Chairman Matthew D’Agostino called the meeting to order at 7:00 pm
Members in Attendance
Matthew D’Agostino, Chairman Present
Laura Walta, Vice Chairman Absent
Vincenzo Pesce, Board Clerk Present
Philip Cultrera, Member Present
David DiNatale, Alternate Member Present
Ronald Pitocchelli, Alternate Member Absent
Others in Attendance
Jodie Geary, Zoning Board Secretary
William Buckley, Director of Economic and Community Development
Petitioners and Representatives of Petitioners
Chairman Matthew D’Agostino called for a moment of silence in memory of all Americans who have died for our country.
Chairman Matthew D’Agostino led the Board in the Pledge of Allegiance.
2. Acceptance of Minutes:
For the record there were no minutes available for acceptance.
3 Old Business:
Any correspondence referring to:
1. Request to Withdraw a Petition on the Agenda:
For the record there are none.
2. Request for a Reconsideration of a Denied Decision:
For the record there are none.
3. Request for Significant Change on a Denied Decision:
For the record there are none.
4. Request for a time extension on a Granted Decision:
#2019 - 12 Lisa Wagner, 62 Bumpy Lane, Methuen, MA 01844
1
Filed in the Office of the City Clerk 8/26/21
Approved by the ZBA 8/25/21
A Variance is required under Section VI-D in the Comprehensive Zoning Ordinance of the City of
Methuen in a Rural Residential (RR) District to construct a single-story addition (16’ x 24’) that will
be too close to the front and left side setbacks at 62 Bumpy Lane, Methuen, MA 01844.
Lisa Wagner explained that they are requesting an extension because in 2020 their contractor was not able to
start the job and they needed to get a new contractor.
Chairman Matthew D’Agostino entertained a motion to grant a six month extension.
MOTION: Vincent Pesce so moved.
SECOND: David DiNatale
DISCUSSION: Philip Cultrera suggested that the Board grant the extension to January 2022. Chairman D’Agostino
explained that legally, the Board can only grant extensions 6 months at a time. William Buckley noted that once a building
permit is issued, the work would need to begin within six months.
VOTE: UNANIMOUS
CONTINUED PETITIONS FROM 01/27/2021
#2020-19 Triple G, LLC, 59 Bonanno Court, Methuen, MA 01844
Special Permit required, per Section V of the Comprehensive Zoning Ordinance of the City of
Methuen and filed under Section XI, for a contractor’s yard which may be open for sales to the public for
use as contractor’s enclosed storage and facilities in a Limited Industrial (IL) Zone as shown on Site
Construction Plans prepared for Triple G, LLC, by Fieldstone Land Consultants, PLLC., dated October 7,
2020, for property located at 46 Old Ferry Road, Methuen, MA.
Chairman Matthew D’Agostino informed the Board that they had correspondence requesting a continuance.
Chairman Matthew D’Agostino entertained a motion to accept a continuance to the March 31st meeting.
MOTION: Philip Cultrera so moved.
SECOND: Vincent Pesce
DISCUSSION: None
VOTE: UNANIMOUS
ROLL CALL
Matthew D’Agostino, Chairman Yes
Laura Walta, Vice Chairman Absent
Vincenzo Pesce, Board Clerk Yes
Philip Cultrera, Member Yes
David DiNatale, Alternate Member Yes
Ronald Pitocchelli, Alternate Member Absent
4. New Business:
2
Filed in the Office of the City Clerk 8/26/21
Approved by the ZBA 8/25/21
#2021-3 Wan Yan, LLC, 125 Merrimack Street, Methuen, MA 01844
Special Permit required for a Restaurant at 125 Merrimack Street, Methuen, per Section V-D of
the Comprehensive Zoning Ordinance of the City of Methuen.
Attorney Anthony Copani, representative of the applicants, presented the plans to the Board. They are seeking a
Special Permit to operate a full service restaurant. The property is located in a Business Highway district.
Presently on this site is a former branch of the Santander Bank. The parcel greatly exceeds the dimensional
requirements for the BH zone, and they will not be seeking any variances. The property contains a little over
three acres of land with 251 feet of frontage on Merrimack Street. The applicant is proposing to add an additional
2,550 square feet to the existing structure to have a total area of 4,900 square feet. There will be seating to
accommodate 147 patrons. The number of parking spaces required by zoning is 47. The applicant intends to
provide 95 parking spaces. The hours of operation will be Monday – Thursday 11:00 am – 10:30 pm, Friday and
Saturday 11:00 am – 11:00 pm, and Sunday, noon – 10:00 pm. He feels that the petition meets all of the criteria
for a Special Permit as set forth in the Zoning Ordinance.
David Jordan, representative of the applicant presented an overview of the Site Plan to the Board showing the
existing conditions and the proposed plan. The size of the building will be expanded. Portions of the existing
building will remain but there will be some extension of the building toward the back and toward the north. They
will utilize the same full access driveway off Merrimack Street. It will be widened in accordance with current city
requirements. The parking field will be extended in the rear 100 -120 feet to provide additional spaces. Some
retaining wall will be added due to the significant slope in the back. Stormwater management will be provided.
This meets all zoning, site plan and Conservation Commission requirements. In addition to maintaining the
entrance driveway they will be maintaining the exit driveway through the adjacent property. It is a second means
of egress and is not a drive through or pick up window.
Regarding the hours of operation, Mr. Buckley explained that the Board does not have to restrict hours of
operation and they would be restricted by the limitations of their liquor license and the zoning ordinance.
Attorney Copani noted that it is anticipated that the applicants will apply for an on-premises liquor license. He also
noted, in response to Board discussion, that they would be satisfied with a limit of midnight on Friday and
Saturday.
Chairman Matthew D’Agostino opened the floor to public participation.
For the record nobody spoke in favor or in opposition.
Chairman D’Agostino reminded Attorney Copani that the applicant would need to address the letter from the
Engineering Department regarding the suggestion to close the north exit and the requirement to notify to Mass
DOT of the change of business.
David Jordan noted that Route 110 is under Mass DOT control. He stated that he had not had an opportunity to
discuss the closure of the egress with the Engineering Department. They will coordinate with Mass DOT and
abide by any requirements they have.
The Board decided to impose the following hours of operation conditions on the Special Permit.
Monday – Thursday, 11:00 am – 10:30 pm
Friday and Saturday, 11:00 am – midnight
Sunday, noon – 10:00 pm
3
Filed in the Office of the City Clerk 8/26/21
Approved by the ZBA 8/25/21
Chairman Matthew D’Agostino noted that there was a quorum of four this evening so that all the votes would need
to be in the affirmative.
Attorney Copani agreed to proceed.
Chairman Matthew D’Agostino called for the vote.
ROLL CALL
Matthew D’Agostino, Chairman Yes, with conditions
Laura Walta, Vice Chairman Absent
Vincenzo Pesce, Board Clerk Yes, with conditions
Philip Cultrera, Member Yes, with conditions
David DiNatale, Alternate Member Yes, with conditions
Ronald Pitocchelli, Alternate Member Absent
#2021-4 Applicant: Super Petroleum, Inc., 50 Braintree Hill Office Park, Suite 210,
Braintree, MA 02184,
Co-Applicant: Petro Realty Corp., 4 North Street, Hingham, MA 02043
1. Special Permit required to reconstruct and extend a non-conforming structure, per Section IX-D & E
of the Comprehensive Zoning Ordinance of the City of Methuen.
2. Variance required for two (2) side building setbacks, per Section VI-D of the Comprehensive Zoning
Ordinance of the City of Methuen.
3. Variance required for rear building setback, per Section VI-D of the Comprehensive Zoning
Ordinance of the City of Methuen.
4. Variance required for front setback, per Section VI-D of the Comprehensive Zoning Ordinance of the
City of Methuen.
5. Variance required for parking setbacks, per Section VIII-B-5-A of the Comprehensive Zoning
Ordinance of the City of Methuen.
All as shown on Preliminary Site Plan, 460 Lowell Street, Methuen, MA, prepared for Super Petroleum, Inc., by
Greenman-Pedersen, Inc. and dated October 30, 2020.
Attorney Anthony Copani, representative of the applicant presented the plan to the board. They are seeking to
upgrade and remodel their existing gas station. The current gas station contains 4 fuel dispenser pumps, with 6
fueling stations. There is also a wooden kiosk where an employee is located. The proposed upgrades include the
replacement of the fuel pumps and the canopy, as well as razing the kiosk and replacing it with a 990 square foot
structure for use as a convenience store in order to provide better service for customers. The underground tanks
will also be upgraded. The request for the Special Permit is to extend and to reconstruct a non-conforming
structure, which is the kiosk. The Board can determine that the extension is not substantially more detrimental to
the neighborhood than the existing non-conforming structure. The neighborhood area is commercial in nature.
Substantial improvements have been made to this area with the removal of the rotary and the reconfiguration and
realignment of the highway access ramps. The upgrade to this gas station will enhance the area. The variances
relate to setbacks and parking. It appears that this gas station is part of the existing plaza, but it is not. Directly
abutting the lot are lined parking spaces of the plaza. Attorney Copani also noted that only 5 parking spaces are
required, but they will be providing 9.
4
Filed in the Office of the City Clerk 8/26/21
Approved by the ZBA 8/25/21
Huseyin Sevincgil of GPI, representative of the applicant, presented the proposed upgrades to the site. Mr.
Sevincgil displayed an ariel of the site depicting the sea of parking. He also displayed a street view which showed
the ingress and egress that was provided for this gas station with the reconstruction of the rotary. There are
currently three existing underground storage tanks. They will be putting in two state of the art double wall
fiberglass storage tanks. One of the tanks would be a split compartment to provide retail diesel. The columns on
the canopy are a type that is not used today. The gas station does need to be upgraded. The tanks were
installed in 1993, so as part of the underground storage tank replacement, they would like to make improvements
to the site as well. At one time this was all one parcel and it was subdivided at some point. Both parcels have the
rights to cross over each other’s property. Mr. Sevincgil noted that the proposed convenience store will be
constructed with non-combustible materials, and a standard 24-foot drive aisle will be maintained around the
building. The only reconfiguration on the site will be within the limits of this property. There is a handicapped
accessible space for any customers coming into the store, a trash enclosure that is fully enclosed and the canopy
with full fire suppression.
Chairman Matthew D’Agostino informed the Board that correspondence was received from the Fire Department
and Police Department and neither department has any issues with the project.
Chairman D’Agostino asked the engineer if access would be available to the existing businesses during
construction and inquired about the timeline of the construction.
Mr. Sevincgil responded that it would be difficult to maintain the exit during construction but the entrance at Lowell
Street and the access at Riverside Drive would be available. In order to exit the property, one would have to
utilize Riverside Drive. The applicant would like to begin construction as soon as possible. Generally, construction
would take 2-3 months.
Mr. Sevincgil also noted that the existing free-standing sign on Lowell Street would remain. The panels would be
swapped out. They will have a submittal to Mass DOT for comment on the location of the sign.
William Buckley stated that his primary concern was that the applicant has the rights to all of the access points,
and he assumes their attorney has reviewed all of the easement documents and they have the rights to make the
improvement they are showing. He has also always been concerned about how this impacted parking and traffic
for the other uses on the site and the applicant has done a good job in working to address those issues. Mr.
Buckley asked the engineer if there would continue to be parking over the tanks. He also asked about the
location of the gates to the dumpster enclosure.
Mr. Sevincgil responded that there would be parking adjacent to the tanks, not over the tanks. Regarding the
dumpster gates, Mr. Sevincgil mentioned that they did not want the gates opening to where the traffic would be
coming in and out of the pumps. They can change the location of the gates if there is a concern about the
dumpster vehicle remaining on the applicant’s property.
Chairman Matthew D’Agostino opened the floor for public participation.
For the record, nobody spoke in favor or in opposition.
Chairman D’Agostino called for a vote on each request.
1. Special Permit required to reconstruct and extend a non-conforming structure, per Section IX-D & E
of the Comprehensive Zoning Ordinance of the City of Methuen.
5
Filed in the Office of the City Clerk 8/26/21
Approved by the ZBA 8/25/21
ROLL CALL
Matthew D’Agostino, Chairman Yes
Laura Walta, Vice Chairman Absent
Vincenzo Pesce, Board Clerk Yes
Philip Cultrera, Member Yes
David DiNatale, Alternate Member Yes
Ronald Pitocchelli, Alternate Member Absent
2. Variance required for two (2) side building setbacks, per Section VI-D of the Comprehensive Zoning
Ordinance of the City of Methuen.
ROLL CALL
Matthew D’Agostino, Chairman Yes
Laura Walta, Vice Chairman Absent
Vincenzo Pesce, Board Clerk Yes
Philip Cultrera, Member Yes
David DiNatale, Alternate Member Yes
Ronald Pitocchelli, Alternate Member Absent
3. Variance required for rear building setback, per Section VI-D of the Comprehensive Zoning
Ordinance of the City of Methuen.
ROLL CALL
Matthew D’Agostino, Chairman Yes
Laura Walta, Vice Chairman Absent
Vincenzo Pesce, Board Clerk Yes
Philip Cultrera, Member Yes
David DiNatale, Alternate Member Yes
Ronald Pitocchelli, Alternate Member Absent
4. Variance required for front setback, per Section VI-D of the Comprehensive Zoning Ordinance of the
City of Methuen.
ROLL CALL
Matthew D’Agostino, Chairman Yes
Laura Walta, Vice Chairman Absent
Vincenzo Pesce, Board Clerk Yes
Philip Cultrera, Member Yes
David DiNatale, Alternate Member Yes
Ronald Pitocchelli, Alternate Member Absent
5. Variance required for parking setbacks, per Section VIII-B-5-A of the Comprehensive Zoning
Ordinance of the City of Methuen.
ROLL CALL
Matthew D’Agostino, Chairman Yes
Laura Walta, Vice Chairman Absent
Vincenzo Pesce, Board Clerk Yes
Philip Cultrera, Member Yes
6
Filed in the Office of the City Clerk 8/26/21
Approved by the ZBA 8/25/21
David DiNatale, Alternate Member Yes
Ronald Pitocchelli, Alternate Member Absent
5. Adjournment:
MOTION: Vincenzo Pesce moved to adjourn.
SECOND: Philip Cultrera
VOTE: UNANIMOUS
Chairman Matthew D’Agostino adjourned the meeting at 7:56 pm.
Respectfully Submitted,
Nancy P. Hudson
Community Development Confidential Secretary
NEXT ZONING BOARD MEETING: MARCH 31, 2021
Anyone needing an access accommodation to participate in City of Methuen programs or
services, please contact Gene Walsh, ADA Coordinator at 978-983-8625 or GWalsh@ci.methuen.ma.us at
least 2 weeks in advance, or 2 business days before any Board or Commission meeting. This notice is
available in alternative formats upon request.
7
Filed in the Office of the City Clerk 8/26/21
Agenda
CITY OF METHUEN
BOARD OF APPEALS
THE SEARLES BUILDING
41 PLEASANT STREET
METHUEN, MA 01844
AMENDED MEETING AGENDA
via ZOOM WEB MEETING
WEDNESDAY, February 24th, 2021 @ 7:00 P.M.
1. Roll Call.
2. Acceptance of Minutes:
3 Old Business:
Any correspondence referring to:
1. Request to Withdraw a Petition on the Agenda:
2. Request for a Reconsideration of a Denied Decision:
3. Request for Significant Change on a Denied Decision:
4. Request for a time extension on a Granted Decision:
#2019 - 12 Lisa Wagner, 62 Bumpy Lane, Methuen, MA 01844
A Variance is required under Section VI-D in the Comprehensive Zoning Ordinance of the City of
Methuen in a Rural Residential (RR) District to construct a single story addition (16’ x 24’) that will
be too close to the front and left side setbacks at 62 Bumpy Lane, Methuen, MA 01844.
CONTINUED PETITIONS FROM 01/27/2021
#2020-19 Triple G, LLC, 59 Bonanno Court, Methuen, MA 01844
Special Permit required, per Section V of the Comprehensive Zoning Ordinance of the City of
Methuen and filed under Section XI, for a contractor’s yard which may be open for sales to the public for
use as contractor’s enclosed storage and facilities in a Limited Industrial (IL) Zone as shown on Site
Construction Plans prepared for Triple G, LLC, by Fieldstone Land Consultants, PLLC., dated October 7,
2020, for property located at 46 Old Ferry Road, Methuen, MA.
4. New Business:
#2021-3 Wan Yan, LLC, 125 Merrimack Street, Methuen, MA 01844
Special Permit required for a Restaurant at 125 Merrimack Street, Methuen, per Section V-D of
the Comprehensive Zoning Ordinance of the City of Methuen.
#2021-4 Applicant: Super Petroleum, Inc., 50 Braintree Hill Office Park, Suite 210,
Braintree, MA 02184,
Co-Applicant: Petro Realty Corp., 4 North Street, Hingham, MA 02043
1. Special Permit required to reconstruct and extend a non-conforming structure, per Section IX-D & E
of the Comprehensive Zoning Ordinance of the City of Methuen.
2. Variance required for two (2) side building setbacks, per Section VI-D of the Comprehensive Zoning
Ordinance of the City of Methuen.
3. Variance required for rear building setback, per Section VI-D of the Comprehensive Zoning
Ordinance of the City of Methuen.
4. Variance required for front setback, per Section VI-D of the Comprehensive Zoning Ordinance of the
City of Methuen.
5. Variance required for parking setbacks, per Section VIII-B-5-A of the Comprehensive Zoning
Ordinance of the City of Methuen.
All as shown on Preliminary Site Plan, 460 Lowell Street, Methuen, MA, prepared for Super Petroleum, Inc., by
Greenman-Pedersen, Inc. and dated October 30, 2020.
5. Adjournment:
NEXT ZONING BOARD MEETING: MARCH 31, 2021
Anyone needing an access accommodation to participate in City of Methuen programs or
services, please contact Gene Walsh, ADA Coordinator at 978-983-8625 or GWalsh@ci.methuen.ma.us at
least 2 weeks in advance, or 2 business days before any Board or Commission meeting. This notice is
available in alternative formats upon request.
Pursuant to Governor Baker's March 12, 2020 Order Suspending Certain Provisions of the Open Meeting
Law, G.L. c. 30A, §18, and the Governor's March 15, 2020 Order imposing strict limitation on the number
of people that may gather in one place, this meeting of the City of Methuen Zoning Board of Appeals will
be conducted via remote participation to the greatest extent possible. Specific information and the
general guidelines for remote participation by members of the public and/or parties with a right and/or
requirement to attend this meeting can be found on the City of Methuen website, at
https://www.cityofmethuen.net/ The Zoom Web Meeting will be broadcast live on Methuen Community
Television (MCTV) on the date of the hearing. Members of the public and/or interested parties seeking to
participate in the meeting can contact the City of Methuen Department of Economic and Community
Development at (978) 983-8560 prior to 12 noon on the date of the hearing for instructions on how to
participate remotely in the meeting. No in-person attendance of members of the public will be permitted,
but every effort will be made to ensure that the public can adequately access the proceedings in real time,
via technological means. In the event that we are unable to do so, despite best efforts, we will post on the
City of Methuen website an audio or video recording, transcript, or other comprehensive record of
proceedings as soon as possible after the meeting.
Get email alerts for Methuen
A daily email when new agendas and minutes are posted.