _____________________ ____________
Jodie Geary, Kenneth Sateriale, Date Approved
Head Clerk Secretary
Page 9
Agenda
Tel (978) 983-8650
Fax (978) 946-1590
METHUEN CONSERVATION COMMISSION
41 Pleasant Street, Suite 217
Methuen, MA 01844
AGENDA
MEETING: PUBLIC HEARINGS/REGULAR
DATE & PLACE: THURSDAY FEBRUARY 17, 2022 @ 7:00 PM
PLACE: SEARLES BUILDING, 41 Pleasant Street
ROOM: 2ND FLOOR CONFERENCE ROOM
& via ZOOM WEB MEETING
I. NOTICES OF INTENT:
A. Notice of Intent – DEP File #219-1263 – MCC File #21-012 – 61 Old Ferry Road – Desal
Ferry, LLC – Norse Environmental Services, Inc. (TABLED from 02/17/2022)
B. Notice of Intent – DEP File#219-1266 – MCC File #22-001 – 151 Pelham Street- Clear
Channel Outdoor – Andover Consultants, Inc.
II. CALL TO ORDER:
III. ACCEPTANCE OF AGENDA / AMENDMENTS (IF ANY):
IV. ACCEPTANCE OF MINUTES: 1/20/2022, 2/3/2022
V. NEW BUSINESS:
A. Request for Determination of Applicability – MCC File 22-001 – 19 & 19 ½ Mystic Street
– Methuen Housing Authority – Allen & Major Associates, Inc.
B. Request for Determination of Applicability – MCC File 22-002 – 566 Merrimack Street –
Eliander Troncoso
VI. OLD BUSINESS:
A. Enforcement Orders
B. Orders of Conditions/Bond – DEP File#219-1260 – MCC File #21-009 – 45 Maple Street
– Thomas Evangelista
VII. CONSERVATION OFFICER’S REPORT:
VIII. OTHER BUSINESS:
IX. ADJOURN:
METHUEN CONSERVATION COMMISSION
AGENDA – FEBRUARY 17, 2022
Respectfully submitted by,
Matthew Davidson, Chairman
**** NEXT REGULAR MEETING ON March 3, 2022 ******* Anyone needing an access
accommodation to participate in City of Methuen programs or services, please contact Gene Walsh, ADA
Coordinator at 978-683-8625 or GWalsh@ci.methuen.ma.us at least 2 weeks in advance, or 2 business days
before any Board or Commission meeting. This notice is available in alternative formats upon request.
Pursuant to Chapter 20 of the Acts of 2021 this meeting of the City of Methuen Conservation Commission
will be conducted via remote participation AND in person to the greatest extent possible. Specific
information and the general guidelines for remote participation by members of the public and/or parties
with a right and/or requirement to attend this meeting can be found on the City of Methuen website, at
https://www.cityofmethuen.net/ For this meeting, members of the public who wish to listen/watch the
meeting may do so in the following manner: Be contacted by phone or by Zoom, please contact the
Commission Office, in-person attendance of members of the public will be permitted, but every effort will
be made to ensure that the public can adequately access the proceedings in real time, via technological
means. In the event that we are unable to do so, despite best efforts, we will post on the City of Methuen
website an audio or video recording, transcript, or other comprehensive record of proceedings as soon as
possible after the meeting.
Page 2